SPEAKER_06I call the word this meeting of the assembly of the whole committee for Tuesday, October 22nd, 2024. Roll call, please.
SPEAKER_04President.
SPEAKER_03President Potter.
SPEAKER_05Ellis. Present Clouding.
SPEAKER_03Here.
SPEAKER_04Mayor Bass. Here. And Assemblymember Henry is absent. A quorum is established. All right.
SPEAKER_06Thank you, Clerk Burnham. Moving on to item two, review review of proposed FY25 municipal budget. We'll start with uh capital projects. As we did last time, I will uh turn the floor over to uh manager Ryan. If anybody has any questions as we proceed, please let me know and uh we'll we'll uh get those to the manager. Manager Ryan, are you ready to continue? Yes. All right, it's all yours.
SPEAKER_01So um you have the capital budgets uh projects in front of you. Um also we have, I believe you have this in your packet as well. Kind of like said 26, just kind of projections or at least uh you know earmarks to think about in the future. I also wrote you a memo and I kind of wanted to help everybody understand that we we agonize a lot over how we prioritize these projects and kind of a one through three you know, critical to life, health, safety, and or legal issues.
SPEAKER_01So, for example, when we find contamination at the future community garden site, there's really not a lot we can do about that. We have to take some action. We're gonna be required required by DEC to at the very minimum put in monitoring wells to understand what the future um solution is to that. Um so that gets you know, that's a legal issue as much as it is necessarily a health or or uh life issue, depending on what it is.
SPEAKER_01Um is kind of the likelihood of becoming a life health safety issue. For example, uh the school restrooms, they're ADA, you know, they they're they're critical infrastructure to the school, uh, we need to consider those. And then three, high priority for the assembly or community, and we're always trying to judge that. You know, what what does that mean? Uh you know, and in my mind, um, and I'll go through the capital project list a minute, but your street sweeper is something that I, as your your manager and and our staff, it broke down last fourth of July, and it's an old machine, and it got a lot of feedback from the community that it was necessary to have our streets cleaned up right away, and the assembly.
SPEAKER_01So that's like a shared vision, I think, that we hear from the community and the assembly. And so that's where you get into the three. Um, this year, anything that didn't meet one of those three just didn't make the budget. Um, and I did that because we, as I I said at the earlier meeting, set out to get a net zero budget, which is essentially a revenue in, revenue out. Um, I don't, we didn't get there. We're at about a$1.2 million deficit revenue in versus revenue out.
SPEAKER_01That includes all of our revenue sources. We're still having to dip into our savings about$1.2 million.
SPEAKER_06Uh that's that's um manager I'm just so all the revenue we're receiving, CPV, sales tax, et cetera, comes in, and then everything we're spending, the difference is we're spending$1.2 million more than we brought in in 2020 2025.
SPEAKER_01That's a projection for 2025. Okay. Yes. Thank you. And and where we chose to get that this year really was out of CPV. Um, and because there was legitimate expenses, and we're actually so it's a 2.2 dip into what we had in reserve funds from CPV, and I know we'll talk about this a little bit, and then um the one million dollar increase in the projected savings to sales tax. Um, but we'll come to those in a minute. Um, but so to go through your CPV projects, uh just kind of top to bottom, uh, we have the design for the school uh ADA upgrades and restrooms.
SPEAKER_01It's actually more than that. There's a there's a main shutoff valve, there's a number of things in that$400,000. But our intent is that one of the key projects in there is to upgrade the two restrooms that you go into in there that are not ADA compliant, not even close, and they're starting to fail. Um, if they were ADA compliant, we it would be a lot easier to go in and like put new tile up on the walls and fix some of that problem that's in there, but they're not even close. So we need to do those kind of upgrades. So that$400,000 is gonna get you that plus other items at the school.
SPEAKER_01But in 26, we're hoping that you could fund the bathroom upgrades and some of the ADA issues, which is about$2.5 million. So that's a portion of that design. Garden City RV utilities, that's$850,000. Um, that was passed. You know, you you made a motion or a resolution for me to have that in this budget. You have it. And um it also has been one of those things that's been talked about being a you know, housing that appears to be a priority for the community and the assembly.
SPEAKER_01Uh the$60,000 is the land trust, the development of a land trust potentially, or it it's it's the start of it. That's a proposal that we have. Um, and again, that was talked about at the assembly and directed, so you have that. Um, and those are all sales tax. We've done the dispatch. Um, you see uh CPV and sales tax funding that. This is something that I think six months ago the assembly maybe a little longer. It has been very hot to get this done.
