Jason talks with Hal Macomber about how a construction team can align with designers and owners in pre-construction. Hal explains conditions of satisfaction and aspirational goals, constructability previews, and starting with a kit of parts. They also cover Woollard's 18 principles of flow, Goldratt's full kit, Kaizen versus Kata, kindness, and the plan to explain the bungee effect in a future episode. What you'll learn in this episode: The difference between conditions of satisfaction and aspirational goals Why constructability previews are better than constructability reviews How a kit of parts and a Takt interval shape design decisions early Why Woollard's 18th principle says flow must benefit everyone Why kindness and Kaizen as self-development help engage people Does your project team know its conditions of satisfaction and its aspirations? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Welcome everybody out to podcast number 980. In this podcast, I've got a friend and mentor, Hal Macomber here again. He's agreed to be on the podcast and he's going to teach us some really cool things. So stay with us. This is the Elevate Construction Podcast. Delivering remarkable content for workers, leaders, and companies in construction wanting to take their next step. Get ready to step out of your comfort zone with Jason Schroeder as he encourages you to do better, live a remarkable life, and
expect more. Let's go. Welcome everyone. I hope you're doing well. And I hope you're excited for this podcast because Hal's got some really cool stuff prepared. So Hal, how are you doing, my friend? I'm doing great. I'm with my grandkids, three of them, and we just finished building Lego. Oh, that's awesome. That's awesome. Did you do it as a part of a production system or was it just fun? Well, I was a four-year-old building
an eight-plus-year-old kit and he only needed my help to take things apart. 10-4. Well, I really am serious. Thank you for spending the time. I know you're very busy. I'm excited for the stuff that you want to talk about with Tacticonstruction. And then I also was, for anybody listening, I was asking Hal for a bit of advice. There was a need that we had with one of our clients and the question that was asked is, how can we better, meaning
the company that asked this was, how can we better align with designers and owners in the pre-construction process? How can we create a more integrated environment? What are some beginner steps? And so I first thought to myself, yeah, I bet Hal would be the perfect person to ask about this. So if we get even a little bit of that, I'll be delighted, but I'm super excited. I'm super excited and I got my notes ready and I'd love to hear your thoughts. Yeah, well, let's start with that.
Okay. So question about this, you're talking about a construction company that wants to know this? Yes, yes. Okay, cool. So there's two or three really key things, but one of aligning practice is to get clear about the conditions of satisfaction that they
have for the project. And by conditions of satisfaction, I mean the hard things that you can see, you can see them in plan, you can see them in the scope description, like parking for 264 cars or lighting, parking lot lighting that for third shift changeover, like sufficient for third shift
changeover. And so you can figure out how many lumens and how many lights we need to have and all that stuff. So this is, you can either see it on plan and you can look at the calcs and determine it's there or it's not there. Okay. So those conditions of satisfaction. Okay. The other are, so it's like, what are your ambitions? What are your goals that have you do
the project in the first place? So if it's a hospital, let's say we've got high turnover at our hospital and staff, and what we would like is to do things with this project that would positively impact turnover. So turnover will drop by half. So these are aspirational goals. It's our aspiration with this project that we're going to decrease turnover.
Okay. It's our aspiration with this project that this hospital will fill its orthopedics project, you know, excuse me, practices that, you know, we can attract more people to the practice. Okay. You can't see that in plan. Now what you can see in plan is, oh yeah, we've got room for more concurrent patients. We've got more room for providers.
We've got more room for procedures. You can see all that, but you don't know that you're going to have the bodies in the hospital. Okay. So it's your aspiration. So you want both of those things. What are your aspirational goals? And what are your, no kidding, conditions of satisfaction? Okay. Now, there's a kind of, there's a number associated with this.
