Elevate Construction

Elevate Construction artwork

Ep.1727 - Why Three-Week Pulls Don't Work

Nov 18, 20267 minAudio
ShareXLinkedInFacebookWhatsAppEmail

A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why short-horizon pull planning can limit visibility, weaken alignment, and prevent teams from gaining the full benefits of Takt and pull planning. Jason breaks down why pull planning should happen at the phase level, where teams can optimize the full sequence, establish zones, create buffers, anticipate procurement needs, and start pre-construction coordination months before the work reaches the field. What you'll learn in this episode: Why a three-week planning horizon may not give teams enough time to anticipate future needs. How phase-level pull planning creates better visibility into the entire sequence of work. Why Takt, zones, buffers, and Little's Law become more useful when planning the full phase. How longer-range planning improves procurement and pre-construction coordination. Why planning systems should connect vertically to milestones, schedules, supply chain, and field execution. Are you planning the entire phase far enough ahead or simply coordinating the next few weeks and calling it Lean? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉). Also, here are links to our YouTube Channels: 路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg 路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt 路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured 路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Hey there, welcome everybody out to podcast number 1727. In this one, I'm gonna talk about three -week pulls. Hey everybody, I hope you're doing well and staying safe out there. I'm super excited to be with you. I have a little bit of a rant today if you're not interested in that. I'm not telling you to go somewhere else, I'm just saying like, just know that I'm super into the rant this morning and not very happy with this concept in particular. What people will do, well, let me first

of all say that I have quite a bit of sympathy and I'm not even saying that I understand the Last Planner system the way I need to. But it took me years to even think that I did. It's very hard to understand the overall system when you first are introduced to it. And there's a lot of people out there that are trying to do their best and I get that. The people doing their best don't bother me. The concept of the actual thing bothers me

quite a bit. And here's the thing, a lean consultant will come in and tell a team, hey, you can do what's called a three-week pull. And what they'll say is, all we have to do is go on the board with three weeks and in those three weeks, we bring in a team to basically do a little bit of a pull plan, okay? And in this pull plan, we will run

the activities backwards or forwards or forwards or back. And we'll coordinate the next three weeks just like we would inside of a pull plan. And there we go, we're off to the races doing a pretty good job here with lean. And the problem is that that brings in a number of other issues with it. And the issues are that first of all, you don't see out far enough ahead to do anything.

So your forward and backward paths don't actually anticipate needs in enough time for it to matter. First of all, or second of all, sorry, you think you're doing lean, so you stop and you let people off the hook. I'm losing count, but three, if you don't pull plan in the phase, then you don't actually ever engage Little's Law. You don't gain time for buffers and you don't plan a phase, which is what should happen. So you're always looking down at your feet and you're never out ahead.

The other thing is you have done one of the things that I hate, hate, hate is that you've put your weekly work plan and look ahead plan up on a wall. And it's not digital, which means that it can't get to the field foreman out in the field and it can't get to workers, it can't get shared around through the project site. So now you've just locked it in one place in a way that's very, very ineffective and stickies are falling off the wall and there's bad handwriting and people don't know what they're doing, what they're following or what's going

on. And now we think that we're implementing something that's worthwhile, that does not vertically align with milestones, does not report out to our master schedule, does not tie to our supply chain, meaning our procurement log in our meetings and is not available to the wider group for discussion. In fact, the other day when I was getting annoyed about following other lean influencers in

the industry and saying that we would never do it, the problem was that the client was like, oh, I know how to do three week pulls, I know how to do stickies on the weekly work plan and why do you not know how to do it lean tactic? One of our people was like, I don't know, I got in trouble with this client and I'm like, you didn't get in trouble with this client, that's a compliment. Because, and excuse my language here, because doing a six week, three week or weekly work

plan pull with stickies out of board is fucking stupid. Like that is not how you do it. You do the pull plan for the phase, which means a geographical area with its own start and finish through which trains of trades flow. And that is exactly how you execute it. When you do it like that, you make sure that you've optimized the entire sequence, you are able to utilize Little's Law and gain

time, you allocate buffers for the phase, you make sure that everything in the phase is geographically flowing, you identify zones, you hit that phase three months ahead of time, you have a long ramp, now you have four to eight months of procurement or supply chain adjustment, you are able to initiate pre-con meetings ahead of time, and I could just keep going and, and, and, and all of the lean concepts of tact and pull and the

rest of it become available to you by doing it properly by phase. This whole concept of doing it out ahead, when just because we don't wanna go in and do the full amount of work, or just because we don't understand tact, or just, or just, or whatever the case may be, is sheer madness, and it is not helping anybody, it is hurting, people get condescending about

it, and then deny doing it the right way with tact and pull, and it's just one of those ranty things that's under my skin that pisses me off. I have never, and maybe there is one, so I'm not saying that I know what I'm talking about here, I have never seen a lean influencer or lean company doing a three-week pull that actually knows what they're doing. I hope you've enjoyed this podcast, on we go.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Ep.1730 - Go to the Pain

    Nov 20, 20268 minAudio

    Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...

    Credit the people on this episode

  2. Ep.1729 - Sandbaggers and Superhumans

    Nov 20, 20268 minAudio

    When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...

    Credit the people on this episode

  3. Ep.1728 - How to Lead From Below

    Nov 20, 20267 minAudio

    You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...

    Credit the people on this episode

  4. Ep.1726 - Level 10 Meetings: Identify, Discuss, Solve

    Nov 18, 20268 minAudio

    A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...

    Credit the people on this episode

  5. Ep.1725 - Preparing to Go to Bid

    Nov 16, 202611 minAudio

    Going to bid is not just about sending drawings to trade partners and waiting for numbers to come back. In this episode, Jason breaks down the planning, estimating, scoping, and documentation that need to happen before...

    Credit the people on this episode