Mobile cranes lift the loads no other machine can move, from steel beams to rooftop units. This episode covers crane types, counterweight loads, rigging gear, loading and securement, permits, and the rates small carriers earn hauling heavy lift freight.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Nothing on a construction site draws a crowd like a mobile crane. These are the machines that lift steel beams, set air conditioning units on rooftops, and place concrete panels 40 stories in the air. And every one of them has to be hauled to the next job on a trailer. For a small carrier, mobile crane and rigging gear freight is a specialized niche with strong rates, but it rewards a carrier who understands axle weights, counterweights, and the crane companies who run this equipment. Start with the machines themselves. A mobile crane is a truck-mounted or crawler-mounted lifting machine
Speaker 1with a telescoping boom or a lattice boom, built to lift loads that no other machine can move. A small boom truck might weigh 30,000 pounds, while a large, rough-terrain crane can weigh more than 100,000 pounds. And most of the cranes you will haul fall in between, roughly 40,000 to 80,000 pounds. Rigging gear travels with the crane. Steel slings, chains, shackles, spreader bars, and counterweight slabs And that gear alone can fill a flatbed. The shippers in this niche are easy to find once you know where to look. Crane rental
Speaker 1companies move cranes between construction sites, wind farms, and industrial plants every week. Steel erectors and bridge contractors call in cranes for specific lifts, then release them the same day. Equipment dealerships deliver new cranes to buyers and haul trade-ins back to the yard. Auction houses move dozens of them after every big sale. and the work runs year-round because cranes are needed for everything from setting rooftop units to lifting HVAC equipment onto hospitals and schools. The trailer you need depends on the weight and the configuration of the crane.
Speaker 1A boom truck can often drive itself to the job, but a rough terrain crane or a crawler crane must be hauled. Most midsize cranes need a low boy, usually a step deck low boy or a removable gooseneck, because they are heavy and their tires or tracks make them hard to load on a tall deck. Counterweights almost always travel on a separate flatbed, because a crane with its counterweights attached is too heavy for one load. Ask the shipper for the full list of what is moving, because a crane plus its counterweights and rigging can easily become
Speaker 1two or three loads. Loading a crane takes patience and a good spotter. Most wheeled cranes drive onto the trailer under their own power, up steel ramps or over the lowered neck of a removable gooseneck. The boom should be retracted and lowered into its travel cradle before the machine moves, and the outriggers should be fully retracted and pinned. Crawler cranes are trickier because the tracks are slow and the machine steers clumsily, so the operator should approach slowly, centered on the deck. Once the crane is centered and the
Speaker 1weight is balanced over the axles, set the parking brake and shut the machine down before you start tying it down. Securement is not optional, and it is not guesswork. A crane needs at least four chains, one on each corner, rated for the weight of the machine, attached to the tie-down points the manufacturer built into the frame. Never chain through a tire, a track, or a hydraulic line, and never trust the boom to hold the machine in place. The hook block should be secured so it cannot swing, and any loose rigging gear should be strapped down separately
Speaker 1in a toolbox or on the deck. Check every chain after the first few miles, because chains settle and loosen. and a loose chain on an 80,000-pound machine is a disaster waiting to happen. Permits are part of the job, and they are your responsibility. A crane wider than 8.5 feet needs a wide load permit, and anything over 80,000 pounds gross needs an overweight permit, with the rules changing from state to state. Some cranes are also taller than the legal height limit with the cab or the boom attached,
Speaker 1so measure the loaded height before you leave the yard. Take photos of every side of the machine before loading. Note any existing damage on the bill of lading and get the serial number, because cranes are expensive and a damage claim without photos is a losing argument. Price the permits into your quote and never let a shipper rush you into running without one. Rates in this niche are strong because the work is specialized and time-sensitive. A local move of a small crane might pay $ 800 to $ 1, 200 for a few hours of work. A regional move of
Speaker 1a midsize crane 2 or 300 miles can pay $ 2, 500 to $ 5, 000, depending on the weight, the permits, and the counterweight loads. Multi-machine moves pay even better, because a contractor setting up a whole job site wants one carrier who can handle the crane, the counterweights, and the rigging together. Build relationships with the dispatchers at crane rental companies, because repeat business is where the real money is. Learn the machines, tie them down like your business depends on it, because it does, and haul them like a professional.
Every highway overpass rests on concrete girders cast in a factory and hauled to the bridge site. This episode covers girder types, precast plants, stretch trailers and steerable dollies, loading, securement, permits...
Skyscrapers and bridges stand on foundations driven deep by pile drivers and foundation rigs. This episode covers the machines, the shippers, lowboy trailers, mast handling, securement, permits, and rates for hauling...
Vacuum trucks and hydro excavators fix buried utilities without tearing up the road. This episode covers the machines, the utility and municipal shippers, trailer choices, loading with empty tanks, securement, and rates...
Every foundation in America starts with a hole dug by an excavator or a backhoe. This episode covers the machines, the shippers, the trailers, and the securement rules for hauling digging equipment, plus the rates small...
Before a highway can be repaved, the old surface has to come off, and the cold planer is the machine that grinds it up. This episode covers milling machines, the trailers that carry them, loading, securement, permits,...