Send us Fan Mail Should You Build a Toronto Multiplex? Five Questions to Answer First I run a construction company, so it may be against my own interest to say this: not every multiplex project should be built. Toronto’s planning environment has created new opportunities to build fourplexes, sixplexes, garden suites and other forms of small-scale housing. But permission to build more units does not automatically make a property financially feasible. A zoning permission is an opportunity to investigate. It is not a business case. In this episode of Real Estate Development Insights, I share five questions that property owners, investors and first-time developers should answer before committing significant time and capital to a Toronto multiplex project. These questions came out of our Toronto Multiplex Feasibility Workshop, where we built a pro forma for a representative multiplex and then tried to break it. We tested the assumptions behind the design, rental income, construction costs, financing, equity requirements and potential downside. If you can answer all five questions using credible information, you may have a viable project. If you cannot answer one or two of them, you may still have an interesting idea - but you do not have a project yet. That is much less expensive to discover before construction begins. The Five Multiplex Feasibility Questions 1. What are you actually trying to accomplish? Before evaluating the property, define what a successful outcome means for you. Are you planning to build and sell, hold the property as a long-term rental, refinance after stabilization, live in one unit or create a multigenerational family property? Building, owning and operating a building require different skills, capital structures and definitions of success. Your intended outcome should guide the design, financing and development strategy. You should also establish your walk-away conditions before becoming emotionally or financially attached to the property. 2. What can actually be built - and does it create the right product? The maximum permitted unit count is not necessarily the best development program. A viable multiplex must be capable of being designed, approved, serviced, constructed, rented or sold, and operated efficiently on the specific property. Site dimensions, setbacks, trees, access, grading, utilities, fire protection, building-code requirements and approval risks can all affect what is realistically achievable. Design efficiency matters as well. You may pay to construct 6,000 square feet but only generate revenue from 5,000 square feet. Adding units can also mean adding kitchens, bathrooms, entrances, fire separations, equipment and circulation space. Maximizing unit count is not always the same as maximizing value. 3. Who will pay for the product - and can you defend the revenue? Revenue assumptions can make almost any multiplex pro forma look attractive. The question is whether the projected rents or sale prices are supported by the actual neighbourhood, unit sizes, layouts, finishes, parking, storage, natural light, utility arrangements and competing supply. Small rental buildings also carry concentrated vacancy risk. In a four-unit multiplex, one vacant unit represents 25% of the potential unit revenue during that period. A landlord must effectively resell each unit every month by continuing to provide a home that tenants consider worth paying for. Design quality, sound separation, durability, maintenance and tenant experience all affect vacancy, turnover and long-term property value. Do not begin with the rent required to make the project work and then search for evidence to support it. Establish a defensible revenue range first and let the pro forma tell you whether the project is feasible. 4. What will the multiplex really cost - and when will the money be required? Construction cost is not the same as total development cost. A complete multiplex budget may also include acquisition and closing costs, design and engineering, surveys, due diligence, municipal applications, permits, demolition, site work, utility upgrades, insurance, legal and accounting fees, financing costs, property taxes, carrying costs, leasing expenses and contingency. Be especially careful with construction costs quoted per square foot. Always ask: Per square foot of what? What is included in the number? How developed was the design when the estimate was prepared? How much uncertainty remains? A cost without a clear definition is not a useful benchmark. Contingency should also be treated separately from profit. If a project only meets its target return after removing a reasonable contingency, it does not truly meet the target return. 5. Can you finance the project, survive the downside and justify the exposure? A profitable-looking multiplex can still fail because it requires more equity, guarantees or financial exposure than the owner can reasonably accept. One of the most important outputs of a multiplex pro forma is peak equity: the greatest amount of the owner’s capital exposed before refinancing, rental income or sales proceeds return money to the project. Financing should match the owner’s strategy. The fact that debt may be available does not automatically mean it is appropriate for the project. The model should also test realistic combinations of problems. Construction costs may increase while the schedule is delayed, rents soften and refinancing proceeds decrease. The real question is not simply whether the multiplex makes money. It is whether this multiplex produces an acceptable outcome for this owner, using assumptions the owner can defend - and whether that owner can survive if several assumptions are wrong. The Central Lesson Small projects are not necessarily simple projects. Multiplex developments may have less financial margin available to absorb design mistakes, construction overruns, approval delays or weak rental performance. Professional developers do not build every opportunity they study. They evaluate multiple properties, test different designs, spend money on due diligence and regularly walk away. That is not wasted effort. That is part of development. Your job is not to make the spreadsheet prove that the multiplex works. Your job is to challenge the assumptions and find out whether it works for the site, the market and the owner. Toronto Multiplex Feasibility Workshop If you are evaluating a Toronto multiplex and want to see how these questions connect inside a working development pro forma, join the waiting list for the Toronto Multiplex Feasibility Workshop: multiplexworkshop.com Learn more about the podcast and explore other episodes at: realestatedevelopmentinsights.com This episode is provided for general educational and informational purposes only. It is not site-specific investment, financial, legal, tax, accounting, lending, planning, engineering, architectural or construction advice. Rules, costs, financing programs and market conditions can change. Consult the appropriate qualified professionals before making decisions about a particular property or project. For more information, please refer to RealEstateDevelopmentInsights.com Join Our Workshop: MultiplexWorkshop.com
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
I run a construction company, and it goes against my own interest to say this, but the truth is not every multiplex projects should be built We just ran a workshop building a pro forma for a real multiplex in City of Toronto. we spent a bit of time building the model, and then we spent a lot of time trying to see what can go wrong, what can break, and what can make this project unsuccessful. What came out of this workshop were five key questions that should help you decide if you should build a multiplex project in City of Toronto.
