SPEAKER_07I call to order this meeting of the Assembly of the Hall for Tuesday, February 4th, 2025. Roll call, please.
SPEAKER_07Okay, thank you. Then we'll move on to item two. Here are citizens present. Do we have the uh sheet? When you are called, please come forward and state your name in any organization you may be representing. Each speaker will have five minutes to present to the assembly. At four minutes, the deputy clerk will issue one gavel strike. At four minutes, thirty seconds, two strikes. At this point, please begin to wrap up your comments.
SPEAKER_07And at five minutes, three gavel strikes, and we will ask you to relinquish the floor. Liz Lavoie, please. Please.
SPEAKER_11Hi, I'm Liz Lavoie. I am chair of Ports and Harbor, but I'm not here uh speaking for Portson Harbor here as a citizen. Um I wanted to thank you for having this meeting. I think it's smart. Um I think that um the Port Master Plan uh was a huge effort and a huge expense. And by it makes it more of a working document. Um we know that things change, things have already changed and will continue to change.
SPEAKER_11So using the Portmaster plan kind of touchstone to navigate future um plans and challenges with, I think, is really smart. So I hope that this is the first of many um meetings where you touch face and see where you're at. Um that said, I did look back at our portmaster plan for the first time in some time, honestly, and um was struck by how bright-eyed we were, um, how shiny the future was.
SPEAKER_11And it's really fun to see, you know, like the bathroom. Like, there it is, we did that. And to look at the ore dock to see what it the plan was and what it became. And um, we have a beautiful new dock there in its place. Um, but that all said, um things have changed. Um funding is changing. Our dock costs a lot more than we expected it to. And um I mean, I read a headline today that said the new Secretary of Transportation was considering tying funding to birth rates.
SPEAKER_11So I'm here to say I think we need to be conservative. I think this is a time to hunker down. I don't think that um in particular plans to, you know, when this when this first document, when the master plan as it is now, was created, the ore dock was um deemed totally industrial. We changed that. We made it multi-use, and now it's really very much a cruise ship dock.
SPEAKER_11And in our change of plans, we added a hundred and twenty, a hundred and thirty-two feet to the end of that dock. Um, the idea that we would want to put a move a ferry terminal over, so a ferry would have to go through the windiest part of our canal, take a hard right, and then dock between our very expensive ore dock and our priceless Yacatania point at the mouth of a glacially fed river that is already creating deposits that we will have to take out.
SPEAKER_11So I don't think it makes good sense. Um additionally, I think that we have to consider that um weather extremes will become more extreme. I think we should plan for it to become windier. Um, I think that as we move forward, we need to look at what nature is doing and build out of its way. Just because we can build something doesn't mean we should.
SPEAKER_11Um speaking to the, this is like a little thing that I always think about you, Tim. Um, Tom, sorry. Gosh. Uh it's been a minute. But the whole bus turnaround. Um, you know, Tom always would talk about how it didn't make any sense to put up, you know, these rounded curbs because then you could never use the space again. And he's right. But also, um, I don't know if you guys know this about me, but I was a very good bus driver, like really good.
SPEAKER_11And I was a very good parallel parker. And you know what I don't think anyone would be good at is parallel parking a bus on a curb. If you just look at that design, it it assumes that the buses come in in order. So right there, it just makes no sense that should be really revisited. Um I think that it's prudent to be conservative.
SPEAKER_11I think it's uh important and smart to uh work on the partnerships that are available to us right now. Uh I think Cruise Line has an interesting proposition. I think that we should um give AMHS the certainty of knowing that we want to keep our ferry terminal working for us now. I think we plan, we work on what we have.
SPEAKER_11We should protect what we have. Thank you.
SPEAKER_07Thank you. Lynn Davison, please.
SPEAKER_00Okay. Lynn Davison, citizen. This master plan for the port was created five years ago in response to what I'm assuming was identified as a pressing need at the time. Five years later, a lot has changed. And I have some questions. What problem was this project initially designed to address? Is that problem or concern still valid?
SPEAKER_00Where does this issue now fall in Skagway's growing list of priorities, including the rock slide, the renewal and repaving of Main Street, our serious and growing housing problem and issues, numerous other infrastructure issues? And finally, has anyone done a thorough cost-benefit analysis of this proposed initiative? If yes, I think we'd all like to see it.
SPEAKER_00Thank you.
SPEAKER_07Thank you. Andrew Cremata, please.
unknownHi.
SPEAKER_01Andrew Cremata, 29-year resident, uh top men's league bowler. Uh I knew I knew uh Orion would like that. Um so uh I'm here to present. Um couple of questions first. Oh, first I wanted to say uh great work on a lot of things lately. You guys have been killing it with the housing stuff, um, and I keep telling myself I'm gonna go to a regular meeting and then don't. But uh just want to mention that first. Um so a lot of stuff's going on. I went took another look at the at the uh plan, and a few thoughts came to mind.
SPEAKER_01Uh, I really like what Liz said. I think it's a good time, you look at this as a first meeting. I think that's a good way to look at it. I think there's a lot of things that need to be addressed. I think there's a lot of uncertainty. I think some of that uncertainty uh can look at with a series of questions. BRIC grant, I know you guys know what it stands for for the benefit of anyone listening, stands for building resilience in communities. That grant is based on environmental change. That is a federal grant that we got because of environmental factors that are causing those rock slides.
SPEAKER_01Do you think that the federal government is going to provide that grant for us and give us all of that money? The other thing, uh, number two, ferries, you have the governor of Alaska right now talking about gutting education, who's already tried to privatize the ferry and failed, and because the state got a bunch of federal money for a ferry that may or may not be built, do you think we're going to have ferry service in 10 years? Do you think the state of Alaska and this governor or future governors under the federal government, the way it's structured at the moment, is going to put money forward that we can spend on a ferry?
