⚡ MASTER THE NEC PODCAST 🎙️ Hosted by Paul Abernathy Master Electrician | National Electrical Code Expert | Electrical Educator ⏱️ Episode Length: 55 Minutes ⚡ ABOUT THIS EPISODEWelcome to Episode 81 of Master The NEC, the podcast where electrical code education, industry experience, and technical knowledge come together!Knowing the National Electrical Code (NEC) is one thing. Truly understanding how to interpret and apply its requirements is something entirely different.Join nationally recognized electrical code expert Paul Abernathy for another installment of Master The NEC, a podcast dedicated to helping electrical professionals strengthen their technical knowledge and develop a deeper understanding of the electrical codes and standards that shape our industry.With decades of hands-on electrical experience, professional education, and direct involvement in the NEC development process, Paul brings a unique perspective to understanding the Code and its practical application.Because mastering the NEC isn't about memorizing every rule. It's about understanding why the rules exist and knowing how to apply them correctly. 🔍 KNOWLEDGE THAT GOES BEYOND MEMORIZATIONThe electrical industry demands continuous learning, technical accuracy, and a commitment to professional development.The Master The NEC Podcast encourages electrical professionals to: ✅ Understand the NEC - Build a stronger foundation in electrical code requirements and their application. ✅ Develop Critical Thinking - Learn to approach complex electrical code questions with logic, technical reasoning, and confidence. ✅ Improve Code Interpretation - Recognize the importance of reading and understanding NEC requirements within their proper context. ✅ Connect Knowledge to the Field - Bridge the gap between electrical theory, written standards, and actual electrical installations. ✅ Expand Professional Expertise - Continue growing your electrical knowledge regardless of your experience level. ✅ Promote Electrical Safety - Understand the importance of proper installation practices and compliance with nationally recognized electrical safety standards. 🎯 WHO SHOULD LISTEN?Master The NEC is dedicated to electrical professionals who want more than surface-level Code knowledge. ⚡ Apprentice, Journeyman, and Master Electricians ⚡ Electrical Contractors and Supervisors ⚡ Electrical Inspectors and Plans Examiners ⚡ Electrical Engineers and Designers ⚡ Electrical Instructors and Educators ⚡ Electrician Licensing Exam Candidates ⚡ Anyone Passionate About Electrical Code EducationWhether you're preparing for your first electrician licensing examination or have spent decades working in the electrical industry, continuing education is essential to professional growth. 🚀 READY TO MASTER THE 2026 NEC? Take your electrical code education beyond the podcast!The Fast Trax® System, developed by Electrical Code Academy, Inc., provides professional electrical education designed to help you develop genuine NEC knowledge and prepare for electrical licensing examinations.Explore our comprehensive 2026 National Electrical Code training programs, electrical exam preparation, and professional development resources. 🌐 VISIT: https://FastTraxSystem.com 🎙️ ABOUT YOUR HOSTPaul Abernathy is a nationally recognized electrical industry expert, Master Electrician, electrical code educator, author, and longtime participant in the National Electrical Code development process.As the founder of Electrical Code Academy, Inc., and creator of the Fast Trax® System, Paul has dedicated decades to helping electrical professionals understand the NEC and advance their technical knowledge. ⚡ THE MASTER THE NEC MISSIONOur mission is simple:Educate. Inform. Challenge. Inspire.We believe electrical professionals deserve education that encourages genuine understanding, technical excellence, and the confidence to properly apply the National Electrical Code. ⚡ KNOW THE CODE. UNDERSTAND THE CODE. MASTER THE NEC.Never Stop Learning. Never Stop Improving. Never Stop Mastering the NEC! 🎙️ Master The NEC Podcast Presented by Electrical Code Academy, Inc. 🌐 https://FastTraxSystem.com #MasterTheNEC #NEC2026 #NationalElectricalCode #ElectricalCode #ElectricianTraining #ElectricalEducation #MasterElectrician #ElectricalSafety #NECTraining #ElectricalContractor #FastTraxSystem #ElectricalCodeAcademy Become a supporter of this podcast: https://www.spreaker.com/podcast/electrify-electrician-podcast--4131858/support.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Welcome to the Master of the NEC Podcast, the ultimate destination for anyone passionate about the electrical trade. Whether you're a seasoned electrician, an eager apprentice, or just someone who wants to dive deep into the world of electrical work, you've come to the right place. Join your host, Paul Abernathy, a true authority in the industry with over 38 years of trade experience, as he electrifies your mind with in-depth discussions, expert tips, and valuable insights that will keep you ahead of the curve. Each episode, Paul will illuminate the complexities
Speaker 1of the trade, decode the National Electrical Code, and share the latest industry trends, all while empowering you to take your electrical career to the next level. So, gear up, plug in, and get ready to supercharge your knowledge, because with the Master the NEC Podcast, the power is in your hands.
Speaker 2Now get ready. Here is your host, Paul Abernathy. Hello! What up, everybody?
Speaker 3Welcome to another episode of Master the NEC Podcast. My name is Paul Abernathy. I am your host. And today we're going to go into part three. We're going to continue on with some 2026 NEC code changes that I feel are relevant to explain to you. But before I get started into that, I did want to remind you to do me a favor and If you enjoy our podcasts, and remember, you can listen to them on the job. You can listen to them in your car from job to job. You can listen to them in your shower.
Speaker 3That's how I listen. There's many ways that you can listen to the podcast and they're available on a lot of platforms. And the easiest way to find the best platform for you is to use your normal Google or Bing search engine. And just type in there, Master the NEC Podcast, and it will show you a list of them. And we have over 1,000 episodes on all different topics. I encourage you to kind of go through the topics and listen. And if it's something that, you know, they're not labeled as the best in the world, I get that.
