Borough Assembly: Committee of the Whole - October 22, 2026

Oct 23, 202651 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Call to Order Review of Proposed FY27 Budget - CIP & Special Revenue Funds: School Funding Debt Service Permanent Trust Capital Projects Sales Tax Fund CPV Excise Tax Fund Mayor & Assembly Discussion Items Adjournment Packet

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_10Call to order the assembly of the whole committee meeting for Thursday, October twenty second, twenty twenty-six at five p.m. Roll call, please.

SPEAKER_09Mayor Hansen. Present. Potter.

SPEAKER_06Present.

SPEAKER_09Burnham.

SPEAKER_06Here.

SPEAKER_09Henry. Here. Uh Howard and Hillis are absent. Quorums established. Thank you.

SPEAKER_10We will get right into review of proposed FY27 budget CIP and special revenue funds. Manager Deech, is there anything you would like to start out with?

SPEAKER_00I'll just note there is a memo from Superintendent Coffran in the packet. Their request is the total is a little bit less than last year. And we have a school board member and the business manager here from the school if you have any questions for them.

SPEAKER_10Wonderful. President Thole or Manager O'Daniel, would you like to present the budget for the school?

SPEAKER_07Mayor, honorable assembly members, thank you very much for uh taking a look at the uh school budget. My name is Corey Thol, the board president, uh, and here to represent the Skateway School uh on behalf of Dr. Cochran, who is currently away uh coaching wrestling. Uh as always, as it says in uh Dr. Cochran's letter, which I'm happy to read to you if you want to listen to me talk longer. Uh, we all thank you very much for all of the continued support, the longstanding support of the Skegway School has been shown throughout the community and honestly through the nation as the students graduate and go on.

SPEAKER_07Um, what you are allowed to do for us and what you continued to do for us upon these requests, uh, I think greatly adds to uh the quality of life in Skegway and is a prime reason why Skate why families come to Skegway and stay in Skegway. So I would like to thank you for that. I will give you a general overview of the budget. If you would like any drill-down specifics, Ms. O'Daniel is your person. Uh in total, with the budget, there is a couple of changes on the uh cap on the student funding school cap side of things.

SPEAKER_07It actually went down. That is largely because uh last year's school count was based on uh 2024, which was 133 kids. Last year the student count went down to 118 kids. So even with the state increasing uh the uh per student funding rate, federal funding rate or state funding rate per student, even with them increasing it, there was a decrease in the cap that you could actually provide to the school because it went down 15 kids, which I guess would like to say shows the true importance of uh that per student funding rate that the state gives.

SPEAKER_07Because even though we went down only 15 kids and that went up, it still had an impact on what you're allowed to do and how much money that the school gets in order for us to operate. That said, on the other side of things, the community service side, that has gone up. Uh, we are able to, even with that funding decrease. Josh, Dr. Coffran and Cindy and the school board have been able to work through things with staffing levels, keep all the same programs.

SPEAKER_07The continuity of programs has not changed at the school. So even with that, we still have all of the academic programs, we still have uh as far as extracurricular, the sports programs, we still have art, we still have music, we have shop, we have all those things that other communities don't have. Uh and so with that, in the community service side of things, just like the cost of living for all of us has gone up between shipping, food costs, the increased cost of travel, an unreliable ferry resulting in more chartering planes and things like that, you'll see the community service side has gone up, the cap has gone down, and it's a net decrease request of around$20,000.

SPEAKER_07Any questions for me?

SPEAKER_10President Thole, that was amazingly succinct.

SPEAKER_07Oh, thank you.

SPEAKER_10Any questions for President Thole?

SPEAKER_12Do we still have DDF?

SPEAKER_11Yes, absolutely. That's all okay, good enough.

SPEAKER_10I didn't catch that, Dan. Can you say it again?

SPEAKER_12I was joking. I know we do.

SPEAKER_07Yeah, DDF, robotics, all of it. That's still all there.

SPEAKER_10Thank you.

SPEAKER_07Yep.

SPEAKER_10Thank you. And congratulations to the cross-country team taken third in state.

SPEAKER_08Yeah.

SPEAKER_10Big honor. Yes. Uh any further discussion on the school budget. Uh Assemblymember Potter.

