In this episode of Master The NEC Podcast, we break down important 2023 NEC and 2026 NEC electrical code topics that every electrician, electrical inspector, plans examiner, contractor, engineer, and code professional should understand. This episode focuses on practical National Electrical Code questions, real-world field applications, and common mistakes made when applying NEC rules in residential, commercial, and industrial electrical installations.We discuss how load calculations changed from Article 220 in the 2023 NEC to Article 120 in the 2026 NEC, including how continuous loads, noncoincident loads, heating and air-conditioning loads, EV charging equipment, grounding, bonding, wet-location raceways, raceway bend limits, conductor ampacity, and detached building feeders should be properly evaluated.Topics covered in this episode include: 2023 NEC Article 220 vs 2026 NEC Article 120 Load Calculations Heating vs Air Conditioning Loads and Noncoincident Load Rules Multiple Air-Conditioning Units and the 125% Largest Motor Rule EV Chargers, EVSE Continuous Loads, and NEC Article 625 2026 NEC Article 624 vs Article 625 for Electric Vehicle Power Transfer Systems Damaged Conductors and Wiring Methods in the 2026 NEC Wet-Location Raceways and THHN/THWN-2 Conductor Requirements The 360-Degree Raceway Bend Rule and Mixed Raceway Systems Grounding Screw Color Rules for Boxes, Devices, and Main Bonding Jumpers Neutral and Equipment Ground Separation on Feeder Panels and Detached Buildings This electrical code discussion is designed to help listeners better understand the National Electrical Code, avoid common NEC violations, improve electrical inspection accuracy, and apply the Code correctly in the field. Whether you are studying for an electrical exam, preparing for an electrical inspection, performing plan review, installing EV chargers, sizing conductors, calculating electrical loads, or working with grounding and bonding systems, this episode provides practical NEC training you can use immediately.If you work with the 2023 NEC, are preparing for the 2026 NEC, or want to strengthen your understanding of electrical code changes, this episode delivers a clear and practical breakdown of key NEC topics every electrical professional should know. Become a supporter of this podcast: https://www.spreaker.com/podcast/electrify-electrician-podcast--4131858/support.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Welcome to the Master of the NEEC podcast, the ultimate destination for anyone passionate about the electrical trade. Whether you're a season electrician, an eager apprentice, or just someone who wants to dive deep into the world of electrical work, you've come to the right place.
Speaker 2Join your host, Paul.
Speaker 1Abernavi, a true authority in the industry with over thirty eight years of trade experience, as he electrifies your mind within depth discussions, expertips, and valuable insights that will keep you ahead of the curve. Each episode, Paul will illuminate the complexities of the trade, decode the National Electrical Code, and share the latest industry trends, all while empowering you to take your electrical career to the next level. So gear up, plug in, and get ready to supercharge your knowledge because with the Master of the NEEC podcast, the
Speaker 1power is in your hands.
Speaker 2Now get ready.
Speaker 1Here is your host, Paul Abernavi.
Speaker 2Hey, what up everybody?
Speaker 3Welcome to another episode of Master the NEC, the podcast where we talk about all things electrical, whether it's marketing, whether it's electrical in general, national electrical Code, whatever the topic goes, wherever it goes, We'll talk.
Speaker 2About just about anything.
Speaker 3If you've never listened to the podcast before, you've stumbled on it. We do have over a thousand episodes on various topics, whether it's you know, just basic code changes or talking about the National Electrical Code, or marketing and hiring and firing and you know, tips and things on you know, running your.
Speaker 2Business from folks that don't know.
Speaker 3I've run businesses for THEAMN now forty years, multiple electrical contracting businesses, both in Virginia and then in Texas, and I worked as the expert and created the ecc IN program back in the day for ETON. I worked at the City of Richmond, Virginia as their engineer and head of their inspections and plan review, as well as City of Alexandria, Virginia. Of course, I worked at NIMA, the National Electrical Manufacturer Association. I was there for a couple of years as there one of their technical experts for
Speaker 3the South, so I had about thirteen states.
Speaker 2I believe that I was.
Speaker 3Kind of overseeing and I'd have my hands in just about a little of everything. And then twenty fourteen I ended up going to work for Uncore Wire which is now Prismium, but it's the world's largest wiring cable manufacturer. And of course all that time, I built my Electrical Code Academy and been teaching people for decades now the National Electrical Code and preparing them for electrical exams and just creating content to help people better understand the National Electrical Code. A couple of years ago, I kind of
Speaker 3started dabbling into the social media. Have a love hate relationship with social media. Of course, people always love to hate people, especially when they're jealous of them or they just don't understand. And that's okay. I embrace everybody. They can ask anything they want, but I have a low threshold for bs, So when somebody wants to do a chest pounding session, I usually shut them down pretty quickly because that's not what I'm here for. I'm not here for the clicks. I don't really monetize much of anything.
Speaker 3The only thing that I do monetize is my podcasts do have some type of monetization on it, and then YouTube. YouTube is what I originally started, and so that when that started, you got to some certain level and you got a little bit of monetization.
Speaker 2It's not a whole lot. I don't promote these things.
Speaker 3That's why I create our own you know, our own network over on fast Tracks too, because I'm just I'm really not into those type of things, of that social media thing, but I still do it like I do these podcasts, and I talk about all different types of topics. So that's where we're at today. So today we're going to talk about some topics today, some questions that you may or may not find interesting. But remember you can always reach out to me, and there's many ways that you can reach out if you do have questions or
Speaker 3you want to get some clarification on something I do. Serve on COPE making Panel five and seventeen. I don't know how much longer I will. I'm really trying to wind down that part of my career. I'd brather me more the submission. I did not submit any public inputs for the twenty twenty nine edition. I figured there was going to be I'll leave that to everybody else did There's some things that I could have worked on, especially in trade cables and things like that, but I figured,
Speaker 3you know, I was going to take a break from this cycle and kind of wind down, and that's kind of what I'm doing.
Speaker 2So as I move on from here.
Speaker 3Obviously I'm going to be involved in the process, but I'm gonna be just like everybody else. I'm gonna submit public inputs and and things like that. Probably won't go to the meetings once this is all done, like I used to uh in that type of thing, but uh, yeah, it's all a part of eventually, you know, winding it winding it down. I've also you know, got into other ventures. Most people know that we have Thermal Electrician and that is basically teaching people thermography for electrical I have a
Speaker 3passion in that, and I've always had multiple cameras, but I've got four cameras now that we utilize and for that side of the business and training that I use. Miles c uh is the is the brand that I currently have. But then also we we've done trade Hog. Many of you have probably familiar with that. That's the AI my that you can ask field questions too, So we do that too and we have a great subscriber
Speaker 3base to that. And then of course we created study Hog, which is you know, for anybody that's studying for an electrical exam, it's just a great helper. It randomly comes up with questions to kind of test your knowledge of the code. While it answers your stuff that you may be studying. It really doesn't matter what well course you're using, whether you're using you know, Mike Holt stuff or or somebody else's or mine or Ryan's or it doesn't really matter because that's a standalone study hog. It just kind
Speaker 3of enhances your study session if you will, especially if you have certain topics that you still just don't understand what maybe a terminology means. Then it's a it's a great resource to be able to just cut and paste it right in there and it'll give you a very good explanation. In fact, it's kind of a we made it and we control it, but it's kind of you know, it's a melding of multiple different artificial intelligence tools as well as things that we feed into it.