The board of directors of the hospital will say, yeah, take care of these conditions of satisfaction and those aspirations. And we can give you $200 million of capital for this project. If I don't get all my conditions of satisfaction, maybe I won't even do the project. But my aspirational goals, you probably won't know
until sometime, let's say three years after you've been operating, have you operating the hospital? Will you have improved your turnover of nursing staff or will you have attracted more people from the region or those things? Now you could be betting on it and the board of directors might say, yeah, we think based on what we're seeing that there's an 80% chance that we're going to make that. So we're willing to give you the extra
money for it. But conditions of satisfaction, it's either there or it's not there. Okay. We can check before it's built. I like that. Get that? Yep. I've got it all written down. So those two things, particularly for a builder, you want to understand that. Now, why? Because you're going to be asked to put a number on it and you could have outside consultants, cost consultants give you the numbers. But that's not like having someone with the
skin in the game giving you the number. Okay. It's like, yes, if you want third shift lighting for changeover of staff on, let's say you're in Seattle on always cloud covered evenings, uh, we're now talking about lighting, bright lighting that needs to start at, let's say seven o'clock as opposed to bright lighting that
needs to start at 10 o'clock because it's always, you know, the light is, the skies are pretty dark. On the other hand, um, so you put a number on it. It's not just any number. It's somebody that knows that environment and says, yeah, I know what the standard lumens are for parking lots, but this is a parking lot that is going to get high turnover at 11 o'clock and we need to do that. So they can give you the number, the
engineers or the, or the architects can give you, you know, what kind of lighting is required and you can run the numbers and say, yeah, that's going to add one on $1 million or $100,000 or whatever it is to the project. Um, and you want to do that before people put, put, I'll say a large effort to CAD to modeling. Um, you don't want to model something that
isn't going to get built. And a lot of architects and engineers, they'll get involved quite early and they're spending your money before, you know, they're spending their money modeling before you are, you're willing to say, well, that's something I want to pay for. It's like, no, don't put those lights in there or don't put those extra procedure rooms or exam rooms in there until I know
that that's something I can afford that will fit my capital, my capital budget. Okay. So you want to have these ahead of time because no one wants to put something in only to take it out. Whether it's, you know, putting in physical construction that you're going to take out or it's putting something in the model that's just never going to get built. Yep. And the owner pays for it. And everybody else, now the owner has less money. And so now the owner is asking others
to cut corners. Yeah. So you want to do these things really early. So tell me, what more would you like to know? So that really helped me out. Let me tell you where my mind is going and I have zero. Please correct me if I'm heading in the wrong direction, but the no kidding, I've never heard the no kidding part. So I wrote down no kidding conditions and
satisfaction. And the aspirational goals, understanding those early on. And then in my mind goes to this and be easy on me, but this is where my mind is, is that making sure that the team is aligned to that and we're partnering with the owner and the designers that we have the right people in the right roles, the right meeting system organization, meeting the right interactions throughout the design and pre
-construction process to help accomplish them. And that the no kidding conditions of satisfaction and aspirational goals are a key part of that agenda. And that we take normal steps like our real-time budgeting, constructability reviews, our scheduling, our early design assist partners. And we really rally them around those conditions and satisfactions, sorry, the conditions of satisfaction and the aspirational goals.
And then one thing that I thought of was, I really advocate and just like everybody else does, but like a really good risk review meeting or a fresh eyes meeting before you go to construction, I think it'd be neat to actually do a plus delta of how well did we do in design and pre-construction and then do it like a little pre-project, pre-flight kickoff meeting with those stakeholders. So that's where my mind went. Okay. Maybe I'm being too solutionizer on this.
No, just. Oh, go ahead. You're going to get really pragmatic people if you're going to be talking to the construction team, they're going to want you to do stuff like that. So let's just call it a plus delta. Where are we? You're joining the team. You're the contractor. You're joining the team. They've been together for a while, owner and architect and some early engineering for certain structural,
yes, mechanical, electrical too. But you're going to be spending money. How are they doing? How is the owner with all that? What's on the table? What are they struggling with? What hasn't worked? So plus delta, doing a serious review of how the team's been functioning is a good thing to do. Now, a lot of people will say, well, wait a minute. That's going after all our dirty laundry. No, we're going after our relationship.
We want to be a learning team. And there's been a lot that's been learned up until now. Let's share it. So that's really a good thing to do. As far as constructability reviews, I hate them. You should be doing constructability previews. Okay. Don't put something in model that you don't know two things, how it's going to get
built and second, what it's going to cost. Ah, I like that. So you do a preview and I'll give you a good example. There was a famous architect that designed a fine arts museum. And they picked, if I remember right, they picked the architect and the contractor at the
same time. So from the start, the owner, the architect and the contractor involved, they go through all the work. They design the general, they got a general layout. They know the materials are going to work with, you know, the cost. They're really in good shape. Time goes on, the project's released. They eventually do buyout and they're going, one of the finishes in the building was Italian
plaster. And so the contractor goes looking and this is in the part of the US where there are no one that could put, could apply Italian plaster. So they look and they look and they look all west of the Mississippi, it's like nobody. They look east of the Mississippi, they find six people in Providence, Rhode Island. So the contractor comes back and says, hey, architect, we need to make some changes.
We need to change the surface. And the architect says, sorry, all the, the both acoustics and the lighting and the protective environment for the artwork, it all has to do with what Italian plaster will do for reflectivity and all that stuff, including sound attenuation.
And it's like, we can't change it. So they had to go to Italy and get multiple dozens of people, set up a man camp for quite an extended period of time, get all the permits to bring them over the visas. Like this was a big oops, but they didn't consider, it's like, yeah, it's in the model, but is it constructible where we are with the people that are local? They never looked at it.
And this is just one story. This is a story that repeats itself all the time. And I mean, I had a situation where I built a house over 15 years ago and I wanted geothermal and I have, I'm on top of an aquifer. It's a perfect place for geothermal, except there was nobody that could build it. Like I would have had to go about 300 miles 15 years ago to get a
crew of people who could do that. I'm a homeowner. This is not like, no, don't spend any more money on this. I mean, I asked right off, who are the specialists that can do that? I'm smart. I was smart enough at the time to do that. There are other things I wasn't smart enough at the time and I didn't do those things and it cost me money, but that one I was. And the contractor says, oh yeah, I've wanted to do a geothermal system. Well, we can get the guys for you.