SPEAKER_01Do you think we're even going to have ferry service? And I think also there are a lot of other grants that are potentially on the chopping block, and there are other questions that we're going to have to ask ourselves in regards to what exactly we're trying to accomplish. Because you look at all of those things on that list. I mean, just the bathrooms are what, five, ten million to build bathrooms, parking areas. So I see I've I brought this up with members of Port and Harbor, I brought it up with some of you, I'm going to keep bringing it up.
SPEAKER_01Twenty years ago, we started CPV funds, that was five dollars. And I remember sitting at the table with my colleague, Mr. Hansen, and he constantly brought it up, and rightfully so, this money does not go as far as it used to. Well, that's just the rate of inflation. At$5 from 20 years ago, it's worth less than$2 now. The money we get from the cruise ships, we get, I think, an additional$8.50 on the public docks and something like four something on the private docks.
SPEAKER_01That's chump change. It's chump change. And that was money from two years ago when we started collecting those monies. It's already worth less, considerably less, probably about 10%. The assembly needs to do what Haynes proactively did and set up some kind of automatic increase in structure so that these numbers increase over time. And the municipality needs to start thinking about how we're going to build out a dock. This is going to get people upset at me, probably to say it. I still believe you need another cruise ship dock on the Broadway Peninsula with a ferry component, and hopefully we can still move forward at some point in the future to build our own ferry because I asked the question because I believe I already know the answer.
SPEAKER_01And I think deep down all of you know the answer too. Unless something dramatic happens, the privatization of everything is going to mean we are in the Wild West, and we are going to have to be in control of everything in our own destiny, which is something we're good at. So that's good. I believe that it would be in our best interest to say we need to approach a global port type of company. Global port holdings comes to mind since that's their name. There are other global port companies. You could put out an RFP for the design, maintain 51% ownership of our port for the municipality and for the people of this community, and then work out an agreement for them to manage the port.
SPEAKER_01We could maintain the small size of our current port structure, I think it's three or four employees. That's not going to get us to the promised land. Or, because I think that that's probably a pipe dream and not something realistic, I think the municipality should consider, you guys should consider as quickly as possible, you got MSC, biggest cruise line in the world, that wants to come to Alaska. You got Virgin coming here year after next, they're going to expand in Alaska. Companies want to go to the mat to be able to come here.
SPEAKER_01And I heard from a friend in Juneau that at this meeting, the CEO of Princess Cruise Lines was criticizing Skagway for collecting sales tax publicly in front of everybody. So that's who they are. So here's what I'm getting at. Put out an RFP. An RFP to any cruise line that wants to come here. How much are you going to pay per head? Have a minimum of$10 to start it, and whoever the highest bidder is gets to bring their boats here. That's how you get that number up where it should be, which is about$25 to$27.
SPEAKER_07Thank you. Since this is a work session, I'll open the floor. Is anybody else who didn't sign up like to speak? Okay. All right. We'll move on. Thank you for your input. We'll move on to item three, review of the port master plan. Manager Deach, are you able to uh kind of tell us where we're at currently with the with the plan and where what the next steps are if we continue to move forward? Just give us an outline of where we're at, please.
SPEAKER_02Sure. And um please feel free, we can call up our port director as well if you want some more information from her.
SPEAKER_07Please, at your discretion.
SPEAKER_02Um so I guess I today I made a sort of a handy summary of the plan because some of the things are buried in there. Um I think so where we're at, phase one is done. Um that was water sewer lines to shoreline park, gravel path, a fence along the railroad, it's done. Uh 2A is done, shoreline park restroom construction.
SPEAKER_02Um and then the other thing that is done, but maybe not as it was first conceived, is the floating dock at the ORDOC. Um, so right now, what the port is working on, um, we've got an RFP out for electrical for the OR DOC. These are components of the the original OR dock projects that we had to drop out due to cost.
SPEAKER_02So there's electrical um and um the fire suppression system. We've got a temporary system in now, but the plan is to have a a permanent one. So those two things are out for bid. They're closing here next week, I think. Um and then we've got some other smaller components of that original or dock project that we want to we want to finish, uh anodes, getting anodes in, um, and some other some other parts of that project that were dropped out originally.
SPEAKER_02So um at that point, um, well, I guess I'll move move on from there. Uh and we got, I feel with the Ferry Peninsula, um, so you can see in the plan uh phase 2B is extending water and sewer to the end of the Ferry Peninsula. Um, and then we had some other ideas for the Ferry Peninsula, like really that shared use of the peninsula with uh AMHS or DOT.
SPEAKER_02And we did start down that road. Uh, we had an MOU with them based on this plan, I think, to say, hey, we're gonna work with you to figure out a way to share use on that peninsula. Um, that got a little off track. We started talking about um, they were we were having a hard time finding a configuration that seemed to work because that that peninsula is a little narrower than the Ore Peninsula. And so then we started talking about, and you probably remember, maybe some of you remember the assembly talking about moving it over to the Ore Peninsula.
SPEAKER_02And so we sort of got off on that, and we um the assembly approved an agreement to um get preliminary designs for what that would look like. And we're still we're waiting to hear back from AMHS about that um because that really is going to be key as to how we move forward with the Ferry Peninsula or a different location. So that's sort of where that is. Um, you know, there are plans for the Ferry Peninsula in this plan, including um a dock extension that would be shared use.
SPEAKER_02So ferry on one side, cruise on the other, um, restrooms, two sets of restrooms, a waiting shelter, and a tour staging area. And maybe that needs to be revisited as well. So that's the Ferry Peninsula. Um, I guess uh Broadway, um, just a waiting shelter and restroom up at the top there. So that's sort of, you know, there's there's those type of projects that are for passengers, you know, comfort, getting them out of the wind, giving them a place, you know, a restroom.