SPEAKER_04Thank you, Your Honor. Um, I think just this is our annual refresh on the slightly complicated world of school funding calculations. And I keep remembering that um in years past the school has fallen um budget-wise a little bit short because of our um difference in um financial calendar years that we're on, bifurcated calendar years.

SPEAKER_04Um and there was one year, a few years ago, that um the school budget fell short because of uh the the property evaluations came back differently. Um but I think that has been that was a few years ago and it hasn't occurred again since. I guess where I'm getting at is slight concerns over um a decrease in property tax that we might see next year. And if that um I don't I don't even know how you would account for that yet because we don't know what that's gonna look like.

SPEAKER_04But um can you just I guess maybe talk a little bit about how you estimate the property taxes?

SPEAKER_03So we the short answer to that is we don't we so it's not based on property tax. It's based on the full and true value declaration that we get from the deep department of oh, it's not even the Department of Education, it's commerce, I think. And that comes, I haven't seen it yet this year, but it usually comes this time of year. Have you seen it? Yeah, and so um w it's a it's a guessing game, truthfully, if I'm being honest.

SPEAKER_03Um, and I don't know how, nor do I think I have the bandwidth to know how the state determines those values. I was afraid about that that Johnson Yeah, and it's so it doesn't, it's not really related to our tax role. It's it however they make that valuation um at the Department of Commerce. Uh, we should know what that is very soon, but as of right now, we we don't.

SPEAKER_04But there hasn't been that big discrepancy that's happened like it did, what was it maybe like three years ago or so? Okay.

SPEAKER_03And uh you're right, it hasn't happened since then.

SPEAKER_10Treasurer rod.

SPEAKER_01I'd like to add to what Cindy mentioned, in addition to that, they don't know what the the what is it, the the rates that you're gonna get. This yeah, they're they're not solidified until the March after we pass our budget. So you're guessing right now for a whole year in advance, not the year that they're in, and they won't have final numbers for that um from the state until March or April. And that is also a counted for in the calculation.

SPEAKER_01So we don't know the true value from the state yet. They don't know the true student count yet. So there's I think that's it's in code that we'll revisit six months because of those items that we can't um crystalball.

SPEAKER_10And and the fall calculation, just that date just happened, didn't it? It was like somewhere around October 20th of when you get the students like consider for half the performance. Right.

SPEAKER_03Uh I it it's if it hasn't finished yet, it's going to in the next probably couple of days.

SPEAKER_11Yeah.

SPEAKER_03I'm not um I don't actually do the count.

SPEAKER_11Right.

SPEAKER_03So I don't have those numbers in my head, but yes, you're right. The count period is just ending.

SPEAKER_10It's right about now.

SPEAKER_03Yeah, if it's not already over. Yeah.

SPEAKER_10Great. Okay.

SPEAKER_03And then the state does all of their investigating and calculating, and we'll get a mid-year projection or a mid-year estimate. And that's generally pretty close, but then their final for the whole year doesn't come in until March or April.

SPEAKER_10Great. Any other questions for uh manager O'Daniel or uh board president full? I got one question. Um I know there were some delays on the bathroom project. Um has that keeps that pretty well under control and wrapped up.

SPEAKER_07As far as I know, there's some small touch-up items to do. And the the yeah, the high school bathroom still needs to have the wall laminates put on.

SPEAKER_05Oh yeah.

SPEAKER_07Oh yeah, sorry. Yeah, it's yeah, there's uh there's some small punch list items yet to be done, but they know that they need to complete those when there aren't school activities. So they'd they did all of the uh elementary wall paneling that was in there that looks really nice. But then the DDF tournament happened, so they had to break. They know that they have passed their period of performance and they need to work around it. And to my understanding, Dawson is still in town and uh they're getting through it as fast as they can.

SPEAKER_07But when they do it on the weekends when it's out there, they're still protecting the carpet. All the things that I would look at as a facility manager is like, yeah, you better be doing that, and seems to be happening.

SPEAKER_08Very good.

SPEAKER_07Yeah. Uh Ms. Pabarai, if you would like to uh sit down and uh talk about some of the finer nuances of the school budget because they have changed in uh I don't know the last four years with the community service program and the cap and all that, you're more than welcome to come and join us at the school board meeting or just ask for a special meeting.