It's like, not 300 miles away. No, you're not going to do that. But this is a, you've got to get, you've got to, this is constructability now. We're not just talking about clashes. We're talking about procurement, where the material's coming from, where the people's use, like experience in using that material. How much, what do we need for skills? Can we take people, a few skilled people
and a whole bunch of newbies to the project? Or is this going to be three licensed people and one helper? Like what's it going to be? As opposed to one licensed people and three installers. You've got to find, you've got to understand this stuff up front. And when the owner can understand it, as well as the contractor can understand it, there'll be, I'll say, incentive for everyone to get
on the same page with that. Yeah, I love that. The whole time you were talking, I'm just imagining a designer looking over to the right, to whoever the builder is and say, hey, can you do this with the Italian plaster? Like, is this possible? And like having those conversations early on in an integrated way, right? Like that, it was so vivid in my mind as you were describing that. And it also, going back, the book that
you asked me to read a long time ago, The Triumph of Classical Management Over Lean Management, talks exactly about that. The feedback loops being so disconnected, like that it's almost too late. I'm kind of thinking that when you're saying, hey, it's not constructability review, it's preview. It's like, let's get ahead. Let's not have a, let's have the feedback loop be before we get into the model. Like, I think that's brilliant. Yeah, way before it's in the model. Yeah.
Yeah. I think you want to start with a kit of parts and you want to let, I'll put it this way. If this is an infill project, let's say we've taken down a six-story building in between two buildings and you know what the planning board is or the neighborhood committee is going to allow for exterior materials.
It's like, okay, we got to put a six-story structure up here. We're not going to get the kind of footings we would be able to have if we were in an open area. It's like, what are the materials we're going to have to use to do this? And then the structural engineer and the architects are going to work together and they're going to fit something in. And that's like starting with a kit of parts, but go further. Like, know ahead of time that we're going
to be putting in heat pumps, not whatever, you know, central air systems of standard type. We know what we're going to do before we do it. And when you start with a kit of parts, it doesn't constrain the architect. Architects are creative. Doesn't constrain the engineers. They're creative.
It says we're going to work with these Lego pieces and we're not going to work with those other ones. It's that kind of thing. And you make that decision early up, early on. And you also say, and by the way, we're not framing on site. We're going to bring in trusses. We're not going to do, we're going to not lay a brick. We're going to do, you know, precast wall systems. We're going to, you know, it's this kind of thing. We're going to prefab these items, et cetera.
I'm going to do that. And so here I'll take a little segue here to tack construction. This project is going to be built on flow. And we want the interval of the pace of work to be every two days. So every two days, whatever is being installed is installed. So what are the systems that we need, that we can assemble and do that? What are the systems we need to bring in that are already assembled? And all we have to do is install
them to do that, et cetera. That's brilliant. Oh, and we can't have, you know, VCT and get the patterns that we want. We need to do something different, right? I love it. That's perfect. And to answer your question directly, I have such a cool outline as you are talking. That answers my question perfectly. Thank you so much. Can I ask you a question before you
do the segue into tact, if you don't mind? Sure. So you had sent me a message, which I appreciate it very much. I already have the books on order. But, and I may not even need to reference it. I'm pulling it up right now. But you had said, read Eli Goldratt's Rules of Flow. And also some books by Bob Emiliani. And in the meantime. Yeah, Frank G. Willard. So Bob Emiliani published, yeah, I've just lost
the title of it. But I can go look it up. But Frank G. Willard, 100 years ago, he was in the automotive industry. And he created the principles, he called them the principles of mass production flow.
And Bob Emiliani republished that book. The book that was actually published first as a book in 1955. But his early papers were published in 1925. And so Frank G. Willard preceded Teichiono and the Toyota production system and all that stuff. There's no way that Toyota didn't know about Willard's work. No way. Okay.
And both Willard and Goldratt make huge contributions in the area of flow. Huge contributions. Willard had 18 principles and I think it's eight rules of flow from Goldratt. If I remember right. Okay, so real quick. So I'm on it. I've already reached out to Bob to do
a podcast and I've got the books coming. Sometimes when a mentor asks or says to do, like sometimes when you said, hey, go read Understanding Variation or the Triumph of Classical Math. Like I'll just go read them and figure it out. This could be that same thing. And I'm fine to go take that journey and learn it for myself. But is there any why behind? So I'm going to do it. But is there any why behind it? What did you see that either you said,
hey, this would make it better or alarmed you or, hey, we need to steer Jason back in the right direction. Was there anything there that you can give me from a context standpoint? So I'm not doing that. I didn't make that recommendation because there's something I'm going to miss. I made the recommendation because it's an opportunity to stand on the shoulders of two giants, both Goldratt and Willard. And both of them have thought extensively about
it. And from their perspectives, their solutions are comprehensive. I'm going to give you but saying that I'm still going to give you one answer to the question, OK, will really help you. So Willard identifies 18 principles. And then at the end of it, at the end of the 18, in the next paragraph in his book, or maybe the next page of the next page in the book, he says, in my 18th principle, he really
going to take this to heart. In fact, the 18th principle, in my opinion, should have been the first principle. And what he says is everyone needs to benefit from flow production. If they aren't, there's something that you don't have right. So the owner, the customer needs to benefit from it. The suppliers need to benefit from it. The designers need to benefit from it. The manufacturers need to benefit from it. The people putting the work in place need
to benefit from it. And they need to understand this like what you're doing well enough so you can find the benefits or see that you haven't produced one for one party and find a way to produce it. OK, well, that's that's genius. Yeah. And you called these, you said they're called 18 principles of flow. I'm pretty sure he calls them principles.