if you can answer all these questions with credible resources and confidence then you may have a decent chance of having a successful project to move forward. But quite frankly, if you don't know the answer to a couple of these questions and are still a little bit shaky it's probably a good sign to dig in a little bit more, do more research, and get the answers right before you start investing in such an expensive and potentially risky endeavor Hello everyone, and welcome back to another episode of the Real Estate Development Insights podcast, where we bring you ideas, experiences, and best practices from the real estate development industry.
My name is Payam Noorsalehi. I'm the president of Solnic Construction Group, Where we help GTA developers plan, build, and deliver successful midrise and multiplex projects with fewer surprises. As always, you can find all the information about our podcast and this episode in particular on our website, realestatedevelopmentinsights.com, realestatedevelopmentinsights.com. And please, please, please remember to subscribe to our show and even better, tell others about us and help us grow the show together.
Thank you, and I hope you enjoy listening to this episode. Okay, just before we dive too deep into this thing, I'm gonna give you the, the standard disclaimer. This is not financial advice, tax advice, legal advice. You should talk to your qualified person before making any investment, financial, or legal decisions. This content is for educational and entertainment purposes, so make sure to talk to your qualified person before moving forward If you've been listening to our podcast before, we've covered this quite a bit, that as of right now, in the past couple years, there has been a very interesting appetite developing over citizen developers and new developers trying to get into the market with this type of-- with this particular type of project called multiplexes, which ca-became about mostly as a result of planning changes that happened over the past three years in City of Toronto.
And understandably so, it's a very good potential stepping stone for people who wanna start their development journey and get one project under their belt and potentially grow, uh, vertically or horizontally, do multiple of them or g-do bigger ones afterwards This has caused many of the property owners and potential investors to ask what is the best use for my property? And properties that previously were only able to use single family dwellings or detached or semi-detached houses were able to be built on them now may qualify for multiple units, four units, six units, garden suites, laneway suites.
There are a variety of combinations that you can define these projects. But one thing that sometimes gets lost in all this excitement and energy to push things forward is that permission is not feasibility. And this is why we set up this workshop because we see a lot of appetite, we see a lot of interest moving toward this segment of the market because it's permitted, not necessarily because it's feasible, and especially if you're a new developer, if this is the first time you're looking at a project and you have not done this before on...
by yourself or as part of a team, you might be prone to risks, this was the reason behind setting up the workshop and now doing this episode just to ensure that if you're starting a project, you have a good chance of making it successful. The last thing we need in this city, and for any reason, for anyone, is to start a project with lower chance of success and becoming a bad investment project for themselves, their community, and the industry as a whole So bottom line is the zoning permission is an opportunity to investigate and probably that's about it.
From that point onward, the rents, the market absorption, the construction, the l- the, the fundraising, the financing available, and whole bunch of other things need to be considered before you decide if this is worth your time and energy and money before you move forward into this type of project So for a while, we've been asking people who are interested in these multiplex projects about their challenges. What is their biggest thing preventing them from starting a project? What is their bigger ob- biggest obstacle in their way that if it was resolved, they would be able to start a project and make it successful?
