4. Declarations: A. Conflict of Interest B. Statement of Contact by Board Members 5. Public Hearing of Skagway Terminal Company, Appeal of Planning and Zoning Resolution No. 25-03: Approving Conditional Use Permit Application No. 2025003: Skagway Terminal Company; Request for Congregate Housing on Block 88 Lots 7, 8, and 9, in the Residential-General Zone 6. Board of Appeals Decision on Appeal of Planning and Zoning Resolution No. 25-03: 7. Public Hearing of Cruise Line Agencies of Alaska, Appeal of Planning and Zoning Resolution No. 25-06: Denying Conditional Use Permit Application No. 2025005: Cruise Line Agencies of Alaska; Request for Congregate Housing in the Waterfront Zone on Tide Land Lease Area, ATS 1719, in the Waterfront Zone 8. Board of Appeals Decision on Appeal of Planning and Zoning Resolution No. 25-06: Packet
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
SPEAKER_05I call to order this um meeting of the Board of Appeals for Tuesday, May thirteenth at seven p.m. Roll call.
SPEAKER_07Hansen presenting Potter Ellis present. Um Mayor Bass is absent. Assemblymember Waddell is absent. And Assemblymember Henry is absent. De quorum is established.
SPEAKER_05All right, item number three, proof of notice.
SPEAKER_07Proof of notice is in the newspapers, posted on the bulletin board, um, website.
SPEAKER_05Okay. Item number four, declarations. Um now would be a time for both items um uh let's see pertaining to resolution 2503 and 2506. If anybody has a conflict of interest, potential conflict of interest, now would be the time to declare that. Assemblymember Hillis.
SPEAKER_06I don't know that it's a potential conflict of interest, but it is worth noting that I do rent to White Pass and also have had a long-standing janitorial contract with them. But I've had no contact regarding this.
SPEAKER_05Noted, thank you. Uh anybody else Okay, statement of contact by board members, once again, for both um um applications on our agenda. Uh I will state that I did have a conversation with um chair planning and zoning, maybe. I don't remember particularly if we necessarily talked about either of these issues specifically, but um I did recently have a conversation with her. Um thank you, uh Chair.
SPEAKER_08I did have a conversation with Bob Bertho a month or two ago, and I don't know that I commented, but he definitely talked about uh item seven. I don't think I made any comment about it.
SPEAKER_05Anyone else? Okay, moving on to public hearing of Skagway Terminal Company appeal at planning and zoning resolution number 25-03, approving conditional use permit application number two zero two five zero zero three, Skagway Terminal Company request for congregate housing and blocks on block eighty-eight, lots seven, eight, and nine in the residential general zone.
SPEAKER_05Um, would the board prefer that the appeal request be read in full?
SPEAKER_08Yes, I would.
SPEAKER_05Can you help me direct direct me to that?
SPEAKER_07Um, Your Honor, I can read it for you. Oh, thank you, please do. Um but additionally, it's in your Dropbox folder, um, folder number three. Um and inside there the first file is the appeal. And I can read it if you would like.
SPEAKER_04Oh, go ahead, please.
SPEAKER_07Um this is uh White Pass and Yukon route um letterhead, the scenic railway of the world with their address, uh P.O. Box 435, Skagway, Alaska, 99840. Um the subject uh regarding appeal on conditions set for conditional use permit application number two zero two five zero zero three, Skagway Terminal Company slash WPYR, block eighty-eight, lots eight, seven, eight, and nine, request for congregate housing.
SPEAKER_07Dear Assembly members and honorable mayor bass. On March 14th, 2025, we received a letter from Stacy Fairbanks permitting official informing us that the Planning and Zoning PNZ Commission had voted to approve our conditional use permit number two zero two five zero zero three with the passage of resolution number 25-03R. We are very much, we very much appreciate PNZ approving our application, but we would like to appeal two of the three conditions set.
SPEAKER_07The conditions included in the resolution are one, a minimum of ten parking spaces will be provided. Parenthesis, we agree and will comply with this condition, in parenthesis. Two, the bedrooms will remain single occupancy. Parenthesis, we are appealing this condition more detail below, end parenthesis.
SPEAKER_07Three, the conditional use permit shall be reviewed annually. Parenthesis, we are appealing this condition more detail below, and parenthesis. The information below pertains to our appeal for the two conditions mentioned above. Condition number two, bedrooms to remain single occupancy. Appeal. While we understand P and Z's thought process on this condition, we find the way the condition is worded to be overly restrictive.