OK, yeah. All right. And I'm just searching it on chat GTP here, and it's not coming up. So I'll probably I'll need to dig deeper. But I love that. That's that goes back to that. Well, maybe it's not the exact same thing. Hopefully I don't make an idiot of myself. But the concept of customers, I learned that in a lean core training, you were you were a part of that back in the day. When I was around DPR, but the the concept there was that everyone around you is your customer.
You're not going to finish the project benefiting one at the expense of others. They all need to be treated in a like manner and benefited and elevated by the outcome of the project. Maybe that's not the same thing. But let me just say that that concept makes me intrigued by this. So I will go research it. Good. Good. And I just pulled up Rulid's work. So it's mass production flow. And he does call them principles. OK. Yeah. OK. Ten four. I love it.
All right. And I'm going to unless the 18th principle, the 18th principle, the system of production must benefit everyone, consumers, workers and owners. OK. Unless the 18th principle was satisfied, the flow production system cannot reach full stature. And if it does not, the equipment and the pertinences necessary for flow production will not be utilized to the full. They might even, in some instances, become an embarrassment. The principle of benefit for all is not
based on altruistic ideals, much as they are to be admired. But upon the hard facts of business efficiency. OK. Well, he's really committed to it. It's like I remember. So I caught that. I wrote that down because I started my my second book on the pocket sensei. OK. And I think is brilliant, by the way. What's brilliant? Your book. Oh, my book. Thank you. Yeah.
Yeah. So this is Wohler's. Things have changed a bit. We've learned since 100 years ago. We've learned 70 years because in 55, he published his book. So in the last 70 years, I was a two year old when he published the book. But you're only 38 now, right? So, yeah, something like that. Well, I'm excited. Let's use this as a jumping off point. OK.
To talk about flow and our last conversation, we were talking about respect for people and respect for human nature. And as I've been writing and and reading more about it, what I'm really understanding is. Let's just say instead of people, let's just remember. We've got humans all over the place, whether
we're in construction or in manufacturing or engineering or software development. We aren't getting any of this done without humans. And yet we act like they are. Fungible resources, they're interchangeable resources, resources like like electricity is a resource. I can get electricity from the power company. I could put PV on my roof.
It's interchangeable. It's like, no, no, no. The humans in the system are. Over the long term, yes, we can make we can make substitutions for the ones we the people that are in our system today, but certainly in the short term, this is these are people like you and I. They have ambitions.
They have cares. They've got worries. They've got loved ones. There's people sick. There's my cousin dying. It goes on and on and on. And we need to design. What let's just call it a production environment, whether the production is. An engineering artifact. Or, you know, a bill of material and
a purchase order that there's there is some output, some function of everybody's of everybody's work and. Everybody as a human is pretty complicated, and I say pretty complicated. Yeah, we we got through 12 years or 16 years or maybe 18 years of schooling.
But with the same worrisome people were the same people who like to laugh or don't like to laugh or like to dance or don't like to dance. It goes on and on and on. And so. To start, we got to remember, it's people that are going to make our production systems work. Well, we've had some broken down production system in the construction industry for a very long time, and we could go into all the
ways that it's broken down from contracting that ends up in litigation to whatever. But we're talking about. A flow based construction process, we're talking about tech construction. And. We need to think about this and I want to go through the details of it, but I'm going to say we need everyone in that system and a tech construction system
playing a role, maybe the role that maintains that achieves and then maintains and improves flow. And that means people who, to this day. The Lane Construction Institute is 25 years old. We still don't have mechanics and carpenters and all kinds of installers from, I mean, installing
flooring, you know, adhered flooring that is a very technical job. And. You can't use any old mastic. You need to know the right material and what you're bonding it to. It's like this is a technical job. There are knowledge workers everywhere. Some of it's tacit knowledge, right, in their fingertips.
Some of it is like, yes, let me do the calcs first before I give you the answer. And that might have to do with, can we get all the concrete placed before? You know, the end of the day, or I mean, it's pretty serious, right? Yeah. But we need people who are installing the work to to say. Hey. I'm going to break flow today because of this.
They need to be able to say it before it's happened. Not just after it's happened. And maybe I mean, today, a lot of time, it doesn't happen until the following week. Oh, yeah. On Tuesday last week, we broke flow. Yeah. Well, why didn't we know about it? On Tuesday. Yeah. Well, we have morning meetings and by the time morning meeting came around, something else was on the superintendent's mind. So we we didn't want to bother him or her. Yeah. So we didn't bring it up.