And the answers were pretty consistent. They were budgeting, perform-performance analysis, fundraising, and equity requirements. In a way, they seem pretty obvious, but at the same time, they kind of have this, um, assumptions behind them that if you have enough money, if you have money, you can deliver a successful project. Which in some cases can be true, but if you've been a listener of this podcast, you have probably heard a lot of developers talking about the fact that money alone is only a part of the puzzle, and the know-how, the experience, the team, the process, the risk management.
The risk management portion, sits almost above all of that, and if without those things together, having the money might actually cause you more harm than good. And that is what this episode is, is, uh, dedicated to, trying to come up with an overall framework for this type of decision-making I'm gonna start the questions by a quotation from one of my fav-favorite authors, Stephen R. Covey, and he has a saying, uh, and in, in his book,"Seven Habits of Highly Effective People," that says,"The, the main thing is to keep the main thing the main thing." And with that in mind, I wanna ask you the first question.
What are you trying to actually accomplish by doing a multiplex project? In other words, what is your main thing? I think a lot of people might not necessarily think about this, especially the new developers, the citizen developers might not necessarily give this question a thought upfront, which should be the cornerstone of every other decision that they make throughout the development journey Most people think that they need to start with the property. What price do you buy that? How much money do you spend on get-- let's get a deal on the construction cost.
But quite frankly, uh, having worked with a lot of developers, having interviewed dozens of them on this podcast, I think we need to start with the owner, what they're trying to achieve, what their risk tolerance is, what their situation in life is, and what would the perfect outcome or the ideal outcome look for them at the end of this project. So why are you considering a multiplex project? Are you trying to build something and sell and get out of it in the next three to five years after completion?
Are you planning on holding it long-term as a rental asset? Or do you wanna live in one of the units and maybe rent out the f-- the other ones and pay for your retirement? Or are you thinking of creating a multi-generational opportunity to create wealth for your grandparents, your grandkids, your ch-siblings, your chi-children, you name it. It's a family effect, and you may or may not be able to capture them all in a pro forma. It's very important to establish what does success look like to you as the, as the, as the person who's gonna lead this project before actually looking at the pro forma, looking at the site, before running numbers.
Because if you don't have that, quite frankly, coming up with a m-- Excel sheet that looks pretty good with a lot of green numbers and a lot of diagrams and charts that are all pointing up to very profitable outcome, it's easier than you think. It's very easy to be accurately wrong on a spreadsheet, and that's a very, very dangerous thing to do. So you need to be careful what you're aiming for. One of the questions that came out of the workshop, was: What is the profit? How do you define profit? If you're looking for profit, you need to be clear on what type of me-metric you wanna measure.
In other words, when you sell something, if you're building a product to sell, it's much easier to define profit. You, you bu-bought it for X, you built it for or developed it for Y, and you sold it for Z. And if the difference of those numbers work that you end up with some money in your hand at the end of the deal, that's pro-probably called your profit. It becomes much more complicated, at least in the me-medium terms and short term, when you talk about rental properties, which is the name of the game these days, which m-- and you talk about holding them or tr-- refinancing them or appreciation value, it can get much, much, much more complicated.
So it's very important for you to understand what it is you're aiming for At the end of the day, building an asset, owning an asset, and operating an asset are different skill sets. They re-require different, you know, capital structures, partnership structures, legal structures, and personalities quite frankly. So this is one of the outcomes of the, the step one or the first question. Do you wanna own it? Do you wanna build it? Do you wanna operate it, or do you wanna just develop it and get rid of it? So try to think about that first because it very much affects a lot of the decisions you're gonna make down the road If you're thinking about build and sell strategy, your whole project will revolve around achievable sales prices, the exit cap rates, absorption rates, the, the, the sales per, per, per unit, how much you're gonna sit on the market, timing of the closings.
Versus if you're looking at a long-term rental setup, you're looking at effective rent, you're looking at vacancies, you're looking at net operating income, you're looking at refinancing and appreciation in the underlying asset, which is the property in most cases, and the amount of m- equity, your own money or your own skin that is left in the game for different, uh, during different stages of the project and the property afterwards. And if you're thinking about being an owner-occupied building, at least partially, a whole bunch of other criteria will come into the fact which mostly about utility, comfort, convenience and performance of the building, and may or may not necessarily have to do with being the most cost-effective and most viable in the traditional sense, of a construction budget.