SPEAKER_01Um we had some issues with it failing, it's getting older. We fixed the failing problem, but who knows when the next one comes. So that's a push. Could it last another year? Maybe, maybe not. Um, but so that's what you see there. Um as you move down to the wave barrier. So I want to make sure that we understand um when I'm talking about a deficit budget, one of the things that I'm not considering is the port budget, the enterprise fund from the port budget. And that is because it is actually in the in the black.
SPEAKER_01Um and so the port budget is the one enterprise that actually funds itself and is actually a little bit of a surplus, about$300,000, I believe, um, going into its fund balance this year if they spend everything that they have budgeted. Um, so that doesn't impact the overall sales tax CPV type um funds, nor does it benefit it. Um so in there we have the wave barrier,$1.5 million. Uh I think most of you know, but I'll throw it out there again.
SPEAKER_01You know, we've we had a failure two Novembers ago. Two Novembers ago. Was it two Novembers ago? Two Novembers ago. Um, where the wave barrier, the welds failed and cracked, and so we had to take off a bit of the end of the wave barrier. Um since then, we've we've welded up some of it, we've taken off parts of it, but it still needs to be addressed. We know we have cracks in the welds out there, um, and we need to come up with a longer-term solution uh for that.
SPEAKER_01Um the next one down is the West Creek levy improvements. That's coming out of the land front. Again, that's not impact, that's just land fund, that's not revenue in or revenue out for us at this point. Um, at least not that I'm considering in that 1.2 deficit. Um, that 350 is a chunk of the work. It's not all of it. I think it's about a 1.2 or 1.3 million dollar effort to fix the levy. But we also know that we can't get that done in 25 because it probably started in the fall. And hopefully we can get some other money to make that happen.
SPEAKER_01West Creek subdivision development, that$20,000 is really just enough to certify the plat. Um, it's not the overall uh moving it forward. That's a much bigger project. We need to um we had one cost estimate for the West Creek uh subdivision development was quite high. Uh, we're gonna look at it and see if we can bring that down a little bit. Um, but it's still so it's a big project uh with a bunch of money, and it's not budgeted for right now. Um community garden remediation. This is one of those that fell in the one category.
SPEAKER_01This is where we went out, we started to dig the test pits. We were supposed to dig 10 of them. Uh, we got on the third one and had groundwater, and um, as near as we can tell, diesel fuel in the groundwater. We took the sample, sent it to DEC. Uh, we're still waiting for guidance on that now to find out what we're gonna do. But generally, our experience tells us we're gonna put in monitoring wells and then start monitoring to see what make sure we know what's in there and move forward. So that$50,000 is our estimate on what it's gonna take to put monitoring wells in and do some testing for 25.
SPEAKER_01There'll be a bigger, I'm assuming there'll be a bigger cleanup effort out there eventually if it's required, but we won't know until we get the data for that. Shore power assessment needs infrastructure. That was something we discussed at the assembly, you moved forward with. Um, this is our contribution to the um uh Burrow Creek hydropower development potential. Um, so we're still working towards that. We actually we have been working towards it, we just haven't spent much money on it, but we're trying to get the FERC license in place.
SPEAKER_01We have a gentleman working on that to get the FERC um license placeholder on that for that. Um fuel barge fender modification. We've talked about that quite a bit. Um, this is to help, and you've you've actually authorized the repurchase of some materials for that already. Um, but this is to get the project done. Or dock anodes, something that we pulled out of the project. Um, this is the new doc. Uh, we still want to get it done. We still need to have that anode connection protection. This is port funded.
SPEAKER_01Um, again, another aspect that was pulled out of the project to get it done. And uh so that we're hoping to get done in 25. Or dock fire suppression, same story. Um trying to get that done. Um and then port dredging. Um, we're not sure where that's at. We we we know that we've had ships uh struggle with coming in because of the lack of water under the keel. We also know that our our new ore dock uh cruise dock is close to the ground.
SPEAKER_01We don't want it banging. Um and this is just to get it started. Um, there may be a spot dredge or a bigger project you can look across. You know, we have$10 million potentially in 26. It really depends on how much of a dredge effort you want to do. We you know, the West Basin is essentially you know, the Orad and Broadway basin, or you're gonna go all the way around and look over at the um the uh ferry float where the tug ties up and grounds out, you know, it'll have to be you'll have to decide how big of a project you can afford in the future, depending on how much you put into the port.
SPEAKER_01And that 1.5 hopefully will get you started on permitting. You're gonna have to sample the sediments to know what kind of contamination you have. I know the last time we looked at core samples out there, uh, when we were looking at the larger ore dock project all the way up in for um shipping out ore itself, it was about a million dollars just to drill the cores to to um get the samples for contamination. Um, so that's just gonna be the start of it. Um rock slide mitigation.