It's like and not bother him. Yeah. It's a human being who doesn't want to go through humiliation by bothering someone, their boss's boss. You know, first thing in the morning. Can I say something real quick? So we do a lot of the tax simulations around the country. And Kevin Rice was up in Canada doing one recently. And he was like, Jason, I was so happy and then a little bit confused or
frustrated. And he did this on podcast number 31 of the tactic construction podcast. We followed your term on that. And he was like, we'll get them in that simulation. The foreman on that job, just that job. And they're like, OK, I'm a little bit into your zone, but I'm past my attack time. Can I do I have your permission? Should we eat into a buffer? Should we? How can we prevent variation? Like he's like, these people, these foremen are having brilliant discussions in this simulation.
And I'm like, they've got it. And then they go into the huddle and it's like silence. And yeah, silence. And I haven't had enough time to think about this. And I'm like, so I've got this big question mark. Like, because this whole time you're talking, I'm thinking, training, training, training. But I'm assuming that that's not it. And respect, respect, respect.
OK, OK. Well, let me say one other thing. So you can guide me in the right direction. We all know that paperwork and visuals and things like that don't solve human problems. But in our huddles with our clients, we've designed tact control boards that will encourage better conversations. Where's your ball tonight? Where's your slowest zone? What's the slowest tact wagon? To switch the conversation from, hey, where are you today?
How many men do you have? Or how many people do you have to, you know, let's look at some real data here, right, that are based on principles of flow. But when you say we need them to think it before it even happens, that goes even beyond things like those tact control boards. So, like, now my mind is like, how do you go beyond the tact control boards? How do we get these foremen who know how to talk the talk in the simulation to have the discussions in the huddle? And you just said respect, respect, respect. So I'm excited.
What does that mean? I just batched a bunch of stuff there. I'm sorry. I do that all the time. You're good. Oh, so let me just say the respect, respect, respect. Again, I'm a laborer. I'm unloading a pallet of goods that, let's say, are going to be installed in the next couple of days. And I either break something or I notice
something was short shipped or whatever. Well, that may mean, but probably likely mean, an attack construction environment. That if I have one, let's just say, electrical device that is damaged and can't be installed, that means there's a miss. We've broken flow. There's this term.
It's a gold rat term. It's called full kit. Get back to the full kit. If we're not flowing, understand the full kit. Well, the full kit for the operation means the device is there. The tools are there for installing the device. Whatever it is, the fasteners are there for installing it. Whatever needs to connect to it is going to be there. The full kit is there. And that full kit, I think it's a
gold rat term, includes the people who are going to do it. So the skill is there. We're not missing that either. The skill to perform within the tack time. We know it's four devices every two hours and the skill human is it to do it. And this notion of full kit is very similar to making sure that before we promise to do work, that we've removed all the
constraints that keep us from installing the work. That's a classical look ahead planning practice in the last planner system, this constraint removal. Um, well, once you're in tack construction, it's like, yes. And there's a different way of talking it. Let's make sure the full kit is there. I like that.
I'm going to put that in the tack steering and control book. Well, make sure you attribute that to gold rat and look that up. I know you're getting his book, but that's I would say, read it and read it. Um, let's, let's be sure that we're going to say that correctly. Okay. Perfect. Well, that's one piece, but there's another side of that piece and it gets to your, yeah, there, the people are having these great conversations, but then we have a standup meeting
and they got their arms crossed or no one's talking or the superintendent says something that he would, he or she was misinformed, but nobody corrects the individual. And it's like, what's that about? Um, we needed, we need the environment that has people engaged. And I, I think we've got a environment in construction that in oftentimes, not always, but
oftentimes people feel threatened, um, in speaking up. It's not just like they're afraid to speak in public. No, no, no. It's not like that because you can see them at the, you know, Friday night's dance, doing the polka, you know, it's like, they've got no problem singing or whatever, or dancing or whatever. It's not the being on stage that's a problem.
It's, they've been punished or they've seen people been punished and they don't want it to be them. So we need this, this environment that people want to engage. And most of the time there's very, I, and this is not some of the time, most of the time there's no effort put into how are we engaging people? Got it. We're not thoughtful about that.
Now we know the right way, the way that engages people and it's called Kaizen. Okay. It's the, it's the best way of, of really engaging the whole population. Because if you say, Hey, I want you to make your job easier. I want you to make your job safer. I want you to make your job more interesting.
What's more engaging than, wait a minute, I'm doing this for myself. Oh, and by the way, I'm going to learn something while I'm doing this. What's more engaging than that? Yeah. But we in the construction industry, we're not serious about all the people all the time everywhere are engaged in making themselves and the
business better. We're not serious about it. Okay. Real quick. I've got a couple of questions. I'm not trying to be too literal. I was actually talking, I was actually talking to Kevin yesterday and I was like, there's two concepts that I really need to learn more about. One was target value design, but then the other one was Kaizen and because people throw around the terms Kaizen and Kata and I
always mix them up. Like what, what reference should I use? Or could I use to like really go get a fundamental knowledge on that? So first thing you should, so let me just take out on Kata first. This is simple. Kata is, it's a way of practice. It's a routine. It's a set of motions.
