In this episode, Jason begins a new series on what happens when critical components are missing from an Integrated Production Control System. He explains how paradigms, mindsets, goals, system structure, and rules shape the way a construction project operates. When owners, designers, stakeholders, contracts, and company leaders are not aligned, even strong project teams can be forced into rushing, pushing, bureaucracy, and anti-lean behaviors. What you'll learn in this episode: Why the owner's perspective can determine how the entire project is managed. How misaligned mindsets create delays, conflict, and unstable working conditions. Why the goal of the system must prioritize people, quality, and finishing on time. How contracts, agreements, team structures, and legal requirements affect performance. Why restrictive project rules can prevent teams from implementing lean construction practices. Are you evaluating the project team's performance without first examining the system they are being asked to work within? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Hey there, welcome everybody out to podcast number 1651. I'm going to start going through a pattern here of what will happen to your project if key items are missing from the integrated production control system. If you're interested in that, please stay with us. This is the Elevate Construction podcast, delivering remarkable content for workers, leaders, and companies in construction wanting to take their next step. Get ready to step out of your comfort
zone with Jason Schroeder as he encourages you to do better, live a remarkable life, and expect more. Let's go. Hey everybody, I hope you're doing well and staying safe out there. What I'm going to do with this is I'm going to do these podcasts and then I'm going to create an AI chatbot and a framework that will show somebody on a project site what will happen according to their
grading system, what symptoms they will see, and what consequences they will have. This is brilliant stuff. Let me explain what I mean. In the framework of how to run a lean project, you have planning a project on a rhythm with the traits. So you have the first partner system, the tag production system, and the last partner system. And then we have components within that are absolutely crucial to everything that we do, okay? And if any of those are missing, you will have consequences. And so I recommend that companies have their
own operating system and grade it every month. And it's predictable what will happen on a job site if you do or do not have them. Now, if you don't have them, all of our books are written around the system. And we have a new IPCS guidebook that just came out that will automatically give you yours if you want. It's super easy, super simple. I'm going to start going through them. And the massive companies throughout the U.S. are actually copying the integrated production control system.
I'm so flattered. So if you don't have certain components, you will have consequences. Let me go through some of the first ones right off. In external factors, I start with external factors in the first planner system because there has to be certain things that are in place for you to do your job well. One of them, and the five external factors, are actually systems levers in systems thinking. And the first one is paradigms. And the reason I chose that one is because you must have the right paradigm.
You must have the right perspective, to use a simpler word for me, with the owner. The initiators or the developer or the owner of the project must have the right paradigm. They must want to do this project right for the sake of people, process, and quality, and not just turn and burn. Okay? It has to be a component. If you don't have that component, then your owner will force you to use CPM. Your owner will force you to rush and push and panic. Your owner will move up the milestone.
And you as a contractor, even if you're well-intentioned, will be forced into classical business management and will be forced into doing things that are anti-lean. The second factor or component in external factors and in systems thinking, in the system lever, sorry, is mindsets. And I have changed the definition. I've just broadened the definition. I haven't broadened the definition. I've used that word to define that the
owner, the designers, the stakeholders, and your internal company have to have the right mindset as well within the paradigm. And they have to allow you to run the project the lean way, where you do it with respect and stability, and you're able to run it with respect and stability. If any of those, the owner, the architect, your stakeholders, or your internal corporate leadership do not have the right mindsets, at least your
life will be a living hell. And probably you will be forced to do some things that are anti-lean and anti -production. Some examples would be, you know, if your owner didn't have the right mindset, they'll force you into CPM and into rushing and pushing and panicking and into a toxic behavior with the morale on your, at least with your project delivery team. If the architect doesn't have the right mindset, they will constantly delay when they get your information and they will become adversarial and they
will withhold from you information, RFIs, submittal approvals, and your punch list. If your, if stakeholders are that way, they will slow things down. A good example will be like the facilities management not helping you with your air handlers, not helping you sign off the building, not helping you with coordination for your MEP. If your internal corporate leadership doesn't have the right mindset, they will force you to do things like work overtime, rush and push and
panic, use classical business management systems. I think I already said CPM. And at a minimum, even if you're a strong leader, they'll make your life a living hell. The third one is the structure of the system. Okay. The structure, no, actually, sorry. The third one is the goal of the system. Sorry, I got that wrong. The goal of the system. If the goal of the system isn't to finish well on time with people and quality in mind, and the goal is something else, you will achieve the other goal and the
project will fail. Like for instance, sometimes the goal is that a superintendent just wants to grandstand and keep everything in his head. Well, then you're going to have a project that's fighting fires. It will happen. Or let's say you have an owner's rep that wants to make a name for themselves and really bad mouth the general contractor. You will be inundated with bureaucracy and paperwork the entire time. So if the proper alignment of the goal is missing, your life will be a living hell and you will actually achieve a different
goal despite your best efforts. Sorry. Four, structure of the system. Let's say everything else is in play, but you don't have the right structure, meaning you don't have the right contract structure. You don't have the right legal avenues. You don't have the right support from the city. You don't have the right division one specs. You don't have the right prime agreement. You're not allowed to have the right team. Like anything that's wrong with the structure will become a limiting factor and lower your performance,
extend the deadline, and will hurt quality mainly. Number five, the rules of the system. The rules are, this also goes into like division one specs and your prime agreement. If there are certain rules that you have to follow this year, you'll especially find this with working with the government, right? Because the government's going to be very strict about you have to use CPM. You have to do flow trends. You have to have your monthly report. It has to be reviewed by a consultant. Then you will constantly be fighting to do
it the right lean way and your life will be a living hell. And eventually you will have to give up and make concessions. So that's an overall summary. AI can help me with the rest of it, but like literally if you're missing those key components, that is, those will be the consequences. And if you're your own developer and you can do it your own way, or your owner doesn't really care, then you are kind of home free, but you have to have those things. And sometimes people say to me, Jason, why
did you tell me if it was so hopeless? And I'm like, Hey homie, I at least tell you. So at least you don't blame yourself. At least you don't go your go home, shaming yourself. At least you don't pin your identity on the success of this project. You know, you're going to do your best, but that you're swimming upstream and it's not going to go well. And at least you can get a little bit more mental health with you and your therapist. You at least have to know it's not entirely your fault. If you run a dirty job, it's partially your fault. But if you run a clean, safe and
organized job site and follow the processes and you have those external factors going against you, it's not your fault. Like I don't ever blame somebody for making a mistake, but I do blame people for not following and implementing the, not blame people. I will, I will, what's the right word? I will fault the behavior of a person, not implementing the process. I will not accept that. But if they're following all the steps in the process and they still make a mistake, I'm good with that. I hope you've enjoyed this podcast.
Please join us next time in elevating the entire construction experience for workers, leaders, and companies coast to coast. If you're enjoying the show, please feel free to share with your construction colleagues and help us spread the word by rating subscribing and leaving a review on your preferred podcast listening platform. We really appreciate it. We'll catch you next time on the elevate construction podcast.
Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...
When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...
You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...
A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why...
A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...