Speaker 2To help validation.
Speaker 3So that's it's kind of a neat platform. But that's at trade hog, dot net, dot com, dot org. It doesn't doesn't matter.
Speaker 2And then of course what else, uh Stack Caddy.
Speaker 3Stack Caddy is one of our latest ventures three D printing, making products that are really geared towards the you know, electrical industry. Because that's really all we care about, you know, is doing that. So that's kind of what you know, we tailor towards, not creating things like that. So so yeah, we're gonna look at some questions today. But again I want to remind you that if you do want to send something to me, all you really have to do
Speaker 3is go to our website, fast tracks system dot com and just like it sounds fast and t R a X Okay, not t R A c K, it's t R a X fasttracks System dot com. And over there, if you look under the info tab, you'll see where it says let's ask Paul. So you can ask me just about anything you want to ask on the National Electrical Code electrical installation. You ask me theory questions if you like. If that's your thing, you like theory questions.
Speaker 3But uh, that's a that's a free resource, doesn't cost you down, So check that out, all right.
Speaker 2So we're going to get into some questions today.
Speaker 3I want to make sure that I answer some of these questions that have come in and the ability to be able to answer these and give you some reliable background code references weren't necessary.
Speaker 2Oh, I want to mention too real quick before we get into these deeply in July. Starting in July.
Speaker 3E C and M Magazine, I'm writing for them, and I'm trying to write something that is unique. We wanted to do something that was unique that wasn't done. You know, Mike Holt has been writing for them for nearly four decades and he does an amazing job, always has. But it's code very specific, and Ryan Jackson's going to be picking up that mantle specifically. I'm going to be doing some code stuff and some videos, but I'm also bridging that gap and trying to come up with I was charged with coming up with a series that can appeal
Speaker 3to electrical inspectors, engineers, design professionals and electricians and some of the.
Speaker 2Interaction and relationships.
Speaker 3I mean, I see on forums all the time where there's arguments back and forth that inspector doesn't know anything, that electrician doesn't know anything. So you know, there's different ways to look at certain things. So we wanted to come up with a series it kind of highlights that. So look for that to come out here in July as well as I'm doing some videos for them and some other podcast stuff as well. That'll come out. Well, been staying very busy working for EC and M magazine. So anyway, let's go on and get into some topics
Speaker 3for today.
Speaker 2Okay, So the first question is.
Speaker 3In the twenty twenty three NEC, load calculations are in article two twenty. In the twenty twenty six NEC, where did they go and does that change how we apply continuous load multipliers?
Speaker 2Okay, Well, in.
Speaker 3The twenty twenty three Brand Circuits Feeder Service low calculations they were in article two twenty, and in the twenty twenty six NEC those same rules for low calculations, they were reorganized and they were moved to article one twenty.
Speaker 2Right. So that's the first.
Speaker 3Big thing that that you you start to realize when you start dabbling into the twenty twenty six NEC. You start getting those codebooks, Your your locality start changing a little bit. And especially what makes it difficult is that if you're on the twenty twenty in your state jumps to the twenty twenty six, or if you're in the twenty twenty and you go to the twenty twenty three.
Speaker 2But when codes are changing, you get so much.
Speaker 3Noise about the code changes, right, and so you'll hear so much about twenty twenty six that you'll forget that your state is really not in the twenty twenty six, right, that they're in the twenty twenty three and so, but you hear so much noise and then you start it's kind of like your brain skips over the fact that you're not on the twenty twenty six, you're on the twenty twenty three. So it can get really confusing for a lot of people, especially because around every code cycle, your state could be changing from twenty twenty to twenty
Speaker 3twenty three, but maybe it's happening right out of a code change cycle, and it gets confusing because you may not be on twenty twenty six, but you're hearing all this flutter about it, and then it kind of gets a little muddy for everybody. So encourage people to keep that in mind. The big difference or that we're dealing with is twenty twenty six makes it clear that load calculations themselves are not automatically required to include one hundred
Speaker 3and twenty five percent multiplier for continuous loads. That does not mean continuous load rules are disappearing. What it means is that the one hundred and twenty five percent factor is generally applied when sizing brancher conductors, feeder conductors, and overcurrent devices under the rules such as to ten dot nineteen a one, to ten dot twenty a to fifteen dot two A one, and you know, to fifteen dot three unless a listed one hundred percent rated assembly or
Speaker 3specific rule changes that result. So it's been made clearer to folks that when you're doing load calculations you're typically not going to be bound by the one hundred and twenty five percent, but when you're doing the branch circuit, feeder calc and overcurrent device, you do take those things into considerations. So calculation, you know, when you calculate the load first, then apply conductors and overcurrent sizing rules where
Speaker 3the NEC requires them. Don't blindly add one hundred and twenty five percent to every continuous load inside of the load calculation.
Speaker 2Unless the specific rule requires it.
Speaker 3So again, we were doing a service load calculation and people are doing the calculations and they forget that we may have done that. For example, for a water heater when we size the branch circuit to it, we did that sizing the conductors right and four twenty two we did all that, but that doesn't carry over to the service load calculation. We don't go, oh, by the way, we have to take whatever the load was for the water heater and treat that as a continuous load. You
Speaker 3get what I'm saying. So we don't do that. So the twenty twenty six made it a little clear, Uh, do your calculation, but you may need to apply the one hundred and twenty five percent for continuous loading to other things like the brand circuit of the feeder application not necessarily a cart blank to the actual load calculation of the structure itself.
Speaker 2Does that make sense?
Speaker 3So again, in the twenty twenty six, you know, all of this gets changed to article one twenty so a lot of the nomenclatures get changed and everything gets moved around and everything. But the twenty twenty six key summary is basically identifies as one twenty five e as changing how continuous loads are a dressed in load calculations. So if I have to give a takeaway to anybody you
Speaker 3know jumping into the twenty twenty six, I mean, you're taught all the time time to take continuous loads at one hundred and twenty five percent, and this is grilled into us. But I would say take a little time and read one twenty dot five E and see how this has changed a little bit in how you're going to consume it when it comes to the overall like a load calculation for the structure, because it's not intended to immediately do that unless the code says do it, okay,
Speaker 3And you still do that for the brand circuit sizing, feeder sizing if you have continuous loads, but it doesn't automatically translate into the service load calculation doing that, okay, So I encourage you to read that one twenty dot five E.