SPEAKER_01Um, we have phase one of that coming to us, that grant. This is the design. So this is our uh our match here of$300,000 for that. Um, so that's that's that's a good thing that that's starting, and we'll hopefully get that design done in 25. Um, and then you also have uh more of that down here for the brick grant of 520 and 1.3. Oh, I I said that wrong. I so I apologize. The 300 is uh potentially uh some of the mitigation out there just to make sure the stuff is in place, cables, broken stuff, and then we have the 520 down here for the brick project and the 1.3 from the grant for pace one.
SPEAKER_06Manager I just so I can understand real quickly, is that everything that's in the port department? If I look through department facility, and if it says port over there and it's in the pink, if we fully fund all these items for 2025 plus the uh the the payment on the revenue bond, plus all the other operating costs for the port, we'll still be in the black$300,000 for the port fund. Is that correct?
SPEAKER_01Okay, thank you. And that's uh I will say, as far as the port's concerned, that is an ambitious set of work. I I imagine something is gonna fall off on one of those sets of work, you know. Um it'd be great if they got them all done, but as as we know, you know, projects don't always get done, weather, short season, you know, cruise ships are in on us. So those will just have to get prioritized. And and a lot of times you're you're pushing against permitting engineers to get it done, uh bids to come in appropriately, sometimes they don't.
SPEAKER_01So I would anticipate one of these kind of falling by the wayside. There's just a lot of work down there. Um and we want to get it all done, but of course, we know that some of that slides a little bit here and there. Sam oh member Wooddell, please.
SPEAKER_02Thank you. Are we still waiting on results from the bathymetry report that we did for the dredging?
SPEAKER_01We have the bathymetry report. Now we're waiting on um uh anchor QA, who's a sub to KPFF, to start talking about quantities and permitting.
SPEAKER_03Okay. And then my other question is what is an ordoc anode? I'm not familiar with what that is.
SPEAKER_01Anodes are just uh they're welded on, they take the corrosion instead of the steel. So you put them on boats, you put them on steel, and so instead of the steel corroding and being eaten away, it eats away their sacrificial anodes. So as the anodes get eaten away, um, you know, over a set of years, they can be like 15-year anodes or 10-year anodes. It keeps your dock from rotting and getting big holes in it. And then every when, depending on how many pounds of anode you put on there, you just replace them like every 10 or 15 years. They're just they're sacrificial so that you don't lose your dock.
SPEAKER_01It eats the anode instead.
SPEAKER_03Um, what part of the dock are anodes on?
SPEAKER_01I guess I'm just all the steel that's underwater.
SPEAKER_03Under the water. So is it like I don't know, like almost like a casing or a fairing or something?
SPEAKER_01No, it looks like a big piece of metal, like a aluminum essentially, that's welded to the metal so that it eats away. You can you can see them uh all over the place. So I have them on my boat, I replace them every year. They just eat away instead of the metal eating away that you want to keep.
SPEAKER_03Okay. Um thank you.
SPEAKER_01Vice Mayor Potter.
SPEAKER_00Thank you. Um, I think I just want to clarify. Um, so going back to the rock slide mitigation um brick project, that$520,000 would is our matching.
SPEAKER_01Yeah, so that's that's the match obligation that we have for the BRIC grant. And then the 1.3 is what the the VEMA funds from BRIC should fund.
SPEAKER_00And in 2024, we were able to dip into that we didn't use that budgeted um uh matching fund.
SPEAKER_01Right in 2024, we had you we had$4.5 million budgeted to start with in case the BRIC grant went, but it it didn't. Um and so now we're in 25. Phase one appears to be going, which means we're gonna have about$520,000 of match requirement for the you know$1.8 million scope of work for design phase one.
SPEAKER_08So remember Hanson. Thank you, Your Honor. Was the street sweeper fixed?
SPEAKER_01Yeah, we we bought a new motor for the sweeping mechanism and put it in there.
SPEAKER_08And then we have the backup with the loader and the brush on there that doesn't necessarily um take the grime and put it in a hopper, but it does sweep it away from the curbs.
SPEAKER_01Right, we got that kind of retrofit sweeper on the front of the loader that you're right, it doesn't pick it up, it just sweeps it out.
SPEAKER_08What was the approximate expense for repairing the street sweeper, if you know?
SPEAKER_01I I I can't remember off the top of my head.
SPEAKER_08Do you remember what the mother I don't I don't know off the top of my head? But more or less would Public Works feels like it's it's functional, the the major uh mechanical failure is fixed. I mean um I mean I I understand it's 30 years old, but um it's I mean it's fixed and it's operational.