Most commonly understood to be with martial arts. I'm not a martial arts person, but my eight-year-old grandson is and I go see him and going from white belt to yellow belt to green belt to whatever belts all the way to black is a process of getting better and better and better and better at Kata. And it getting better. It's like then in the moment, your body
is not, your mind is working. Your body, your whole body is at work. So Kata is about a routine. Okay. Kaizen is generally translated. That's a Japanese word, Kaizen. It's generally translated as continuous improvement. But as continuous improvement, there's a different word for continuous improvement than Kaizen.
That word is Kairyo. And that's an improvement. That's an improvement in the process. That's an improvement in the product. That's an improvement in how it's made. That's an improvement in how it's installed. It's an improvement there. It was Kaizen that led to Kairyo. Kaizen is the self-development, right?
The individual developing him or herself. That's what Kaizen is. That's awesome. Okay. But it's not how it's used. It's used as the continuous improvement in the environment. And people talk about and measure that in terms of the seven ways to the eight ways. And it's poorly understood. And it's why I'm writing. I mean, it's always intended to write volume two of the Pocket Sensei, but I'm writing
it now. We've got too much of a problem in the work situation. The humans don't want to work in construction anymore. It's like it's not attractive enough. And people are leaving construction, let alone they're not even going to construction. We've got to change it because we got a lot of building to do. We got a planet that's burning.
Yeah. And real quick. So what I heard you say is that in order for people to even fit into the tech construction, knowledge is one thing, but they have to have the right environment. And that's going to take the right culture and environment on the job. And then even with that, we have the other opportunity, I'll call it, of they may have experienced pain or what did you call it? You said, I always lose my notes.
But anyway, they may have seen other people be punished or shut down. Oh, yeah, yeah. They may have been punished before. So they may have pain or punishment from previous jobs. So even if you do have the environment, you have some pain or punishment to overcome. And we have a difficulty or an opportunity of people even wanting to be there in the first place in construction. Right. Yeah. And this is at one level.
Let's just start being nice. That's like, what's it? It's not National Kindness Day, although there probably is a National Kindness Day. But do a good thing day or something. What is it? I can't. There is a day. I forget the name, but do a good thing. It's like, yeah, but it's not just for a day.
It's like, come on, we can be nice to each other. Yeah, yeah. That's such a good point. I was doing a podcast with Adam Hoots earlier on this week, and he was talking about kindness. And I had never thought about it before, because just like me, I'm blind to this. Or just like everybody else, I'm blind to this. And he was like, go out and be kind. And I was thinking about it. And he brought up this point. He said, when we get in trouble, people will say, push, overtime, weekends, you know, trade stack, trade burden, materials, throw money at the
problem. And I was thinking, and I gave him this. Well, because I was listening to him, what I learned from him is like, that's going to, in most cases, unless you don't have enough people already, going to counteract, right, your production in this production spiral, I've got something I want to ask you before we're done. And I was thinking, even if somebody was like, what's kindness going to do? That's only going to give you a little bit of benefit. But if you look at the delta between even if it was just a little bit of benefit and the dumpster fire you're going
to create if you start pushing and rushing, you know, that's a big delta. And then I said, at the end of it, kindness probably isn't just a small gain, it's probably a huge, huge gain on a project. And I don't know, I've always been around jobs that did it that way, and it worked out well. But I see a lot when traveling the United States, people are just not nice. There is a lack of kindness. So I think you have a big point there. What I'm struggling to do is be able to explain it in a compelling way.
I need to dig deep and find a way to repeat or scale what you're talking about in a compelling way. Because it's a big topic. Well, yeah, I am too. It's like, I mean, this has been on my mind for a long time. And both, you know, a lot of things in my life got in my way of proceeding with. I mean, I wrote the book six, seven
years ago, my first book. And fully expecting within the next two years, I'd have the next volume out. But I didn't. You know, I let things go. But boy, you know, we've got a lot to do. We don't have enough housing. We have so many unhoused people, so many unhoused people. And this is and it's getting less and
less likely that they'll get housed because housing is more and more expensive. We got to turn that around. So there's so much to be done. But we better be nice to people because they aren't going to join the industry. And then housing is not even going to be possible to build. You know, it's like this is the system is broken. And, you know, Adam and I've talked about the kindness thing before. We're not the only ones talking about kindness,
for sure. But kindness is a place to start. Kindness doesn't hurt us. I think, you know, maybe you won't invite me back. I think we need to get to love. We need to be in a real loving place with the people that we work with.