SPEAKER_07Our plan is to have the facility with a 20-person occupancy limit, but we feel the condition should be set to the overall limit and not to and not a per room limit. If, for example, we hired a couple, we should have the flexibility to let them share a room.06.030A3 KI provides specific language defining congregate residences that meet IBC code, provided that occupancy does not exceed 10 persons on a 5,000 square foot parcel or 20 on a 10,000 square foot parcel.
SPEAKER_07The permitted area for this conditional use has a 15,000 square foot and thus should be allowed a 20-person max occupancy. Additionally, if during final design we opted to design in a two-bedroom on each floor, that should be allowed. Alternative, we would ask the Board of Appeals to change this condition to set a maximum occupancy on the facility of twenty people in total.
SPEAKER_07Page two, condition number three. The conditional use permit shall be reviewed annually. Appeal. According to municipal code nineteen point zero four point zero six zero B four restrictions and conditions, the planning commission may require conditions listed in B4A through N. Nowhere on that list does an annual review of the conditional use permit get mentioned.
SPEAKER_07PZ may place a condition on time limits that affect the development schedule of the project to limit impacts on neighbors, but the conditional use put in place makes it difficult for any organization to make an investment in a project like this with the unknown what an annual review may entail.
SPEAKER_07As we understand it, all conditional use permits are required to adhere to the conditions associated with the permit, and if they fail to do so, the municipality has a process to follow in order to remedy any failure to uh follow conditions. We fail to see why this conditional use permit would be treated any differently. We ask the Board of Appeals to strike this condition from the permit. Thanks for your time and attention to these matters.
SPEAKER_07Please do not hesitate to contact me for any information or questions. Kind regards, Tory Korn, White Pass, and Yukon route. Uh, email address, phone number.
SPEAKER_05Thank you, Clerk Burnham. Um, okay. Um, we are moving on to um the appellant speaking in support of their appeal. Um Mr. Korn, would you are you prepared to to speak?
SPEAKER_00Yeah, I'll I'll keep it very brief and uh thanks everybody for your time tonight. And I apologize ahead of time. I've got a betting a little bit of the early season cold here. So um, but we did uh just want to reiterate that we're really excited about this project um since the time we've selected um a contractor with uh Dolan construction to complete the project for us, and it's gonna be well designed and well constructed, and I think it'll be a real real asset, not only for our company, but uh for housing within the community. And again, really just looking for some flexibility on how we how we end up rooming people and how how we design it.
SPEAKER_00And in terms of the annual review, just that you know it's a several million dollar project, and the idea that every year you have to come back to review um seems pretty arduous, but um but we're excited about the project and uh hopefully we can um just get to your consideration on these two points. Thank you.
SPEAKER_05Thank you, Mr. Korn. Um Clerk Burnham, are you aware of any municipal representatives prepared to speak on this matter?
SPEAKER_07Uh Your Honor, I believe um the manager is here to entertain questions, but not necessarily to speak under this item.
SPEAKER_05Okay, I will entertain questions from the board to the appellant. Um please be mindful to uh direct your questions through the chair. Does anyone have questions for Mr. Korn? Assemblymember Hansen.
SPEAKER_08Thank you. Uh Madam Chair, if I could ask why the parking space or the it's only limited to 10, it seems like you could have a lot more parking or at least make it not the the throat of the parking area not restricted. And uh it seems like there's a lot of unused accessibility, particularly since it interfaces directly with 14th Avenue.
unknownMr.
SPEAKER_05Card, I know um I don't believe that is one of the three conditions that you are appealing, but would you mind um speaking to that?
SPEAKER_00Yeah, if I if I recall correctly, the the code required, I think, nine parking spots. And I think during public comment, it was asked that we add another one to 10, and that was the condition that P and Z then adopted as part of it during their hearing. And we thought that was reasonable. I I don't think we're necessarily limited to 10. I mean, Assemblymember Hansen's correct, it was a large lot there. I think we're only using about a third of the total lot space for the actual footprint of the building. So yeah, there'll be much additional space, but I think in terms of the the permit, condition use permit, 10 is what they come up with based on public comment, and that's where we uh landed on.
SPEAKER_05Thank you. Uh does anybody else have any questions for the opponent? Um, Mr. Korn, this is um Assemblymember Potter. Can you just speak to uh one of the conditions um states that the bedrooms will remain single occupancy? Can you speak to um to the design of the unit? So you you have 20 units, but um some of them are some of them specifically going to be designed for a couple.