SPEAKER_01I think the the reason it's in here, you know, we we debated it last year, we went for the grader. Um really the sweeper is the next piece of equipment that we just think is prone to failure because of its age. We did fix a sweeper motor, but it's you know it's a$500,000 piece of equipment, and people get pretty excited when we're not sweet sweeping the streets. Thank you. Very clear. Okay. Um so the port projects, I think it's important to remember that's not you know, they're they're standalone.
SPEAKER_01They're in their enterprise fund as an enterprise fund should function. Um if you move down the main street, that$150,000 is finishing up where we've started. Um you know, that's the preliminary design and planning. This this gets into these higher categories because it's critical infrastructure, and it's not just critical infrastructure in the sense that it's a road. We have failing infrastructure under it. And that's one of the biggest problems is as that happens and we're tearing manholes up and things like that, it's a problem. So, and you're we've we've tried to be very upfront with this.
SPEAKER_01This project is massive, right? So, this this is just the start to get the community on board to start planning. I mean, you're talking a$50 million plus project by the time you put this on the ground. So you got a lot of thinking, a lot of planning, and you got to chase money. You know, this isn't gonna happen next year or the year after. This is a big, big project, and you got a lot of community, hopefully, a lot of community input on how you want to develop your main street, your main street, not your main street, but develop main street. It's your route to school, it could be your secondary heavy hall if you want in the summer.
SPEAKER_01You could also take back the right-of-way and have more room. So, and then you've got all the failing infrastructure under that you need to deal with. So, this is something that really needs to be thought about and planned out. And I don't think anybody has any illusions that this is gonna happen in the next year or two. This is a big project that you got to think about, plan for, and hopefully start chasing money on a on a very high level for this is gonna be a big project.
SPEAKER_06Man, Jerayan, the uh the infrastructure underground that Main Street that's failing, how what's the life expectancy on that?
SPEAKER_01Are we past it already? Uh I I don't know that I can answer that. I'm hoping that we get some of that out of respect on this, and and um part of it is you know, we just have things like starting to stick up out of the road, so we're we're ripping the tops off of things, right? Like covers and manholes and things. So I don't know that I can tell you that right now. All right.
SPEAKER_06Thank you.
SPEAKER_01Street sweeper, uh Ryan hit on that a little bit. I think it's 23 years old or 24 years old. Uh we did fix the motor for the sweeper on it. Um, but it's one of those that um everybody gets pretty excited about when it's not running. And so that's why it's in here. Um incinerator design and construction. Um, this is that project that you're you're you're uh we started, we're gonna finish up. It's CPV and sales tax. Um, I think this it's really important to look at 2026 on this.
SPEAKER_01This is probably a$10 million project. And I don't think that you can really fund it in 26. We have it there to highlight that it's it's it's one of your bigger projects coming up. But I don't I don't know, you would struggle, I think, to get enough money out of CPV and sales tax to fund it in 26. Uh so I think it's probably really gonna be you're gonna have to push it out 27, something like that. And and be strategic about how you would fund that.
SPEAKER_06Um for the 10 million for uh for the main street planning and design or no no where you're incinerator. 10 million for incinerator. Oh, I see combined, I see.
SPEAKER_01Yeah, six point three. We have a budget, you know, sixty-eight percent CPV and uh you know thirty-two percent uh sales tax. But you you don't have that kind of funds going into 26. So it's gonna have to slide. Right. I don't know how you would fund it. Obviously, you know, you can chase grants for it. I hope that we end up, you know, we've got the wastewater treatment plant grant. Hopefully that kind of stuff is out there. I know that we've been told, you know, that was the biggest grant they've given out in that.
SPEAKER_01Um the wastewater treatment grant they've given out. Um, but we keep trying, and hopefully we have a million or so for taking down the uh ore shed in the future. But you know, I don't know why we wouldn't try to get that funded in a grant as well. But in the meantime, I really don't know how you're gonna make that happen in 26. It seems very challenging. Uh ground thought machine you can ignore. I took it out. Um wastewater treatment plant upgrade design construction admin.
SPEAKER_01Um that goes along with getting your grant in place and your construction in place for uh uh 2026. You get that design, that's your grant funds uh that you have to build that um down here below. Um if you look at 26, there's 1.2 million CPV, 6.8 million grant, and 500 in sales tax. So um that would be what you would be building in 26, which then gets weighed against you know the earlier conversation of$10 million for uh incinerator.
SPEAKER_01Uh and remember that's a grant, so you don't want to you don't want to mess that wastewater treatment plan up. And it is one you're out of compliance on, and you do have your transfer station up and running, uh, and which is doing a brilliant job out there for your municipal solid waste right now. Yeah, a little bit of 301H money down here. That's just something we have to continue to do to complete our permit for EPA. 301H is our EPA permit to operate a wastewater treatment plant uh in Skangway.