And let's just start by putting real toilets in place on construction sites. Let's start with putting a place to eat, a cafe. I mean, you look at what, you know, hot shot companies who are paying $100,000, $200,000 to have people come to work for them. And they give them free lunch. It's like, come on. These are people that are breaking their back
sometimes, literally. And we're not even giving them a place that they can have clean hands. And eat, you know, out of the sun or out of the rain or out of the wind or out of the cold. Come on. I agree. You know, it's interesting that you talk about housing. I think I've mentioned this before, but we
started Lean Built. And the developer that we're working with has a contract for a couple of properties here in Phoenix. And we're going to be their builder. And the goal is to stream. I mean, multifamily is perfect for tax. I mean, we've talked about it multiple times. And I was thinking about it. We will, this sounds arrogant, but we will have no problem hiring people for our company.
Now, trade partners is a different story because they might be skeptical until they come work there. Hiring, taking care, our sites will have beautiful restrooms, beautiful lunch areas, beautiful environment. It'll be clean, safe and organized, just like we've always run projects, right? But for the trades as well? For the trades as well, yes. And the idea is we want to, instead of me running around the country training, let's create a site with a larger trailer and viewing spaces to where they can come see
how these production systems work. And every time I get on a podcast with Hal, we go use it as a test ground to implement and increase the level of respect. So I don't have any worry. The trade partner, we're going to do everything. We're going to make the trade partner's life great. And they're going to make a ton of money. But once they work with us on the first job, I don't have any worry about the second job. But I don't worry about people working for us because we know how to do it. I've learned these things. I've learned these things from you. We're going to implement it. We have the money.
The developer is 100. The developer already in Canada already has custom built bathrooms, custom built lunchrooms, really takes care. I mean, these sites are beautiful and we help them with their operations. In fact, every month we're on every one of their jobs. And so I don't have any worry about being able to do it ourselves. Then my mind goes to how can we encourage others to? And the best thing I always come up with is let's go, instead of Jason talking
about it, which there's nothing wrong with talking about it, because obviously you're talking, I'm learning, but we're going to go showcase it, video it, invite people to see it and see what we can do with this. Maybe do some kind of mastermind and see if we can scale it. My point being is you're talking to me like we know how to do it right now. What you're talking about, we know how to do. Be kind to people today. Now, how do we get it to scale? And so I, yeah, I'm a hundred percent
on board with you. Let me just say that. Yeah, it's, I don't know if, hold on. I don't know that if in my lifetime I'll see that it has, it's going to scale, but it has to scale because putting the climate deniers to the side for a second, it's an existential crisis for the people
on the globe. I mean, it really is. And so we've got to take care of all those things that are going to keep the temperature from getting to two degrees C because it's going to be at 1.5 a lot earlier than we had modeled. Well, I totally agree with you. And I've been watching a lot of science shows lately, and Kate was talking about, Jeff
Bezos and Elon Musk are talking about how can they start building in space? And the first thought was, we don't even know how to build on earth. You hear Neil deGrasse Tyson talk about terraforming Mars. He's like, we can't even agree on how to not trash our own planet. So even understanding how to not trash our own planet, we might have to go to a different planet. We have got a lot of ground to cover, and we're still messing with the basics. You know, one thing I want to say, I'm reading a lot from W.
Edwards Deming and the books that you've recommended. You all knew, I'm not saying you're old, I know you're only 38 to 45, but you all knew we were in crisis decades ago. But the United States didn't. It's coming clear to me that Japan, post -World War II, hey, we're in a crisis. We need to get out of it. But the United States is also in crisis, but people aren't realizing it. And I'm wondering if we're going to be a whole lot worse in five years than
we even are today. I wonder if we've just begun to see this problem manifest. Like, it's pretty scary. I'm not trying to be doomsday. I'm just saying, like... Yeah, I'm optimistic. Okay. I really am optimistic. I see people more and more, just not in my tight circle, but, you know, in the larger circles that I'm in. I see people taking better care of the
environment, personally. What we need to break through is taking better care for our community, not just for our household. Ah, got it. And I'm just going to use heat pumps as an example. This is a really quick one. You can have put far less carbon in the environment with a heat pump than you
would have with a gas pump, and do it at a lower cost than we're doing today. It's like, go to a heat pump. This is a no-brainer. But we get all this contradicting noise. Oh, yeah. It's like the gas companies are saying, yeah, use natural gas. It's a green fuel. Well, no, it's not.
And it's a transitionary fuel, yes, but it's not green. But you said you had one question you wanted to ask before we wrap up here. I know we've taken time. I think it's probably, well, let me ask this. On our next podcast, would you help me name, think through, and really understand the way
you do this concept? And I've butchered this, so please be gentle with me. But one of the things that I think people don't understand is the effects of stacking and trade burdening, and when they get out of the flow. And I have owners and architects and contractors all the time be like, oh, we're behind schedule. Oh, we'll just add more crews. We'll just throw people into the area. We'll just rush and push.
