Every highway overpass rests on concrete girders cast in a factory and hauled to the bridge site. This episode covers girder types, precast plants, stretch trailers and steerable dollies, loading, securement, permits and escorts, and the rates for heavy civil freight.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Every highway overpass you drive under is held up by massive concrete beams that were cast in a factory, loaded onto a trailer, and hauled down the highway to the bridge site. These are bridge girders and precast beams, and moving them is one of the most demanding jobs in heavy civil hauling. For a small carrier, bridge girder and precast beam freight is a high-skill niche with strong rates, but it rewards a carrier who understands long loads, escorts, and the precast plants and bridge builders who ship this freight.
Speaker 1Start with the freight itself. A bridge girder is a long concrete or steel beam that spans between bridge supports, and a typical highway girder is 60 to 150 feet long and can weigh 40 to 100,000 pounds. Precast beams include box beams, I-beams, and double T-sections used in bridges, parking garages, and buildings. The beams are cast in a precast plant, cured for days or weeks, and then shipped to the job site, and every beam must arrive without a crack, because a cracked beam cannot be used and
Speaker 1a replacement takes weeks to cast. The shippers in this niche are easy to find once you know where to look. Precast concrete plants ship girders and beams to bridge and highway projects every week. Steel fabricators ship plate girders and box girders to bridge sites across the country. Bridge contractors and highway departments schedule beam deliveries around crane availability, because a beam arriving late can idle an entire crew. The work follows the infrastructure calendar, so spring through fall is the busiest season, with bridge replacements and highway expansions driving
Speaker 1steady demand in every state. The trailer you need depends on the length and the weight of the beam. Most bridge girders travel on a specialized beam trailer, or a stretch flatbed, because a standard 48-foot flatbed is too short for a 100-foot beam. The beam is supported at two points, and the trailer must be able to steer the rear axle to get a long beam around corners and through intersections. Some beams need a steerable dolly at the rear, and the combination can stretch more than 150 feet from the front of the truck to the back of the trailer.
Speaker 1Know the length and the weight before you quote the job, because a wrong guess can mean a load you cannot legally move. Loading a bridge girder takes a crane and a careful crew. The beam is lifted by a crane at the precast plant and set onto the trailer, supported on wood dunnage at the exact points the engineer specified. The beam must sit level and straight, because a beam that is loaded crooked can crack under its own weight. Once the beam is set, the crew secures it with chains and binders at the lifting points, and the driver checks the load height and the overhang before leaving the plant.
Speaker 1A beam that sticks out too far at the rear needs a red flag and sometimes a rear escort, and the driver should walk around the load one more time before pulling out. Securement is not optional and it is not guesswork. A bridge girder needs heavy chains and binders at the support points, rated for the weight of the beam, and the beam must be blocked so it cannot shift sideways or roll. Never chain across the middle of a beam, because the pressure can crack the concrete, and never trust friction alone to hold a 100,000 pound beam in place.
Speaker 1The driver should stop after the first few miles and check every chain, because chains settle and loosen. and a loose chain on a bridge girder is a disaster waiting to happen. A cracked beam is a ruined load, a delayed bridge, and a claim that can sink a small carrier. Permits and escorts are part of the job, and they are your responsibility. A bridge girder longer than the legal limit needs an oversized permit in every state it crosses, and anything over 80,000 pounds gross needs an overweight permit.
Speaker 1Most girder loads need at least one escort vehicle, and some need a police escort through cities and tight interchanges. Route surveys are often required, because a 100-foot load cannot take every exit or turn, and some states restrict oversized moves to daylight hours. Price the permits and the escorts into your quote, and never let a shipper rush you into running without them. Rates in this niche are strong because the work is specialized and the loads are enormous. A single girder move might pay $ 3, 000 to $ 8, 000, depending
Speaker 1on the length, the weight, the distance, and the escorts. A full bridge set of 10 or 20 girders can be worth tens of thousands of dollars in freight, and the precast plant wants one carrier who can handle the whole set on schedule. Build relationships with the dispatchers at precast plants and bridge contractors, because repeat business is where the real money is in this niche. Learn the beams, secure them like your business depends on it, because it does, and haul them like a professional.
Skyscrapers and bridges stand on foundations driven deep by pile drivers and foundation rigs. This episode covers the machines, the shippers, lowboy trailers, mast handling, securement, permits, and rates for hauling...
Vacuum trucks and hydro excavators fix buried utilities without tearing up the road. This episode covers the machines, the utility and municipal shippers, trailer choices, loading with empty tanks, securement, and rates...
Mobile cranes lift the loads no other machine can move, from steel beams to rooftop units. This episode covers crane types, counterweight loads, rigging gear, loading and securement, permits, and the rates small...
Every foundation in America starts with a hole dug by an excavator or a backhoe. This episode covers the machines, the shippers, the trailers, and the securement rules for hauling digging equipment, plus the rates small...
Before a highway can be repaved, the old surface has to come off, and the cold planer is the machine that grinds it up. This episode covers milling machines, the trailers that carry them, loading, securement, permits,...