SPEAKER_05Can you just kind of um touch base on the that aspect?
SPEAKER_00Yep. So so we don't have a final design yet. I should leave it that. But the current design shows 10 bedrooms upstairs, 10 bedrooms downstairs on a two-story facility, each bedroom being designed with kind of like a little wardrobe closet, um, a bed, um, and then a sink that will go in the room as well, and then kind of uh Jack and Jill bathroom as we describe it, that um adjoins into the next bedroom down the hallway. Um so each room is designed on that premise that there'd be um one person.
SPEAKER_00You could move the wardrobe out, for example, and put a double bed in, though. And that was kind of our thought was just that if we have a married couple or something like that that wanted to be able to share their bedroom, we just wanted that flexibility. I I don't imagine that P and Z or anybody at the municipality wants to come in and do bedroom checks to make sure there's only one person in the room. Our intent is not to put bunk beds or four or five people per room, and I'm I'm certain that was the concern that that some people had. Um we're very much, I think, provide quality housing for our employees, and this is going to be a quality um structure.
SPEAKER_00And so we really just want the flexibility to be able to room couples if if so desired.
SPEAKER_05And if I could ask one more question, do you have um uh a set idea of of which employees or you know which department this housing unit will be used for? Is it um just will be open for um kind of whoever needs it?
SPEAKER_00Yeah, I mean, I think historically we've used uh units out closer to the shops for for train and maintenance away workers, things like that. Um, this one, I bet it'd be open to anybody that that works for us in the summertime.
unknownYeah.
SPEAKER_05All right, thank you. Um okay, we do not have anybody signed up for public hearing, so we can move on to item six, Mr. Burnham.
SPEAKER_07Um, I want to be sure that you open the public hearing and close it, whether or not you have anyone testifying.
SPEAKER_05I thought I was gonna nail that one. I thought I was being clever. Um, okay. I would entertain a motion to open the public hearing.
SPEAKER_08I move we open the public hearing. Second.
SPEAKER_05We have a motion and a second to open the public hearing. Is there any discussion? Uh here we know discussion. Roll call.
SPEAKER_07Pullode.
SPEAKER_05Yes.
SPEAKER_07Hillis. Yes. Hansen. Yes. Potter. Yes. Four yes motion passes.
SPEAKER_05Okay. Moving on to the public hearing. Um, Clerk Burnham, do we have anybody signed up for the public hearing?
SPEAKER_07Um, you do not.
SPEAKER_05Okay. I would move that we close the public hearing portion of the meeting.
SPEAKER_08I move we close the public hearing. Second.
SPEAKER_05We have a motion and a second to close the public hearing. Is there any discussion? Roll call.
SPEAKER_07Hillis. Yes. Hansen. Yes. Potter.
SPEAKER_05Yes.
SPEAKER_07Colloding.
SPEAKER_05Yes.
SPEAKER_07For yes, motion passes.
SPEAKER_05Okay. Moving on to item 6A. Um, I would entertain a motion to reverse, disapprove, or affirm the decision of planning and zoning, wholly or partly, or consider a motion to modify the order, requirement, decision, or determination of the commission.
SPEAKER_08I move we modify the decision of planning and zone planning and zoning resolution 2503 to modify condition number two to read to allow a maximum of 20 persons for 20 people for the facility.
SPEAKER_05I will second that. Uh we have a motion to amend the second um condition to read uh to amend condition number two to allow a maximum occupancy of 20 persons. Is that correct? Um do we have any discussion? Assemblymember Hansen.
SPEAKER_08I find the appellants uh description and reason for this to be very valid in that they may change some of the the layout uh to be two bedrooms, uh leave some flexibility in the design. I think that's wise. I think that's good. Um and I think that the intent um was that you wouldn't have 40 or more people in this structure from P and Z, not that they're all single bedrooms.
SPEAKER_05Do we have any further discussion? Um I think this is a um as the appellant states in code, um the occupancy does not ex is not to exceed 20 persons. And that is their intent not to exceed 20 persons. I don't think we want anybody in the municipality to get in a situation where we're um doing bedroom counts. Um roll call on the motion to amend condition number two to allow for a maximum occupancy of 20 people.
SPEAKER_07Potter.
SPEAKER_05Yes.