Speaker 2So it's a great time to.
Speaker 3Pause the podcast, go grab your codebook and read it.
Speaker 2Okay. That was a good question.
Speaker 3A lot of people ask that question because you know, you're familiar with seeing the reference to continuous load everywhere, but you don't think about the fact that you know that doesn't necessarily have to equate to the actual overall calculation. And so the code actually says percentage percent multiplier says load calculations shall not require continuous loads to be calculated at one hundred and twenty five percent.
Speaker 2That's for the load calculation.
Speaker 3Again, remember you and there's an informational note there by the way, so that those that are you know, they grab their twenty twenty six and go look at it. There is an informational note there, and it still reminds that you still may have these continuous loads in play with the one hundred and twenty five percent multiplier for other reasons like sizing of conductors and overcurrent protected devices and all that kind of stuff. So there's there's diversity in an actual load calculation. So this just brings clarity.
Speaker 2To the intent of the code.
Speaker 3So that's one I'd say, go you don't get a look at and the course says always if there's anything about that that you still question, be sure to let us know in the comments or wherever you're listening to this podcast, or feel free to reach out. How more than happy to go in even even more detail if necessary. The next question that somebody has sent to me is, says Paul, when calculating a dwelling or non dwelling service or feeder, can we omit the air conditioning load when the heat is larger, or emit the heat when the
Speaker 3air conditioner is larger. Okay, so this has a lot to.
Speaker 2Do with the.
Speaker 3Non coincident loading, and we use ac VERC because that's an easy one, right, because it's either the heats on or the AC's on one or the other.
Speaker 2They're not on at the same time.
Speaker 3Now, if there is a situation, heat pump, whatever you have, that both would be on at the same time, then they're not considered non coincident loads and you have to account for all loads. So that would still be added into your load calculation. You just may not get any breakout. You just take the full value. Right, But there is a rule in the code where it talks about the non coincident loads, and so it's it's one of those things that you know the answer is yes, but only
Speaker 3when the loads are truly non coincident loads, meaning they are not expected or permitted to operate at the same time. So the code gives you two parameters for this, especially in the twenty twenty six edition. It says, okay, if it's unlikely that they'll operate at the same time, and that unlikely could be due to something they have to do with a timer, or something to do with an interlock, or something that makes it unlikely for this to happen. And of course HJ is going to have to, you know,
Speaker 3understand what's going on, so you just kind of you gotta explain it to them, or you could have something underlisted equipment that is mechanically designed to keep them from operating simultaneous. Either way, those would be situations of a non coincident load. Now in the twenty twenty three this is handled into twenty dot sixty. Okay, so a non coincident loads that's what it's titled. The basic concept that there are two or more loads that will not operate simultaneously.
Speaker 2That's at the same time you are.
Speaker 3Permitted to only use the larger of the two loads that would be running at any one given time. Now, however, there's a common mistake is skipping the fact that there is a motor rule in two twenty dot fifty, and people always hear us talk about, well, you got to get that extra twenty five percent, and they go hunting for that and wonder where the hell that is. You can't forget that to twenty dot fifty. It just so happens that we were doing load calculations for ac versus heat. The largest motor typically in the dwelling is going to
Speaker 3be the air conditioning compressor. It is a motor, and you would take that at one hundred and twenty five percent plus some of all the other loads that would be running under air conditioning, and then compare them to the heat. And if the heat was greater, then you just would get rid of all of the AC's loads because you're gonna size the load based on the larger of the two, because that's what the non coincident load rule allows. But then of course when it comes to the motor, you still have to count for the largest motor. So now since the AC is gone and you've removed
Speaker 3all that because the heat was larger, and we're sizing for the heat, so it doesn't matter.
Speaker 2You know, this is where people get.
Speaker 3Lost, and I don't know how to I don't know how to dumb it down simpler than Look, if I size conductors and I size loading, and I do the calculation for the larger of two loads, it doesn't matter if the lesser's running as long as everything is sized to the larger. What does it matter if everything sized to one hundred amps but the lesser sixty amps? Why can't I just forget about the lesser? If the larger if everything size to the larger absolutely, and that's the concept here, but it has to truly be a non
Speaker 3coincident load. Now you still have to count for two twenty two fifty. It just so happens. If the AC was larger than the heat, and we already did the AC motor at one hundred and twenty five percent, then we already have account for two twenty dot fifty. It's already been figured in. We don't have to do it again. But if the heat is larger than the AC and the AC is removed from the equation, that's gone now. So you now have to go find the next largest motor operated equipment that's in the structure, and that becomes
Speaker 3the one where you're going to gain that twenty five additional because you probably already took that motor at one hundred percent when you did maybe an appliance calculation or something. You've probably already done it. So all you're doing is looking for that extra twenty five percent. Now, so many people out there want that word that to be in the code. They find this very confusing. It's not confusing if you go to four thirty dot twenty four. Obviously, when this is being applied. It's because you have multiple motors in the building.
Speaker 2So if you.
Speaker 3Didn't go and spend all that time in the non coincident loads, and you just have multiple motors in a building, then you know that the rule in four point thirty twenty four from motors is you take the largest motor at one hundred and twenty five percent, and thus some of the other motors.
Speaker 2Well, that's all we're doing here.
Speaker 3Whether the largest motor is already into the calculation because it was the part of the AC and it's accounted for, or that was discounted because the heat was larger, you still have to count for the largest motor. So that means we hunt for the next largest one. I'm not sure why this is so complicated for people to grasp, and I think it's because they want the code to be just just say it, right, just say it. They would like I just say it. It does say it,
Speaker 3It just does it in its own way.
Speaker 2Right.
Speaker 3So in the twenty twenty six, this concept has been relocated into article one twenty the case, it's still the same key identifies the the actual application. The only difference is now we have a one twenty dot six that talks about what's considered a non coincident load, and it's going to make reference to one twenty dot eleven A, which is going to be given us some guidance on these loads.
Speaker 2That's it.
Speaker 3So it's no real change here, nothing to you know, get you know, worried about with that.
Speaker 2It's just a concept.
Speaker 3And again surprising how so many people don't understand when we are teaching the code and we say, you know, you need that that the largest motor at twenty five percent, and all we're trying to do is capture that that intent of the rule which was to twenty dot fifty. Uh. And it's you know, obviously changed for the twenty the twenty twenty six edition.
Speaker 2But that's all we were That's all we were trying to do. That's it.
Speaker 3Nothing, that's nothing extra, nothing, you know, crazy side of that. Still, you know, it's one twenty fifty now, so it just moved from two twenty to fifty to one twenty fifty.
Speaker 2So but that's all we're trying to do with it now. That's it.
Speaker 3Okay, what's next question? We have great questions today.
Speaker 2Let's see here Paul on a non dwelling load calculation. Okay, non dwelling is.