So to wrap this one up, ask yourself: What do I want to own when the project is finished? How long do I intend to own it? How much capital can I commit? This is a very key and big question. How much skin in the game can you keep for extended period of time and still be able to go to bed at night and have a good night's sleep? what role do I want to have after the con-construction is over? Yes, you can develop something, you can build something, but are you ready to be a d-landlord for the next ten, twenty years of your life and deal with tenants?
I know people who, uh, do that for a living and enjoy it, and they can really find meaning in it, and there are other people who cannot think about having a single, tenant in their basement. a very key question that can go unnoticed is also is what will cause me to say no? What is your red line? How do you decide that you need to walk away from this project or any project that has this type of setup? And this is a very personal question. It's very easy, especially for a newer developer or citizen developer, to fall in love with the property, to fall in love with the design, with the idea of the dream home, with the idea of the dream building, and that very beautiful rendering.
And, uh, it's very easy to fall in love. It's very easy to get emotionally attached to it, and that can potentially get you into trouble. The seasoned developers, the professional developers that I've had the privilege of working with or learning from, they very rarely develop emotional connections to these projects. they walk away from great sites with great potential many, many, many times just because it's not the right fit for them at that point in time, at that stage, uh, of their investment process that they are in.
So have to have a little bit of a clear framework so that you don't get emotionally tied into a project, and you make sure you can move forward if you need to All this should get you to a point that you're able to answer, is a multiplex project the right vehicle to get you to that objective? Because there are o-options out there. There are no shortage of options. you can buy an existing property and use it as rental. You can buy stocks, you can invest it in a whole bunch of different things and not be tied to this.
And this is an important distinction. Figure out what you wanna do, see if th-this gets you there, and can you live with that So question number two is a little bit of a technical nature. What can you build on that particular property, and is that the right product for that market? I'm sure you all have heard that real estate is about location, location, location, location. Another part of this equation is, yes, you have the location, you have the part-- property, and the-- what you can develop should fit the market you're developing it for can you get the right fit of product on that site?
Is much more important question than what can I build? How many square footage? How many units? can I do with Garden Street? Can I do a fourplex or a sixplex, or can I go all the way up to ten units or 30 units, whatever it might be. That is the secondary question. The first question is: Can you create product market fit? If you can build a lot of great units, but it's not right fit for the neighborhood from a parking perspective, from a storage perspective, from a demographic perspective, from an access perspective, that's a bad decision, that's a bad project, and you should walk away.
So very important question to ask. Can you figure out a good way to define and then almost guarantee that you can meet the product market fit. This is where a lot of projects go wrong, especially for newer developers, for citizen developers, that they might be emotionally or financially tied to a particular property, and, uh, you need to make sure that you get the fit right One of the most common pitfalls that we see in this type of thinking is what is the maximum number of units I can get?
What is the maximum number of rentable area that I can get? And quite frankly, these questions, they're good to know, don't get me wrong, but at the same time, they're not the only question to be asked. The better question is what can be designed, approved, serviced, built, rented, or sold, and also efficiently operated? So if you can't meet all of these, doesn't matter how big you can build, make the units. Doesn't matter how many square footage you can get. You're just basically digging a bigger hole for yourself or your financial investments to get into it.
So please be clear on those before you go in and start maximizing the whole things. We've seen a number of projects that they've gone ahead and they've maximized too much. They've even gone up in terms of a unit count. They've gone to ten units or twelve units or eight units or sixteen units, and after two and three years of playing with numbers, they come back and like,"You know what? This is just too much for that site. Let's dive it back. Let's shave some things. Let's bring it to something that, yes, it's, it's less than we're able to build or we're permitted to build." But at the same time, it m- reduces the risk, it re-reduces the equ-equity requirements, and it actually makes the numbers work better.
So more is not always better in this particular context I'm not saying the technical side doesn't matter. Trust me, it does. Knowing what your zoning is, knowing your setbacks, your property lines, your tree, tree issues, trees, tree protection zones, how your community of adjustment in your neighborhood, in that particular neighborhood looks at such properties, the height requirements, the water table requirements, so on and so forth. They're all of them are very technical. There are a lot of information. You have to have the right team.
You have the right d- have the right consultant team in place, but none of them by themselves can bring you the right product market fit, which is the most critical. I al-also wanna emphasize something here. If you are in a situation that you've looked at a property and that property for it to, from a technical perspective, for it to be able to give you the mar-market fit, you need all the stars to line up. You need the approvals to go to according to plan. You need your timelines to be exactly like you dra-- you, you dreamt it.
