Ep.1718 - Japan Takeaways Part 3: Calm, Clean, and Built to Flow

Nov 2, 202613 minAudio
ShareXLinkedInFacebookWhatsAppEmail

What does excellence look like when safety, production, logistics, and human behavior are all designed to work together? In this final episode of the Japan Takeaways series, Jason shares what stood out most from visiting another construction site and precast facility where cleanliness, visual planning, worker access, and daily production systems were all deeply integrated. Jason explains how Takt planning, look-ahead planning, worker huddles, afternoon foreman coordination, visual communication, and carefully designed site conditions created an environment that felt calm instead of rushed. What you'll learn in this episode: How clean, organized environments support safety, quality, and production flow. Why Takt planning and time-by-location systems create greater visibility and stability. How morning worker huddles and afternoon foreman planning support daily coordination. Why thoughtful access, walkways, staging, signage, and logistics make work easier for people. How calm leadership and reducing rush, push, and panic can create a better workplace. Is your project designed to help people succeed calmly or are your systems forcing them to rush and recover? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉). Also, here are links to our YouTube Channels: 路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg 路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt 路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured 路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Hey there, welcome everybody out to podcast number 1718. This will be the last Japan takeaway. So Japan takeaways number three that I do from the recent trip. Really cool stuff. If you're in our share WhatsApp chat, you'll see all the pictures and everything. If you ever want to get on that WhatsApp chat, let me know. But I'm super excited to share this with you. So podcast 1718, if you're interested in that, please stay with us. Welcome, everybody.

I hope you're doing well and staying safe out there. Yesterday, the kids and I hooked up my white trailer, took the back, the tail, the ramp off of it, filled it or lined it with hail, bales of hay, sorry, straw, straw bales, and had my Oogie Boogie in the back of the Ford with my earplugs and super loud Halloween music. And we did not let the rain stop us. We were out there with umbrellas, jamming, having

a great time. And now I'm on my way to Canada for my last foreman bootcamp in Canada with high street. They're taking over the integrated or sorry, the high street production system themselves. And I'm super excited about that. So this will be the last trip and I'll be back in a week. And that's the last of my major trips. So I'm pretty stoked about that. I also get to see what kind of who did the translation for the Japan trip. So that was really cool. Get to finish out all the takeaways there.

So I'm going to go through the images here from the the visit and go through what I consider to be the most impactful points. So this, the, we were able to go to the prefabrication, sorry, the, damn it, but the precast plant, perfectly clean, beautiful, wonderful human systems. Literally everything that they do did was just

so the quality was beyond out of this world. When we went to the second construction project site, we saw, and I was, I was expecting, I maybe not expecting to see different things, but I was like, Hey, not everything's going to look perfect. Right. But it was. And when they took us in, they showed us their critical chain flow map with what's sorry, I couldn't get rid of that sneeze. I hope the editors catch that.

The critical chain with labor spent labor from a project delivery standpoint on site labor on site from a craft standpoint, then their path of critical flow, then their other flows really, really nice. They had tech planning their six week, actually one, two, three, four, five, six. This one was actually a seven week look ahead plan. Everything was in time by location for it was in a time by location format.

One of the things that I thought was really cool, this project had a lot more variation to it and how it needed to be built. And it was still just so I got to see Kevin, sorry, Kevin will come. And I got to see pictures of how they did their foundations and how they did their reinforcing their rat slabs. And the layout was just out of this world over the top. One of the things that stood out to me that I thought was really neat, usually, and I'm not digging on us, I'm just saying usually in the night in the United States, you have leave outs or people are

crawling in and out of reinforcing, but they had literal aluminum stair towers over the vertical reinforcing to access the inside. It was really remarkable. And so everything flowed on a beautiful tech time. Then they do their roof where they set up scaffolding and they will take, I don't know if it's aluminum, but basically whatever the roofing materials, rolls of that, and they'll mold it on a machine and then extend it

onto the roof to where it's one continuous seam. And it's better that way from a waterproofing standpoint. Their restrooms, they had individual stalls for the workers using urinals and then Japanese toilets for the restrooms, hand wash stations, normal worker huddle area. A couple of the things that I noticed on this project versus the last site is they have dedicated aluminum walkways with handrail out to the exits. If there was ever a need to get

off the construction site, the exits aren't just going outside of a gate. There are stairways and really there wasn't anything that wasn't like super nicely detailed. They had all, and I'm not sure it's aluminum, it could be something else, but that metal aluminum non-conductive stairways to access different elevations throughout. It's really nice. All lay downs were great. One of the things that I really liked seeing was that they don't, they're not as paranoid about safety glasses as I am.