SPEAKER_07Clodine. Yes, Hillis, yes, Hanson, yes, for yes, motion passes.
SPEAKER_05Um I would move, I move to strike condition number three um requiring requiring an annual review. Second. We have a motion and a second um discussion. I think um I am um I lean towards the appellants uh discussion of this in their appeal.
SPEAKER_05I think it it's I I think the the permit should be approved or not approved. Um there are noise condition, there are noise requirements, restrictions already in code, um, and there are methods to um enforce um noise complaints and various other um possible situations that that might um that would possibly be addressed in an annual review, but but I do think that placing an annual review condition does not um necessarily inspire um uh the significant investment in construction that a project like this is going to require.
SPEAKER_05Assemblymember Hansen.
SPEAKER_08Thank you, Madam Chair. If I could ask uh the clerk through the chair a question, a procedural question that I'm confused on. Um the decisions uh that the resolution of planning and zoning is filed with the state and it conveys with the property. Is that true?
SPEAKER_07Unless there is a conveyor. Condition that uh indicates that it the conditional use is not transferable after a sale. Um without that existing, it would not transfer. So, or sorry, if there is a condition that the conditional use permit does not transfer with a sale, then the conditional use is is uh terminated at the time of a sale.
SPEAKER_08Thank you. And if I follow that up because I'm trying to understand how this process works going forward, because some of these things are are relatively new uh in that PNZ has a thorough process for their own um resolutions. If that's not a condition that it wouldn't be transferable, how could an annual rue which could potentially revoke a conditional use possibly work unless it was already put in there that you could if it's not if it's permanently transferable, how could it be revoked?
SPEAKER_08That's what that's my the the crux of my question. I think that's actually kind of a procedural misnomer. It doesn't work both ways. That's my confusion. I and I have no problem with the motion. It's more about the process that I don't, it does not jive that if if it's doesn't have a condition where it can't transfer and it stays with the property, then how can you in the in in the future potentially revoke it? I think that's actually doesn't work. That's that's a it's a it's a it's a little bit of a problem there. And I have um that that's that's an aside, but I have no problem with the motion.
SPEAKER_07Clerk Barnum. Um I'm not looking in the code directly right now, but my understanding is that um planning and zoning can review uh permits, and they have in the past. Um I've found two earlier today that were revoked after a review. Um many review or many conditional use permits have um you know an a review one year from approval, or uh, and if you look back 20 years, there's many um permits that have uh uh a review every two years.
SPEAKER_07Um it is difficult to track those. Um but my understanding is that planning and zoning can cause review due to complaints. So if there's multiple complaints, they may uh ask for um a conditional use permit holder to come in um and where they hold another public hearing and they consider it for a review, and and they could, similar to the assembly, bring her a resolution that modifies the conditional use permit or amends it.
SPEAKER_05Oh, I guess I don't have to raise my hands. Um Assemblymember Calodi, you you had your hand up.
SPEAKER_01Um I think that answered my question. Um my understanding of uh the included review process was um dependent upon the conversation of the unit being single occupancy or not. Um so the way that I understand the converse or understood the conversation to happen at planning and zoning um was after a year they would decide whether or not that was fitting for the occupancy. But I think since we have modified that already, um in my perspective, the review process is just a little redundant.
SPEAKER_05Thank you, Dan. Just wanted to make sure it's on record that Assemblymember Calode is also the Assembly liaison to planning and zoning. Um and I think I understand you what you're saying is a conditional use permit still has to, it is granted um on the the different uh premises, including, you know, will not affect life safety or the neighbors. So even without an annual review, it still has to, it's still a conditional use permit that has to meet those certain criteria.
SPEAKER_05Is there any further discussion? Assemblymember Hillis.
SPEAKER_06Thank you, Your Honor. I did have a question and maybe it's for the clerk through the chair, but um uh assuming there there was a review um and there was an issue, is there a process for mitigation to continue the conditional use permit at that point? Or what is the process after that if there was a review?
SPEAKER_05Clerk Burnham, is that something that you can um you're prepared to answer?
SPEAKER_07Uh I think it it would begin at a at a sort of a complaint level. Are are is the municipality receiving complaints? What avenue are those complaints uh arriving at the municipality through? And uh I think typically those are dealt with in-house by staff. You know, they will follow up on the complaint with the conditional use permit holder, and maybe it can be resolved that that in that direction.
