Before a highway can be repaved, the old surface has to come off, and the cold planer is the machine that grinds it up. This episode covers milling machines, the trailers that carry them, loading, securement, permits, and the rates in this steady resurfacing freight niche.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Before a highway can be repaved, the old surface has to come off, and the machine that does that job is the cold planer, also called a milling machine. It grinds up the old asphalt in a single pass, loads it into a truck, and leaves a clean surface ready for fresh pavement. These machines move constantly between resurfacing jobs, and for a small carrier, cold planer and milling machine freight is a steady niche with good rates, but it comes with quirks you need to understand. from the grinding drum to the dust. Start with the machines themselves. A
Speaker 1cold planer is a heavy machine with a rotating drum covered in cutting teeth, built to grind asphalt and concrete to a precise depth. A small planer might weigh 20,000 pounds, while a big highway-class milling machine can weigh more than 70,000 pounds and cut a lane 12 feet wide in a single pass. The drum is the heart of the machine, and it is also the most expensive part to damage, with hundreds of teeth that wear out and need replacing. The machine usually travels with a conveyor that loads the ground-up material into a dump truck, and that conveyor folds
Speaker 1up for transport. The shippers in this niche are easy to identify once you know where to look. Highway milling contractors move planners between state and interstate resurfacing projects all season long. Municipal and county road crews rotate planners between city street jobs. Commercial paving companies haul planners between parking lots and subdivision streets. Equipment rental companies shift planners between branches, and dealerships deliver new machines to buyers and haul trade-ins back. The milling season runs hardest from spring through fall, when
Speaker 1the weather is warm enough to pave, and a good milling contractor can keep a planner working five or six days a week. The trailer you need depends on the size of the machine. A small planer can ride on a heavy equipment trailer or a tag trailer pulled by a medium-duty truck. Most highway-class milling machines need a lowboy. usually a step deck low boy or a removable gooseneck, because they are heavy and their tracks make them hard to load on a tall deck. Some planers are wider than 8 1⁄2 feet with a conveyor in transport position,
Speaker 1so ask the shipper for the transport width and height, because the folded conveyor can add height you did not expect, and a machine that is too tall for a bridge will stop your day cold. Loading a planer takes patience and a clean deck. Most planers drive onto the trailer under their own power, up steel ramps or over the lowered neck of a removable gooseneck. The tracks are slow and the machine steers clumsily, so approach slowly, centered on the deck, with a spotter watching the edges. Before loading,
Speaker 1ask the shipper to sweep the worst of the milled asphalt off the machine, because loose chunks fall on the road and ground-up asphalt on your deck is a mess that never fully comes off. Once the planer is centered and the weight is balanced, set the parking brake, and shut the machine down. Securement is not optional, and it is not guesswork. A planer needs at least four chains, one on each corner, rated for the weight of the machine, attached to the tie-down points the manufacturer built into the frame. Invere through a track, a hydraulic line, or the conveyor.
Speaker 1The drum should be raised off the deck and locked, and the conveyor should be folded and pinned so it cannot bounce or swing. Check every chain after the first few miles, because chains settle and loosen, and a loose chain on a 70,000-pound machine is a disaster waiting to happen. Permits and timing are part of the job. A planer wider than 8 1⁄2 feet needs a wide load permit, and anything over 80,000 pounds gross needs an overweight permit, with the rules changing from state to state. Milling contractors also work on tight schedules, often at night when traffic
Speaker 1is light, so a planer that is supposed to be on site at midnight needs to be there at midnight, not at dawn. Price the permits into your quote. and never let a shipper rush you into running without one. The fine for an unpermitted, oversized load can wipe out the profit on the whole job. Rates in this niche are good because the work is specialized and time-sensitive. A local move of a small planer might pay $ 600 to $ 900 for a few hours of work. A regional move of a highway-class milling machine, two or three hundred miles, can pay $ 2, 000 to $ 4, 000, depending on the weight, the permits,
Speaker 1and the urgency. Multi-machine moves pay even better because a contractor moving a whole milling spread wants one carrier who can handle the planer and the support machines together. Build relationships with the dispatchers at milling companies and rental yards, because repeat business is where the real money is in this niche. Learn the machines, protect the drum and the conveyor, tie it down like your business depends on it, because it does, and haul it like a professional.
Every highway overpass rests on concrete girders cast in a factory and hauled to the bridge site. This episode covers girder types, precast plants, stretch trailers and steerable dollies, loading, securement, permits...
Skyscrapers and bridges stand on foundations driven deep by pile drivers and foundation rigs. This episode covers the machines, the shippers, lowboy trailers, mast handling, securement, permits, and rates for hauling...
Vacuum trucks and hydro excavators fix buried utilities without tearing up the road. This episode covers the machines, the utility and municipal shippers, trailer choices, loading with empty tanks, securement, and rates...
Mobile cranes lift the loads no other machine can move, from steel beams to rooftop units. This episode covers crane types, counterweight loads, rigging gear, loading and securement, permits, and the rates small...
Every foundation in America starts with a hole dug by an excavator or a backhoe. This episode covers the machines, the shippers, the trailers, and the securement rules for hauling digging equipment, plus the rates small...