Speaker 3I'm not going to make an effort to do that. I don't have the time nor the desire to do that. I just put out material. But if you go through it, you'll see some things that are relevant to you. And I prefer you to just click the play button and listen and get 10 minutes in, 15 minutes in.
Speaker 2And then if it's not for you, it's not for you. But I encourage you to listen.
Speaker 3Because there's a lot of little golden nuggets that we share over the past two decades that I've been doing podcasting.
Speaker 2And so I encourage you to listen.
Speaker 3Again, over a thousand episodes in the Master the NEC podcast, as well as other podcasts that we have out there, Grounding and Bonding podcast.
Speaker 2A bunch of different stuff.
Speaker 3It's available on, I think it's Spotify, Deezer, iHeartRadio, Apple Podcasts, Google Podcasts, Podbean. There's a platform for everything. So I encourage you to listen and share with other people. Let people know at the job site that we have this podcast out there. And I have probably covered a topic that is germane to something that interests.
Speaker 2You through the years. That's your mission. That's your job. That's your passion.
Speaker 3That your assignment is go through and find the episodes that are meaningful to you. And feel free to leave a comment on whatever platform. And we appreciate you sharing with other people. Give us a five-star review. Again, we do this for you. If you don't like what we do, then don't listen.
Speaker 2Move on. Go to something else. But if you do like it, we appreciate the kudos for it.
Speaker 3All right, let's go on and get into this episode of And so we left off in the episode two, part two, which I believe was episode 80, if you're going by numbers. And again, like I said, we have over a thousand episodes, but not all of them are numbered the same way. So this is part of a series when we started and we're at 80. That's just the episode of how we started. So again, there's no rhyme or reason. I could probably index these things a lot better. But again, don't be crying to me about
Speaker 3it because I ain't listening.
Speaker 2I'm just saying. Doing the best I can do. All right. So let's get into it now.
Speaker 3So we're moving into talking about part three of the National Electrical Code for the 2026. Wiring methods, conductors, and installation practices. That's generally what's covered under part three. So the first one we'll talk about is of significant importance to me, being the fact that I'm director of technical services for Prismian, the world's largest wiring cable manufacturer.
Speaker 2And now they own Atcor as well. So again.
Speaker 3It is section 300.4C, which changed. And 300.4 added this provision. It addresses conductors and wiring methods that have become unsuitable for continued use because of damage. Now, when a manufacturer ships you wiring cable, it's, you know, you need to inspect it before you install it. Now, during the process of the installation, if you damage it or do something to it, Now you've got a product that is damaged and it's between you and the inspector. And there are
Speaker 3certain things that you can repair. Damaged sheathing, you can repair it with a listed repair tape. But when you damage a conductor, expose copper or expose aluminum or something like that, or damage a wiring method, damage some MC cable to the point where convolutions come apart. You know, the manufacturer can't really help you at that point because you're the one that damaged it. And this new provision is going to make it very clear if the damage has been sustained to the conductors or the wiring method,
Speaker 3could be.
Speaker 2Raceways as well, that it's considered unsuitable.
Speaker 3This now gives the AHJ the authority and the inspector as the deputy for the building official, who is actually the AHJ, gives them the authority to say, you know what?
Speaker 2You got to rip that out. You got to replace it.
Speaker 3I just don't feel good about Before it was an argument and you go to the manufacturer, we could write a letter.
Speaker 2Yeah, I'll say it's okay.
Speaker 3And now the 300.4 C is going to say, look, there's other aspects that we didn't consider. For example, damage because it's been overloaded. So excessive heat, maybe fire and water exposure. So we have those NEMA evaluation documents for fire and smoke. And we also have it for evaluating water damage, electrical equipment. Back when I worked at NEMA, we helped put these things together with the manufacturers. So those documents are out there that have given guidance forever. And they tell you to reach out to the manufacturer. But now you're getting specific rules in 300.4C in the
Speaker 32026 NEC that's directly addressing these things. So excessive heat due to overloading or where it's at or in proximity to, say, an elevated heat source.
Speaker 2Fire, water exposure, corrosion.
Speaker 3Specific conditions can compromise the insulation, the integrity, the mechanical strength, and the dielectric performance properties of a conductor or cable. Those things are significant, and each one of them has to be looked at on a case-by-case basis. Now, where the wiring method or conductor is no longer suitable for use, then that is determined by AHJ.
Speaker 2Then it needs to be replaced.
Speaker 3Now, if you submit something to a manufacturer, the manufacturer looks at it and says, yeah, that's damaged.
Speaker 2I would, you know, I'd replace it.
Speaker 3It's no longer a situation where like, of course, the manufacturer is going to say that because they want to sell me more wire.
Speaker 2They want to sell me more cable. Well, no, is again, it's.
Speaker 3Contrary to what people may believe, once it's installed, we don't want you to have to buy a new wiring cable. You may think otherwise. You think, oh, yeah, sure, you're always wanting to sell us more. I'm just telling you, and I'm a straight shooter.
Speaker 2We do not.
Speaker 3We'll sell you more for a new project, but if you've got something you already ordered, we don't want you to trash that and reorder it.
Speaker 2We want you to be able to use it.
Speaker 3But if we evaluate something and we're the extra set of eyes that look at something and it is definitely, we're in agreement with the HGA that that needs to be replaced and you're going to have to replace it. Now, this provides a more explicit installation requirement rather than leaving the entire issue up to general workmanship type provisions because now it's evident damage.
