In this episode, Jason concludes the before-phase planning series by explaining how to prepare every phase for a successful start. He covers aligning procurement and logistics with phase dates, kitting materials for crews, clearing roadblocks, confirming predecessor work, and following a structured planning cadence. The goal is to ensure that people, materials, equipment, information, access, and quality requirements are 100% ready before work begins. What you'll learn in this episode: How kitting, room kitting, and prefabrication improve flow in each zone. Why logistics and procurement must align with the phase schedule. How to identify and remove roadblocks before crews begin installation. Why high-risk work packages require more detailed planning and preparation. How to use a 12-week planning cadence to reach a confident go or no-go decision. Are your phases going wrong during construction, or are they starting wrong because the work was never fully prepared? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Hey there, welcome everybody out to podcast number 1649. I'm going to talk again about before phase planning. If you're interested in that, please stay with us. This is the Elevate Construction Podcast, delivering remarkable content for workers, leaders, and companies in construction wanting to take their next step. Get ready to step out of your comfort zone with Jason Schroeder as he encourages you to do better, live a remarkable life, and
expect more. Let's go. Welcome everyone. I hope you're doing well and staying safe out there. I got a couple of things to update everybody about. Good stuff. By the way, Lean Logistics, we get to move into our building on August 1st. We'll start manufacturing things out of there to support construction projects that need those supplies.
I'm pretty excited about that. Another thing is I decided to go back through Lean Book 5 and 6 and actually reduce and make it even sharper. I'm almost done with that. They're really good right now, but I'm going to do an upload. I'm actually going to probably come through the project manager book one more time and see if I can crisp up some things. I'm always attempting to reduce, reduce, reduce, make sure that it's super crisp. I just flew to Florida to meet with some Turner Humans in their Master Builder program.
Really neat group. I was able to visit with them. I love seeing that companies are doing training. We need to start doing that on a mass scale. In fact, somebody reached out to me about doing some field engineer boot camps, and so we're going to do one here pretty soon. I want to see how many people are interested. We'll do it either way, but if you're interested in sending people to the FBE boot camp, please let me know. We're getting close for that. The other thing I've realized is that there's a lot of major companies out there that
have patterned their production system frameworks off of what we teach. It's pretty remarkable, actually. It's really cool. It's an honor that that would actually happen. What else do we have? Okay, well, I think those were the main things that I wanted to go through here. Let's talk about before phase planning. I'm going to head into one of the final sections.
Stock the stations. Procurement aligned to the phase dates. One thing that we can do is really start tracking materials to the zone, broken out properly, and really start to get it. This whole thing with logistics is a big thing. It's a big deal. How do we get logistics into alignment with the phase, detrash it, and kit it properly
for the zones to where literally the crew just has to install? That's really the ideal. That kind of advanced planning can happen in before phase planning. The kitting, actually putting everything into kits, bins, rolling carts, and making sure that it is easy is a massive effort that you can start coordinating the details of with the foreman as you near the date, especially by the
time you hit the pre-construction meeting. I've told you before about room kitting. If it's not just like full kit, room kitting is pre-cutting and actually kitting so that everything is done actually by the room, not just the zone. That's really cool stuff. And then really locking in some pre-fabrication and making sure that everything is just flowing seamlessly to the zone. I mean, that's really what it's all about. And actually, I'm just going to keep going
here and finish this out, and then I'm going to take these podcast transcripts and also take the optimization section and turn it into a book about before phase planning because we just don't do enough of this. We just don't do enough of this. Okay, let's go into section five. Clear the track and set the signals. One thing that we can do is really, really, really start looking for finding and discussing and solving roadblocks. Tracking predecessor work, like as the other phase
is coming along, make sure that the substrate is acceptable, embeds are cleared, benchmarks are there, floor flatness tests are done. We really need to make sure that whatever this new phase of work is sitting on is ready to go. One thing that's really simple and silly is making sure all all RFIs are answered and submittals and shop drawings are approved. That seems pretty simple, but it's not always done, right? The one thing that we can do is make sure that equipment is on the way
and ready to be staged. I'm thinking like in a hole for a basement, you know, equipment that you might have to get on the roof, equipment that you might have to hoist into place for the exterior, right? Make sure that equipment is coming on site in a remarkable way. Scaffolding. Do you have scaffolding? Or actually, I'm just going to amp this up a bit. Do you have scaffolding or shoring? Any system that needs a lot of planning, right? Are you super ready to go for that?
Information permissions and directives. Make sure that our permits are on track. Make sure the inspector is on board. You might even have to do a pre -construction meeting with the inspector. Space. Actually mapping out where things go for line site inventory. That's really, really cool. And making sure that our quality inspection and our dates are scheduled 100% ready to go before the phase starts. Now I've probably given you, it's probably not that many actually, probably like 45 different ideas.
There's probably more. The bottom line is whatever you need to do to make sure that phase is successful, that's what we have to do. And I know it sounds silly for me to say it, right? But that is what we have to do. We have to get to a point where everything is 100% ready for that phase before the phase even ever starts. So think about like this, projects.
Oh yeah, let's do it like this. Projects don't typically go wrong. They start wrong. And you can actually take that down fractally to the actual crew itself. Phases don't typically go wrong. They start wrong. And the work in a zone for a work package, work packages typically don't go wrong. They start wrong. So anything that you can do for before phase planning, like let's go ahead and do it. And remember a given is that you do
the pull plan. A given is that you do the pre -con meetings. A given is that you do the look ahead planning. A given is that you do the supply chain management to the actual phase, right? Here's something that I want to follow up with, okay? Here's the step. Choose the phase and understand its risk profile and do everything you can to mitigate that risk. Classify the installation work packages and make sure
that you have detailed out and created full kit for your high-risk ones at least. Then 12 weeks out, confirm the route. Do your fresh size meeting, your pre-mortem, your 4D, your page-by-page sequencing, your IWP breakdowns, your zone density and buffer placement, your multi-train design. 8 to 10 weeks out, crew the train and make sure that procurement is on its way. Verify production rates. Visit crews on other sites. Make any foreman or trade or, you know,
supplement calls. Pull the long lead items and prefab orders against the dates. Make sure everything's coming on time. 5 to 6 weeks out, make sure that anything like scaffolding, access, kitting, room kitting plans are coordinated. 4 weeks out, make sure you're finding or removing roadblocks but permits are confirmed. Run the mock-up, the first-run study. Set the benchmarks. Make sure the conditions of satisfaction are understood. 2 or 3 weeks out, host a pre -con meeting for at least the trade, the
first trades. Make sure that roadblocks are removed. Test before you go. Make sure that logistics are 100% ready to go. And then 1 week out, go no-go baby. We need to make sure that we're 100 % ready. And hold this as a cadence. Do this before every, every phase. And this is what before-phase planning is all about. I'm going to turn this into something better than just a podcast. I'll let you know when it's there and I hope you've enjoyed these and on we
go. Please join us next time in elevating the entire construction experience for workers, leaders, and companies coast to coast. If you're enjoying the show, please feel free to share with your construction colleagues and help us spread the word by rating, subscribing, and leaving a review on your preferred podcast listening platform. We really appreciate it. We'll catch you next time on the Elevate Construction Podcast.
Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...
When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...
You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...
A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why...
A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...