You need your construction cost to be exactly at the lowest possible margin that you've heard on the street. You need a whole bunch of different things to line up. There's a very good chance you're gonna be disappointed, and quite frankly, at that point, you were probably more leaning toward gambling than developing because things tend-- have a tendency of not going according to plan. And it's very critical that you build these into your model when you're looking at it in terms of contingencies, in, in terms of plan A's and plan B's and plan C's potentially, to see what would you do if some of these things don't work.
And that ha-applies for the market fit and also the technical side. So please make sure you keep that in mind. The third question, question number three is, who will pay for this project? And can you defend the revenues? When you go through the pro forma exercise, you're gonna see that it doesn't matter which type of project, which scale of project, if it's a condo or rental, if it's a mid-rise or low-rise or high-rise, almost always, the revenue lever, the numbers that you put as your sales or rent incomes are one of the most powerful ones.
Meaning you can very easily turn a ver- very bad pro forma into a very good one if you assume that you're selling a condo unit for seventeen hundred dollars a square foot, or if you're collecting five dollars per square foot for rentable space. And that's where a lot of mistakes or optimistic estimates happen, and you should be able to defend it. Not just defend it for the bank who's gonna lend you the money. Quite frankly, you need to be able to defend it for yourself, for your investors, people who've trusted you with the money.
So it's actually interesting. We ran this analysis in our workshop, and we, as part of the workshop, we worked through some sensitivity analysis tables where you can see what happens if your rent goes up by 10%, so it gets better, or your construction cost goes down by 10%. And unanimously, in almost all cases, the effect of the revenue is significantly higher on your bottom line regardless of how you define your profit. ROI, return on c- cash on cash, return on equity, Equity multiple, whatever you wanna call it.
The effect that these rents have, the revenue side has, is very significant, so you need to ensure you get it right. Otherwise, you might just be selling yourself and other people a dream that is too optimistic to come true. And also, you have to appreciate that this might change through time. You might not be able to get that rent day one. You might not get there that fast in terms of stabilization. If you're building a fourplex and one of the units stays all empty for six months, that's quarter of your revenue, and it's a significantly higher percentage compared to if you're building a 60-unit building on a major street and two of the units stay empty for a year.
relatively speaking, that's a much lower impact on a bigger building. So it is very critical that you have the right numbers and also make sure to take into effect the, the normal vacancy rates. People do move throughout time. You have to have some in-incentives potentially, depending on when you're hitting the market and if there's competition for your product. There might be incentives that you need to include. So the effective rate, the actual money that ends up in your account, especially at the beginning, might be very different from what you're modeling.
And if you needed that to be 100% accurate for the pro forma to work, then you're potentially setting up yourself for failure. So very important to get your revenue side correct in short, incorrect accuracy can be a deadly sin. You can model your rent to a cent on a square foot, but if the original assumptions are not correct or they're too optimistic, you're just getting false confidence, which actually will get you in trouble what are some of the items that you need to think about when you're thinking about the market fit and how the revenues will actually become a reality?
You need to know about anything and everything you can about neighborhoods. if you look at the developers and also, uh, brokers and realtors, a lot of them have areas that they work w- in, and they don't necessarily do spray all over the map.
The reason is it takes time, it takes effort to know the, the locals of a neighborhood or an area or a couple of wards in city of Toronto, so you get a good understanding of that area. So if you're trying to start a project, but you're looking at a project, one of them in Etobicoke, the other one in Scarborough, one downtown and one North York, you're not necessarily gaining, momentum, and you're not necessarily putting this, the, the, the wins and stacking them on top of each other in terms of getting to know the neighborhood.
So our suggestion would be to focus on a single neighborhood or a ward or an area and try to look in that area that fits your criteria. That's another thing. You might be able to make the numbers work in certain places of the city that you might not like, wanna even have investments in. Just because the investment works there and you get a proper rate of return does not necessarily make it good fit for you. That's another thing you need to think about. But anyways, know the neighborhood, focus your efforts in there, get as much local knowledge as possible before making these decisions.
Unit sizes along with unit mixes are a very key item. Uh, there's a, there's a saying that if you're playing with pro formas, if you turn every unit in your building into a studio, small studio, and just assume rents for it, you probably will get the higher, highest return possible in that project. If you're not building student housing or senior living experience, having too many small units will hurt you. On the flip side, having too many large units could hurt your proforma in the actuality.