Speaker 3If there are four air conditioning units that can all run at the same time, do we take one compressor at one hundred and twenty five percent and the other three at one hundred percent?
Speaker 2Okay?
Speaker 3So yeah, So I'm it's asking about a load calc I guess, yeah, so a non dwelling lowcal So generally, yes, if all four units can operate simultaneously and the load calculation.
Speaker 2Is being performed under a motor.
Speaker 3Load calculation rule, then yes, generally you just do the largest at one hundred and twenty five percent, and then of course the sum of the other three, right, that is.
Speaker 2Motor load calculation rules.
Speaker 3Now, under the twenty twenty three NEC two twenty dot fifty UH sends motor loads to the motor rules. You know, for multiple motors, you would be at four thirty dot twenty four, which requires this UH basically says conductors supplying several motors to have an opacity of not less than one hundred and twenty five percent of the largest motor plus or sum of the full load current that is full load current, not nameplate current.
Speaker 2Full load current from four.
Speaker 3Thirty dot two forty eight two forty nine to fifty depending on what you're you know, what motors you're dealing with, single phase, three phase or whatnot.
Speaker 2Okay, So that's where it's there. Now.
Speaker 3They are not non coincident with each other, okay, So the one hundred and twenty five percent treatment comes from the motor calculator rules, not from the non coincident load rules.
Speaker 2Okay. So if they.
Speaker 3Can all run together, then they're coincident, right, So they could all run together.
Speaker 2So don't use two dot sixty.
Speaker 3Or one twenty that's six uh one twenty dot six or anything like that to drop three of them.
Speaker 2No, that's not how it works. Use the motor rules.
Speaker 3And that is the largest at one twenty five plus the sum of the others at one hundred percent. That's the that's the proper course of action.
Speaker 2Okay. So you know, and those are the you know, those are the motor rules, and that hasn't changed.
Speaker 3So while things move around a little bit in the code, if I have four again, four air conditioning units with compressors their motor loads, again, you're gonna follow the same rules, okay. And incidentally, in the twenty twenty six edition, in one twenty dot fifty. It's gonna be b which is air conditioning equipment, which is basically going to send you article four forty uh part four at the same same, same concept, right, But these are motor loads, so we're gonna treat.
Speaker 2Them as such. Okay, let's see here.
Speaker 3What's that's that's a that's a good, good quest question. They are all good questions, really, They've all been pretty good questions today. Next one says, is an ev SE treated as a continuous load? And does that mean the service load calculation must automatically use one hundred and twenty five percent of the EV charger rating? Okay, well, EV charging equipment is generally treated as a continuous load for conductors in overcurrent sizing. We we we follow all that
Speaker 3in the twenty twenty three edition, that is in six twenty five dot forty two. Okay, so yeah, so for ev s E load requirements, and of course too ten dot nineteen A one to ten dot twenty a, fifteen dot two A one and to fifteen dot three. By the way, these are feeders in brand circuit calculations for continuous loads as well as overcurrent protection. Uh.
Speaker 2It says for continuous loads.
Speaker 3Sizing those are the code reference you're gonna you're gonna want to go to. Now, the brand circuit or feeder conductors and overcurrent protection may need to be sized at one hundred and twenty five percent of the continuous load, but for a service or feeder load calculation, and we kind of started with this. The twenty twenty six has made it clear that continuous loads are not automatically multiplied by one hundred and twenty five percent inside the load calculation, okay, unless specifically mentioned in the calculation rules that require it.
Speaker 3So this becomes a great discussion that many people are going to have as we move into the twenty twenty six because people may be mixing these together. Right, They may be saying, so, what is the calculated load and what size conductors are required and what size overcurrent protection is required? These are related, but they're not always the same step. So the load calculation is different and it's not going to out for the continuous loading when it
Speaker 3comes to the ev s C, but the branch circuits and the feeders and the overcurrent protection and sizing of the conductors will if that make sense, Hopefully that makes sense, so you know, at twenty twenty six ev Power Transfer Systems is they're still shown in the code as continuous loads when it comes to sizing, right, But it does not mean that you're going to change the.
Speaker 2Load calculation if you will. Okay.
Speaker 3But speaking of which, you know, one seven of the twenty twenty six AEC talks about ev SC loading and it says for EACHS, ev S e served. Okay, So again that's if you have EVS. I do my house. I have a Tesla. People know that, they know I bought one of those. Talk about that in another episode.
Speaker 2Why I did that?
Speaker 3Not because I'm a big Elon fan, not because I just you know, believe it.
Speaker 2It's the amazing technology.
Speaker 3You've heard my position on ev the grid struggles, but my area where I'm at, it made the most sense, and I can explain that.
Speaker 2In another another podcast. I don't want to get into that.
Speaker 3But but if you're expected to serve an EVSC, the load shall be calculated by the name plate rating of the equipment if available, and if it's not available, then it would be seventy two hundred watts or seventy two hundred vah if the name plate is not available. Okay, so you really want to go to the name plate, and if that's not available, you use seventy two hundred watts as you're base part of your load calculation. You're not taking continuous loading. You're just taking it and added
Speaker 3to the load calculation. Okay, that's the whole point of when the code went out of its way to say, you know, it's you don't always take continuous loads in the overall load calculation at one hundred and twenty five percent. No, you made for the conductor sizing, you made for the feeder, you made for the brand circuits, you made for the overcurrent protection, but.
Speaker 2Not for the overall load due to diversity. Okay.
Speaker 3So again, just just makes it real clear. Now if your name plates greater than seventy two hundred, obviously you folks know you're going to use whatever is greater. Okay, I'm just saying, good question though. That's another good question that people have been asking lately. Uh in you know about ev So what's next see article Let's see here in the twenty twenty six NEC what is the difference between article six twenty four and Article six twenty five
Speaker 3and which one applies to Let's say a Tesla wall Charger. Okay, so I did a podcast on this already. I would assume this person that submitted this probably did not listen to that episode. It's a great example of going back and listening. Now, all of our podcasts now also on our YouTube channel. They are podcasts, but they are also available for you to listen to over on our channel. So again, we did that for a while and we stopped, but we're back to We're back to doing that. So
Speaker 3they're up there because a lot of people sent in and said, look, I like listening to the podcast on the simple YouTube and that's fine, So we did that. Okay, so let's just you know, Tesla just happened to be what I have. I have a Model Y Juniper twenty twenty six. So in the twenty twenty sixth and EC, article six twenty five remains the main article for electric vehicle power transfer systems like electric vehicles okay on the road type of vehicles, whereas the new six twenty four
Speaker 3covers electric self propelled vehicle power transfer systems that would be things like agricultural marine type of evs. Self propelled electric like like golf carts or those those uh you see those trailer trailer park type carts things like that, or people that go to the beach, you know those non gas electric golf carts and things, so charging those type of things now have some rules that that before we're a little muddy.
Speaker 2And how you do them.