SPEAKER_07Maybe it can't be resolved, and um and then I think potentially they could escalate it to planning and zoning review. I don't think that there is a detailed specific process for that, but um, I know having served on planning and zoning in the past, that um those reviews don't necessarily become public hearings and considerations of changing resolutions right away.
SPEAKER_07They're it's more of a discussion point, like they hold a work session and they let the property owner or the conditional use permit owner know that they are going to be discussing their conditional use permit at this work session. That's not a meeting where you can make a decision and then they can the the conditional use permit holder can see like this has now become a little more serious as you're holding a public discussion about my permit.
SPEAKER_07Um, but I think that's not the the usual case. I think most times if there is a concern with between uh a complaint and uh a property owner or a conditional use permit holder, they're probably dealt with on an administrative level.
SPEAKER_05Somebody married, does that answer Fogan? Okay, is there any further discussion? Um we are voting on the um motion to amend um to remove the conditional to remove the annual review of the conditional use permit. Um roll call.
SPEAKER_05Okay, and now to the main motion, back to the main motion. Uh Clerk Burnham.
SPEAKER_07Um I don't believe you made a main motion. Um, you had a motion to modify regarding occupancy, and you had a motion to strike. Um, I think if you followed those with a motion um uh uh to recognize that the prior two motions uh were intended to amend the resolution or modify the met the resolution, uh PZ two five-03.
SPEAKER_07I think that would be adequate.
SPEAKER_08I move to affirm planning zoning resolution twenty-five oh three as amended.
SPEAKER_05Second. Does that work? Any discussion.
SPEAKER_07I think if you verbalize it by amend you mean to modify, then I think that's I recognize that as amended means modified.
SPEAKER_05Any discussion? Roll call. Yes.
SPEAKER_07Hanson. Yes, Ellis. Yes, Potter. Yes. Four yes, motion passes.
SPEAKER_05Okay, moving on to public hearing of Cruise Line Agencies of Alaska appeal of planning and zoning resolution 25-06, denying conditional use permit application 2025005. Cruise line agencies of Alaska request for congregate housing in the waterfront zone on tide land lease area, excuse me, ATS 1719 in the waterfront zone.
SPEAKER_05Um, does the board prefer that the appeal request be read in full? Does anybody want it read in full? Okay. Um we uh if the appellant would care to speak in support of their appeal, now would be the time to do so. Mr. Korn, are you prefer to speak in support of your appeal?
SPEAKER_00Yes, I am. And I appreciate you guys not reading this one in full. That was a pretty long, long letter. So good choice on that one. Um, so I just quickly again, we you know, we really thought this was a pretty creative way to add some beds um to Skagway in a you know self-described housing crisis that we that we find ourselves in. And and we took a really hard look when the Chickamen Barge became available um through the U.S. Forest Service GSA auction site and thought this would be uh a really unique way to uh try to address some housing shortage.
SPEAKER_00And we you know we focused on limiting it to use by Cruzline Agency personnel and port security personnel that were authorized, Twick users knowing that it would be down in the waterfront zone. Um the initial meeting that happened on February 13th, we were we were really um encouraged. The fact it went it past three to zero in favor of um giving the condition use permit, but then really frustrated that a month later um was denied uh three to two. And in that month, you know, and I will admit that I am woefully ignorant of the process on on some of this stuff, and I've learned a lot over the last couple months.
SPEAKER_00It's it's pretty confusing though, and but you know, we didn't receive any contact during that month between the meetings, um, and it certainly felt like there's a lot of work that had been done on the side of the municipality to work to convince others that that this was not a good project or to be against it. Um but we didn't we never supplied any supporting documentation for any of the findings with respect to how this didn't uh fulfill the four requirements of a conditional use permit with respect to health and safety and um in those categories.
SPEAKER_00Um in addition, we really felt the conditions that PZ had put on the original conditional use permit um were appropriate and they would have been a challenge um to begin with to complete. But we just felt that um having that opportunity um was something that we really wanted to get done and work with municipal staff to find a way to make this work so that uh could benefit um to benefit everyone. Um since that since that meeting where it was denied, we we stopped a lot of the work um on the six conditional or I'm sorry, on the six conditions that have been set, but we did continue the process of getting the ADC permit because we figured that would be the longest process time, and I know it was was one of the uh main points of discussion.