Speaker 2So let's say there's a building fire.
Speaker 3And a contractor cannot assume that the conductors are suitable for reuse merely because a continuity test shows an unbroken conductive path. So just because it's been exposed to a fire, it's been near a fire, you might see some damage sheathing, it gets repaired, and you say, look, continuity is fine, it's okay. It's going to take a little more than that. Now, again, that's between you and the AHJ. This just gives them
Speaker 3more teeth. So electrical continuity does not establish insulation integrity. And a megometer test alone does not automatically, and you've heard me talk about this before, just because you may do a megometer test that does not automatically prove that fire damage installation remains suitable for continued service. In fact, I've seen occasions where a megameter test on a Megger, which is a brand, says that the conductors are fine,
Speaker 3and I personally know that the damaged conductors are there, and they are not fine. the insulation is totally gone, but yet it's still past the Meg test. So again, just because you see these numbers on a meter does not, I mean, they're helpful as long as in the.
Speaker 2Context of what you've got.
Speaker 3If I've got a return path, I've got metal raceways, I've got a way to validate the test, then yeah. But if everything's insulated and it's a non-metallic raceway, then those tests are pretty much just all over the place. You could have one conductor that's gigaohms and the next one right beside it, 20 megaohms. It happens every day. My point is, I just don't want you to blindly accept something that's on a meter. It goes a little deeper than And that's when you can reach out to a manufacturer and we understand the nuances of humidity, conditions
Speaker 3of use, application, temperature, all those type of variables. Where it's being located, what the raceway type, how was it installed? Was it plexed? Was it single conductors pulled in, paralleled?
Speaker 2What was it? And we may be able to help you.
Speaker 3But just don't, if you start ripping it out just because of something that says it on a meter, just because you're comparing it next to two conductors. then that's on you. It's not on the manufacturer. You gotta reach out to the manufacturer, okay? Soapbox removed, I'm just saying, I'm just saying. All right, the next change we've got is to 300.6E, and this is protection of wiring beneath roof deck expansion, okay? So the protection requirements for wiring methods installed beneath roof decking were broadened, got a little
Speaker 3broader here in the expectation of that protection. Now, earlier requirements focused primarily on metal corrugated roof decking. So the revised language recognizes that mechanical fasteners used on other types of roofs can create a similar penetration hazard. So the applicable separation requirements now extend more broadly to wiring methods and materials beneath roof decking. Um, The familiar one and a half inch protection dimension remains an important consideration subject
Speaker 3to obviously the applicable exceptions. But this brings us to needing a practical example. So let's just say that I'm installing an electrical raceway installed directly beneath the underside of a roof deck. And it may be vulnerable when roofing crews install fasteners for installation, roofing membranes and solar mounting systems. It doesn't have to be specifically a corrugated roof.
Speaker 2Okay? So the potential for damage is still there.
Speaker 1Okay?
Speaker 3So compliance during the original installation should account for reasonably unforeseen damage or even foreseeable future work on that roofing system so that when you're running the wiring methods, you take that into consideration that it's not just a corrugated decking system. It is whatever I'm running underneath this roof, whatever the membrane is, whatever they could do in the future, if they do it, will it have the potential of damaging my wiring method?
Speaker 2That's the foresight that you have to put into it. It makes sense? And it totally makes sense to me.
Speaker 3So again, that's your change for the 2026 when it comes to that. The next change is to where it says listed cable ties required for securing and supporting wiring.
Speaker 2That is 300.13E.
Speaker 3So what is changed in the code when it comes to the cable ties for securing and supporting? It's that cable ties and associated fitting devices used as a means of securing and supporting are different cables or flexible raceways must be listed, identified for that use.
Speaker 2Why is that?
Speaker 3Well, not every plastic cable tie is evaluated to support the weight and service conditions of electrical wiring. I mean, you can get a lot of them from Harbor Freight. You can order them off of Alibaba. You can get them, you know, in bulk. Doesn't necessarily mean they've been evaluated for anything, okay? Some cable ties are intended only for bundling or cable management, not necessarily the weight and service support of that wiring method. So, this revised rule distinguishes
Speaker 3between products used to organize conductors and products that function as a required mechanical support. Okay, so practical example moment again, an installer cannot automatically use ordinary nylon ties to support flexible conduit overhead simply because the ties appear strong enough or they purchased them in bulk supply. Okay, does that make sense? A product being commercially available or even labeled
Speaker 3as heavy duty is not the same as as being listed and identified for the specific electrical installation function. Same thing with staples now, okay? Again, significant changes when it comes to those type of things. And there was always a listing labeling requirement, but it was kind of nuanced. People didn't really follow it, but they're there. Okay, so that applies to that. But again, we're focusing here on the fact that the cable ties, because you can buy cable ties in bulk, and they're just for bundling and
Speaker 3bringing things together. They're not necessarily designed to support as a mechanical function.
Speaker 2So I have to assume that the industry understands this.
Speaker 3And a lot of the companies like GB and things like that, that actually make tie wraps, understand this, and they're going to obviously jump all over this listing requirement, okay?
Speaker 2All right, let's go on to the next one.