SPEAKER_02Um and then there are some, I guess there's the big, big ones on the OR dock. So the marine services platform is called a T-shaped dock in this plan. Um, and that's the one where we've um come to really general terms with the Yukon government about access and building the dock. And uh we are still working with the Yukon government on an export cooperation agreement, and that's been very detailed, and um we're we're still working on it.
SPEAKER_02So so that's what's going on with the MSP. Um, we were up at Mineral Roundup last week or two weeks ago, and there's I mean, there they want to plan to bring containerized ore through, or they would like to bring bulk ore through, but um, with our ordinance, they are planning around containerized ore coming through. So there's still that the interest.
SPEAKER_02Um, as far as I know, nothing has changed, but that was two weeks ago, and a lot has changed since then, too. So um, and then the other one is the roll-on-roll-off dock, and that would include moving the fuel header up further north and um and then relocating AML over to the west so that to make room for this, you know, um staging, you know, vehicle staging area.
SPEAKER_02Um that we were hoping for PIDP grant funds for that. We, as you know, we applied uh during the last round and we just didn't make it to the Secretary of Transportation's desk. There was our application was really good. Um, there had some suggestions for changes, but they um they highly recommended we reapply. And that's sort of in flux now, I think, because um, you know, when the funding freeze uh came along, what they also did was pull the PIDP grant from um they they pulled it, so you couldn't reapply, but now apparently it's back up.
SPEAKER_02So I think we're gonna go that direction for that. But I you know it all comes down to funding. It seems as though we need to maybe decide what steps we want to do next, and um maybe get a plan for how those would be funded. Um and I think generally, though, you know, like was said, a lot has changed. You know, our perspectives have changed, our needs might have changed.
SPEAKER_02And so I guess we're just looking for assembly discussion about what your thoughts are on the plan, what we can bring back to you for you to consider.
SPEAKER_07Okay. Thank you, man. As this is a work session, we won't be making any decisions or motions here tonight, but we will be having that discussion. So I'll open it up to the floor, or up to the I'm sorry, not to the floor, but up to the uh the body. Um discussion. anybody have discussion points?
SPEAKER_08Uh thank you, Your Honor. I don't really have much. I just kind of wanted to remind um give everyone a recap of how we this came to be. Um on the December 5th meeting, um, there was an item on the agenda that uh was a consideration of American Cruise Lines proposal. Um and I suggested that we move that from the remove that from the agenda and have a committee of the whole meeting to discuss our intended future um for the port.
SPEAKER_08But um because the way it was written on the original agenda, we could only talk about that one proposal. Um so now this allows us to talk about the future of the port, but I just don't want that specific proposal to also kind of fall out of our scope.
SPEAKER_07Okay, thank you. I think that proposal does is kind of the catalyst for this discussion because you know what we do with the ferry float uh has to tie in or should tie into our bigger picture uh model here. Um we can start discussing that item first. Just what do we think about the American cruise line uh proposal for the existing float where it sits, what we think, um, and then we can move on maybe the bigger picture items and how that you know how that smaller one affects the bigger ideas.
SPEAKER_07Any thoughts?
SPEAKER_05Um thank you, Your Honor. If if uh American Cruise Lines is a a small higher-end cruise ship, I don't remember the exact number of passengers, but I think it's under 250. Uh they were the first cruise ship to come back to Skagway during the pandemic. I was actually building the shoreline fence when that first train uh left and came back. Uh their proposal, uh, if AMHS is uh conducive to it, they would pay for it.
SPEAKER_05And it would also be a berth for the tugboat or other vessels as they came, and it would be uh, I think it would diversify the port in a good way. However, I think we've got to, you know, make sure that that that does not leave us with a deteriorating ferry float, because that's first and foremost that that ferry float is in uh very poor condition. Um and we don't really control it. It's it's really AMHS's property.
SPEAKER_05We own five twelfths of it, but for all practical purposes, they control the strings. Uh so I I I would if they're if they're willing to fund the bill and it can be done in accordance with what AMHS you know sees in the future, I support that. I personally, if we're looking at the big picture of what was the master plan um that happened before the rock slide that happened before the pandemic, we went in a different direction because we had to.
SPEAKER_05We developed the Ore Peninsula um to accommodate the largest cruise ships because we were afraid of our economy because we had rocks coming down on the railroad dock. Um we figured out a way to have four berths. Now it is a little bit compromised with the busing and with the uh with the tendering. Um but I personally don't support five berths.
SPEAKER_05I don't think we're anywhere near ready for it. I think we're busting at the seams, and I don't think our infrastructure can support it on a number of levels. Um so in terms of what this plan showed in 2019, I I I I times changed. We had to go in different directions because of the circumstances. Um so building a fifth berth isn't something that I want to entertain uh off the ferry peninsula. It's just I don't I don't think we can cram more potatoes into our five-pound sack.
SPEAKER_05Um so that's that's you know, in terms of trying to build out a fifth berth, I'm I'm not there. And I'm not gonna advocate for that. But I you know, in terms of American cruise lines, I think that's you know, they're they're a higher-end uh clientele from from from my understanding. Uh they have been here, they've been um very engaged, and I think it also we we've heard numerous complaints of ports and harbors that we never accommodated a a tug berth in in our master design.
SPEAKER_05And while this would you know not do that for every day, it would certainly give the tug uh uh a more secure spot uh to come in and out that's right in the middle of the port, that would probably be pretty beneficial.
SPEAKER_07Further discussion? Vice Mayor Potter.
SPEAKER_03Thank you, Your Honor. Uh I agree with Assembly Member Hansen. I appreciate American Cruise Lines. Um, they were the first ones that were there for us in uh 2021. They've been um really proactive about reaching out. Um I just want to kind of answer a question that was brought up during Here Citizens Present about um kind of referring to to I guess the Portmaster Plan as a proposed initiative.