SPEAKER_01I think I hit on all of it.
SPEAKER_06Any questions for the manager? Vice Mayor Potter.
SPEAKER_00Thank you, Your Honor. Um, I'm curious why does the street sweeper not qualify for CPV money?
SPEAKER_01Um I don't know. I suppose it probably could have. Um I think at this point, uh, I don't know that it matters that much. You've you've you've bumped your CPV funds down you know to 2.6 million if you keep the budget as is. And and you know, you and your sales tax is at$11 million if you keep it as is. So you go into next year, it's it's not the days of the past where you had this massive amount of CPV funds and you you were trying to find ways to spend it.
SPEAKER_01We're not there anymore. Um, you know, CPV hasn't changed in value. We talked about this a little earlier. You know, it's$5 to spend$5 a head forever. And so your$5 just doesn't mean what it used to mean. And so you're not in those days where CPV was this giant chunk of money that you can figure out how to spend. Everything you're authorized to spend is taking it down. You know, you're spending a$2.2 million out of your sale savings of CPV this year. If you repeat that process next year, you'll be down to um 0.4 million dollars,$400,000 in reserves.
SPEAKER_01Um so um not next year, but 26 when you're budgeting your 26. So I don't know that we need to fret like we used to over how we're spending CPV because it just doesn't hold the value it had. And you know, the only way to increase what you bring in CPV is to bring more people here, which then puts more impact on the community and more more financial needs. So you're not in that that game that we we were even in 19 where we had this large CPV surplus and you were trying to figure out how to spend it, you're not so you don't even need to be creative at this point, unfortunately.
SPEAKER_06Any further questions before we move on down the agenda? Okay, moving on then to 2B, sales tax fund, and I'll leave that again to manager Ryan.
SPEAKER_01Okay, so you have your your sales tax uh page here. If you go right to the top, um on along that first line under 24 there, it says beginning reserve balance, and we are projecting based on what um Heather has seen come in, that we're gonna have a 10.2 million, nearly 10.3 million reserve balance going into 25. Um, that's in part because some of the projects that we didn't put on the ground, but also you know, we didn't know what we were gonna run into this year as far as cruise ship dock capacity was going.
SPEAKER_01I think we used 75 percent of the the uh scheduled ship passenger count to help drive this. Um, and the reality is you know, we're we're looking more closer to 12 million dollars in sales tax revenue in 24 than the 9.4 projected. This year we're we're projecting a lot closer to that. It looks like next year is supposed to be or 25 is supposed to be similar to this year. So we're we're projecting that$12 million in revenue sales tax. Um and then as you you close you you you you you move on down here, you'll start to see the school, um, you'll start to see the expenses towards sales tax.
SPEAKER_01Um, and really the the one that is the first one is the school. Uh we have budgeted at$627,000, um, 913. And that is uh$443,000 and some change for community recreation, our local contribution, and$184,000 of community welfare. Uh, and that's what the school requested. And then we have the um two$2.1 million dollars for the local contribution.
SPEAKER_01That's that is what the school asked for, and it's a hundred percent contribution, and that's what we're suggesting we fund.
SPEAKER_06Um manager Ryan, on your what was your beginning sales tax reserve budget or balance and going into 24? I I guess my question is how much have we added to the sales tax reserve over this period this year?
SPEAKER_01Well, we we had projected, I believe, about six million dollars. That was our just over six million dollars is our you know, our 50% operating fund. That's what we were shooting for. That close. Um, but with the increased revenue and some of the expenses not being put on the ground, um, instead of at the six, we're at the 10.2 or 10.3 million.
SPEAKER_06So this year alone we realized 4.2 million and we added it to our reserve for sales tax?
SPEAKER_01We we yeah, we have about 4.2 more than we had estimated now for a couple of reasons. Thank you. Yep. Um, so that's the school funding. Uh then you can you can slide down and you can start to see you know the bond allocation, um, mill rate adjustment of 2.5, capital projects 2.6, um, and the clinic of 1.4. Um, all of that um totals spending about 11 million and 300, I think, thousand, which means you're gonna put in um about one million dollars into your fund balance or reserve for sales tax for a total of total projected at the end of 2025 of 11 million three hundred and seventy-two thousand dollars.
SPEAKER_01And I think operating you know, or operating 50% reserve would be pushing about seven million dollars according to the resolution.
SPEAKER_06So we'll be in the black for sales tax one million dollars. Yes. But in the red, two point two million for CPV.
SPEAKER_01Yes.
SPEAKER_06Okay.
SPEAKER_01Okay. That we're I think we are in the school portion. I don't have a lot to say about the school other than we're funding them at what they requested at the cap.