Speaker 3Let's talk about welding metal raceways prohibited. Okay, so under the 2026 NEC section 320B, the change here was the previous wording that could permit certain specially designed welded raceways installations was eliminated. Now, the explanation for this is welding can compromise protective coatings, deform a raceway due to the heat, introduce rough internal surfaces, or otherwise affect the installation's mechanical
Speaker 3and electrical characteristics and properties. And we just don't know when you're doing these weldings. So the allowance to do that has been removed. Now, the revised rule closes that former allowance and prohibits welded raceways for the purposes covered by this specific section, which is 300.20b, okay? So a practical example of this, and I always like to bring these practical examples, is a contractor working in a food processing facility cannot simply weld rigid metal conduit to.
Speaker 2A support or an.
Speaker 3Enclosure as a substitute for an appropriate listed fitting and support method.
Speaker 2That can't be done.
Speaker 3Could argue it in the past, could be tongue-in-cheek, but the reality is it's specifically now prohibiting that application.
Speaker 2And again, it alters the raceway.
Speaker 3It alters it in a way that we don't know. So we're not going to let you do it. Now, chances are the building could fall and an old welded raceway would probably still be standing, but that's irrelevant. We don't know what happens to the properties. We don't know when you're heating it up, what could happen, what process could create. So again, it's something you can't do. The next change is in 300.24. That is the maximum 360
Speaker 3degrees of bends now applies across mixed raceway systems. Now, We're all familiar with this when it comes to between pull points not to exceed 360 degrees worth of bends. It can damage, increase the sidewall pressure on a conductor. When it's being pulled, it can make it harder to pull. Yes, you're using pulling lubricant. Yes, most of us manufacturers produce a product that puts pulling lubricant directly onto the conductors, and we encourage you to add additional lube.
Speaker 2Just because we do it doesn't mean you can't do it. Add more, right?
Speaker 3But the problem with the 360 degree is it was specifically governed in each one of the different raceways.
Speaker 2And so this changes it.
Speaker 3So this new general rule establishes the cumulative bend limitation where different conduits or tubing wiring methods are combined. So there was an argument in the past that if I had transitioned using a transition fitting between one type of wiring method to another type of wiring method raceway, that the rules would be only applicable to that one portion of the raceway that applies to, let's say, rigid metal conduit. And if I transition to PVC, it would start all over again because that could argue at that point that
Speaker 3I could have between pull points, if I had PVC transitioning to rigid, that I could have up to eight between two pull points.
Speaker 2And that was not the intent. Okay?
Speaker 3That's not what we're trying to do. And I don't think anybody tried to do that. I mean... You know, and some people brought up, well, that could break the math. So if I did part of it in rigid and I knew I needed one more and I just didn't want to pull a pull box, then I could put a small section of PVC in transition and then go back to rigid. And yes, that's assuming you're not using the raceway as an equipment ground, which the code permits you to do it. You'd have to put a wire type equipment ground in there.
Speaker 2I get it. People do some crazy things. Okay.
Speaker 3But they might do that just to circumvent not having to put a pull box.
Speaker 2I get it. But now it's clear that was not the intent. That's not what you're going to do.
Speaker 3So previously, individual raceway articles provided bend limitations, but combining raceway types created an interpretive gap. For example, as I said, one could run a transition from EMT, let's say, to rigid, very common, without an intervening conductor pull point. So the revised requirement makes it clear, crystal clear.
Speaker 2And I would assume everybody else wouldn't try to do that anyway.
Speaker 3But again, I've been in this industry many years and I worked in the wiring cable industry many years. This was brought up many times about circumventing the pull box requirement by doing something like this. Well, 2026 gets rid of that.
Speaker 2Not a loophole.
Speaker 3It's just, it wasn't the intended purpose. But we, sometimes you got to close those things that people will do. even when they shouldn't do it, okay? So that was the example, right? So the revised requirements makes it clear that the total bend between pull points cannot exceed 360 regardless of the combination or applicational raceway types.
Speaker 2Practical example, I'm gonna do a run.
Speaker 3So I've got two 90 degree bends in EMT, that's 180. I got one 90 degree bend in RMC, so I'm transitioning, that's 90. And then I have two 45 degree bends in PVC. So let's say I'm transitioning there in one complete run. I don't know why you'd do that, but if you did, that's 360 degrees. So no additional bend would be allowed between those pull points, even though I'm using different types of raceways.
Speaker 2Does that make sense?
Speaker 3Now, that was always the intent, okay? But We had to make people... We just had to tell people. Sometimes you got to just tell them. A transition fitting does not reset the bend count.
Speaker 2Okay, folks? So... I'm just saying.
Speaker 3All right, the next one we have is to 310.5. And what changed here, and you heard me talk about this in, I believe it was part one, where we had that 10 amp branch circuit, very limited applications, but it's there.
Speaker 2If you want to do it, you can.
Speaker 3But in 310.5, correspondingly, we had to make some changes there. So the minimum conductor size provisions now are going to permit, and this is in 310.5, which is dealing with conductors, is a 16-gauge copper and a 14-gauge copper-clad aluminum conductor for qualifying applications. Again, remembering the other limitations we talked about earlier in part one, why you would want to do this, but if you want to do this, then you can, okay? I can tell you that I am not aware, and the reason this is significant is because
Speaker 3it's always been, people have said, what's the smallest branch circuit conductor that we can have legitimately in the code, even though we could have remote control and signalings get smaller, but legitimate building wire with the smallest size. Well, it was 14 gauge forever, but now it's dropped to 16 gauge copper. But I don't believe any manufacturers, at least I don't think we are, are going to produce a 16 gauge copper non-metallic sheet cable, for example. I'm just, what's the point? Because then at that point, we're going to be limited to 10 amps. And I want a
Speaker 3conductor that can do both receptacles and switches, lighting and receptacle loads. And that's why we would stick with the 15-amp, 14-gauge. That's just my opinion, okay? Doesn't mean you can't do it. I'm just giving you my opinion on that. Now, in the 2023 NEC, it introduced provisions again for that 10-amp brand circuit, but retained conductor sizing limitations that restrict some practical implications. So the 2026 edition coordinates the permissible conductor
Speaker 3sizes with the applicable 10 amp circuit provisions that are under 210 that we talked about in a previous episode. So these revisions requirements do not authorize universally the use of 16 AWG copper for ordinary 15 or 20 amp receptacle circuits. That's clearly not the case. You know, you don't have to be a brain surgeon to realize that 15 amps is going to need 14 gauge.
