What does a construction site look like when planning, logistics, safety, and production all work together? In this episode, Jason shares his second round of takeaways from Japan after visiting an active project site and seeing a highly structured production system in action. Jason breaks down the planning layers he observed from the summary schedule and critical flow map to the Takt plan, six-week look-ahead, weekly work plan, and day plan and explains how zoning, worker huddles, standardized logistics, clean access, and visual systems created a site that felt calm, methodical, and continuously flowing. What you'll learn in this episode: How multiple planning layers work together to create predictable production flow. Why time-by-location planning and clearly defined zones improve coordination. How morning worker huddles and afternoon foreman planning support daily readiness. Why cleanliness, standardized access, logistics, and visual systems matter to production. How leadership behavior can influence how deeply Lean is implemented, even in Japan. Does your job site feel like it is constantly reacting or is everything designed to flow? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉). Also, here are links to our YouTube Channels: 路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg 路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt 路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured 路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Hey there, everybody. Welcome out to podcast number 1717. This is going to be Japan takeaways number two. If you're interested in that, please stay with us. Welcome, everybody. I hope you're doing well, staying safe out there. I'm super excited about today and going through some of the cool things that we learned in Japan on day two. And I do want to close out the first one by saying that we got to
a really nice hotel, I think, in Koyama. And when you get to the hotel, you put on pajamas and you wear around slippers. And on each of these days, I got to go to the Japanese onsen, which is the hot bath, which is where you strip down to nothing. You have a little washcloth that you put in front of you and then you wash and then you can go into the hot bath. And it's just really a nice experience. Anyway, the second day where we went to
a project site and when we get to it immediately, I'm not disappointed. Like, it's super nice. We were a little bit like a little bit in a rush because of the schedule, but we got to spend some good time there. You take your shoes off to even get into the construction office. I thought it was phenomenal. Now, the Japanese construction company, and it's pretty common there, there's a couple of things from a scheduling standpoint that I love. Number one, they have a critical chain graph,
which shows the lines through their different phases and which ones are critical. But it's not a critical path. It's a path of critical flow. The other thing is, after that, they turn it into a tax plan and everything is built off of a rhythm. So they do it like we do. And then they filter out a six week look at it. And it's all in Japanese. Oh, my God. Sorry about those yawns. I am not able to control this.
The only way I've been sleeping is sleeping pills and trying to get over this jet lag. It'll be another four days. Sorry, everybody. But I hate that I do that to you. Anyway, the six week look ahead is in a time by location format, not in a time by deliverable format. Everything is broken out by zone. So their zone maps show the entire building broken out by the zones, the same zones that are on the construction schedule. So it's absolutely phenomenal. Actually, I forgot to say that they have a summary schedule as well.
That's quite beautiful. That governs all of it and shows exactly where they are from a phasing standpoint. So if you saw their zoning, you would be like, oh, my gosh, that's so cool. They do it. And with their zoning, they also show crane locations, forklift locations, the flow of the arrows, where they're doing light side inventory staging. I mean, the whole thing is just really cool. They have day plans that show where everything is supposed to be on a daily basis,
which I thought was phenomenal. So, oh, sorry, I skipped. And a weekly work plan. So let me go through these one by one. They have the overall summary schedule, their critical chain flow map. It's almost like a flow diagram. The TAC plan, the six week look ahead, the weekly work plan, and then the day plan. All of those. And I've got pictures of all of those. I've been posting those and I think it's just really, really cool. So the cool thing is when I go out there, they have beautiful custom bathrooms with
hand wash stations and everything. Beautifully stacked trailers. Everything in the yard is just so. In fact, one of the things I like is they have a brush with a bucket of water and a track pad, I guess, where you can clean your shoes to get into the offices. Then you take off your shoes. The biggest thing that I thought was cool is they have a morning worker huddle area with standard safety signage, a weather vane, a TV that can be out in the weather.
So I thought that was super cool. And then all of the standard work by leader and per task. And every morning they go out there and communicate to the workers and do their stretch and flex. The afternoon beforehand is when the foreman and the leaders do their planning. So anyway, go through the parking lot and everything has base and nice rock. And there's string lines gritting where the parking stalls are.
Everything is beautifully clean. One of the things that I love about Japan is that they put down these metal plates. Actually, I don't even know how they rig them. I don't see holes in them. Oh, no, I see where they're rigging right now. Anyway, metal plates everywhere for the equipment pass on the project site. They're not walking on mud or dirt any at any time. They're always walking on plates. So I'm walking out there and they have these really neat stanchions and what we call
bones. They call them cones and bones in the United States. But all of their delineation is this standardized set up to where you don't have to build anything out of wood. Nothing's out of that nasty caution tape. Anyway, the whole site is beautifully clean. The thing I noticed about the Japanese is that all of their exits are clearly delineated. Their exits, you can, meaning like even the site has exits. It's not just a given that you'll go
out of gate and everything has those aluminum ramps and aluminum stairs. And I thought that was really neat. Each of their supervisors has a nice hard hat, the safety gear, the shades for sun protection. They have standard uniforms, standard safety badges like you would see in the military. Like you can see what everybody's trained for. And standardized pants and then their fall protection. So it's all dialed in.
When I was walking up to the actual project site stairs down into the excavation, the metal plates go actually into the job site where they're doing the excavation. They were placing rat slabs on this particular project site. And everything was just very, very nice and methodical. I almost want to say slow, but that's not really what it was. It was just flowing. The entrance was beautiful. Took pictures on the way out.
And I was just absolutely blown away. And I'm like, oh my gosh, I can't believe this is so good. So then in this podcast, I'll take you over. We immediately got to go that same day to their steel manufacturing plant. I think I'll leave it with that today in this podcast. Their steel manufacturing plant was really well organized, had a really nice flow. They had created an electronic system to see where their bottlenecks were. So I thought that was really cool.
And then they, in Japan, they have box beams that are custom welded. And then they fill these things with concrete because their high rises have to be, they have to withstand massive earthquakes. So I was like, whoa, that's super cool. Now, their steel plant was a little bit more old fashioned. And I started to ask myself why. Meaning you couldn't see signs of an Andon
or of other lean things, but they were flowing very, very well. What I realized is it followed the pattern of the leader. And there was kind of an old-timey leader. The leader did say something a little bit condescending to Wakana as a female, which means that you could tell he was a bit old school. And when we asked him about his leadership, and by the way, I couldn't hear any of this, so I don't know anything about it to say anything. But the leader said his biggest lesson, the
thing that he's improving, is not to be scary or yell at the workers. So you could tell that they're making progress in the direction of being a more accepting, loving culture. So I realized even in Japan, they're still on their journey to try and become lean. But it was an absolutely remarkable day. And I'm never going to hear again from anybody that we can't keep a job site clean, and that we can't do worker huddles. I hope you've loved this podcast. On we go.
Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...
When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...
You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...
A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why...
A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...