And they're not as paranoid about the weeds. It rains so much in Japan that, oh, and I, so there's two reasons for this. The safety glasses is because they've, they believe in removing from an engineering standpoint, the root cause of eye injuries. Now, would I still run a project with safety glasses? Yes, but I'm not going to be super crucial or sorry, critical of them. I'm not going to be judging, but the Japanese culture of being in harmony with nature

allows the project site to be beautifully clean, but they allow some of the natural, um, I don't know if they're weeds actually, but the foliage, I guess, plant life to exist as long as it's alive around the perimeter. And it's actually quite beautiful. If it was me, I would have that mode down all the time. I'm wondering if that's kind of a waste, you know, in Phoenix, if we have weeds, it's because of neglect. It doesn't rain here except for lately. This year has been really rainy, but anyway, um, all the stair towers had the screen

on it. I natural for them. Um, the remote restrooms were just as nice as the main office ones. They, they even had vending machines out there for the workers that were at different points on the site. Now go inside the project. Everything's beautifully clean. One of the things that I saw was these really neat steps that automatically are used that stack on top of each other. Actually they're stackable steps for changes in elevation. Now, what blew me away was that on

the reinforcing, I was taught, you know, Hey, just walk on the rebar and don't be a little baby, but they had, uh, fabricated almost like mesh, uh, mats that were easy to pick up. Um, and without bending over actually that are used for walking. And so they had walk paths all over the reinforcing. And I thought that was great. I looked at the entrance. Beautiful recently placed slab. Uh, beautiful. No. And this is one of the big things

that annoys me as a cement Mason is no cement spilling over onto the adjacent slabs, making it look ugly, um, netting in from the roof to make sure that nothing falls down. I mean, you couldn't find a piece of trash or something wrong on this entire project site. And all there were still steel plates all the way around the perimeter. Um, what else did I notice? There was a moment on the roof where, uh, they had this rail system where the rolled roofing, what could be, this is redundant,

rolled into place. And there was a signal person saying, let's go, let's go. And they worked in total participation. Remarkable. I asked the one of the, I was asking the onsite supervisor continuously as we were walking different questions about his leadership and things like that. His biggest leadership thing is don't push and don't be too scary. Um, I asked him about the end on, cause we always have people in construction want to know how the, the end on works.

And he pulled out his phone and showed me a group chat with the, that he had with the foreman and with his own craft. And he said, this is the end on and I'm also the afternoon foreman huddle. And I was like, Oh my gosh. So the key here is I'm looking at these pictures and we invented the integrated production control system based off of Paul Acres work and other lean training. And then you go to Japan where Paul Acres learned it and you see the exact same system in place created from the right

basis in two different locations. It's crucial to understand the basis. And I want to close out by saying the signage here. Oh, one of the things that he said is three months before the trades come on site, they have a meeting and he's assessing whether or not the trade and the foreman are aligned. His motto is don't rush. Don't pressure others to rush a considerate place helps create a comfortable workplace. And then I translated that into English.

It says, don't rush. Don't pressure others to rush a calm, unhurried place helps create a comfortable workplace. And then there were 10 rules for workplace health and 10 rules for workplace safety. Number one, create a healthy, safe, and positive workplace. This is for the health to avoid excessive eating and drinking, eat slowly and enjoy your meals. Three, always keep your work clothes clean for take an active part in health checkups. Five, seek treatment promptly whenever something feels wrong

with your health. Six, rest during breaks and days off to recover from fatigue. Seven, warm up with exercises before starting work. Eight, wear the required protective equipment correctly. Nine, use working postures and movements that avoid unnecessary strain. 10, guard against work-related injuries and illnesses, including burns, back pain, and gas poisoning. 10, rules for workplace safety. One, always wear your hard hat and work

clothing correctly. Two, inspect machinery and tools before use. Three, follow instructions from your supervisor or work leader and perform the work correctly. Four, use fall protection whenever the work presents a risk of falling. Five, stay away from restricted areas and dangerous locations. Six, report unsafe conditions to the person in charge immediately. Seven, when working together follow the established work procedures and signals. Eight, follow correct procedures when handling electrical equipment

and hazardous materials. Nine, check that the surrounding area is safe before operating mobile construction equipment or mobile cranes. Ten, keep the work area organized and tidy as you work and clean up when the work is finished. So this will be the last of my Japan reflections but I gotta tell you, over the top remarkable. This definitely sets the bar. I'm never ever going to hear any excuses for why we shouldn't be excellent.

This is how they do it and it's calm stable and they're on schedule and nobody's getting hurt. I mean literally they have half as many accidents as we do and we have accidents because of rush, push and panic. And the other thing just real quick, I'm writing a book called and I'm actually not writing it. I'm researching a book and organizing it with AI about the human mind and it's very interesting and a lot more possible than I

thought to align the way the human brain works with being lean. And the afternoon foreman huddle, the morning worker huddle, clean environments, all of these setups are designed to help the human brain succeed. I hope you've enjoyed this podcast.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Ep.1730 - Go to the Pain

    Nov 20, 20268 minAudio

    Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...

    Credit the people on this episode

  2. Ep.1729 - Sandbaggers and Superhumans

    Nov 20, 20268 minAudio

    When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...

    Credit the people on this episode

  3. Ep.1728 - How to Lead From Below

    Nov 20, 20267 minAudio

    You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...

    Credit the people on this episode

  4. Ep.1727 - Why Three-Week Pulls Don't Work

    Nov 18, 20267 minAudio

    A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why...

    Credit the people on this episode

  5. Ep.1726 - Level 10 Meetings: Identify, Discuss, Solve

    Nov 18, 20268 minAudio

    A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...

    Credit the people on this episode