Speaker 220 amps is going to need 12 gauge. You get it? The general rules I'm talking about. But it is there.
Speaker 3So we still have circuits that require 20 amps. We still have other things. So keep that in mind. Keep that in mind when we're doing it. Okay?
Speaker 2Okay.
Speaker 3The next change is quite significant because it was a real safety concern that we saw quite a bit when people were With the transfer switches, ATSs, and generator applications, and the way they're configured in service equipment, we saw an advent where people were getting creative in how they ran service conductors through enclosures that weren't related to service equipment.
Speaker 3that were getting from point A to point B and running it through different enclosures that weren't necessarily service rated or service equipment. They were just, you know, transfer equipment or not service equipment. And it really put the future electrician who came back later at risk because they were assuming that if it's not service equipment, they're dealing with something else. They would have no idea that service, you know, service conductors were in there. And so what I'm talking about, In the 2023 edition, you had 312.8, and it was
Speaker 3talking about splices or conductors that pass through electrical enclosures and routing them through. And, you know, this is not the situation that people are used to seeing where I have a meter, and then it goes from the meter straight to service panel.
Speaker 2And then straight through.
Speaker 3Maybe that panel to another service panel that's right beside it, because maybe it's a 400-amp service. You have two 200s that are right there. I mean, that's the configuration. And you have service conductors that would pass through the meter. One set stops at the first 200-amp, and the other two, you'll say, continue on through to the second one. And so you have service conductors passing through service equipment, service enclosure.
Speaker 2That's okay, right?
Speaker 3The problem that people were doing is in a configuration setup where they have things like ATS or transfer switches, and what was happening is they weren't necessarily being used as service equipment, and you had service conductors passing through it, and obviously they're unprotected if they're on the supply side or line side of a service disconnect.
Speaker 2They're not really protected anyway, right?
Speaker 3And, you know, it gives the false impression that there's some protection, like they're on the load side of something.
Speaker 2And they're not. So, you know, it's a hazard. So the code changed.
Speaker 3And by the way, it got moved from 312.8 up to 312.11. And what it's doing is it's basically service conductors passing through certain electrical enclosures was now restricted. So that you're making sure that those service conductors, as you're routing them through other enclosures, that it is other enclosures that contain service conductors.
Speaker 2Okay?
Speaker 3So you still have all the same requirements, the labeling requirements, the fill, the percentage, the 40%. You still have all the same requirements you had in 312.8. It's just now in 312.11, we added.
Speaker 2One more, a fifth element to that.
Speaker 3And making sure that those conductors that are passing through have to be in an enclosure that has service conductors in it, okay? Not feeders, service conductors in it. So some element of service conductors have to be involved in it, okay? Not just a panel that would have only feeders in it, okay? And that would be an example of a transfer switch that wasn't being used as a service disk. So the explanation here was that servicing conductors upstream of the service
Speaker 3disconnect are generally not protected by premise service over current protection. Yeah, it is protected by overload, right? Because the device is going to limit the load on those conductors, but not short circuit ground fault protection.
Speaker 2There's absolutely nothing for that.
Speaker 3On the conductors that are upstream of the service disconnect or the service overcurrent protective device, okay? Remembering that overcurrent is typically short circuit ground fault and overload. The only thing is protected really on the line side is overload. Short circuit and ground fault is not protecting those conductors, by the way.
Speaker 2Y'all know this.
Speaker 3So, but running those conductors through other enclosures that did not already contain service conductors creates an element of a risk. And people were doing that with transfer switches and getting creative, routing it back and forth, trying to bring it through the enclosures because it's just the path of least resistance.
Speaker 2Not speaking as a circuit, but just saying in general.
Speaker 3That's probably a bad way to say it. There's somebody out there that'll cut that shit out and use it differently.
Speaker 2But that's okay. You know what I'm saying.
Speaker 3The easiest way to get from point A to point B, and they see this as, wait a minute, the equipment's already here, the raceway's already there, I'll just run it through there. And that creates a hazard. Maybe that's an easier way to say it. All right, so allowing these conductors to pass through certain downstream equipment enclosures can create an undesirable fault condition that will not clear an overcurrent device. So the revised provision more directly addresses the hazard. So a practical example okay, is an installer cannot assume unprotected
Speaker 3service conductors may pass through a feeder distribution panel simply because there is sufficient physical space within that enclosure.
Speaker 2Just because it may meet the.
Speaker 3And it seems like it might be an easy way to get from point A to point B. And this came up a lot when you had maybe a disconnect, maybe emergency disconnect. Then you had the service panel right there next to it, let's say, for whatever reason. And because of where you orient the transfer equipment for a generator, you're tying all this together. You're saying, dude, it's just an easier way to get from point A to point B by feeding it through existing raceways.
Speaker 2And yeah, yeah. That created a potential problem.