SPEAKER_02Thank you.

SPEAKER_10And your new uh liaison is uh Assemblymember Howard um to the school board. And she's um away, I think, at a family event right now, but she'll be um she just got she's been to one meeting so far since the election.

SPEAKER_07Fantastic.

SPEAKER_10Yep.

SPEAKER_06All right.

SPEAKER_10Um right, moving on to uh thank you both for coming and um running a fantastic school. Moving on to debt service.

SPEAKER_00Yes, so debt service is very exciting. Um, it's uh item 2b in your packet. And this detail you can see. Um, you know, these are just scheduled payments for bonds that we have outstanding and loans that we have outstanding. And I think one of these loans will be paid off this year. Is it the clinic or the library?

SPEAKER_01I believe the I believe the clinic refunding is going to be paid off.

SPEAKER_00Okay, yeah. So we're we're just going through our schedule of repayment on all of these. Uh, you're not seeing the um Garden City RV Park utility project bond because we are going to be applying for that with the January. There's a bond issuance that's supposed to happen in January. So we're working with the bond bank to get our application in for that. Um and so once we actually have the funding, it'll show up in the budget.

SPEAKER_00Does anyone have any questions about debt service?

SPEAKER_10Pretty straightforward. Dan, do you have any questions about debt service?

SPEAKER_12No. Uh I did have uh occasion to speak to the city manager uh earlier today on some possible approaches to take on the maintenance aspect of multiple buildings, not least of which the school in town, but uh that'll be for a later day. Okay.

SPEAKER_10Uh hearing no questions, we'll move on to item C, two C, permanent trust.

SPEAKER_00Yes, so the permanent trust fund is our land fund, aka land fund. Um, and this is uh item 2c in your packet. Um, it's pretty straightforward. We um we're limited on the amount of money we can spend out of this fund. Um and this is where we receive our payments for land sales or any sales that we financed in the past. Uh, this is also where we expend funds uh for doing land surveying or anything that would help, you know, prepare land for sale or for anything else.

SPEAKER_00Um and yeah, so all the all the revenue we get from sale of land goes in from the interest on the permanent trust fund, all goes back into this. And so the principal can't be touched, but we can spend a portion of the um investment interest every year.

SPEAKER_10What what is the principal?

SPEAKER_00Um we'll have treasurer roted.

SPEAKER_01It changes every year based on whether or not we use the interest income or not. If we don't use it, it rolls into principal. So I can get you that number, but I don't know it off the top of my head because it's but there's a minimum you can't go below of the It's around 3.3 million, but I don't have an exact number.

SPEAKER_00And so every time we sell land that that principal goes up.

SPEAKER_06And then can't be touched.

SPEAKER_10So right now our interest over the principal is four hundred and eighty-eight thousand three hundred and thirty-seven.

SPEAKER_11Is that right?

SPEAKER_00We are showing investment interest. Oh, oh, I see. Yeah, so what this is showing is our Meritrade account right now through August is showing investment interest of 382,000. We've got 160 plugged in to be um to be conservative with that because it can it varies um by the end of the year, who knows? Um, but then you can see um I've got 600,000 going into capital projects that are land related, like the West Creek levy.

SPEAKER_00Um, so that's coming. So you see our revenue 171,000 um expenses right now, 30,000. And then with that transfer over, we're using about 450,000 of um of investment interest, basically, or that's what we're planning.

SPEAKER_10Okay. Any questions on the permanent fund trust, otherwise known as the land trust? The land fund. All right, moving to 2D capital projects.

SPEAKER_00Yes, so this sort of I'll try not to go back and forth between documents too much. But um you can see in um I updated your um item 3.1 in the packet. It's the summary budget. And on the last page of that, page 19, um, you'll see our sales tax and CPV. And so for those particular funds, I'm gonna work from from that page of the summary because there's not a whole lot to see.

SPEAKER_00You see, you're seeing the same thing in the detail, basically, but this is updated with 2 million coming from CPV going to the clinic. So I'm gonna use that page for reference. Um, capital projects. I I've mentioned this before, but we are we're trying to complete projects that we've started. So you'll see on this list um Garden City RV park utilities. That's land fund is gonna pay for the remainder of the engineering on that.