SPEAKER_03Um this came out. Uh that there's a lot that has happened um since this. We got through the pandemic, but um I don't think we should expect that one to be the last. But but also what happened is that we took control of our part port um as of March 18th, 2023. So um, you know, there's a lot and and we needed a design on what to do with it. So I just kind of wanted to remind um some folks about that.
SPEAKER_03Um I have so Ports and Harbor reviewed the American Cruise Line concept and recommended option B. In the Port Master Plan, um the Ferry Peninsula, um there's a proposed much larger dock that is 600 by 80 with a couple extra components, so it would accommodate um you know one of the standard size cruise ships.
SPEAKER_03And um I I I share concerns about that. Um, but with this American cruise line dock, um we can fit in. American Cruise Line ships are about 270 feet long. And I have a question that maybe um I don't know if Manager Dieter or Port Director Jennings or somebody at the table can answer. I'm wondering um with the size of the dock that's um proposed by American Cruise Lines and option B, excuse me, um, could that also thinking about the size of like a silver sea um size ship that's uh 691 feet, um would that also, would a dock proposed an option B also be able to accommodate um one of those ships that's smaller than um say Disney, but a little bit larger than an American cruise line ship?
SPEAKER_07Would you please come up to the podium, please?
SPEAKER_02I was gonna say this seems like in Cody's wheelhouse.
SPEAKER_09I'm sorry, I wasn't prepared. I didn't have that drawing at my own. I think I can I can investigate that further. A lot of it's gonna depend on location of ballards, where their lines go. So there's a lot of components that we would have to consider in in what that design would look like for a larger vessel.
SPEAKER_03Okay, that's yeah. Um I apologize for not giving you the heads up, it just popped into my head. Um so I think uh also kind of going back to um what also was mentioned, uh to work with the partners that we already have. I think we need to, not just we as Skagway, but we as at a minimum the entire state kind of need to move away from any kind of um dependence or we're counting on grant money.
SPEAKER_03So these um I think kind of private partnerships are gonna become um a little more interesting. So um I'm at a point right now where I would be supportive of um kind of continuing a conversation with American cruise lines on their option B um proposal.
SPEAKER_07Thank you. Further discussion?
SPEAKER_10Thank you, honor. Um, I'm interested in Port Director Jennings' opinion of the American Cruise Line proposal if she wishes to share it with the table.
SPEAKER_09Please thank you. Uh so I think that um depending upon um the discussions with uh AMHS, that's gonna direct a lot of the conversation that we have here internally. Um obviously there um they have some concerns with the shared use and um those types of things. But overall, I think that um if we can accommodate them, we already do can accommodate several of the other small vessels, uh, the American Dream Cruises and previously um we have accommodated American cruise line in past years.
SPEAKER_09Um, they just don't happen to bring the same vessels here that we could accommodate at that dock. So I think um for reference, the American constellation that they currently bring here is uh 170 passengers. Um I guess I would say 170 passengers is quite small comparatively when you're talking about uh, say, the Norwegian Bliss that's carrying over 4,000 passengers, and they might bring that 170 passenger difference.
SPEAKER_09Um, you know, if they're beyond their uh lower birth occupancy, which is uh a double birth. So I think those numbers are quite incremental to our community on any given day.
SPEAKER_10Um as a follow-up question, I believe it was in the Ports and Harbors summary, but there was a mention of maybe the tug being able to tie up to the stock. Is that something that we're looking at?
SPEAKER_09Certainly, I think that um that would totally be an option for us. I think the one thing that we have to consider uh the challenge is right now for the tug there, is that um we would need to dredge. That's part of the issue that we have um right now in an extreme low tide. Um, having said that, I will also say that um it is my understanding that they have um revamped a berth um for the tug to rest at at the end of the railroad dock on their floating dock, um, that they're um utilizing it there.
SPEAKER_09Um they were this uh late this winter, last the end of last year, they were using that. Um the Annate isn't currently here, um, but they have started using that berth at um the railroad dock for the tug. Obviously, that doesn't work when there's a ship in port, but um they do have that space.
SPEAKER_10Thank you. And um further, if um the table was to come with the recommendation today of you know, pursuing the conversation with American cruise lines and the Alaska Marine Highway system of one of these proposals, do you have a preferred method? One of them is the um option A, which is to use the existing barge, but to install four mooring dolphins with a floating fender, and the other one, which was the recommendation from Portsett Harbor Advisory Board, which would extend the barge by 100 feet and include two dolphins and floating fenders.
SPEAKER_09I think the extension obviously um provides some additional options there. Um, I think a lot of it depends on what the intent of AMHS is. I know right now my understanding is that they simply intend to resurface the existing facility. Um, you know, I've heard lots of other discussions that it needs to be replaced. I don't know that we're hearing any um confirmation that that is the intent of AMHS. So I think there's a lot of conversations to be had about what the intent is with the current facility before we would make any determinations.
SPEAKER_09But I think for our purposes, if we're looking to make it um as functionable for our purposes, certainly I think the option, I think it's option B that I'm looking at here. Sorry, my um option B is the extended one.
SPEAKER_10That is correct. Yeah. Yeah. Okay. And lastly, is there anything in regards to the portmaster plan as a whole that you would like to see the assembly discuss or review?
SPEAKER_09Sorry to put you on the spot. Um but um I think that there's um a lot of components. Um I think as Manager Deach said, um, you know, we we started out with the plan, we've made some progress on it, um, our funding sources have changed. We know that um, you know, the current federal freeze on grant monies um creates an additional challenge for us. Um we have some additional information, I think, about mining in terms of mines that may be coming online, that may um inspire us to consider our multi-use at the Ore Peninsula.
SPEAKER_09Um so happy to elaborate when you guys want to discuss that component, but I think any direction that we can get that is the intent of the assembly is helpful for us. I think the one thing that's not factored in here is dredging, and I know that this has been brought up at uh budget time, and it really impacts us no matter what we do. Um, and I also think um, you know, it impacts potentially the use of the ferry float, the Broadway dock, and um, you know, if we are looking at uh moving the fuel headers at some point, um, we we will want to evaluate that um for that inside berth.