So regardless of what the numbers say and how you can optimize for the numbers, reality check and common sense is a very good thing to have. And look at the units, look at the mixes, and see who is gonna be the eventual end user, who's gonna live in this building, how are they gonna fit here, and how best to incorporate them to your development journey One of our podcast guests said something that have stuck with me, and I think it's very relevant to the journey of becoming a purpose-built rental and multiplex developer, especially if you're doing it for a first time.
And he said that if you're a condo builder, you're gonna o-only have to sell a unit once. most of the times, you sell it off black line drawings in a marketing campaign, in a sales office without actually showing the product. Sell it once. But if you're a landlord, and you have hundreds of units, you're selling all those units to all of your tenants every single month. Because every single month, all those tenants have the option of saying,"You know what? I don't like this building anymore." The other building, new building has better amenities, it's more acoustically favorable.
It's-- in other words, it has less sound transfer. It doesn't s-uh, smell like mold. It's newer, whatever you name it. It has better access, maybe it has a swimming pool, and they get the chance. They get to choose every month, and they could move. So when you're thinking about it from that perspective, as a landlord, you need to make sure month after month after month, your tenants wanna stick around, stay pay you and keep your vacancy rates as low as possible.
There's always gonna be a certain amount of movement, but you do not wanna g-- uh, make it worse than it needs to be by thinking about it ahead of time, planning for it, designing for it, and essentially building for it That means decisions like layouts, unit mixes, soundproofing, durability, maintenance, property management, and tenant relationship are key that needs to be done ahead of time. and this will all affect how much money you can get, how much rent you can collect. And again, this is the most potent lever.
So if you, you're wrong on this, this is where you get the most damage to your project Bottom line, the worst outcome is not that your Excel sheet shows a little bit lower than expected and you walked away from the project. That's actually not a bad outcome. The worst outcome possible in these scenarios is you build something that no one wants and sits empty on the market, and it will take you years, if not decades, to recover from that type of project So to wrap up this section don't start with the rent that you like to collect and try to prove it on your spreadsheet work the other way around See what the actual rent potential is in that neighborhood with that greater product, and see if you, with that realistic expectation of income, if you can still make a viable, reasonable estimate and pro forma work and then move forward.
If your pro forma relies on everything in the skies to line up, then you're probably not in a good position to move forward So question number four is probably the most popular question, but as you can tell, it's on the fourth priority compared to the other questions. And the q- that question is about the cost. How much would a multiplex project cost? I would add when will be the money required? Because this, this is very key. And What do I mean by that? I-- This is...
Like I said, it's one of the most popular, most, most common questions that I get on a daily basis. What's your square foot number? How much does it cost to build one? How much, uh, how much should we pay for the land? How much we should we... Construction cost. What's the construction management fee? Da, da, da, da. You, you name it. There's a lot of questions on the cost. And yeah, I don't-- I'm not saying you shouldn't be asking those questions, but But a complete pro forma for a multiplex project does-- has dozens of items into it. One of the interesting facts that I think a lot of people don't really think about upfront, especially the newer developers and citizen developers, is the is the financing fees.
The financing fees in a project, and I don't mean the, the premium, necessarily just a premium that you're paying your mortgage broker or whoever gets you the deal. I'm talking about the actual interest on the, on the financing deals that you're getting could be such a huge number that's making a difference, but in most cases it goes unnoticed. So think about cost as a wholesome approach, not just a construction cost. In the bigger scheme of things, yes, you should try to be as efficient as possible with your construction processes, your design processes, your material selection, but don't lose the market fit and also make sure you get whole bunch of other things, uh, in, uh, in the, in your pro forma, including the items that we just talked about.
Uh, I just wanna go on a side note rant here because obviously we're, we're a construction company, and I, I consider myself to be a construction person. Be very careful, please, with the numbers that you hear on the market. These days, uh, we hear very interesting numbers on the market when they-- when you talk about it. What's your cost per square foot? And the-- some of these numbers are very low, which, yes, hopefully, they can deliver, and they might be able to do it, and maybe they are doing it. But it's very important to ask the right question. What's your cost per square foot?
Uh, begs the question, what's-- what kind of square foot? Are we talking GCA, which is G- gross construction area? Are we talking rentable area? Are we talking gross floor area? Below grade, above grade? With the appliances and services, without them, with the landscaping, without them? And whole bunch of d- different nuances. And h- it's very, very, very easy to say random numbers day one and say:"Yeah, yeah, for sure, we'll build it for this much." And then once you go through the process, you end up wh- with whole bunch of surprises and cost increases, and not necessarily because people lied.