SPEAKER_00And since that time, it has been issued and authorized um through ADC. Um, we're using Admiralty Environmental to develop our quality assurance program and assist us with monitoring, testing, and reporting the permits effective May 1st of this year through December 31st, 2027. And it comes with requirements for weekly, monthly, and quarterly testing. Um so it's it's it's stringent, and I believe you guys are familiar with Admiralty Environmental, they do a lot of work, they're based out of June, but do a lot of work with uh Muskagway um municipal wastewater as well, I believe.
SPEAKER_00Um the other part of this that we really want everybody to consider is um this is not a permanent structure, you know, it's a it's a barge, and so with tugboats we can move it in and out, and and that's why when the annual review is part of this, we well again, similar to the previous one, we feel it's probably a little bit arduous to do an annual review, but in this case, um given our ability to hook the barge up to tugboats and move it out, we felt that that was something we could we could totally live with. You know, we we want this to be something that the community can support, but we really feel like we need the opportunity um to try it.
SPEAKER_00And and since that initial meeting, it's now been you know three months, and we find ourselves in a tough spot um to get it anywhere near um in place for 2025. But um, but just to rem to remind everyone that it's not a permanent structure and and with a couple of days' notice can be can be moved out. Um so again, I think the appeal we wrote, you know, we've asked you to reconsider a lot and won't go through each one. But again, just appreciate your guys' time and discussion and thoughtfulness on this one. Thank you.
SPEAKER_05Thank you, Mr. Korn. Um Clerk Burnham, do we have a municipal representative that would like to speak?
SPEAKER_07Um, yes, you have manager Deach.
SPEAKER_05Manager Deach, please.
SPEAKER_02I um I do I guess I have a question for the chair that maybe the clerk can help answer. Um, is it appropriate for the Planning and Zoning Commission chair to represent the municipality to explain um the reasons for the denial?
SPEAKER_05I I am okay with that. Does anybody have an issue with that? I am okay with that.
SPEAKER_02Okay, I feel like uh they would have a lot more intimate knowledge and detail about it than I would.
SPEAKER_05So thank you. Chair maybe.
SPEAKER_03Hello, uh Laura, maybe chair of the planning and zoning commission. Is there a direct question or just an explanation of the um denial? Yeah, I think can you just uh take us through um yeah, so um just to state on um the difference between the two meetings, um I was unable to attend in February um on the 13th. So the motion um in the approval of that resolution went through. So the the difference between that time was not um isolated conversations of the commission, that was me bringing that forward and doing research into code.
SPEAKER_03Um primarily when looking at the denial under Title 19 uh 060080, I believe. Um there is for the waterfront that the principal use. So the fact that this housing um unit itself is a barge, there's nothing that says a barge could be put out there with another housing unit on it. Um so the idea that the barge itself has a principal use of residential is not my understanding of how that is zoned and that it is not permissible.
SPEAKER_03So, like a live aboard in that situation would need to be a secondary use. The argument was that the dock itself acts as a port for the cruise ships, but to who my interpretation of that is putting a barge and adhering it to the dock in that area, there would be no limit, basically, if this was approved at this point, that would open the door to residential development um using any of our docks or private docks as the primary use. So you could adhere a floating barge and you could have multiples of that.
SPEAKER_03And so that was my understanding with looking at the code that this was just not permissible, um reading through it. In addition to that, the number of concerns about safety mitigation, um, access, um what needed to be put in place before um changing development of liveaboards and allowing that in the water present zone outside of the small boat harbor, that those considerations hadn't been made yet. And so um the myriad of safety concerns and everything else, you know, and just wasn't necessarily like code restrictive, but the use of a barge um for a primary use instead of uh the principal use of it, that that is just not allowed in our code.
SPEAKER_05Uh thank you. We will now go back to um questions for the from the board to the appellant, Mr. Corn. Does anybody have questions for Mr. Korn? Uh Mr. Korn, this is um Assemblymember Potter. Um this didn't end up being one of the conditions, but um considering that pedestrian access is not currently allowed on the railroad dock, um what is the plan for employees to access their um their housing that would be down there?
SPEAKER_00I think Stuzy address, or sorry, Stu Stevens addressed that, I believe, at the PNZ meeting, a similar question had come up about access. So the plan during the day was they would have access to the shuttles if there's a ship in the railroad aft position. Um and then typically speaking, these employees are the port security that help monitor and and coordinate the shuttles to some degree anyway. Um and then also by by minivan, by company, company vans or preside agencies.
SPEAKER_05And and were there are there any um requirements in place that um that people accessing the the housing barge would be required to be um employees?