Speaker 3So physical wiring space and electrical separation requirements are different code issues and unprotected conductors like that cannot be intermingled with, let's say, a feeder distribution panel or sub panel just because the routing may be easier for somebody. Okay, so those taps, those splices, those that are permitted as conductors pass through have to pass through and be associated with service conductors within those enclosures that you're doing the splices
Speaker 3and taps. Yes, it can have other, obviously a panel is going to have feeders in it. They're also going to have brand circuits in it, but it has to have those service conductors in it.
Speaker 2Make sense? Okay.
Speaker 3So that's a safety concern. And if I didn't explain that well, I'm sure somebody will tell me. But the key here is it's eliminating you going downstream of service equipment and intermingling service conductors and feeders in the same enclosure.
Speaker 1Okay.
Speaker 3All right. The next one is ceiling fan rated outlet box requirements have narrowed a little bit. So we're talking about 314.27. So what has really changed here in the 2026 is The application of provisions requiring ceiling fan rated boxes in dwelling units was refined a little bit. And this was driving people crazy about, do I have to put a ceiling fan in everywhere that a plausible ceiling fan could be installed? So the prior additions created situations
Speaker 3where fan rated boxes were required even when the installation location was unlikely to to support a ceiling fan, whether it's blade restriction or whatnot. But the way the wording was, it really caused an issue for the inspection department and installers. And shit, these boxes aren't cheap. They're more expensive than a regular light box. So that's where the situation came in. Another good example is over an island in a kitchen, and you're going to do hanging pendant lights.
Speaker 2I mean, what the shit? Why would I want to put in a ceiling fan box? You know, why? So any confusion.
Speaker 3So the refined language places greater emphasis on applicable sleeping rooms, living rooms, and location designed for ceiling fan use. So, you know, this one obviously begs for us to give a practical example, right? So a group of decorative pendant lights above a kitchen island should not automatically be treated as multiple future ceiling fan locations solely because they are
Speaker 3located within a habitable area. That's a common sense. But this is why we make changes to the code. I mean, sometimes unintended consequences come from a lot of good work by many good people that sit on code panels and We can't perceive. And, you know, it's always that old saying, the more eyes you put on something, the better we can refine something and get better and better. And that's why we change things every three years, not just add stuff, but we go to clarify stuff.
Speaker 2We go to move stuff around and make it easier to flow.
Speaker 3And sometimes we can't see the forest for the trees and we need that direction.
Speaker 2So this is an example of that.
Speaker 3So the requirements for fan rated boxes where a fan is actually supported remained separate from provisions anticipating the future ceiling fan installations. Okay, so obviously if a ceiling fan is going to go in, ceiling fan box. There are other areas where in the future that it's not likely to put a ceiling fan. So I'm not going to cram that down your throat. Again, over an island. It's not going to happen. So again, just kind of refining
Speaker 3it and avoiding some of this you know, issues where there's this argument between inspectors. By the way, it's a good segue to say that if you haven't started watching or reading my articles over on ECNN Magazine, I started my stint as the NEC contributor for them to take the place of Mike Holt was start out with, let's explain the relationship between electrical inspectors and the electrician. And
Speaker 3I felt that that was a logical approach to start my introduction for them because I actually reach out into both those worlds. I've been an electrical inspector. I've been a head of a jurisdiction making decisions for jurisdictions. I've been a master electrician in multiple states for years. There's this thing that you run into between the inspector and the installer, and there can be conflict. So I wanted to start that journey by painting that picture, and I'm
Speaker 3hoping this will be a long-term relationship between me and ECNN Magazine. But that's where I wanted to start this journey, neither right nor wrong, here nor there, whether you agree to it or not, or you like the articles or you don't like it. I'm going to do it anyway, whether you like it or not. So in this case, your opinion doesn't really matter. But it is what it is. And that's the that's the path. That's the course of action that I took. That makes sense. And that's what I did. OK.
Speaker 2All right.
Speaker 3The next one we're looking at is accessibility of outlet boxes clarified.
Speaker 2Obviously, when we have junction boxes, they have to be accessible.
Speaker 3And there are some specialty boxes that are designed that kind of recess into the wall and they could make it difficult to get to the wiring, the connections, the terminations and things like that. So while 314.29 of the 2023 code was, again, talking about junction boxes, conduit bodies and what have you, it wanted to make sure that it expanded this to pretty much all outlet boxes or all applications to make sure that that the devices that
Speaker 3may be in there, you still can get to them safely and even for future applications.
Speaker 2So I'm going to read this to you.
Speaker 3So the accessibility provisions were expanded to better address concealed and specialized recessed device installations where they are made specifically so the device recesses back into the wall.
Speaker 2Well, that's great.
Speaker 3But you still have to remember that getting to the conductors, even though this may recess back in, the manufacturers have to be very aware of getting to those terminations. So certain products are installed so that the device appears, the device itself appears nearly flush with the finished wall surface, right? While the electrical connections remain in a recessed enclosure. Now, The revised provisions address the condition under which that internal wiring connections are considered accessible.
Speaker 2And the manufacturer has designed it in a.
Speaker 3Way that we can actually get to it and not just say, oh, it's back there and you have to do some type of. electrical yoga to be able to get to these terminations. So a specialty recessed receptacle, for example, that's installed requires a proprietary removal tool must be evaluated against the revision so that it is determined whether or not is considered accessible, those provisions. Now, there are these new devices, these receptacles, that basically look like they're built
Speaker 3into the wall. And so the manufacturer gives a special tool or a way to get this out so that you can get to the wiring. And so when they design these, this is important because it's putting the manufacturer on notice. that we can't just have junctions back in the wall. This is a specialty box. And so a normal junction box, we put a cover on it. A normal box, we know how to get in the box and get to the terminations.