Because giving a very rough order of magnitude number day one, it could be off by twenty, thirty percent, depending how much information you've provided. So very important to allow for your construction cost to be fine-tuned r- uh, through the time. At some point in time, obviously, they need to be fixed. They need to be, uh, capped or decided upon, depending on, on the, the, the type of contract that you have. But just going and asking someone:"What's the cost per square foot?" It's the wrong question to ask.
It will give you potentially misleading information and can get you in trouble. So please be careful about that. Can we also talk about contingency for a second? Contingency is a real thing. I've seen it and I've heard it that people think,"Oh, contingency is just part of the profit," and yeah,"Well, we won't really need it. We won't really use it." In my experience, construction phase is a very risky part of the process. A lot of unforeseen things can, can happen that you would have never thought about, and it's really crucial to have proper contingency when you go through the process.
So skipping contingency and thinking,"Okay, we're gonna make that contingency our profit, and that's how our numbers are gonna work," is a very risky move. Uh, make sure you have your contingency and your profit however you wanna, uh, calculate it s- done separately, because there's a good chance that you will need your contingencies to pay for things that you haven't seen or no one could have s- predicted on the project. Question number five. Question number five can you finance the project? Can you withstand the downsides or potential downsides to-- for the project?
And the most important question, is that exposure and the risk actually worth it? One of the most critical definitions and items that I think people need to think about, uh, especially people who are in their first time in doing this, is the peak equity required. What does that mean? Almost all projects have an element of debt financing, which is in simple terms means a loan. Construction loan, mortgage for your property, take out financing, different names, but they all fall under the category of debt.
In other words, someone else's money lending you. Why is that important? Because whatever they lend you, you have to complement with your own money. That's your equity. and your equity could be stuck in a deal for a long time before you can get it back. Depending on the scale of project, the, the way the pro forma works, it could be from months to years or, or even decades, depending on how, how big the project is. So the key question here is, are you comfortable having that much of your personal net worth or, or, or your wealth sitting outside of your control, invested in a project for that period of time?
There are a lot of conversations right now in the market that with CMHC financing, there are special programs, you're gonna go through the process, you're gonna get all your money back, and potentially some on top of that. While that is true, and it could be true, and it does happen, it's not the common rule, and you should not really bank on it. If that's the only reason you're thinking of doing the project, I would suggest you rethink it. Think again. The project on its own needs to have merit. It needs to work by its own merit, and it needs to work on their own numbers.
And then the fact that CMHC is helping and subsidizing that type of project is the cherry on top and something that makes it that much more lucrative. But if you're thinking that, oh, I'm gonna borrow from everyone, and I don't wanna have any equity of myself left in the deal or to start with inside the deal just because I can get so much financing, it's not necessarily a good thing. remember, the higher the lending and the borrowing cost in a project, the higher leverage, yes, it could work in your benefit, but it could also backfire and mean that if you're in trouble, the trouble is much deeper than you would have anticipated.
I also wanna make a side note about the current programs, and I don't know when you're listening to this, but as, as of right now, which we're in the toward the end of twenty twenty-six, the most popular program out there w-- from CMHC is CMHC MLI Select. Very important note that I don't see almost anyone talk about it, is that this type of program is designed to work for long-term hold strategies. What does that mean? When you go through a process, you're gonna notice that they're giving you very good rates at very high, ratios of lending, but it comes at a premium.
They're giving you... They're selling you an insurance product. CMHC sells insurance on that loan, and that insurance, five, six, seven or maybe eight percent premium. It, it's a huge number. It could be a quarter million dollars or more in the actual premium. Why? Because you're paying that to lock in the rate for a very long time, maybe four decades, four, forty-five years. And it's worth it if you see it to fruition. If you take that, and then in two to three years you start breaking it, getting out of it, chances are, bottom line, you've lost money.
'Cause you've paid it for a product that could have worked for four decades, and you got out of it in four years. So be careful about that. I don't wanna spend too much time here. It's more a mathematical equation. But we went through this. this is one of the outcomes of the workshop that we looked at the numbers, and you can s-- very clearly see how this could backfire. So do your math. Go back to the question number one, what do you wanna get out of this thing, before you decide how you're gonna finance it. Just because the financing is available doesn't mean you should take it I wanna go back to the peak equity requirement.