SPEAKER_00No, they I mean employees could bring friends over or something like that, if that's the question. But as you know, if you go down to the dock on any given evening, you know, that area is a restricted area and the only access is by by vehicle. And so that would be how people would have to come and go.
SPEAKER_05Thank you. Does anybody else have any questions for Mr. Korn?
SPEAKER_08Madam Chair, if I could just clarify if the appellant just said that it would be by vehicle access only, was that the answer Mr.
SPEAKER_05Korn, that that was the answer, correct? They would be accessing it from um vehicles.
SPEAKER_00Yeah, like presumably they would be in a company minivan or something similar and drive to the end of the pier and park there.
SPEAKER_05And do you know how how many how many parking lot spaces would be um it's it's hard for me to picture that area exactly. How many um cars can can park in that area?
SPEAKER_00Well, when there's no ship there, you could you could park a whole bunch, but we'd be looking at having like one minivan and probably have to have an employee dedicated to helping people move off and on as needed. You know, there would have to be some coordination between the employees that live there, kind of a watchman or a supervisor type that lived at the house that could coordinate that. So as people were coming and going. Um, our employees that are currently um working port security very rarely come up with their own cars, you know, and not. Say that they couldn't, but we wouldn't be putting in permanent parking spots for eight cars or anything like that if that's uh if that's a question.
SPEAKER_00It would have to be coordinated effort amongst the employees to access.
SPEAKER_04Assemblymember Hanson.
SPEAKER_08Thank you, Madam Chair. If I may a question ask a question through you to the appellant, about how close would this floating barge be to the June 2022 rock slide that was on the south end of the railroad dock.
SPEAKER_00Gosh. In terms of feet, I I couldn't tell you off the top of my head. Um if Stu's there, he might have a better guess, but I'm gonna say 100 yards. But that's purely a guess I would need to.
SPEAKER_05Uh a thousand feet is what um um Stu just said.
SPEAKER_00A thousand feet, okay.
SPEAKER_08So the the I guess just to follow up on the jog in this dock that we can see in this very small picture, that's not necessarily accurate to the way the dock looks.
SPEAKER_00I'm not seeing what you're seeing, semi-Mr. Hansen. Can you tell me what's the job?
SPEAKER_08It's very hard to make it out. It's very small detail here, but um, you know, I having been down there after that occurred, it it seemed like it was fairly close to this jog in the dock that's just above, just north of the ramp. But um it there's not a lot of oh gotcha.
SPEAKER_00No, that's uh you would walk to where the dock widens, that's where the June 22nd, 2022 slide was. So it's still further down, further north from from where we load our shuttles and things like that.
SPEAKER_08Thank you.
SPEAKER_05Um but I I actually attended in person the um original planning and zoning meeting when this um was presented. And I'm trying to find the the memo from the manager.
SPEAKER_05I I think one of the um something that was brought up um, but I do not believe made it into the conditions was um the request that cruise line agency of Alaska um um obtain a uh a rock slide risk assessment. Is that something that um has been discussed at all or that you have thought about?
SPEAKER_00I believe the the comment, and correct me if I'm wrong, Manager Deach, was that um that area had not yet been assessed by the municipality as part of their efforts on the rock slide mitigation, but was included in a larger map of um, I think in the coastal zone management plan of areas um susceptible to rock slide, but that that specific area had not yet been assessed. Um we can tell you anecdotally it's not an area that has been um subject to historical rockfall.
SPEAKER_05All right, thank you, and thank you uh for the the finding assist from Assemblymember Hanson. Um does anybody have any other questions for Mr. Korn? All right, thank you, Mr. Korn. At this point, we will um will entertain questions for the municipal representative from the board. Does anybody have any questions for our chair of planning and zoning?
SPEAKER_05Okay, um moving on. I will entertain an a motion to open the public hearing portion of the meeting make a motion to open the public hearing second. Right, we have a motion and a second to open the public hearing portion of the meeting. Any discussion? Roll call.
SPEAKER_05Clerk Burnham, do we have anybody signed up to uh participate in the public hearing? Uh you do not. Okay. I move that we close the public hearing. Second. Any discussion? Roll call.
SPEAKER_07Hansen. Yes. Potter?
SPEAKER_05Yes.
SPEAKER_07Hillis. Yes. Claudie. Yes. Or yes, motion passes.