SPEAKER_09So it is a key component for our master plan.
SPEAKER_10Thank you. Um and if I might ask the manager one more question, would you mind um updating the table on the current status of the dredging projects? Thank you.
SPEAKER_02Uh so we are expecting, you know, we've got the two going. Um we've got sort of the larger projects that we expect to have designed this year that we would then do in the over the next couple of years, probably depending on funding. But um we're waiting right now for Anchor QEA is the subcontractor for KPF, and they are putting together a memo of the alternatives. Um, so there are many different variables, I guess, that are going to affect the cost, where we do it.
SPEAKER_02You know, if we do the whole basin, that's an extraordinary cost. And partly because um in order to know where to dispose of the dredge materials, we need to either just assume it's all hazardous and dispose of it um off-site, you know, like ship it down to wherever Washington or Oregon, um, which is more expensive. We can do it that way, or we can do sampling to characterize what is down there, which in itself is really expensive.
SPEAKER_02So there, and you know, we could decide to just dredge in front of the Broadway dock first, or just dredge, you know, we we can decide which sort of areas we'd like to dredge based on what those costs are, you know, and how we dispose of the material. So um, long story short, we're getting that memo uh we heard today in two weeks. They're planning to have it to us. So at that time, we'll be able to vet it then through Ports and Harbors Board and the assembly and get your input on that.
SPEAKER_02Um as for the smaller project under uh under the southwest corner of the or the float. Um just talked about that today.
SPEAKER_09Um, do you do you want to take that and having them so it sounds like that piece um is a much simpler process. It won't require the full um barge and the clamshell, uh, all of the components that we saw down here several years ago when White Pass was doing um the dredging that they did. Um, we'll get a little memo on that um as well. Um, but it sounds like that's something that we could potentially um pursue by the at the end of the season.
SPEAKER_09We wouldn't want to do it in the in the peak of the season. And and really the issue is um at an extreme low tide, there's just concern um about the the proximity with the sloughing and um just how the um embankment settled. And so it's it's a fairly small amount that would need to be dredged at the corner of that, the new cruise float. Um, it was something that was raised early on, but we didn't know how everything would settle after they removed all the old pilings and stuff.
SPEAKER_09So we think we can potentially resolve that um this year. No, it's not, it's not, it's not under that, but it's a special permit, but um it sounds like it's a um a simpler permit to get just um by the nature of it. So it won't be I think it's related to the volume that we're we're gonna dredge.
SPEAKER_10Thank you. Um hearing all that, I don't think I have too much to contribute to the review of the portmaster plan at this time this evening. Um since this meeting was specifically geared towards the discussion of the American Cruise Lines proposal in the ferry float, I would say that my um takeaway from the commentary I'm hearing from both the public and table and perhaps staff is that moving the ferry float at this time isn't necessarily our immediate goal, and that if we wanted to move forward with the cruise lines proposal, um discussions between ACL and A MHS that we could do so.
SPEAKER_10So I would be in favor of you know moving forward with option B, maybe sending it back to the assembly table to make that recommendation.
SPEAKER_07Thank you. Director Jennings, is there a has there been any time commitment discussed for either any of these options? Um are we talking if they build it for us, do they want three-year commitment, they want a six-year, they want 10-year commitment? Because uh the the way it's designed, I mean, we could probably put this in fairly easily. And then if we wanted eventually in the future to uh realize a larger dock there at the ferry, um we could do that. The only thing that would stop us really would be that commitment we would make to them.
SPEAKER_07Has there been any discussion on that?
SPEAKER_09No, I think at this point the discussion really is um the assembly's wishes if this is something we would entertain um as a community. And so I think that's where it's at. And I think from the discussions that were had uh with former manager Ryan, uh with um some of the assembly or excuse me, the Ports and Harbors board, um, is that really perhaps that's the the discussion for the for you for this body is do you have any objections to it?
SPEAKER_09And perhaps they whether it's our obligation or American Cruise Line's obligation to start that dialogue with AMHS. And I I think perhaps it's just that the Assembly supports this and can continue the negotiations or discussions with American cruise lines and direct them to AMHS. Or I I don't know what role the Assembly wants to have in those discussions.
SPEAKER_07I think our support to AMHS for this project would carry a lot of weight. Again, I worry about the time commitment that applies. Right now, developing the dock as it's in the master plan now, uh, very expensive. And so unless we're willing to, I think, unless we're willing actually to partner with someone to realize those monies, it's going to be a hard road to hoe to get the money out there. Um with that in mind, if we're not going to immediately look at getting a partner and look at putting money together to develop that area, then it seems advantageous to allow this small cruise ship to tie up there.
SPEAKER_07Um as long as their infrastructure doesn't stop us in the future or their time commitment doesn't stop us in the future. Um I would support it. I think right now I don't have any desire to um seek a partner uh to find these monies, uh, but that's a discussion to be had. Um that's right, man.
SPEAKER_05Ryan. Thank you for that, Your Honor. I have uh one question about uh phase 3A and manager Deach's memo. Uh the first bullet point says existing sheet pile wall removal and replacement to provide more room between ore and Broadway docks. I remember this differently than the way that's written. I remember this was more about depth for uh particularly for ore ships, uh, and that the existing sheet pile really can't go deeper uh if we need to dredge there.
SPEAKER_05Um and so my question is, this is this about upland space or is this about berthing depth?
SPEAKER_09I believe that um initially when we were evaluating um in in the initial phases of the Ore Peninsula redevelopment design, um this was something that we investigated. Uh the intent was to consider wrapping that sheet pile the rest of the way around the face of Broadway to allow right now um where AML's um the doc that AML uses is at there's uh a slope there, uh rip wrap that goes down.
