Skip to content
PodSubs
ShowsPeopleGuestsJobsNewsEvents
More
BlogPodCred
Menu
ShowsPeopleGuestsJobsNewsEventsBlogPodCredNetworksSign in
Join nowSign in
  • Shows
  • People
  • Jobs
  • News
  • More
    • Guests
    • Events
    • Blog
    • PodCred
    • Networks
    Join nowSign in

Elevate Construction

Elevate Construction artwork

Ep.1694 - The 47 Things Before Work Starts

Sep 16, 20267 minAudio
ShareXLinkedInFacebookWhatsAppEmail

In this episode, Jason explains why successful construction teams do not simply start work, they prepare for work. He introduces the concept of the "47 things" that must happen before a work package can begin and why these pre-phase planning activities are often more important than the actual field execution. Jason explains how construction teams get trapped in reactive firefighting when they fail to plan the hundreds of small preparation tasks that happen before production starts. By identifying these activities early, assigning ownership, and managing them through clear gates, teams can create stability and predictable flow. What you'll learn in this episode: Why preparation before a work package is more important than simply supervising execution. How every construction activity has dozens of tasks that must happen before work begins. Why project teams struggle when they start pre-planning too late. How human capacity, PTOs, and competing priorities affect project preparation. How milestone gates can create better control over pre-mobilization, pull planning, and pre-construction activities. Why project management systems should track preparation work, not just scheduled activities. Are you managing the work that happens before the work starts or are you waiting until the field is already under pressure to solve problems? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉). Also, here are links to our YouTube Channels: 路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg 路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt 路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured 路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Welcome everybody out to podcast number 1694. In this podcast, we are going to talk about the 47 things. If you're interested in that, please stay with us. Welcome everybody out to podcast number 1694. I'm super excited to be with you. This is one that I'm super passionate about, and I don't really know how to explain it super, super, super well without drawing visuals, but I'm going to ask you to feel me on this one.

It's pretty cool because... I'll tell you the whole journey. I've been thinking about the Aviator Project and how everybody can stay super on track with tasks and realizing that the before-phase planning is more important than actually the phase, meaning all of the project delivery team activities that we have to do, that we get to do before an activity starts, is more important

than actually just standing there watching and supervising the work. Like really bad behaving construction, I'll call them managers, will just be like, hey trade, go ahead and start. Here's your contract, go ahead and start. And I'm just going to stand out here and walk around and look at shit. Sorry about that, I didn't warn you. Really great project delivery team leaders know that there's like 47 things before any work package can actually start. And those 47 things have to be done well and on time.

And here's the kicker. If you take a construction schedule and you look at every first activity or first wagon, every independent activity, and you isolate those and everything else in the schedule disappears. And then you put those starting activities or independent activities, anything with a work package that has to be prepared, and you put it in a diagonal from top left to bottom right. But in front of every one of those is 47 activities of preparation that have to

happen before to the left. You will see a big old page full of a whole bunch of stickies. And now I want you to imagine that each of those stickies take a level of effort to get done. And each human on the project delivery team only has a certain amount of capacity to do them. And then you consider PTOs, and doctor's appointments, and distractions, and blah, blah, blah, and all the other things. Then all of those stickies have to move out to the left and start sooner.

And you realize, oh my gosh, that's the problem in construction because we're not starting all those things soon enough. And then we get behind. And then at the two-thirds point in the project, not only do CPM schedules really hurt us, but the human brain is de -incentivized for pre-planning and incentivized to fight fire. So we start to do less. So the latter third of the project is affected because of a lack of pre-phase planning.

And the concept here is that we have to stay out ahead. In fact, in the production plan at Aviator, this is what we did. I broke it out into different categories, and it's mainly supply chain, contracting, training, pull plan preparation, and work packaging. So I created a couple of gates.

The first gate is the pre-mobilization meeting. I want to be in there. I want to be in that meeting. And then I want to be in the pre-pull plan gate and check to that our team is ready with all the activities before that. Then I want to be in the pre -con meeting gate for that trade. And I've organized it all into gates. And I've taken every activity that you have to do.

And it's not 47 for everything. It could be 50. It could be 35. But anyway, all 47 items and loop those into the gate. So when I go to the pre-mob meeting, I should be able to check with the project delivery team. These things are done, right? Yep. Okay. And this is what we're about to do, right? And now it goes on their to-do list. Then when we get to the pre-con meeting, that's the gate before we actually host the pre-con meeting. I'm like, hey, all of those things are done. Yep. And this is what is ready for the pre-con meeting, right?

So I'm checking these things in gates. And the gates going from left to the right of the pre-con to the pre -pull plan to the pre-pre-con meeting. Okay. And what I've done is templated checklist for each of those gates so that when a project delivery team member enters those phases past the gates, they have a template on ClickUp or Sonar, whatever you want to use. But in this case, we're using ClickUp. And now they can program their work according to Fibonacci numbers using the scrum method between

those two different gates and manage their time. The bottom line is we're always advancing forward. And so it was really cool. Intact has these gates and the timelines now and ClickUp has the templates. And now all I have to do is make sure I'm in those meetings and I'm set up for everything that I need to be set up for. So it's super, super cool. Anyway, the bottom line here for me is we've got to find a way in project management software to not just look at the scheduled activities, but the 47 things that have to be done ahead of time.

And we have to create project delivery systems that can actually accomplish them. Taking into consideration human capacity as well. I hope you've enjoyed this podcast. On we go.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Ep.1730 - Go to the Pain

    Nov 20, 20268 minAudio

    Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...

    Credit the people on this episode

  2. Ep.1729 - Sandbaggers and Superhumans

    Nov 20, 20268 minAudio

    When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...

    Credit the people on this episode

  3. Ep.1728 - How to Lead From Below

    Nov 20, 20267 minAudio

    You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...

    Credit the people on this episode

  4. Ep.1727 - Why Three-Week Pulls Don't Work

    Nov 18, 20267 minAudio

    A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why...

    Credit the people on this episode

  5. Ep.1726 - Level 10 Meetings: Identify, Discuss, Solve

    Nov 18, 20268 minAudio

    A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...

    Credit the people on this episode