SPEAKER_00So we're doing that in FY27. West Creek Levy improvements. We are going to be starting, we're out to bid now. Um, we're hoping to have a contract in place before the end of the year so that this construction can happen in as as soon as we can in the new year. So you'll see that that's also in here. Um I'll skip over port for now, I think.

SPEAKER_00Um rec center up building upgrades. We need to finish the HVAC engineering, and that's on page two of um of 2D, I think in your packet. Um, we're finishing up that. The school restrooms indoors is a larger project. Um, we, as President Thole mentioned, they're finishing up the part of phase one, which was the um the restrooms.

SPEAKER_00The next part of that phase, we'd broken it up so we weren't spending so much money all in one year. The next part of the phase was supposed to be um the locker rooms and the doors, like just all the doors and making them ADA accessible. We've since split that up, so we're not spending as much in one year. And so we are only what you're seeing here,$500,000, is just for the ADA doors. And we've moved the locker room improvements to FY28.

SPEAKER_00Uh, you can see in um I added an item 3.3 in your packet, and that's a three-year um, it's a 27, 28, 29 view. Um let's see. I'll try, I'll try not to get too much in the weeds here, but I'll just go through these ones first. Um and then so school building upgrades.

SPEAKER_00We we were going to start doing some more here, but we whittled it down to only finish the HVAC engineering for the school. The HVAC project itself is about six million dollars for the school. So we were going to have to break that up into phases. We were planning to start that next year, but we've moved it to 28. Or no, we've taken it out completely. Um, incinerator upgrades. We've, as you know, we've started their um the incinerator itself is demolished and they're doing some concrete um demolition up there.

SPEAKER_00So yeah, they're they're well underway with that project. And so we hope to finish this. Um we hope to finish this in FY27. So that will be off the off the plate. The well controls, um, that's replacing the pumps and the controls for well. One and two. And this is the one we awarded the contract. There were problems with the contract, with performance.

SPEAKER_00We terminated the contracts. We're buying the generator now for this project. It was part of the contract, but um we decided to go owner pre procured and so we could spend that money in FY26. Uh so that will then be finished. And there'll be a little bit left to do in FY28. Um for the port, um, we've still got money in here for a match for the ferry float replacement.

SPEAKER_00And um Southeast Conference, I heard today that they're still waiting to hear if the PIDP grant, you know, who it was awarded to, if they got it or not. So we should know by the end of the year if this actually matched needs to stay in in the budget. Um, the industrial doc, we're hoping we're out to bid right now for um engineering, for design for that, and for NEPA environmental compliance work.

SPEAKER_00Uh, so that'll close soon, and we hope to get going with that. But that's funded um primarily through the PIDP grant. Um, we have some more work to do for the port office remodel. Um, brick rock slide project is continuing on. So you'll see that still coming in future years, too. The welcome garden, we have the engineering for it, so we want to get it done in FY27. That's a port-funded project.

SPEAKER_00Um, I talked about the rec center upgrades. Yeah, I think I've talked about everything there. Um you can see in the three-year uh snapshot here for capital projects that so in FY27 right now, we're showing eight about eight million coming out of sales tax to um to primarily the sales tax funds are going to finish those projects that we want to finish, like wastewater treatment plant, uh incinerator, and the levy, West Creek levy.

SPEAKER_00You'll see in FY28 that starts to go down. Um, so we're just gonna, there's a couple, a few more things we need to finish for those. We're looking at 3 million in FY28 from sales tax. And then right now in FY29, we have$50,000 being spent from sales tax. And that's because we're not planning anything new yet. And we we really want to in this coming year sit down and talk about how we schedule and fund capital projects.

SPEAKER_00So we're sort of we're getting all everything done that is started, and we're going to start anew in a in a hopefully organized and practical way that doesn't spend a lot of a lot of sales tax all at once. So that is what you're seeing for capital projects right now. There it is a lot of money coming from sales tax. It's more than it was last year, about$500,000 more.

SPEAKER_00And it will, you'll see in the sales tax fund um with that adjustment for the clinic, um, we're taking$5.8 million out of reserves. So I'm you know, I'm I'm presenting these to you under that um under that concept of finishing these projects that we started and you know, sort of refreshing.