Speaker 2But some of these junctions, some of these junction boxes.
Speaker 3are unique and specialized and you still have to be able to get to the wiring. So really the onus is on them and they have to make sure that it meets the accessibility provisions when they manufacture it and provide the tool in accordance with that. Okay. So the fact that the device itself can be removed is, even with a tool, does not automatically establish that all their electrical connections remain accessible in a manner that's required by the NEC.
Speaker 2So that is on the manufacturers. So they're going to have to step up to the plate.
Speaker 3Because I've seen these out there that, to be honest with you, yeah, I get the flushness of it, but being able to get.
Speaker 2To the actual terminations, okay, that's a whole nother story.
Speaker 3So really, this one's kind of driven towards the manufacturers and sure they understand that.
Speaker 2Next is a change in 334.2.
Speaker 3This is the listed support hardware required for non-metallic sheath cable. Now, many people in the industry call this Romex. That's a trade name of Southwire. but it is really non-metallic sheet cable. You can call it whatever you want. But what changed is the listing provisions were expanded for accessories used to secure and support non-metallic sheet cable. Now, you heard me talk about this earlier when it came to cable ties. Well, this is something that is also for things like staples, straps, hangers,
Speaker 3and other applicable supporting hardware devices. now receive more explicit listing treatment. Now, we had listing rules before for this type of stuff like staples, but hardly anybody ever paid to get it evaluated. And even though there was a UL standard out there for this, well, this is now holding their feet to the fire and saying, okay, well, now when I buy that box of staples, it's going to have a mark on there and it's going to have said that it's been evaluated.
Speaker 2It's listed. I'm just using staples in general. But that's what it is.
Speaker 3So staples, straps, hangers, and other applicable support hardware now receive a little more scrutiny and listing treatment. This is important because NM cable is susceptible to physical damage when support devices compress it, deform it, penetrate the sheathing, are not installed in a proper manner.
Speaker 2Okay, so they have to be evaluated.
Speaker 3Now, there could be some types of products that are being used every day that nobody ever thought about, that once they do go through evaluation, which they should have, but they, you know, nobody was enforcing it, really wasn't any rules for that. I mean, you could have pulled a 110-3B, but Dude, I'm telling you, AHJs and all that, don't think about the staples. They might think about the ones that have the little color on it that tells you whether or not you can put two NMs or one NM under it. I get that. That might bring
Speaker 3up 110.3B. But in general, it's things you don't think about. But now bringing this to light, it's going to make people say, whoa, wait a minute. I know you're securing and supporting that non-metallic sheet cable, but now I need to make sure there's some listing for that support and securement.
Speaker 2That's critical.
Speaker 3A practical example, I guess I could give, a generic staple used for building materials shall not automatically be assumed suitable for securing NM cable.
Speaker 2So using just a staple and thinking, you know.
Speaker 3Now this is the same as we've said for years, just taking a nail and nailing it in and bending it over a cable does not, yes, it's going to secure it. Yes, it's going to support it. That's going to bring more scrutiny to the installation. And that is where an AHJ may say, wait a minute. wait a minute, that is not 110.3b. That is not the intent of that nail.
Speaker 2I get it. Then you're caught, right? But it could have been just as easy.
Speaker 3For example, let's just say I have a staple that's designed for SC cable, SCR cable, and now you're using it for a non-metallic sheath cable. It could be argued that that is not what it's intended for. Do you get my drift? So a lot more scrutiny now for those folks that do that. So inspectors should evaluate the intended use and application listing for support devices rather than simply doing it based on appearance alone.
Speaker 2Like looking at it and saying, well, that'll work. That's fine. Totally different. Changes.
Speaker 3Constantly changing. And again, some people argue, okay, great. That's more money for the UL or the third party testers.
Speaker 2I get it. I get it.
Speaker 3We struggle with that all the time, but it makes sense because there are so many people out there trying to support non-metallic sheet cable.
Speaker 2It's not that it's fragile. No, it is.
Speaker 3It can't be located where subject to physical damage and installed properly. It's going to be just as good as any other wiring method out there. But Or I should say reliable, as reliable as any other actor. I mean, by the way, MC Cable is under the same restrictions. It can't be located where it's subject to physical damage as well, even though it has the armor on it.
Speaker 2So, hello. So, NM Cable says that too.
Speaker 3Okay? So, you know, yeah, the armor gives it some element of protection, but it doesn't remove the fact that it can't be located where it's subject to physical damage.
Speaker 2You get me? So, that's making that clear.
Speaker 1Okay?
Speaker 3Okay. Anyway, just a little more work for the AHJ, and if you're the installer and you have the staples or you have the straps or whatnot, maybe you take a picture of the packaging or you keep the packaging or whatever in case you get an AHJ.
Speaker 2That questions it, that type of thing.
Speaker 3All right, the next one, let's stay in non-metallic sheet cable for a moment because there was a change in when it came to the bending radius for non-metallic sheet cables. So a little bit of anatomy here for you folks out there that are not familiar. Now you have round non-metallic sheet cable, like a 14-3, 12-3, whatnot, and the diameter is simply the diameter. And that's published information. You can measure it. You can caliper it yourself, whatever. But there's values for that, and that's what you use. And it's still five times the OD, okay? Well, what changed
Speaker 3with the flat cable in 2023, when you're bending it, even if it's running flat along the side of a stud and you turn it horizontally through a framing member, we were still forced to use the wider dimension for that five times, which caused us to have to have a more radius bend and kind of loopy a little bit. And people argued is really, do you need that.