SPEAKER_03Okay, I just I'm confused, and I was hoping somebody could help me. On the proposed budget for school funding, I have 2.816 on the sales point or sales tax thing on the school's projected budget budget school district projected budget form, it says 2.744. And I guess I'm just wondering what the discrepancy is there if I'm just reading this wrong.
SPEAKER_06Uh oh, I say total verbal appropriation.
SPEAKER_03That doesn't include the welfare program. The what program? The the community welfare program.
SPEAKER_06Oh Alex, you're looking at total borough appropriation there where it says 2.7 million?
SPEAKER_03Yes.
SPEAKER_06Okay. And then we're looking at our budget on our sales tax school funding, 2.1 million.
SPEAKER_03Yeah, okay, I think I found it. Thank you. I or I don't know. I strike that I think we have the same numbers as their worksheet. We do.
SPEAKER_06Yeah, I'm not there's the 2.1 right here. That's the number we have. That's roughly the number we have.
SPEAKER_03Alex, are you you're looking at the total for sales tax, the total budget? There's more than just school funding in there. Thank you. It's so similar. It's like a hundred grand off that I was like, what is that? Anyway, thank you.
SPEAKER_06Any further questions on sales tax or school funding? Okay. Moving on to item two C, CPV excise tax fund. Manager Ryan?
SPEAKER_01Yeah. Um, so this is set up very similar to sales tax. You can see that we have the reserve balance of$4.9 million, what we're starting in 2025 with. Uh, then we have our expenses as we go down. We have um, well, first we have the revenue of about$90,000 in interest. Um, and then we got the six million dollars, and then we have an expense for our investment advisor of$40,000. And then you start to see bond payments, transfer to capital projects. That's what we just talked about, 1.4.
SPEAKER_01Water and sewer is picking up$4.79, or not$479,000. Garbage is picking up$669,000. Uh, visitors department,$527,000, and general is$5.14 million. All of that totals uh$8.347, which means we're spending an additional$2.297 million that we had of that fund balance of$4.9 million.
SPEAKER_01So we're we're getting about six million dollars, spending around$8.3 million. So that's about a$2.297 deficit to our fund balance in the CPB fund, which leaves us with$2.6 million at the end of 2025. So now you know the earlier question about could we spend more sweet street sweeper, we could probably make that argument, but the the reality is it doesn't much matter because it's a it's a small amount and you're easily going to spend that, and you have a large chunk in your sales tax.
SPEAKER_01And we did add the sales tax this year. So you're really sitting on two chunks of money that are um very usable at this point. You're not you're not limited really at this this much by um having a large balance and something that's not accessible.
SPEAKER_06And just and again, I just want to go over my basic assumptions here that um if we do everything if we approve everything that's in your budget the way it stands, uh operational budget, the the capital improvement, the CIP budget, um, including the sweet street sweeper and et cetera, all those items, if we did all of that, we would have at the end of 2025, we would have 2.6 million in CPV savings, and we'd have about 11 million in sales tax savings.
SPEAKER_06That's correct. Now, if I wanted to take if I wanted to make this a zero-zero budget and I wanted to remove that 1.3 million uh burden that we see from our CPV, we could come out of either CPV savings to do that, possibly, or we could come out of our sales tax, and instead of 11 million having saved, we'd have 10 million saved. Oh, you might have to repeat that. I'm not sure I followed that one. If at the end of 2025, if we spend everything the way you it's presented here, we would have 2.6 million left in CPV, and we'd have about 11 million left in sales tax.
SPEAKER_06Yep. Correct. Now, if we wanted to spend, if we wanted to spend more, let's say we wanted to buy two street sweepers, then this would drop to 10.5 million in savings. Right. So everything we do from this point, if we if we spend more, is going to come out of our two one of our two savings accounts because that is we've assumed we're out of money we're gonna earn. That is correct. Okay. If we want to put more money into savings, then we have to cut somewhere to find those funds to put into savings. If for some reason we feel like 11 million is not enough, we want to have 15 million going into 2026, we've got to cut to find those those revenues.
SPEAKER_01Yep, that's correct.
SPEAKER_06Okay. Any further questions for the manager? Manager Ryan, how do you feel about us going into 2026? You know, are our savings sufficient at these levels? Do we need more savings? Do we what is your I know you're you don't have a crystal ball over there, but what's your prognostication for 2026?
SPEAKER_01When I look at this budget, I see you're at a a a 1.2 or 1.3 deficit, um million dollar deficit of revenue in, revenue out, excluding the port. I need to be careful of that. Um I think you're in a good situation. Skagway has a habit of budgeting, putting the budget forward. It's a conservative budget and generally overproducing in revenue or underproducing in what they've spent. And and I think that a lot goes into the fact that you're on an annual budget where if a project doesn't happen, it doesn't carry till the next year.