SPEAKER_00There it the assembly can cut some of these. Some are easier to cut than others, I think, um, if you wanted to. I would I don't necessarily want you to, but there is that possibility and we can talk about if that's something that you want to look into, we can talk about what is sort of easier or harder to stop midstream on for now.

SPEAKER_10Vice Mayor Potter.

SPEAKER_04Can you tell me what is the number that represents six months of reserves that we have to um I think I've got it here down?

SPEAKER_06Is that it?

SPEAKER_00Okay, okay, fifty percent um of the general fund expenses at this time with this budget is uh seven about seven point four million dollars. So we are at um, but we can't, what is it? I have to be between when I'm when I'm looking at the budget, the treasurer tells me I need to stay between 50% and 75% uh reserves. So right now we're at 67.

SPEAKER_00Um so we still have we have enough money in our reserves to need that.

SPEAKER_10A little follow-up on this, and Clerk Burnham might be able to refresh my memory a little bit as he was finance chair at the time we came up with this reserve, as I recall. We never really had a policy. Um and coming out of COVID, that seemed like we probably should have a guideline going forward um facing the you know kind of frightening fiscal picture that we had. And with the fiscal year being January 1, by having effectively six months of you know, having half the budget, which would give us six months if we have a tourist season that in theory would get us almost like a year.

SPEAKER_10Um and that's kind of how we came up with this this half month because we didn't have anything on the books at all. It was just sort of budget to budget every year, and it just wasn't really a guideline for the assembly or finance or staff going forward of you know what our target was. And we had different numbers kicking around, but it was more about time than it was about a base number. A base number is constantly changing. So we were we were looking more about time of how we could plan ahead, but we're not saving money superfluously just for the idea of keeping it under the mattress.

SPEAKER_10Um, it was more about how we could set future governments up, um, or even you know, current government up so that um we had a backup plan if things go awry. And I don't know, it was Clerk Burnaman. Did I describe that fairly accurately? Okay. Um so it I would say uh finance chairpotter, that number was created more about a time uh consideration of how we would be able to follow into the following fiscal year if things go terribly awry and for unforeseen unforeseen circumstances.

SPEAKER_10Um if it's a situation where we have no tourism and no sales revenue and no CPV money, that's a that's a dark day. Um, but we've been there. So, anyways, that's that's a that's a brief synopsis of how we came up with the six months of or the half of the general fund um standard for to follow.

SPEAKER_10Assemblymember Burnham, I think you were participating in those uh discussions back then too. Did I summarize that well or miss anything or mischaracterize it?

SPEAKER_02I think you get summed it up good. I mean, we had discussed everything from a year to three months or what would be feasible, and yeah, I think we land on six months, and then that kind of went into the the mainstream of it. And yeah, as far as I know, we've been pretty much sticking to it once we decided to go that route.

SPEAKER_11So yeah.

SPEAKER_10Uh Vice Mayor Potter.

SPEAKER_04Thank you. I have a couple questions. One is about the time of year where I get a little focused on the rec center. It's the th I've been waiting for this moment. Um, can you take me through again? I'm looking at the Capital Projects Rec Center building upgrades. Um 50,000 from sales tax, but there's the 352,000 figure.

SPEAKER_04Um can you can you take me through? We we have we started engineering yet for that project? Where where is that at? And can you just take me through the rec center um building upgrades again, please?

SPEAKER_00Yeah, so we were starting with HVAC. Um initially we had, I want to say it was 1.7 in the FY27 budget to actually start doing those HVAC upgrades. And we pulled it. We do right now, we're mostly finished with the engineering. Um, we did spend some of our money, if you remember, this year, um from we moved some money around so that we could replace the do an emergency replacement of the controls of the Rec Center HVAC, um, which I think are done or close to being done, which should help us through the winter.

SPEAKER_00I mean, it's a huge improvement, you know. The system itself, though, is very, it's on its last legs, so it's gonna have to be replaced. I don't, I took it out and I don't have it scheduled yet in the future. So I I think that it was 1.7. I shouldn't, I actually had that in there and I took it out. Um, I know that the recreation director would really like that project to happen, but I was having a hard time balancing the budget.