SPEAKER_05Okay, moving on to item 8A, Board of Appeals decision on appeal, planning and zoning resolution 25-06. I will entertain a motion to reverse, disapprove, affirm the decision of Planning and Zoning Commission wholly or partly, or consider a motion to modify the order, requirement, decision, or determination of the commission.
SPEAKER_05I move that we affirm the decision of the Planning and Zoning Commission in all. We have a motion and a second discussion. Um, I guess I will um just add in I do support the idea of a housing barge. I just cannot um just for safety reasons um and the idea of um employees and non-employees uh driving down that dock at all different hours of the night.
SPEAKER_05Um and I think there is the condition to indemnify for White Pass and Kuzean agencies survey point to indemnify the municipality of Skagway, but there is nothing to stop a family member of someone who gets hurt to sue the municipality of Skagway. Um so while in theory I love this outside of the box idea, I think we can maybe revisit this when we address um more significant rock slide mitigation.
SPEAKER_05Any other discussion? Assemblymember Hillis?
SPEAKER_06Yeah, I I too love love the idea, but have some uh concerns about it. It was mentioned having a s a single van maybe for transportation at times, and I just worry in the case of an emergency of moving people quickly across a possibly compromised dock if there if there was a rock slide. Um I I just think there's work to be done on this yet um for safety reasons and uh like the chair just mentioned, the liability does still extend um through family.
SPEAKER_06So I I I yeah, love the idea and I hope it we can continue to work on it, but not in favor of this right now.
SPEAKER_05Any other discussion, Assemblymember Claude?
SPEAKER_01Thank you. Um I would also agree, uh, but I did just want to um thank everyone for bringing this forward. Um, we are in a housing crisis, so the idea that people are um coming up with creative solutions and taking action is um beneficial to our community. Um so I appreciate that, but uh don't think that we can ignore the risk involved with the rock slide, especially. Um that's what I keep getting hung up on um just is the opportunity for risk.
SPEAKER_04Sembly member Hansen.
SPEAKER_08Thank you, Your Honor. Um I've I I attended both of the planning and zoning hearings uh just in the audience, and I have to say that I initially read it black and white, um, says residential uses are not allowed in waterfront district, but I was compelled by the bunkhouse argument um that that is uh directly pertinent to a principal use, and um that that I thought um did change my viewpoint a little bit.
SPEAKER_08However, with our our joint transportation plan that we've agreed with White Pass um to not allow people to walk or stand, you know, for very, you know, in in in the really you know on this dock, except to just get on a bus and and very, very quickly be whisked away, um I think I have a philosophical problem of saying you cannot walk there, but you can sleep there. Um and for that reason, I I don't, you know, if we had geological studies saying that you know we had mitigation nets, other things, you know, going forward.
SPEAKER_08But I I think if you can't walk there, I don't know how I can say you can sleep there.
unknownThank you.
SPEAKER_05Someone member Hansen, is there any further discussion? Uh Clerk Burnham, roll call, please.
SPEAKER_06Hillis. I'm sorry, can you restate the motion?
SPEAKER_07To affirm decision of planning and zoning commission regarding uh planning and zoning resolution 25-06.
SPEAKER_08Yes.
SPEAKER_07Potter.
SPEAKER_04Yes.
SPEAKER_07Cologne.
SPEAKER_04Yes.
SPEAKER_07Hansen. Yes.
SPEAKER_05Okay. Um that brings us to item nine, adjournment.
SPEAKER_08I move we adjourn.
SPEAKER_05Second any discussion. Um I would like to thank the everybody who made it to the meeting tonight. Um roll call.
Call to Order Roll Call Approval of Minutes: November 5, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report Manager’s Report Presentation from...
Call to Order Discussion of Rockslide Mitigation Project 65% Design: Presentation from the Design Team Questions and Answers Written Questions from the Public Questions from the Mayor and Assembly Overview of Guided...
Call to Order Roll Call Approval of Minutes: October 8, 2026 Special Meeting October 15, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report...
Call to Order Review of Proposed FY27 Budget - CIP & Special Revenue Funds: School Funding Debt Service Permanent Trust Capital Projects Sales Tax Fund CPV Excise Tax Fund Mayor & Assembly Discussion Items Adjournment...
Call to Order Review of Proposed FY27 Budget - Operating Funds: General Fund Visitor Fund Clinic Fund Harbor Fund Port Fund Water - Sewer Fund Solid Waste Fund Mayor & Assembly Discussion Items Adjournment Packet