Speaker 3I know what Encore wire, we have a bunch of these really nice they look like look like the golf carts, but they're like tricked out.
Speaker 2I mean, they're just amazing looking.
Speaker 3They're pretty cool, they're long, they hold a bunch of people, but they're pretty cool. They take people on tours, but they're all electric charging, and so we really lacked a lot of rules for that. But six twenty five, just remember, if you're dealing with EV vehicles, Tesla's, Rivians, Chevrolet Bolt of Volt, the Bolt Rivian, all that kind of stuff, Ford Lightning, whatever it is, you're gonna be in six twenty five. If you're doing something for carts and golf carts and you know all that kind of stuff, then
Speaker 3you're gonna be in six twenty four.
Speaker 2And they mirror each other very well.
Speaker 3In fact, it's classic case where they probably cut and paste them. A vast majority of six twenty five over into six twenty four and just take out what's not real relevant to the self propelled versus the regular EV.
Speaker 2But that's what they did. That makes sense. Okay, next question we have.
Speaker 3It says if conductors or wiring methods are damaged by water, fire, overheat, corrosion, or similar conditions, can they be reconditioned and reused under the twenty twenty six inc. Now, so under those conditions, somebody's gonna have to be make the determination. If it's obvious that something was overheated to corrosion or been subject to submersion, or locations that have been subject maybe dry location, product that's been sub subjected to wet location, this is
Speaker 3going to be an AHJ's call. However, Now in the twenty twenty sixth edition, we do have some teeth for that for the AHJ and the manufacturers. Three hundred dot four C was introduced in the twenty twenty six and it deals with damaged wiring methods and conductors. So the practical answer is that damage conductors and wiring methods must be replaced. It's not just as simple as Johnny go out and grab the electrical tape. Also for additional guidance,
Speaker 3they added the two references to the ANEMA documents that are available evaluating water damage as well as evaluating fire damage. These are documents that are put together collectively by all the manufacturers, and so they give recommendations from a manufacturer. Of course, there's a case by case situation, and this is not the same as reconditioned, a totally different thing. So it's in this situation it's important now that this is a major field issue when you've got flooding, fires, overheating, raceways,
Speaker 3failed terminations, corrosion and inspectors come and look at it. Mechanical damage equipment may sometimes have reconditioning rules somewhere else in the code. For certain types of equipment, like, for example, the standard circuit breakers, there is no recondition GFC out devices, there is no recondition AFC out of ices, there is no recondition.
Speaker 2That's just a full flat out replacement, okay.
Speaker 3And in a lot of the manufacturers, for example of wire and cable, if non metallic sheath cable is submerged or water gets into the end of it, it's a flat replacement, okay, because we don't test it for long term exposure to moisture that would be up into the paper jute that gets up into the cable assembly, and what it can do long term, right, we have no we have no history of that, so you know, it's something that should be replaced, and that's typically with the
Speaker 3guide that you're going to get from the manufacturer. But generally you cannot recondition damaged conductor insulation.
Speaker 2Once it's gone. It's gone.
Speaker 3And in the past people would say, I'll just throw some electrical tape on it, but the fact matter is you can't put insulation back on a conductor. Only a manufacturer can extrude insulation onto a product, and then it gets evaluated by UL to make sure it meets the proper UL eighty three, UL forty four, testing in UL twenty five, fifty six, all these different standards, so that when it's being utilized and it goes from being compliant to not compliant, I mean it's still listed, right because
Speaker 3it's already left the factory.
Speaker 2It's in the field.
Speaker 3The problem is when it gets degraded to the point where it's exposing conductive material because it's been damaged, you can't really just wrap it with electrical tape and I know, that's not what people want to hear, and that was the in the past, that's what people would do.
Speaker 2Right.
Speaker 3So if a conductor's installation has been cooked, soaked, chemically attacked, physically damaged in some way, code answer is now clear under three hundred dot four C is the answers not wipe it off and meger it right, that is not the answer. The twenty twenty sixth NEC now gives inspectors clearer language.
Speaker 2To require a replacement. Okay. So, and this was driven by the Steel Tube Institute.
Speaker 3Again, uh, different wiring methods exposed to conditions that are outside the scope of their listing, and there is no real way of knowing how they're going to react long term. It's just much safer to replace it. And so that's kind of the direction that it was going. I hopefully that answers that question for the gentleman that could answered that asked that question. Let's see here, do we have another one, yes, Jeff is okay. Next one says if
Speaker 3e MT, PVC or another raceway is installed outdoors or in a wet location, the conductors inside considered to be in a wet location. Yes, So we've been preaching this one forever in a raceway that's outdoors, whether it's above grade or below. If it is outdoors and the raceway is physically in a wet location, as to find an article one hundred the NC, then it is a wet location,
Speaker 3not only outside of that wiring method, but inside of that wiring method.
Speaker 2Okay, so that's a wiring method.
Speaker 3So yes, the inside of a raceway installed in a wet location is considered a wet location.
Speaker 2And that that means.
Speaker 3That the conductors or cables that happen to be installed in that specific raceway must be suitable for the wet location.
Speaker 2Whether they could outlast you or me.
Speaker 3Whether you could put nonmatallity cable in a raceway outdoors, underground with moisture, your nose going to get in it, Will it outlive you and me?
Speaker 2Maybe? Is it allowed? Absolutely not.
Speaker 3Another example would be thhhn by itself is not a wet location rated product. T for thermoplastic, two H is for high heat in for nylon. There is no w in there. This is a dry location product that is acceptable in a damp location. Okay, believe it or not, go look that up now. But most modern building wire today is never going to be just a thhhn, It's going to be thhwn dash two as well.
Speaker 2Of course, the W is going to denote a wet location. Okay, okay.
Speaker 3So in the twenty twenty three this concept the piers in three hundred dot five B where it tells us that in underground installations that it's a wet location, also tells us in three hundred dot nine that for raceways in a wet location above grade. So in the twenty twenty six the wet location raceway rule is reorganized and expanded and it includes now drainage requirements for above ground raceways and wet locations. Now, this could be draining it to a box with wheepholes, This could be draining to
Speaker 3a specific fitting that allows the weeping. This could be installing it in an arrangement to drain to some location where it can drain. So these are important considerations. Now when everybody wants to do raceways outdoors, is how are they going to be arranged to drain now above grade in wet locations, Because now the new language says that it has to include drainage requirements, so the raceway does
Speaker 3not magic keep the inside dry right. If the raceway's in a wet location, the conductors inside must be wet location RADI conductors there will get moisture in there. They don't care whether you think it's liquid tight. It's not liquid tite. It's going to get moisture in there. Okay, So no matter where it's located, you're going to need to have wet location RADI conductors in there.
Speaker 2Okay. Let's see here. Another question, Paul.
Speaker 3If I run EMT for part of a raceway system and then I change to rigid metal conduit, can I have three hundred and sixty degrees of BENZ in the EMT and then another three hundred and sixty degrees worth the BENZ and the rigid before installing a pullbox.