SPEAKER_00And so I took it out. We also had some money, um 190,000 in for you can see the top one for McCabe, because our we have the same HVAC system or the same age, same controls, and we were going to see if we could do um just replace the control panel like we did are doing at the rec center, but I took that out as well.

SPEAKER_06Follow-up question, Assemblymember Potter.

SPEAKER_04Um thank you. Is what is the um, can you give me the total? Um, it's probably in front of my face somewhere. The total amount of um what we are spending to um what is the total amount we are transferring for mill rate adjustments?

SPEAKER_00Um yeah, that so that if you look on page 19 of that 3.1 document, um under transfers, so it's the third section down under sales tax. The second line is for the general mill rate adjustment, and it's about 2.5 million.

SPEAKER_04So that's the that's the total amount.

SPEAKER_00Yeah.

SPEAKER_04Okay. Thank you.

SPEAKER_10Is that largely because we have more work sales tax revenue this past year? Um the decrease from 3.34.

SPEAKER_00That decreased because I used um why did that just decrease? Because I use more CPV, I use more CPV funding to um to fund the general fund.

SPEAKER_10And last year we put most of the CPV into the incinerator.

SPEAKER_00Yeah, and into sewer and water and solid waste. Yeah. Oh, we also have more port funding and grant funding this year in the general fund.

SPEAKER_10Vice Mayor Potter, I'm sure you've got another question. I can just see it on the tip of your tongue.

SPEAKER_04Not yet.

SPEAKER_10Okay.

SPEAKER_04Not at this time, Your Honor.

SPEAKER_10Assemblymember Henry, uh, do you have any thoughts or questions on capital projects?

SPEAKER_12No, none. Thank you.

SPEAKER_10Okay, thank you. We'll move on then to item E, sales tax fund.

SPEAKER_00Yes. So um, if you go to page 19 of your handout 3.1, I think that's a good summary of both C sales pat sales tax and CPV. Um you can see I I bumped up sales tax returns a little bit from um even what we were um estimating for this year because we're we're estimating a a decrease in passenger volume for next year, 11% decrease, I think.

SPEAKER_00And then and then like a 4% increase in the cost of goods. So using that, we were at like 12,400,000 or something, and I just bumped it up to 13. We're probably on track well this year at the six-month mark, we were about, or after the second quarter, we were about 10% up from the prior year. So I've this feels conservative.

SPEAKER_00It may be more, but I it's hard to choose that number to put in the budget.

SPEAKER_10Did I you just said you you're projecting 11% less passengers yesterday?

SPEAKER_00And that's based on the schedule, or yeah, that was based on the schedule and the port. Um, the port keeps track of their schedule and what they're um what they're expecting for passenger numbers next year.

SPEAKER_10So we were 1.4 this year and my rough maths about 1.25.

SPEAKER_00I can get those those specific numbers, but yeah, it it was a it was down a little bit based on the based on the schedules that we had when we were estimating. Oh, thank you. Um, so the 2026 estimated passengers were 1.36, and we came out with 1.44 something. 2027, our estimated passengers are 1.3 or 1,319,000 and change.

SPEAKER_00So it's it's down just a little bit, but we wanted to make sure that when we were looking at what we were budgeting or forecasting for revenue from sales tax, we took that into account.

SPEAKER_10And are are you uh targeting you know 100% of what the the skip shut schedule says, or you're doing 90% or um I I wanna I can ask Cody and confirm this, but I think we go for like 80% of the um of the maximum capacity. And this year we were over 100% for most of the year.

SPEAKER_00Um, I think maybe the last month we were a little under. Yeah.

SPEAKER_10In April, but we had one ship in April.

SPEAKER_00Yeah. So yeah, so it's it's hard to tell, you know.

SPEAKER_10So when we get 104% capacity, which it doesn't mean there are people sleeping, you know, outside on the bull rails. Um, the way that the ships calculate their passengers is somewhat like the way uh the school calculates kids. It's a pretty complicated algorithm. Um but when it goes over capacity, we're not just over 100% of what we because you're calculating sales tax that you said 80% of what the the passenger expected.

SPEAKER_00I believe so, yes.