SPEAKER_09We looked at um potentially sheep piling all the way around to allow that berth to be further north. Um I want to say that it came in in excess of a hundred million dollars just to wrap around um the face of Broadway and just around um to the edge of the ore peninsula.
SPEAKER_05So if I'm remembering right, it would basically bring the sheet pile out in plane with the dock, if I'm understanding that correctly or no?
SPEAKER_09No, it would just continue um along the same face that the current sheet pile is. So that um the the small uh dock that AML uses would be removed and that sheet pile wall would go around it. Nope, it only only went around the face.
SPEAKER_01Okay.
SPEAKER_05Okay, thanks for that clarification. And I do remember that it was in the the the price tag was was would took it off the table immediately. Um as I re you know, this is four years ago, I won't say that we were having these discussions just because of that price tag.
SPEAKER_09It was in the very early, early phases where we were deciding what kind of development we were going to do, what made the most sense. Um and eventually we obviously ended up with the the floating dock. Um I don't know if you recall, there was discussion whether it was gonna be um instead of a pontoon, it was gonna or a wooden deck, it was gonna be a concrete deck. And you know, there there was all sorts of different scenarios that we evaluated, but um that sheep pile wall was a component of that initially, but the the costs um definitely took it off the table at the time.
SPEAKER_05Thank you. And if I could just follow up with one thing, Your Honor. Uh something Director Jennings said uh previously, I could not agree more, and it's actually not really ever specified in this original uh port master plan is I think dredging is the number one thing we have to do. Um it's not listed in any of these things, but it's imperative for us operating as a port. Um, it will be expensive. We understand that, and and I think the direction that we've uh been been pursuing and doing these in small in phases uh will make it to where we can afford to do it and and address the parts that are needed the most.
SPEAKER_05Um but you know, in in this whole scenario, we have to dredge, uh particularly along the Ore Peninsula where the silt's coming down the river 24-7, 365 days a year, and then there's isostatic rebound. Um and that's the one phase of anything we talk about with you know what um various people have mentioned here tonight, that that's the one aspect of our harbor that's really not very negotiable.
SPEAKER_05Um moving forward in the future with discussing uh the marine services platform, a Roro dock, there would be additional dredging that would not be inexpensive to achieve that uh to get the depth that we need on the north end of the ore basin. But that's something I think that that really I think to me, other than maintaining our docks and and some of the other projects we have, you know, concurrent uh to making the dolphins so that the uh fuel barge is aligned with the dock, which is we've already signed a contract on that, that's underway.
SPEAKER_05Uh but I would say uh beyond beyond maintenance, I'd say that's absolutely paramount of of anything we consider uh relating to the port. And I thank you for pointing that out because it's you read this and it's very fancy, a lot of great pictures, a lot of great illustrations. But if a boat can't pull in, it's all moot.
SPEAKER_07Thank you. Further discussion.
SPEAKER_04Uh yeah, I have uh one one question. I I was reading in the uh master plan and the extended the big 250-page thing. I didn't get all the way through it, but I was reading a little bit about the consideration for adding on to the ferry dock, and of course it was talking a much larger thing than what we're discussing for American Cruise Lines, but there were concerns about um uh space with the Broadway dock mentioned um in there.
SPEAKER_04With this smaller one, would that still be a concern at all um with space putting a a boat further over there, or is there still plenty of space there?
SPEAKER_07Manager Deach, are you would like some clarification on the question?
SPEAKER_02Uh you know, I it was a little before my manager time, so what I I don't it doesn't look as though the plan um you know it puts it would put the ferry the plan in uh the drawing in this plan would push the ferry back a little bit, but I don't I don't know unless this boat needed to swing somehow, um, that it would be in the way.
SPEAKER_09I think maybe more clarification on what the what um Assemblymember Hillis' question is. I I don't think that I'm understanding.
SPEAKER_07Assemblymember Hillis, can you restate the question, please?
SPEAKER_04Yeah, and maybe it's a poorly thought-out question, but um basically uh just just curious if there is any if there will be any difficult difficulty caused with docking at Broadway dock by adding a um more docking area for the American cruise lines ship on the um ferry dock. In the extended comments, there was some concerns about space, and and that's where it came from.
SPEAKER_04And maybe those concerns were were just concerns and weren't actually found in anything. But I just read that I wasn't a part of that thing at all, so I was just wanting clarification on that.
SPEAKER_09So just to be clear, it's about American cruise lines, about them using it.
SPEAKER_07I think it's if they are using it, if we if we then will that affect them pulling into Broadway, the cruise ships coming into Broadway.
SPEAKER_05Um larger cruise ship.
SPEAKER_09So I think if we I think the intent would be um with the design that we had in the portmaster plan, is that the um left side of that dock uh or west side of the dock would be designated for the ferry, and the east side would be designated for the cruise ship. So I don't think that there's a conflict. We currently utilize that now with the smaller vessels, the smaller cruise ships, the uh Alaskan Dream cruises.
SPEAKER_09Um they can be at berth at the same time that a ferry comes in. Um, there's some juggling that happens down there when that happens, but um, we currently utilize that.
SPEAKER_04Perfect. And yeah, I I am very much uh in favor of considering continuing consideration um with this proposal that American Cruise Lines brought forward. I I think this is a an interesting opportunity, and like others have said, it's a great time to be looking at our private partnerships further and deepening those. So thank you.
SPEAKER_09And if I may, um manager Deach just pointed out um the Broadway dock. And as it stands right now, we limit the size of a vessel at the Broadway dock so it does not um impede the ferry. So um I will say that we've had Disney reach out and say, you know, they may have an interest in um that if they were to bring a larger ship here. Um, but I don't think that that's a feasible solution as long as our setup there is is what it is.