SPEAKER_01And so a lot of times if a project takes a little longer to put on the ground, or maybe we lose the appetite for it, you don't spend that money. So, generally speaking, you saw it in sales tax this year. We thought we'd be at a six million dollar um savings in sales tax, roughly on a rounding. Um, but really what we see is a balance of about 10 million. So you're you know, you're you're you're quite a bit to the good there for one reason or another. That really does appear to be what happens with most of Skagway's budgets in the past.
SPEAKER_01Um, despite the fact that we do budget amendments and change things, uh, it still seems to work out that way. Um so I I think you've done well. I mean, I think I think you're in a good place. Um, I hope I've got your capital projects on there that you you wanted the most. Um and you've provided a lot of service. I have held down all of my departments for their extra personnel requests. I I will warn you. Um I I I have agonized over this with my staff and myself. I am I am going to add a garbage person to this budget.
SPEAKER_01We're using high-paid employees to go run the garbage route. And not the garbage route is not important, people, but we those entry-level people, we're taking high high wage people and putting them on it. I'll put it in there if you if you all don't want it, you know, you'll have to cut it out. Um, it won't change the budget that much. It'll probably take us to a$1.3 or$1.4 million deficit. Um, but I think it's it's it's good use of of municipal funds. And um we are really struggling to keep up over there, and we can't with our current staff. We we steal staff from all over the place.
SPEAKER_01Um with that said, I I think you're in a good place.
SPEAKER_06Yeah, go ahead. Well, just on that. So if you if we have a diesel mechanic working the garbage route, they're getting pays at a diesel mechanic. They're not getting paid as a garbage collector.
SPEAKER_01That is yes, yeah. No matter who we take, we don't we didn't we don't have a split position of you know entry level garbage route laborer and diesel mechanic half and half and change their wage. They're they're paid whatever rate they are at. And yeah, so yes. But but I think you're in a really good spot. I think you um, you know, I don't want to, I wouldn't want to see you continue a deficit budget year after year, but uh if what happens in what's happened in the past plays out again in 2025, you probably won't be.
SPEAKER_01Um, because that seems to be what happens. I will say though, we've we've we've we've gotten much closer and more confident in budgeting what we really think is gonna happen. We you know, we had that like 75% projection for last year because the docs weren't in place, the rock slide seemed to be a wild card. Now we're saying, well, we're gonna go with what we made in 24. It's a very similar year. So we're not holding back on those revenue projections.
SPEAKER_06Questions? Okay. Well Commander Ryan, thank you. Um obviously please stay with us while we finish up our meeting, but uh good information and thank you to the staff and everyone who came out tonight. Appreciate your attendance. Okay, moving on to item three, mayor and assembly discussion items. I'll open the floor as usual if anybody has any points of discussion that they would like to bring up. If not, we'll move on to closing comments and go from there.
SPEAKER_06Any discussion items. O'Ryan.
SPEAKER_08Well, if we're gonna cut something, I feel if the street sweeper has been fixed and it's 20 years old, that would be half a million dollars. That'd be a place I'd start. Um, I understand when it's broken, everyone's very upset, but we do actually have another way to mitigate it now with a loader with a big brush on there that we didn't have before. Um, that's not as good as the street sweeper, but it's a start. Um and I would like to the goal of trying to have a balanced budget.
SPEAKER_06I like a balanced budget. I would prefer that. Um, I know where we're at now, we'd have to cut that to not come out of savings. I guess it depends on how we look at things, but to not come out of savings at all, we'd have to cut about 1.3, 1.5 if manager Ryan adds another position, and that'd be something we'd have to consider. Are our um reserves healthy enough? I think going into COVID, we had roughly 20 million-ish. Um, now I'm not saying that's how much we need now, but uh code dictates we manage 50 percent of the operating budget, we keep it in there, that's roughly seven million-ish.
SPEAKER_06Um, so we're well up we're above that. That's something that we'll have to uh discuss. I mean, I if I was gonna try to get to zero budget, I would obviously street sweepers little hanging fruit on there, and then there'd be other items we could go after, but um something to consider. If that's a direction you want to go, please consider what you'd cut to uh to add that back to our savings. Deb?
SPEAKER_00Thank you, Your Honor. I agree with Assemblymember Hansen. Um, I think if Dan Henry, Assemblymember Henry were here, he would be putting some kind of plug or this demonstrates the need for a seasonal sales tax increase. We just can't um we can't have it all. And so when the town you know sees a street sweeper that looks different or maybe doesn't work all the time, um that's a result of we're not bringing in enough sales tax money to cover all of these things.