SPEAKER_10Therefore, we have 8.0% exceeded our revenue projections for this calendar year, for this fiscal year.

SPEAKER_00Probably. We don't have all of our um, I know we the deadline for third quarter sales tax is the end of this month. And so second and third quarter is really what shows us, you know, those those are the big big quarters. Um, but after we got second quarter in, we thought we were about 10% over.

SPEAKER_10So I could I could see it being staying in that trend historically we've done it at 80%. I thought it felt like it was 90%, but it it was 80%.

SPEAKER_00I'll have to check for you. Yeah, I'll check with Cody.

SPEAKER_10Any questions on the all-important sales tax fund?

SPEAKER_00Yeah, I think it's all pretty straightforward. You've got the school funding in here. We have fees for the remote sales um service that we get, which has boosted our revenue quite a bit. Um and then the transfers out is what I find interesting. The you know, 1.7 is going out to the bond, 2.5 is the general mill rate adjustment, 8 million for capital projects, um, garbage and water and sewer between the two, about 1 million.

SPEAKER_00And those were last year, those came out of CPV. So with then the down to 2.3 going to the clinic, um we're we're up about 10% from our expenses from last year.

SPEAKER_05Great.

SPEAKER_10Any further questions, comments? Okay, we'll move on to item F, CPV excise tax fund.

SPEAKER_00Um this one's this one's fairly straightforward as well. Um, you can see that we, you know, we base what we're getting, what we get in FY27 is based on the passenger numbers from FY26. So we're expecting 6.8 from CPV uh from the shared revenue from the state. And when do we get that payment usually? We usually get that payment in February.

SPEAKER_00So we'll we'll know how close we are on that when we get when we see that. Um we our expense coming out is the investment advisor. They get a, you know, and that's an estimate of what they get a percentage, I think, of the interest or of the balance. Um and then so you can see I I really was heavy with CPV in the general fund. Um, that's it's up a little bit from what we did last year to the general fund.

SPEAKER_00We're sending some over to the clinic, visitors department, but I'm not using CPV in capital projects, water sewer, or garbage. And in the end, it's it's it almost comes out, it's almost a wash, right? Whether it comes out of it'll come out of the CPV fund regardless. Um, but with that 2 million that's going to the clinic, we will bring our balance from 3.3 million in reserves to 1.3.

SPEAKER_00And that's all I've got there. Do you have any questions about that?

SPEAKER_10Any questions? Questions about CPB.

SPEAKER_00I do have one thing to note that I should have mentioned under Capital Projects, the laundromat trailer or container. So we've been talking about doing a container that has laundry facilities, basically. And we can put it on a pretty small piece of land, hook it up to water and sewer. The cost is about we we're still waiting on a on a quote. Uh we got one quote for a very large one, and we're gonna get a quote for a little smaller one, but it was um just under$300,000.

SPEAKER_00And I don't know, I wanted to talk to the treasurer about whether or not that's considered a capital project or if that's a capital outlay, outlay item that needs to go into you know into one of the operating funds. So that is not in your budget right now. I just wanted to note that.

SPEAKER_11Thank you.

SPEAKER_10Any final questions for manager Deech? All right, moving on to item three, mirror and assembly discussion items. Does anyone have anything? Oh, Assemblymember or Clerk Furnham.

SPEAKER_09Um, Your Honor, I just wanted to point out that your October 15th Assembly standing committee and liaison list has Assemblymember Howard as the chair of HEW and Assemblymember Pomeroy as the liaison to the school board. My bad.

SPEAKER_10Just to clarify. I'm freewheeling up here at Florida.

unknownYeah.

SPEAKER_03Well, we know how good I am at EPG.

SPEAKER_08All right. Uh got that off our chest. What else?

SPEAKER_10Assemblymember Potter.

SPEAKER_04Uh just on the topic of meeting schedule, when do we see the when do we see the first? What are next steps for the budget? When do we see the first reading?

SPEAKER_00The it will come to you for first reading or introduction on November 5th. So at your next meeting. And then we'll do the second meeting in November is the second reading and public hearing, and then third and final on December 3rd, whatever the first meeting in December. So we give ourselves a buffer just in case you know we need more time before the end of the year because it has to be adopted before on or before December 31st.