SPEAKER_05So thank you. Some member Hans. Thank you, Your Honor. Uh if I could just follow up on one thing that uh in the design of the cruise dock for the Ore Peninsula, uh and Director Jennings could tell you in great detail these issues and problems with the simulator and the pilots. Uh there was I think that comment that you're reading in there, their concern was about the the bigger ships have a wider berth or uh and and they were getting closer to the uh Broadway dock.
SPEAKER_05And at the time um we were looking at a plan to do that, and they effectively rejected it. Um therefore we we we designed the oar dock to be in much deeper water so that it was slid further south and the the the tip of the um oar ship would not be as close to the the aft of the Broadway ship. And that was done with uh three very deep water dolphins that uh you know the tax papers approved and paid for.
SPEAKER_05Uh citizens did. And um so I think the current concern you're reading there um was was very real from the pilots, and it's something that we've we've actually already you know really addressed by going in a much longer dock and much deeper water uh because of the um tight quarters in the uh the ore basin there. Um so yeah, it it the the American cruise lines would be on the east side of the float, not on the west side, which where where the cruise were the uh AMH docks.
SPEAKER_09Uh if I may, uh I think that if we do consider uh American Cruise Lines proposal and we want to ensure that um we are meeting all of those um concerns and any constraints, I I believe that this is actually set up at um one of the simulators, and we could certainly ensure that we have um industry and pilots and everyone on board um before we were, you know, before we would finalize a design or a um plan forward.
SPEAKER_07Especially if American Cruise Lines pays for it. It'd be wonderful. Um further discussion? Vice Mayor Pog.
SPEAKER_03So I'm just kind of wondering, are we um are we still just doing a uh general discussion of Portmaster Plan? We are. Um it seems like we've got a um good kind of direction going forward as it pertains to the American Cruise Line proposal. Um but kind of thinking about bigger issues, I met with uh Port Director Jennings yesterday because I've been trying to wrap my mind about uh you know the big issues. And I think um, as was mentioned earlier, I think it's kind of nice to to look at this port master plan as a living working document that we can kind of go back to because obviously um I think you know, even when you think about our comp plan that's done every 10 years, like 10 years feels like a long time to um to wait to start checking in.
SPEAKER_03Um I would just throw in um kind of thinking about priorities for a master plan. Seems like a little thing, but I think it's a big thing. Um, bathrooms and um shelters. Ketchukan is a really cool setup. You um it's it's not unsimilar as to kind of what the designs look like in the portmaster plan that's in front of us, where you've got um really nice building right there um down at the waterfront and bathrooms, and it also functions as the visitor center, and that also hosts a bunch of the different local um independent tour operators.
SPEAKER_03Um so I kind of see that as um something that um maybe would be less than a hundred million dollars. Um but the big issues I see that two I see kind of two big questions um that I've been focusing on. Um the first one being um this portmaster plan uh reflects the sentiment of the community at this time, whenever that was, um three-ish years ago, where there was interest in maintaining the or dock area as a multi-use um industrial component kind of area.
SPEAKER_03So I think that's a question that we probably want to um think about if if that's where we're still at, especially considering casino mine. It sounds like Minto is coming back online. Um are we still interested in maintaining that industrial component down there? Um I guess as far as we know, until we hear otherwise, we'll just keep as we've already um um directed in past assembly meetings, continue to to have conversations about the Marine Service platform.
SPEAKER_03But I think it was the um it's the PIDP grant that we would be needing to move the fuel headers. Is that correct? Um so that's the moving those fuel headers is important if we want to um better, I think, more efficiently accommodate the fuel purge. Yeah. Director D.
SPEAKER_02Yeah, PIDP would be for moving the fuel headers and uh the roll-on-roll-off doc that would theoretically replace um AML's dock right now.
SPEAKER_03Thank you. Um so I think that's that's a big question that we that we should be asking ourselves. And then the second big question, and uh manager Ryan brought this up um a few times, um, and I briefly addressed it with Port Director Jennings. Yesterday, until um the port hears differently, until the assembly gives them direction, they're just going to, this pertains to scheduling of cruise ships until they get direction from the assembly.
SPEAKER_03They're just gonna continue to schedule um basically fit as many ships in as they can. Um I did ask uh Port Director Jennings to you'll see the copy of the um draft copy of the 2026 schedule, and there's a lot of ships on it. Um maybe it works, maybe we'll be happy with it, maybe we won't be happy with it, but it's important because those schedules are done almost two years in advance. So June of this season is when she can correct me.
SPEAKER_03This memory goes all the way back to yesterday. Um it will be June of this year where you start working on the 2027 schedule, or that's when is that when the work starts, or is that when it's kind of decided?
SPEAKER_09In June, July is when the cruise lines start submitting their requests. So this summer they'll be submitting requests for 2027. The draft schedule that's in your packet is all but solidified. I think maybe there's a handful of little shuffling that tends to happen. Um, I think the other piece that's not that you don't see obviously reflected in in that schedule is petrol marine schedule. Um they anticipate a fuel barge every 21 days, and we have committed in their birthing agreement um two days a month reserved for them.
SPEAKER_09Um, you know, they they they can't plan out what those are. So um I've gone through um 25 and 26 um and have um figure uh estimated that we can meet those commitments, but it it's something that we're gonna have to be very mindful of. Certainly I'm mindful of when we get these drafts, um, making sure that Cruise Line agencies who um they still do a lot of the the scheduling through Southeast Alaska because they can look at all the ports and figure out how to adjust itineraries and make sure that um, you know, that there's a spot for everyone to go.
SPEAKER_09So um, but we'll start seeing the the requests uh coming in this summer for 2027. But what you so what you see now though for 26 is um mostly done.
SPEAKER_03So thank you. Um so those are kind of what I see um as two big questions for the assembly. Um do we still see the OR DOC as multi-use? Are we still um interested in keeping that open for also um industrial? And how how do we you know decide, how do we give, figure out what that direction is to give um what when it comes to scheduling? I do not have the answer really to either in this moment.
