Ep.1656 - How to Start a Construction Project Strong and Avoid Early Delays

Jul 29, 20265 minAudio
ShareXLinkedInFacebookWhatsAppEmail

In this episode, Jason continues the IPCS series by explaining how teams can prepare to start a construction project strong. He covers the critical work that must happen before and after the notice to proceed, including mobilization, permits, temporary utilities, trade partner preparation, staffing, safety, and spatial planning. Without this preparation, teams can lose weeks immediately and spend the rest of the project trying to recover time that may never be regained. What you'll learn in this episode: Why teams must prepare during the 90 days before and after the notice to proceed. How temporary utilities, permits, trailers, and mobilization affect the project start. Why trade partners need pre-mobilization meetings and clear installation work packages. How day-by-day spatial planning improves foundations, basements, and early concrete work. Why losing time at the beginning creates delays that are difficult to recover later. Are you preparing your project to start with stability, or allowing the first weeks to become a series of preventable surprises? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉). Also, here are links to our YouTube Channels: 路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg 路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt 路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured 路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Hey there everybody, welcome out to podcast number 1656. In this podcast, I'm going to talk about what happens if you're missing the component of start strong. If you're interested in that, please stay with us. This is the Elevate Construction podcast, delivering remarkable content for workers, leaders, and companies in construction wanting to take their next step. Get ready to step out of your comfort zone with Jason Schroeder as he encourages you

to do better, live a remarkable life, and expect more. Let's go. Welcome everybody, I hope you're doing well and staying safe out there. I'm super excited about this one. When you prepare to start strong, you basically have 90 days before your notice to and 90 days after your notice to proceed, and you have to start strong. You've got to get out of the hole fast.

You've got to make sure that you're doing well with your first trades. Most people lose months or I would say weeks on the front end and then they try and make it up on the back end where it's impossible. It doesn't make any sense. And here's what I'm talking about. 90 days before your start, you're getting your temp water, you're getting your temp power, you're organizing your trailers, you're organizing mobilization, you're getting your permits together, you're making sure that any of the utilities are rerouted, you're coordinating the

engineering of your shoring or your scaffolding, you're making sure that the team is built, that you're ready to go. And one of the most important things is engaging the trade partner preparation process. That's where you with the trades should be well at least the first ones that are starting well past an executed contract. You should have hosted a pre-mobilization meeting, meaning the trades know what's expected of them when they get on site.

Three weeks before they start at a minimum, maybe three to six weeks in this case, you're bringing in the trade foreman with their PM and their superintendent, and you're going through expectations and creating a single visual feature of WorkBoard with an installation work package so that you can get started well. And confirm their labor and confirm their schedule, okay? And you are doing all of the small things like your safety startup kit, your federal and state notifications, you're getting your printer set

up, you're making sure that you have fire extinguishers, you're making sure that you pulled all of your temporary permits, you ordered your SWIP, you've got your little mobile mini for your temporary office, right? Here's what happens if you don't do this. If you don't do this, everything will be a surprise. You will lose two to six weeks right out of the gate. And here's one of the biggest things. Nobody I know of triggers or thinks to do a basement or foundations or concrete phase

day by day, or at least a week, sorry about my yawning, or at least a week by week analysis on paper showing where things will be and whether or not everything fits and hits, and whether or not you can actually finish that basement or that site mobilization or that foundation schedule on time because you definitely have the space. When you're coming out of the ground, it's always space that constrains you.

It's always space that constrains you. So you have to map that out. So if you haven't done this, you're not going to be able to finish your project on time out of the gate. You'll have to make it up somewhere else, which is always impossible. You're not going to have the project team. You're not going to have the permits. You're not going to have the temporary power and water or comm lines. You're not going to have the trees show up properly. They're going to show up like an accident, again losing time, and you're not going to have the things that you need starting out.

So you'll be scrabbling when you do need a safety and quality presence in the field. It's going to be an absolute nightmare. You're going to lose time right out of the gate if you don't do this. And so I hope you've enjoyed this podcast. Please join us next time in elevating the entire construction experience for workers, leaders, and companies coast to coast. If you're enjoying the show, please feel free to share with your construction colleagues and help

us spread the word by rating, subscribing, and leaving a review on your preferred podcast listening platform. We really appreciate it. We'll catch you next time on the Elevate Construction Podcast.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Ep.1730 - Go to the Pain

    Nov 20, 20268 minAudio

    Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...

    Credit the people on this episode

  2. Ep.1729 - Sandbaggers and Superhumans

    Nov 20, 20268 minAudio

    When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...

    Credit the people on this episode

  3. Ep.1728 - How to Lead From Below

    Nov 20, 20267 minAudio

    You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...

    Credit the people on this episode

  4. Ep.1727 - Why Three-Week Pulls Don't Work

    Nov 18, 20267 minAudio

    A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why...

    Credit the people on this episode

  5. Ep.1726 - Level 10 Meetings: Identify, Discuss, Solve

    Nov 18, 20268 minAudio

    A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...

    Credit the people on this episode