SPEAKER_10Clerk Burnham, do we have assembly of the whole meetings next week? Or is this a maybe some committee meetings were pretty light scheduled next week? This is it till the November stuff that's scheduled.

SPEAKER_09We have um rock slide stuff at the beginning of November, but there's no other uh assembly of the whole. Okay.

SPEAKER_10Assemblymember Potter.

SPEAKER_04Acting as the Ports and Harbor Advisory Board Assembly representative, I will make a pitch that um there's a little change in the finance committee schedule as next Wednesday. Um Ports and Harbor Advisory Board will be meeting um with presentation. Um the Selkirk representatives are going to be here, I believe. It's trying to remember an email that I read all the way back to this morning. Um, but I would like to make sure that's on everybody's radar.

SPEAKER_10It's just what day?

SPEAKER_04Uh next Wednesday. Just kidding. The following Wednesday. Oh, because I keep thinking it's Halloween week. It's always Halloween week in my heart. Okay. Wednesday, November. Yep. The day before the next assembly meeting.

SPEAKER_10So it's after finance.

SPEAKER_04Finance will be is moved to before the assembly meeting on that Thursday.

SPEAKER_10What time?

SPEAKER_04Five o'clock.

SPEAKER_10Five o'clock, November 4th.

SPEAKER_04Really starting to feel the heat.

SPEAKER_10Ports and Harbor's presentation from Selkirk Copper.

SPEAKER_04Finance meeting is five o'clock on Thursday. The Ports and Harbor Advisory Board meeting is Wednesday, November 4th at 5 30. With Selkirk.

SPEAKER_10Okay. Anything else?

SPEAKER_02Nothing, Jay? Um, actually, I was just sitting here trying to figure out whether or not to to bring up an idea of moving the or a possible capital improvement project to make a place to put an RV park north of on the north end of town. I'll stop there. But um, so yeah, uh I'm probably will start with this crazy notion in a public works committee meeting and then go from there.

SPEAKER_02Um yeah, other than that, I'm very glad you corrected yourself. That was full transparency. I like the whole yeah, I'm done.

SPEAKER_10Uh Assemblymember Pomeroy.

SPEAKER_11Nothing at this time. Thank you.

SPEAKER_10All right. Assemblymember Henry, do you have anything?

SPEAKER_05No, sir.

SPEAKER_10Great. I think that's about does it then. I'm a major motion by Pomeroy and a second by Henry to adjourn discussion. Hearing none, roll call.

SPEAKER_09Burnham. Yes. Henry. Yes. Otter.

SPEAKER_11Yes.

SPEAKER_09Pomeroy.

SPEAKER_11Yes.

SPEAKER_09For yes, motion passes.

SPEAKER_06All right, meeting adjourned, thank you.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Borough Assembly - November 19, 2026

    Nov 20, 20262 hr 52 minAudio

    Call to Order Roll Call Approval of Minutes: November 5, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report Manager’s Report Presentation from...

    Credit the people on this episode

  2. Borough Assembly: Committee of the Whole - November 9, 2026

    Nov 10, 20263 hr 6 minAudio

    Call to Order Discussion of Rockslide Mitigation Project 65% Design: Presentation from the Design Team Questions and Answers Written Questions from the Public Questions from the Mayor and Assembly Overview of Guided...

    Credit the people on this episode

  3. Borough Assembly - November 5, 2026

    Nov 6, 20261 hr 34 minAudio

    Call to Order Roll Call Approval of Minutes: October 8, 2026 Special Meeting October 15, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report...

    Credit the people on this episode

  4. Borough Assembly: Committee of the Whole - October 21, 2026

    Oct 22, 20261 hr 4 minAudio

    Call to Order Review of Proposed FY27 Budget - Operating Funds: General Fund Visitor Fund Clinic Fund Harbor Fund Port Fund Water - Sewer Fund Solid Waste Fund Mayor & Assembly Discussion Items Adjournment Packet

    Credit the people on this episode

  5. Borough Assembly - October 15, 2026

    Oct 16, 20261 hr 49 minAudio

    Call to Order Roll Call Approval of Minutes: October 1, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report Manager’s Report Communications to the...

    Credit the people on this episode