SPEAKER_03Um but um I think it's just important for everybody to realize how far in advance those the ship schedules are um created. Um so there's some food for thought.
SPEAKER_07Thank you, Vice Mayor Potter. Definitely something that we should consider and be thinking about up here. Um and as we move forward, um, we understand that the the port is our economic driver for our community. And I do agree that we do need to have these meetings more regularly to uh to just address the future going forward. How are we gonna do this? So the good things to consider. We can reach out to people we know, see their feelings about it, um, and try to develop a uh plan going forward.
SPEAKER_07Further discussion. Okay. On the phone, anything else? Any other input?
SPEAKER_04Nothing, nothing at this time, thank you, Your Honor. Nothing at this time, Your Honor.
SPEAKER_07Thank you. Um, I know that I again I can support us looking at uh one of the options from the American Cruise Line uh and then at our next meeting, especially if we don't have any immediate intention of going after or developing that dock in the near future. Again, I wouldn't want us to be committed time-wise if we do allow ACL to go in there. Um and I don't right now have the desire to push forward on that dock, find a partner, find the funding.
SPEAKER_07Um but that may change in the future. But right now, I'm uh I would I would support it since we don't have another plan for that area.
SPEAKER_03Thank you, Your Honor. Sorry, you just triggered um another neuron fire. Um I have been talking about and um had the clerk's office work on uh a resolution um kind of addressing uh nothing, you know, um of of substantial movement, um, but just a basic resolution saying that um basically we don't have any um immediate plans to move the Alaska Marine Highway uh from its current ferry position.
SPEAKER_03So I think while I just have everybody at the table, I feel like that's what I'm hearing from the table. But I really um if anybody feels otherwise, I'd be love to hear about that.
SPEAKER_07We looked at some of the options for moving it over toward the to the part to ORDOC, or basically where Timsco is located. We looked at some of those, but the price tag was exorbitant,$150 million. And I think that really caused us to reconsider. Now, there is some talk that possibly there are federal funds we don't know about now, but that DOT could leverage to help us with that project if we were interested in making that move. Uh those but again, that's not that's just talk.
SPEAKER_07That's just a possibility. But uh otherwise, the the the cost of moving it over alone almost makes it undoable. O'Rion? Or Sigma Hanson?
SPEAKER_05Thank you, Your Honor. I think we have to be clear. Uh whilst AMHS has gotten mixed signals from us for a long time. Uh and it it that the the ferry float uh it should have been replaced 15 years ago. Its lifespan was up and it sank. Well, what, 11 years ago, something like that. I think we have to be very clear. We can't say, uh, until something better comes along. We have to be direct or it's not gonna happen.
SPEAKER_05We can't kind of pander to see what the market is, or especially with the state of funding in Alaska for these projects, and then also knowing that that's gonna be hanging on federal money, it can't be wishy-washy. So I'm just saying, like if we want to pursue a fifth berth on the ferry float, then we got to say we're doing that and we go for it. We can't be, you know, wishy-washy.
SPEAKER_05Maybe we'll do it in a few years, maybe we won't, maybe we'll go for you know a supermax project in the birth of the Skagway River. Um we we can't go back and forth. We want Alaska Marine Highway to take initiative where they were about 10 years ago to replace the dock, and they were, you know, really had good momentum. Um we've got to be clear about it. You know, say in five years we might change your mind, that's they're not gonna they're not gonna move, they're not gonna do anything.
SPEAKER_05We've got to be direct. That's that's my take on it because we've given them mixed messages for a long time. And I I don't I think that's been to our detriment. And if you look at the condition of the south end of that ferry float, it reflects that we can't even get it resurfaced because we're there, we've given them so many different directions of what might be possible. So I think going forward, we've got to be clear. That's that's my feeling on it. So member Clody.
SPEAKER_08Thank you, Your Honor. Um, I would like to echo that I think uh definitive statements are great. Um, but as for this conversation and it being a work session, I don't think that's our goal here tonight. Um so perhaps that's something that we should consider putting on an upcoming agenda um so we can discuss things more definitively.
unknownOkay.
SPEAKER_07That's a possibility. I I I agree with definitive statements, I do, but I also retain the right to, as we move into the future, be flexible and respond to our opportunities as they come. If if we lock ourselves into a 20-year ACL commitment and we can't develop that property, I I think that's not an ideal spot for us. I think we need to be able to respond to opportunities as they come. Um and I hope we can keep ourselves in that position where we can do that. Further discussion?
SPEAKER_05I move we adjourn.
SPEAKER_07Second. Discussion?
SPEAKER_08Thank you both.
SPEAKER_07All right. Uh roll call, please. Henry.
SPEAKER_06Yes. Ellis. Yes. Yes.
SPEAKER_05Yes.
SPEAKER_06Hansen.
SPEAKER_05Yes.
SPEAKER_06Ploney.
SPEAKER_05Yes.
SPEAKER_06Six yes motion passes. Thank you, everyone. This meeting's adjourned.
Call to Order Roll Call Approval of Minutes: November 5, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report Manager’s Report Presentation from...
Call to Order Discussion of Rockslide Mitigation Project 65% Design: Presentation from the Design Team Questions and Answers Written Questions from the Public Questions from the Mayor and Assembly Overview of Guided...
Call to Order Roll Call Approval of Minutes: October 8, 2026 Special Meeting October 15, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report...
Call to Order Review of Proposed FY27 Budget - CIP & Special Revenue Funds: School Funding Debt Service Permanent Trust Capital Projects Sales Tax Fund CPV Excise Tax Fund Mayor & Assembly Discussion Items Adjournment...
Call to Order Review of Proposed FY27 Budget - Operating Funds: General Fund Visitor Fund Clinic Fund Harbor Fund Port Fund Water - Sewer Fund Solid Waste Fund Mayor & Assembly Discussion Items Adjournment Packet