Speaker 2The answer is no.
Speaker 3It was never intended that way because it says from pull point to pull point. But what people were doing is they were arguing that you could go three hundred and sixty degree's worth of BENS and EMT and then change over with a changeover transition fitting which wasn't a pullbox, and then change over to let's say rigid okay, or PVC, whatever it was, and then you were allowed to go up to another three hundred and sixty degree worth of bens and that wiring method right, So, no, that is
Speaker 3not what the intent was. But as always, every couple of years we changed the code to you know, people can argue the gray areas all they want, but a lot of times I tell jurisdictions in age JS be forward thinking. Don't be afraid to look at the even if you're not on the twenty twenty six in your jurisdiction, and just say you're even on the twenty twenty. It never hurts to look forward and see if there's something that seems ambiguous today, did it get cleared up in the next issue or possibly the issue after that, depending
Speaker 3on how far your you know how state is behind and to whatnot. So historically, the three hundred and sixty degree ben rule appeared in the individual raceway articles, okay, such as three fifty eight dot twenty six for EMT okay, So dot twenty six was that bend rule where you don't exceed three hundred and six degrees, and it was very common, uh for example, and even rigid metal condo it it was three forty four dot twenty six.
Speaker 2Okay.
Speaker 3Now there are folks out there that would argue that if you change raceway types, the bend count could reset. Now, I never understood this argument because being somebody that's pulled plenty of conductors in raceways, working for a manufacturer and understanding what sidewalk pressure is and how hard it is to pull. It's hard enough to get it through three sixty worth of bins between pull points. But now incorporate that into that and start thinking, well, you know, I
Speaker 3can go up to seven hundred and twenty degrees were the bins. That's just not practically. You're going to You're going to damage the conductors. And it just wasn't a good argument, and it's never been a good interpretation. It's you know, because clearly if the Doc twenty six is within that wiring method, it's germane to that wiring method. And but the way the rule, the way it was written, people could argue that, right. So now that is changed, right, so to clarify, you know, because some tried to argue
Speaker 3that again, if you change the raceway types, the bend count could reset. That was never a good practical interpretation. But the twenty twenty six a NEC closes that door completely with the addition of three hundred dot twenty four, which so now instead of being embedded just in each of the specific articles for certain types of wiring methods, it is now generically placed in three hundred dot twenty four, and it addresses the total number of bins in combinations of.
Speaker 2Conduit or two being wiring methods.
Speaker 3Okay, so the change from EMT to rigid does not give you a fresh three hundred and sixty degrees at that transition. Okay, it's between pull points, so the raceway system is still the raceway system. The conductors don't care that the raceway's name changed halfway through the run. So the common denominator here is the conductors that are being pulled for these wiring methods. So if we're trying to the whole rule here was to try to limit the damage.
Speaker 3And there's some wise guys out there, and I've seen them on these Facebook groups. They want to talk smack about it and say this, but then in their same interpretation, they don't even understand what an outlet is. So you can't you can't really, you know, you really can't listen to them because they clearly they don't have a track record of being very accurate on anything.
Speaker 2So that was never the intent.
Speaker 3And as a real electrician, I'll tell you there's no way I'm trying to pull conductors through seven hundred and twenty degrees or the bins.
Speaker 2I'm not.
Speaker 3Now the argument would come when people would try to get a little bit more than three sixty and they would argue this that nothing says, and they were trying it because they didn't want to redo the installation and they were trying to convince the inspectors, and YadA, YadA, YadA. But again that's cleaned up now in the twenty twenty six and it just goes to show you that that the intent was never dictated by the wiring method. It's basic common denominator was the conductor and.
Speaker 2The potential for damage. Okay, So whether it goes through.
Speaker 3And this is the same argument I'll make to people who will put in a pullbox, okay, and just to meet the three hundred and sixty degree bins between pull points, they will put a pool box in there, and they will not size it properly because they never intended to use it. If you never intended to use it, then it is still one solid pull. It's not considered a pull point if it's not sized properly, it doesn't meet the rules for sizing depending on the size with three, fourteen,
Speaker 3twenty eight whatnot. If it doesn't meet the sizing requirement the six times and eight times and all this, then it is not a pull point. So if you're just pulling straight through it, to me, it's just another raceway, and at three hundred and sixty degree between pull points, is still in effect regardless of the wiring method or eight undersized.
Speaker 2Or improperly sized box.
Speaker 3So a lot of engineers, you know, they'll just throw a box in there and say we met the rule. The question is it's that box compliant in size that it's supposed to be. If the answer is yes, then you're choosing not to use it. That's fine, it's still a pull point. You're just choosing not to use it. But if that box is not sized properly and you're just pulling through it, and you're just putting it in there to appease the code, to me, this even gives it now more teeth to say, Nope, I'm sorry. I consider that box nothing more than a transition at this point,
Speaker 3potentially because we're worried more about the concern of the conductors. Now, if you don't like that, you don't agree with that, then that's where I tell you to get involved in the code. Every three years we change this code, and you know, feel free to put in a public input, feel free to disagree. But we're using a little common sense on this one. It's about not damaging the conductors. Okay, okay, let's see.
Speaker 2What do we got next? We got time for another one. Let me look over. Jeff says, yes, okay, all right. So the next one says, does.
Speaker 3Every ground screw and electrical installation have to be green?
Speaker 2Wow? This is a great one, Okay, Jeff.
Speaker 3I think that's why Jeff wanted me to keep going that this is a great one because there is a massive misunderstanding about the green finish on a.
Speaker 2Car on a screw.
Speaker 3Okay, So the answer is no, and we could stop there. But this is one of those areas where electricians often mix up different rules.
Speaker 2For example, a metal box, So an equipment.
Speaker 3Grounding conductor connection is covered in two fifty one forty eight C to a metal box.
Speaker 2Okay, we're all familiar with that.
Speaker 3The screw used for grounding the box must be used for no other purpose and must be identified for grounding. Means that it's basically doesn't mean it has to be green, but it has to go in an area that specifically maybe it's raised or it's been dedicated for specific purpose of grounding and bonding application. The NEC does not simply say that every box grinding screw must be green in all cases.
Speaker 2Okay.
Speaker 3Now, for the wiring devices such as receptacles and switches, two six requires that the grounding terminal screw to be green, hexagonal or otherwise properly identified as specific.
Speaker 2For that rule.
Speaker 3Right, So that as an example, on a device where if it's going to be for grounding equipment grounding, then it would be green, hexagonal or otherwise properly identified with a G or some amimbic ground symbol or whatnot. Now that that's a key to remember. Now, main bonding jumpers. The main bonding jumper is the conductor or the screw or the bar or whatever that's going to connect the grounded conductor or the neutral to the enclosure. Okay, at
Speaker 3the service equipment, So that is a main bonding jumper. It intimately connects all that together. Okay, And that is under two fifty twenty eight. Now two fifty eight B says that if it happens to be a screw, doesn't have to be a screw.