And in my own mind, I called it. So here's what I thought. I was like, this is a bungee effect. It runs in this direction, and it springs back. So in my observation, and none of this is correct, so this might freak you out for a minute, but if you're in a flow, and a designer or owner or somebody or contractor says, hey, just go ahead and stack that trade. Ask them to do arbitrarily twice as much work as they were originally going to do
as a part of the flow, and burden them, and with no thought, just dissolve the logic in the schedule and just assume that they can make it happen and just throw resources and time at it, work overtime, work weekends. I see in my brain, after learning from you and other people, that there's these 14 things that will spring it back in the other direction. And if you don't mind, this might be painful because you already know, but we're now batching. We now have context switching.
We now have larger team sizes, complexity and communication. We have changing leaders, changing crew composition. We now start working overtime. We have difficulty with onboarding. It takes quite a bit to onboard new people. We're now not focused on quality. We're not removing roadblocks. All of these key 14 things come into play, where now we've created this variation, and now it springs it back in the other direction. And instead of actually doing an overlap and
being ahead of schedule, they're actually farther behind. And in my mind, I call it the bungee effect. But I'd love to know how to name it, flesh it out, and really vet that concept. And then I would love to challenge, elevate our team to come up with a graphic and a really great way to explain it so that people can see and get past the misconception that you can just stack schedules and still win. Because what we see the numbers showing is that when you start stacking schedules, it actually
starts to push farther out. So my question to you is, I mean, I know you know all of that stuff, but would you mind helping me to flesh that out? Yeah, I'd be glad to. I don't have a thought specifically about trade stacking, because it's the wrong thing to do. It's like, it makes your project longer when you stack.
Yes. It doesn't make it shorter. Yes. So, but there's this, I don't know, contrariness to that. But there is, we've got to demonstrate that the thing to do when we need to make up time is to have shorter intervals
of work. So if we're on a one-day tact, if we're in a five-day tact, where way too many projects are on a five -day tact, we should be on a two -day tact. So we have three two-day periods in a week. And then we need, if that's not doing it, we need to cut it to one day. Because every time we cut tact, we bring the project in sooner. And this is straight math.
And people don't understand the math. And by the way, this is really easy. It's simple. It's simple algebra. It's simple algebra. Yeah. Um, we've got to get a new common sense around why is a 15-minute tact time far better, far better than a five -day tact time. Okay. I like that. And so when you mentioned, and I know
I'm dragging this out, we'll close. I've taken up too much of your time. But this is what I'd like to explore. Because we are talking currently about the benefits. And we're even talking about the math. And we're talking about the production laws because of you. And I don't think people have been watching enough to see that when you stack or burden that it extends and why. So I want to articulate that. And here's what got me thinking about it. You said respect for human nature.
You told me that the last time we were together. And I was thinking, I was thinking to myself, and I'm not being insensitive. I hope nobody gets after me about this. But it's fun to get after you. That's funny. Well, I'm just saying like, I live with people who have been diagnosed with ADHD. And there are a lot of people in this industry who have that condition or behaviors that are associated to that diagnosis.
And people with ADHD, I'm coming to learn, respond better to emergencies or deadlines than they do boring tasks. And what I'm asking them to do is go pre-planned. Boring. Do training and get really good at your skill. Boring. Do preventative thinking with removing roadblocks. Boring, right? So, your explanation of what respect for people
really was originally supposed to be translated as has got me to think, our people nowadays are incentivized to stack trades, rush and push, be busy, be forced by deadlines. And there's very little motivation in our contracts, in our environment, in our cultures to do the pre-planning, pre-thinking, pre-modeling, like you were talking about early on in the podcast. And my mind is in the spot of
how can we make this pre-stable planning, how can we motivate people to do that? How can we incentivize people to do it? How can we make it more natural? How can we make it more of a part of the system? And so, all I'm trying to do, and I would love to do this on the next podcast, is how can we get people to not only see what you're talking about with the math, but also see the effects of the stacking and burdening and being incentivized by the wrong things so they get the
holistic picture. That's all. So, I really think I'm going to be able to learn quite a bit from you when we go through that. Okay. So, the next one, it's math plus planning plus improving. Okay. And that is the base. Those are the base practices. Okay. Okay. Perfect. Now, yeah. I love it. And just, I want to say, and the
improving is getting everybody involved, too. Okay. Not the planning that's foreman. It's the planning that's everyone. Okay. Perfect. Okay. Okay. Well, I've got a bunch of stuff to ask on the next one, Hal. Thank you so much. Please, not before Christmas, okay? Yeah, no, not a problem. Well, let me ask you a question. Is there one sentence or a bit of advice that you would like to leave with anybody before we close it down?
Yeah. We need more than a little kindness in the world. Okay. We need to go out of our way to be kind and set the example that we want to see. Oh, that's awesome. Okay. Well, now's the perfect time. I promise you, I'll remember that. Thank you, Hal, so much. I hope everybody's enjoyed this podcast and on we go.
On we go. Please join us next time in elevating the entire construction experience for workers, leaders, and companies coast to coast. If you're enjoying the show, please feel free to share with your construction colleagues and help us spread the word by rating, subscribing, and leaving a review on your preferred podcast listening platform. We really appreciate it. We'll catch you next time on the Elevate Construction Podcast.
Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...
When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...
You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...
A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why...
A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...