SPEAKER_00I, for example, consider the idea of having a year-round dedicated per staff person to take care of our look after our seniors, um much higher of a priority than a street sweeper. Um, but I hope I hope the community is following these meetings because it's a conversation that we have to have all together about our priorities given our um which it it seems weird because you're busy all summer, so it kind of seems weird that uh you're talking about not having enough sales tax reserves.
SPEAKER_00But that really just goes back to our 5% seasonal sales tax is is really at this point dysfunctionally low. So um Um, I hope everybody's following these meetings, but um that's that's where I'm at in this kind of thought topic.
SPEAKER_08Thank you. Thank you, Your Honor. I I would follow that up and I would say it's not necessarily the sales tax that's just functioning low, but obviously the CPV hasn't changed ever. Um that$5 a head is worth a lot less now than when the state put it in place. I mean, I think we should be lobbying amongst all the poor communities to raise that. We should be advocating for that at C trade. Um it's simply worth less.
SPEAKER_08Um likewise, you know, the burden on the municipality to uh match the the school's request at the max fund every single time when the state hasn't changed the allocation per student in I think I've heard 17 years. I mean, they do little one-time things, but not in terms of the allocation for every single kid in there. It's a it's in in this past year, I think it was really close. It had bipartisan support, and the governor vetoed it. I mean, that's that's the burden that it comes back to the municipality that the state, you know, what what's being contributed is less and less and less.
SPEAKER_08And so therefore it falls on our shoulders. So I wouldn't say necessarily that the sales tax is is isn't adequate. I I think we should be really squawking pretty loud in Juneau because I don't think it's fair the way the state has has kind of squeezed throughout the whole, you know, everywhere. And I I fully understand the the debate that they have about less taxation. I mean, that's a an Alaskan mantra, don't tax. Um, but you know, just counting on oil to feed us entirely isn't working.
SPEAKER_08And I mean, I think Senator Keel has given us great information over the years, but I I would really say when it comes down to it, I'd say we need to be targeting CPV funds as being inadequate, you know, for the burdens that it brings to our community. And we're probably the most burdened community of every single cruise ship out there because we have the smallest population and the third most tourists, uh, very close to what Juno and Ketchukan get to this day. So I would say really it's that$5 a head that is is just a it's a it's gone down um in a major, major you know, percentage from where it used to be.
SPEAKER_08Um and I think manager Brian summed that up very well. It's the burdens are growing, and the amount of money coming back from those burdens isn't isn't equating. So I to say that we need more sales tax, I guess that could be a reaction of where you get to. Um and I know we had a great debate about what's fair regionally compared to, and I know Sam had a full spreadsheet of the whole state. And um, you know, what we proposed on the ballot was pretty close to what other communities were doing.
SPEAKER_08But I I would say really the CPV head tax is not adequate and it hasn't been adequate, and it gets less adequate every year.
SPEAKER_06I agree. We should get uh more CPV. I I broached it to uh some of our uh legislature uh folks, and uh not a lot of traction right now. We'll see. But I think again, you're right, a concerted effort of all the communities would probably have uh uh more likely of an impact. Further discussion? Okay, we'll move on to closing comments.
SPEAKER_03Um thank you.
SPEAKER_06Summit member Hillis. Nothing at this time, thank you. So maybe member Calodi. Nothing at this time, thank you.
SPEAKER_08Thank you, both uh Manager Ryan and uh Manager Bass for running a good meeting. Um this is uh the nitty-gritty. Thank you.
SPEAKER_06Vice Mayor Potter.
SPEAKER_00Nothing at this time, Your Honor.
SPEAKER_06Okay, all right. I don't have anything. I would uh consider a motion to adjourn.
SPEAKER_02Move that we adjourn.
SPEAKER_06Motion by Waddell, second by Calodi to adjourn. Discussion? Roll call, please.
Call to Order Roll Call Approval of Minutes: November 5, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report Manager’s Report Presentation from...
Call to Order Discussion of Rockslide Mitigation Project 65% Design: Presentation from the Design Team Questions and Answers Written Questions from the Public Questions from the Mayor and Assembly Overview of Guided...
Call to Order Roll Call Approval of Minutes: October 8, 2026 Special Meeting October 15, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report...
Call to Order Review of Proposed FY27 Budget - CIP & Special Revenue Funds: School Funding Debt Service Permanent Trust Capital Projects Sales Tax Fund CPV Excise Tax Fund Mayor & Assembly Discussion Items Adjournment...
Call to Order Review of Proposed FY27 Budget - Operating Funds: General Fund Visitor Fund Clinic Fund Harbor Fund Port Fund Water - Sewer Fund Solid Waste Fund Mayor & Assembly Discussion Items Adjournment Packet