Speaker 2It could be a conductor.
Speaker 3But course is if it's a conductor, you got to size it properly, right, so then you got to get into the side rusty twenty eight and then of course that's going to send you to two fifty one to oh two. But if it comes with the screw, then that screw has to have a green finish that is visible once it's installed. Okay, so those be honest with you, Those are the rules that really pertain around it. So, I mean, we might buy those green screws. They go
Speaker 3in the metal boxes and they don't have to be green. But if it's a thread of entry and it's two full connections and two fifty dot eight and it just so happens, they make them green and that makes it easy to identify. But at the end of the day, if it's a specific area in the box it's designed for that screw. It's not gonna be the other ones that we're mounting. Obviously it's designed, it's threaded for this purpose. Then that's all the intended it needs. It wouldn't have to be green. You want to be green, that's fine. Now,
Speaker 3when it comes to devices and switches where they do have an whipping ground, they're going to be green.
Speaker 2Okay, when it comes to the main bonding jumper, if.
Speaker 3You're gonna be using the screw type, which comes in most panels today, most two hundred eight panels, most one twenty five's, you know, whatever it is. When it comes to electrical panel that is service rated panel, then it's going to have a screw. Now, some of them have these little z bars, you know, these zinc coated bars and things like that. But when we're talking screw, it has to be green. The z bar doesn't have to be green. The screw would have to be green if it was being used as the main bonding jumper. And then there's no sizing involved, right, you don't have to
Speaker 3go any calculation.
Speaker 2You just the screw comes with equipment.
Speaker 3That's it done, right, Okay, I hope that makes I hope that makes sense. Okay, let's see here, do we do we have time for one more? Oh? Well, I shouldn't mention the box grinding screw a device grinding screw and a main bonding jumper screw are not the same rules. So let's stop getting those grinding and binding all that stuff confused. Don't take the green screw requirement for one
Speaker 3section and force this into another section of the NEC where it doesn't make reference to it, just because you don't know, right, So that was my key takeaway.
Speaker 2I forgot to mention my key takeaway. That's the key takeaway.
Speaker 3Don't just randomly apply different areas of the code just because it meets a narrative.
Speaker 2It's not how it works.
Speaker 3Okay, let's see. Let's look at the last one here. I think it's the last one. Jeff is the last. No, it's got a couple more. But I don't don't. I don't think we're gonna go more than an hour on this podcast. I start losing interest from people if I go more than an hour. Hell, some of you, I've lost interest ten minutes into it. All right, it says, what's this gonna say? Hey, Paul Love your podcast. Got a question for you. When feeding a detached garage or another building from a dwelling service, can the grounded conductor and equipment grinding to be bonded together again in the
Speaker 3detached building panel generally no, okay. So that's that separation on a remote distribution panel. So once you're on the load side of the service disconnect, the ground to conductor and equipment ground and conductor must remain separated. Okay. Now, for feeders to a separate building or separate structure, two fifty two B requires an equipment ground A conductor to be run with the supply conductors. Okay, So you're gonna have those four conductors run, so the ground to conductor
Speaker 3is isolated from the equipment ground A conductor and the metal enclosure at that separate structure. Okay, so it's basically floating. Okay, So the neutral to ground bond normally occurs that the service disconnecting means not again downstream at the feeder panel.
Speaker 2Okay.
Speaker 3Now, there was some allowances in the code we call existing rules. It's the old three wire feeder allowance. That's no longer allowed for new installation. That was an existing installation based on legacy condition. But for new work, the answer is you got to run four wires for that feeder.
Speaker 2You have an ungrounded conductors two of them.
Speaker 3You have a grounded conductor if it's needed, and then of course you have equipment ground and conductors.
Speaker 2Typically what you're gonna run.
Speaker 3Another misconception out there to folks is when it goes to feeder panels or to equipment, they think you always have to run a neutral.
Speaker 2You do not. Now.
Speaker 3Obviously, with the remote distribution panel, you would because you're gonna have one twenty volte loads and you need a neutral.
Speaker 2Okay, so no brainer.
Speaker 3But you could have a situation whether you're running a brand circuit to a piece of equipment or something else where you're gonna absolutely have no neutral loads, so where you're required to bring the neutral or in this case we'll say grounded conductor to the service. In all applications you may not need the neutral downstream. If there is no need for neutral, You're always going to have the need for the equipment ground because you got to clear the overcurret devices right, got to create an effective ground fall current path. But there may not be a need
Speaker 3for a neutral downstream. With that said, most you know germane to this question. Most detached structures are going to be have two forty vault loads one to twenty volt loads, and so you would need to have a neutral right, so just to kind of make sure that's that's clear. But we did at one time kind an allowance that if you have no conductive metal conductive path between the structures, then you could run three conductors over to it and basically treat it like a service.
Speaker 2Okay if you will.
Speaker 3So that changed many years ago, so that a new construction, none of that's going to take place, So you would bond at the service. You separate downstream. The attached garage panel supplied by the feeder is not another service. It's just a feeder going to another pan located downstream of the service.
Speaker 2This makes sense, Okay, do I have Do I have time for one more?
Speaker 3Yeah, let's do one more. I know I'm running close to the hour, but let's go on and answer one more. It says, hey, Paul, if the terminals are rated seventy five degrees C, why do electricians keep talking about using the ninety degree C column for THHHN, THW and two conductors. Well, the reason for that is, on a rare occasion, you could get lugs that are rated ninety if the insulation on the conductor's rated ninety, and then whatever the load terminals are rated ninety, then you could use the opacity
Speaker 3values at ninety.
Speaker 2But in the real world that really doesn't.
Speaker 3Happen too often, so usually you're going to be limited, okay under the termination rules in one ten dot fourteen C. But when we use ninety, so the code will say to us that, you know what, when it comes to adjustment and correction for conditions of use, maybe I have an ambient temperature that is other than thirty degrees celsius eighty six greees fahrenheit, or have more than three current current conductors bundled, then I have to do something to the opacity. Obviously, it's going to be less than what
Speaker 3we started out with, okay, because the bundling of conductors more than three current, that's going to create heat.
Speaker 2Heat's hard to dissipate.
