Ep.1688 - More Detail Isn't Always Better

Sep 15, 20267 minAudio

In this episode, Jason explains why asking for more detail in a construction schedule can actually create more problems instead of solving them. He explores how excessive detail can become an escape from uncertainty, collaboration, and proper planning. He explains why a sophisticated production plan should communicate the work clearly at a high level, while detailed planning happens progressively through pull planning and detailed work packaging. More detail does not automatically mean more accuracy, feasibility, or team buy-in. What you'll learn in this episode: Why excessive detail can become an excuse or escape. Why more detail does not necessarily make a schedule more accurate. How time-by-location planning creates clarity without unnecessary complexity. Why detailed planning should happen progressively through pull planning and work packaging. How visual tools and drawings can communicate detail more effectively than an overloaded schedule. Why trade input and buy-in are essential before treating detailed plans as reality. Does your schedule provide useful clarity or is unnecessary detail hiding a deeper planning problem? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉). Also, here are links to our YouTube Channels: 路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg 路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt 路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured 路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Hey there, everybody. Welcome out to podcast number 1688. This one's gonna talk about more detail. If you're interested in that, please stay with us. Welcome, everybody. I hope you're doing well and staying safe out there. I've got a really neat topic here that I wanna talk about. Let me tell you a story. There's a really cool company that's into tact and lean and everything, is having our company, paying our company to help them with support,

really cool stuff. And they have this, unfortunately, and he's a good person, it's just a behavior type thing probably, but a very grumpy, grumpy behaving, close -minded superintendent. Really just not into the tact, tact, pull, lean, anything. He's just really super grumpy and just trying

to fight it every step of the way, and I think that's great for him. So, but the problem is, though, the rest of the team is on board with it. And one of the things, by the way, Intact is just a phenomenal software. I literally freaking love Intact so much. I, it's not just because we've been working with them, but it's heading in the direction where it's, like Aviator in Buckeye, that $100 million project, is starting back up again in

Buckeye for Lean Built, our construction company. And hopefully, if we can get it under budget, we'll start in February. And I hopped in and moved everything in the course of 20 minutes, and it's all up to date for the current timeline and all our current circumstances. Like, I just love it. I was never able to quickly learn how to use Tacting or T-Modi or LCM Digital. And, you know, TouchPlan and some of these others are easy to use, but they're just so cumbersome, it's ineffective.

And I just love working with Intact. So he was like, I don't like the Tact schedule. And first of all, there's more detail in a Tact plan and Intact than in a CPM schedule. More logic as well, it's just more simply shown. And the problem was that he couldn't quite get his mind around the time-by-location format, which is a problem for any builder brought up in the time-by-deliverable, which is very, very faulty for many reasons, which

I've talked about before. But he couldn't get his mind around it. He's like, I just need the detail. I just need the detail. And I want you to know that detail is an escape. Detail is an excuse. Detail is an insecurity. And let me explain this. Have you ever heard the comment, if I had more time, I would have written a shorter letter, right? I love, love, love that quote, that saying, whatever you want to call it, because it

speaks to the elegance of simplicity and sophistication, I might say. So if somebody had more time, they would have written a simpler letter, which was easier to read, but actually was packed full of the elegance, the simplicity, and the meaning of the actual message that they were trying to get across. The same thing in tech plans is, when you are sophisticated, when you are intelligent, when you are very educated in the subject, and

when you are sophisticated in the sense of scheduling, you can articulate it in a time -by-location format without the detail, meaning that the detail is inherent in the packaging and high-level enough for a human being to see. The second thing is that when you have a phase in a construction schedule, or rather a construction production plan, as you approach that, you start to do the pull planning and the detailed work packaging. So everything is detailed as you go in

a rolling wave. People that really want the detail, the detail early on without trade input by themselves, are letting their brains run wild, and they're worrying so much that they're relying on detail, even though it's not accurate. Okay, so now what? We have more detail. Okay, so what does that mean? It doesn't mean it's right. It doesn't mean it can happen. It just means that you got it out of your brain so you could stop worrying about it, but it didn't help anybody because

the rest of the team can't see it because it's so detailed. It doesn't matter if they could because it is inaccurate, and it doesn't matter even if it was accurate because the trades haven't bought into it because we must verify that it actually can happen. Some of the worst behaving, meaning the most incompetent supers I've ever worked with are the ones that wanted more and more detail. It's an escape. It's like, okay, I don't know how to orchestrate this in rolling waves at a high

level. I don't know how to coordinate. I don't know how to work collaboratively with the trades. I don't have a proper system installed, so I'll just start adding detail upon detail after detail after detail, and if you wanna get into detail, detail it out visually. Detail it out with drawings. Detail it out on your logistics maps. Detail it out in other ways, but don't throw a bunch of garbage detail into a schedule that actually can't happen. Detail does not mean that it's right, and it does not mean that it can happen.

I hope you've enjoyed this podcast.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Ep.1730 - Go to the Pain

    Nov 20, 20268 minAudio

    Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...

    Credit the people on this episode

  2. Ep.1729 - Sandbaggers and Superhumans

    Nov 20, 20268 minAudio

    When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...

    Credit the people on this episode

  3. Ep.1728 - How to Lead From Below

    Nov 20, 20267 minAudio

    You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...

    Credit the people on this episode

  4. Ep.1727 - Why Three-Week Pulls Don't Work

    Nov 18, 20267 minAudio

    A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why...

    Credit the people on this episode

  5. Ep.1726 - Level 10 Meetings: Identify, Discuss, Solve

    Nov 18, 20268 minAudio

    A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...

    Credit the people on this episode