If you run your pro forma and the pro forma tells you that you need somewhere between half a million or a million bucks in peak equity stage or skin in the game at peak in the deal, and you don't feel comfortable doing that, that's a sign to think about partnerships with the right structure. Obviously, ta-talk to your lawyer. talk about fundraising and basically diversifying the amount of risk you're taking in your portfolio. Same for the other people who might lend you money to, to work in this project.
Think about that. That's a cr-critical topic, especially if you're a citizen developer and trying to do this for the very first time Okay. So we went through the five questions, and I think you get a sense of what I'm trying to get at. yes, it's a doable project. It's a great type-- project typology. I think a lot of people should be doing it, but you should also do your homework. Optimism alone will actually get you in trouble. just because it's a smaller project doesn't mean that it's easier.
Actually, in many cases, it becomes harder because you have less margin or less meat on the bone in these projects to be able to absorb the hits, the mistakes, the unforeseen risks that come with it, and you have to be that much more diligent. This is one of the common mistakes that I see. Because it's, it's smaller, doesn't mean it's easier, and it actually means it is riskier. Potentially, it can be riskier than a larger project, let's say a mid-rise. But that being said, it's, it's a great project to start with. Get your feet wet, get the right team beside you, and try to figure out, at least hypothetically, these, the, the answers to these questions before you start looking at the actual number.
If you buy the site for a million or a million fifty or one point one million, it's far less impactful on your success and your project than making sure that you have the answer to the right five questions, which are: What are you actually trying to accomplish? What is your main thing? What can you build on that site, and does that fit the market you're trying to serve? This is one question, very key question. Third one was: Who will pay for the product? What's your equity structure?
Can you defend the revenue? How much will it cost? What happens if the cost goes a little bit not according to plan? How much equity do you need to have in the deal, and can you finance it? Can you survive the downturns? Can you survive the exposure that it will bring you? And is it worth it for you and your investors and whoever you're representing and you're r-raising money from? These are the key questions you should be asking. if you have a good, solid foundation, you can answer all these questions, then you're probably in a good situation to start.
If not, probably not the best choice to move forward. Regroup, partner, create other structures, do more due diligence, wait for the right time. we don't wanna have failed projects and wasted money, ingenuity, and creativity in the industry. It is much better to not do a project than to do the wrong project. It's much better if you walk away if you don't feel comfortable. And trust me, a lot of the seasoned developers that I work with, they look at dozens of sites.
They spend money. They do due diligence. They do the math thing. They talk to the planner. They talk to an architect. They have the stats down. They spend weeks running their pro formas, and they walk away. If it's not comfortable, it's not the right fit, if they don't feel good enough about it, by default, they walk away. And I appreciate that this might-- this will become much harder if you're a new developer, if you're a seasoned developer. It's not something that you would intuitively want to do, but it's really good to think about these questions and try to make sure you have all those answers before you move forward.
Your job, if you may, in this process is not to present something and make sure it looks good. It actually is the other way. It's to try and see if does it works? Does it work? Ask the question, challenge the question, and that's what we did in that workshop, and I think we're gonna continue doing these workshops every so often. And if you h- if you're evaluating, uh, multiplex in Studio Toronto, if you wanna see if these numbers make sense, if you need backup to answer these questions, and you need help with your project, by all means, Please go to our workshop website and sign up for the next iteration of the workshop that is gonna come up.
Uh, you can find that multiplexworkshop.com, multiplexworkshop.com. And I wish you all the best. As always, if you have any questions, comments, please let us know. I hope that you have found this episode useful. Hopefully, I didn't scare you too much to step away, but I'm a big believer that we need prepared people to in, uh, start developing. Thank you very much. I hope you enjoyed listening.
Send us Fan Mail Where does the garbage truck go? On a tight Toronto mid-rise site, the answer can change the ground-floor layout and how many homes you can build. In episode 65 of Real Estate Development Insights, I...
Send us Fan Mail What changes when the architect becomes the developer - and takes responsibility for getting the project built? In this episode, Payam Noursalehi speaks with Noam Hazan, architect and founder of Noam...
Send us Fan Mail What should you investigate before turning a Toronto major-street property into a small mid-rise apartment project? Heather Dubbeldam and Derek McCallum of Dubbeldam Architecture + Design join Payam...
Send us Fan Mail What is changing inside Toronto’s housing approval system - and what will developers actually notice? Jag Sharma, Deputy City Manager for Development and Growth Services at the City of Toronto, joins...
Send us Fan Mail Toronto has announced residential development-charge reductions of 40% to 60%, backed by $1.5 billion in funding. But the commercial question is not simply how large the headline discount is - it is...