Speaker 3So we have to adjust the opacity to the conductors so that the temperature doesn't get high enough that it causes a problem with the insulation, which is based on the thirty degree c's eighty six degrees fahrenheit. So anything that's going to cause the temperature to get above that starts pushing it closer to that volatile temperature level. Of the insulation, which would be again ninety degrees c insulation. So if you take the ambient temperature and you take the heat from current flow and you don't adjust it
Speaker 3in some way or correct it in some way depending on your condition of use, then you run the risk of the insulation breaking down. So in order to keep that from happening, we have to do some type of calculation, and we call that conditions of use. Can we call it ambient temperature correction, and then we call it a adjustment for more than three current care and conductors. So, and those rules are all in three ten dot fifteen,
Speaker 3and so it's it's really important. That's one of the areas that I tell people all the time, and over on our message board anc chat dot com, I actually have a free course over there that teaches opacity. So if you're somebody out there listening to this and you're like, dude, I'd like to wrap my head around this this adjustment and correction thing and understanding conductors and their opacity whatever the end result would be based on a condition of use, Go take that lesson. It's free, doesn't cost you anything. It's over on any z H A T dot com
Speaker 3nec chat dot com.
Speaker 2Go check it out. It's free. So so let's talk about this.
Speaker 3It's a multiple step process for conductors with ninety degrees c insallation such as th hh N thw N Dash two. And by the way, thhwn in itself is not ninety degree rated installation in a wet location, that would be seventy five because it does have one H.
Speaker 2But because it has a.
Speaker 3Dash two on it, it's basically treats it as ninety degree rated insulation whether it's wet or dry, whereas THHHN has two h's, so it's inherently ninety degrees dry.
Speaker 2Okay. So again that dash too just signifies it. Oh, it's okay.
Speaker 3You can use the ninety column to do your adjustment at corrections form. That's perfectly fine, okay. So the ampocity tables are in three, ten, sixteen. That's the value we're gonna use from the ninety and we're generally going to be starting point that value at ninety, and we're going to apply the vestment or correction factors where necessary in order to reduce the actual apacity capability of that conductor based on what the condition of use. Now, but after
Speaker 3the adjustment of corrections have been applied, that final selected apacity still can't exceed the temperature limitations of the terminals under one ten dot fourteen C. So whatever you start out with at ninety and now you apply these multipliers to it, this is the new apacity of that conductor. So now you have to correlate that with the selection. And that's going to also tell you whether or not you're going to be in a seventy five degree column or the sixty degree column after you've done this adjustment
Speaker 3of correction, and that's when you need to go look at one ten dot fourteen C. So for most equipment RTED one hundred and years or less and using conductors one gauged or smaller, that usually means that you're going to be under the sixty degree C column. The only exception to that is if the equipment is listed otherwise. In other words, the conductors are rated for more than sixty, the terminals are rated more than sixty, maybe seventy five, and then the loads terminals are rated seventy five.
Speaker 2Well, if that's the.
Speaker 3Case, then you can't ignore the sixty and use the seventy five. If any of those things are unknown, then you stay locked into the sixty So for example, don't it doesn't matter that my conductors are rated ninety if my breaker was rated seventy five, But the load at the end, I can't tell what the load rating is, temperature rating on those terminals at the equipment, I just don't know what they are. Then guess what that's the weakest link. That means that the apacity can exceed that of the sixty degree column. Even though you're saying, but
Speaker 3wait a minute, Paul, it's a ninety degree rated conductor, it's got a higher opacity, and the lugs are rated seventy five, it doesn't matter because we don't know what's at the other end. And that's a limiting factor right now for equipment that's rated over one hundred amp years or conductors that are larger than one. Okay, So when those that are larger than one, say one not larger, then the seventy five degree column is the commonly used application for the terminals. So it's very rare that we're
Speaker 3going to have terminals that are rated ninety okay, But just remember that the ninety degree C column helps us when it comes to D rating. It's our friend engineers all the time. I'm like, let's embrace this ninety for adjustment of corrective purposes.
Speaker 2It does.
Speaker 3It usually does not let you terminate the conductors as if the equipment terminal is rated ninety, unless, of course everything's rated ninety, and that's a rarity they're out there. But it is very rare that you're going to see in ninety degree rated lugs ninety rerated insulation. That that's not rare. That most of our installation today is most of it's going to be ninety, but then the load it's going to be not ninety. It's probably going to
Speaker 3be seventy five or whatnot. So those are the kind of things that you really have to stop. And this can be really confusing for people, and it's probably one of the more challenging rules that people don't understand. It's conductor sizing things like that. Okay, all right, you know that's enough for this episode. I've gone on over an hour. I just want to make sure that I covered some of these questions. I have a bunch more people are asking, so I'm probably going to do another episode to this at some point and pick up these other questions. Remember
Speaker 3you can ask me any question you want on any topic. I'm more than happy to elaborate. Just go to our website, fasttracksystem dot com. Under the info tab, you'll see the tab that says, let's ask Paul. Just submit your information, be as detailed as possible. Submit it, and I'm more than happy to answer your questions on an upcoming episode or podcast.
Speaker 2I'm more than.
Speaker 3Happy to dig into just about anything and give you the insight any wisdom I may have on it.
Speaker 2But it's free, doesn't cost you anything.
Speaker 3Okay, all right, folks, Till next time, Stay safe, God blessed, we'll catch you on another episode of Master the NEC podcast. Till then, take care and be safe.
Speaker 1Thanks for tuning into another electrifying episode of the Master of the NEC podcast. We hope you're feeling more powered up and ready to tackle the electrical world with the knowledge and confidence you need to succeed. Remember, in the electrical trade, knowledge is power, and we're here to make sure you stay plugged into the latest insights, tips and code updates. If you enjoy today's episode, don't forget to subscribe, leave us a review, and share the podcast with your fellow electricians and industry pros. Until next time, Keep your
Speaker 1tools sharp, your circuits clear, and you're my focus because here at the Master of the NEC podcast, we're all about sparking your success. Stay safe, stay smart, and keep mastering the trade. From all of us here at Electrical Code Academy, thank you for all your support and we will see you on the next amazing Master of the NEEC podcast episode.
NiteNerds™ - The Future of Permanent Outdoor & Landscape Lighting Is Here! What if your home could look absolutely stunning every night of the year - with the touch of a button? Welcome to the world of NiteNerds™, where...
⚡ MASTER THE NEC PODCAST 🎙️ Hosted by Paul Abernathy Master Electrician | National Electrical Code Expert | Electrical Educator ⏱️ Episode Length: 55 Minutes ⚡ ABOUT THIS EPISODEWelcome to Episode 81 of Master The NEC,...
⚡ MASTER THE NEC PODCAST 🎙️ Hosted by Paul Abernathy Master Electrician | NEC Code Expert | Electrical Educator⏱️ Episode Length: 1 Hour, 23 Minutes ⚡ ABOUT THIS EPISODEWelcome to Episode 80 of Master The NEC, where...
⚡ MASTER THE NEC PODCAST 🎙️ Hosted by Paul Abernathy Master Electrician | NEC Code Expert | Electrical Educator ⚡ ABOUT THIS EPISODEWelcome to another episode of Master The NEC, the podcast dedicated to helping...
The National Electrical Code is a minimum standard - but what does that actually mean?In this episode of Master The NEC, Paul Abernathy takes a deeper look at one of the most misunderstood concepts in the electrical...