Speaker 2Much on it?
Speaker 3So what was clarified in the 2026 is, look, if I'm going to be making a bend on the flat side as I'm running up a stud, let's say, and it's flat and you're stapling it properly on a stud and you're not stapling it on its edge because you can't, and I'm running it up and then I'm turning it horizontal to a framing member, now the bend radius is clear that it's five times the diameter of the minor dimension. not the major dimension, which is the flat, flat part,
Speaker 3not the narrower, but the flatter side that you're running it up the framing member with, right? Now, any other bend that you may turn and you sharply turn it on its, you know, minor diameter, you know, kind of that, you're going to stick to the five times the wide dimension or the major dimension. But if you're going to run it flat and turn it horizontally, let's say through a framing member, then you do not need to have that big loop that comes out now to do that because now the radius or the bend radius has gotten
Speaker 3more shallower for you because it's five times the diameter of the minor dimension. And again, all this is published from the manufacturer. Of course, you can measure it yourself, but I can tell you right now, our product sheets for uncore wire in Prismian, we give you those values. And you're going to be hard pressed if you're going up and you're turning it through a framing member. You're going to be hard pressed to exceed that or be tighter than what's allowed based on five times the minor
Speaker 3dimension of the cable assembly.
Speaker 2So that helped a lot of people out.
Speaker 3Now remember, if you're bending it on its narrow side or you're going up and turning it or you're pulling it through other types of raceways with conduit bodies and all. And yes, you can put non-metallic sheet cable in raceways through conduit bodies and whatnot, just not in wet locations.
Speaker 2Okay.
Speaker 3But, and you still have to be aware of, you know, there's fill requirements where you treat the cable as a single conductor and yada, yada, yada. But there's also rules where you can put an mCable in a raceway for physical protection and you don't have to worry about fill requirements.
Speaker 2And I'm not going to get into all those.
Speaker 3Chapter 9, Note 1s, or Chapter 9, Table 1.
Speaker 2I'm not going to get into all that.
Speaker 3That's a different episode and I probably covered that God knows how many times. And I'm not going to talk about the various notes, like Note 9, if you will, in Chapter 9, Table 1. So I'm not going to get into all that. Um, but so you can have non-metallic sheet cable in raceways. Okay.
Speaker 2Let's, let's get rid of that right now where people say, no, you can't. No, you can't. Yes, you can.
Speaker 3Right. And we have, so what about the provision where it has to be secured to the enclosure? We have allowances for that. Okay.
Speaker 2So there, there's certain provisions for that. So just let it go. All right.
Speaker 3But now it's pretty clear that the flat NM cable can now be the bend, uh, can be based on the narrower dimension or the minor dimension when you're turning it or bending it on the flat side, not the narrow side, but on the flat, wider, major diameter. But if you're going to bend it any other way, then it's five times the diameter of the major.
Speaker 2Width, okay?
Speaker 3Not the minor, the major, okay? So all it did really was clarify.
Speaker 2That's it.
Speaker 3So proper bending radius must protect the internal conductors as well as the insulation without imposing unnecessary restrictive insulation. methods based on an inappropriate cable dimension because you're not using the right dimension. And that's where people get these big radius loops and all to try to comply with the NEC.
Speaker 2You get what I'm saying?
Speaker 3So we're giving you a little bit of a reprieve. Again, I've told you over and over that non-metallic sheath cable is pretty damn resilient. I mean, you got to make an effort to screw it up. It's very reliable. It's been in homes forever now. So again, you know, some people say, I would never do that. Chicago people, they would never. That's blasphemy.
Speaker 2We're never using a non-metallic sheath cable. Whatever. But then that's whatever.
Speaker 3Okay. Okay. Next change we'll look at here is for threaded wasteways, terminations are clarified. So under 342.29 and 344.29, what has changed?
Speaker 2A new or.
Speaker 3Revised requirements clarify how threaded IMC and threaded RMC entering enclosures must be mechanically secured. So when a threaded conduit enters an applicable enclosure. Appropriate fittings or lock nuts are required on both sides of the enclosure unless another compliant termination method is used. This resolves interpretations that previously allowed
Speaker 3insufficient mechanical fastening of the raceway at the actual enclosure. So I've got to give you a practical here. So when threaded rigid metal conduit or RMC is connects two enclosures using ordinary lock nut type terminations. Two lock nuts are generally needed at each enclosure for a total of four lock nuts.
Speaker 2Okay?
Speaker 3So, assuming that that's an installation where you're allowed to do that, we're not talking service conductors and assured reliability and all that. So, you know, maybe feeders and brand circuit or whatnot. So, the two lock nut approach, one on the outside, one on the inside, are generally needed, that's going to be four overall, okay? If you're connecting two boxes together, for example, okay? Now, a threaded connection provides mechanical retention, but the installation must also safely meet
Speaker 3the applicable grounding, bonding, and fitting requirements as well, okay? So it's an important provision that we need to make sure that if you're going to be using the threaded conduit entries, You're going to have to use appropriate fittings or you're going to have to install the lock nuts appropriately to make sure that this connection is reliable and solid. That's all we're saying here. It's not a big major change, but it is something that is clarifying. And it was
Speaker 3brought to my attention that And I don't know how they do this or how it would have been. I mean, I can't wrap my head around it. But there were many people that were doing this with Ridge and IMC going into enclosures that were only using one lock nut. Or they weren't using some type of fitting on the inside and the outside to make sure that it's secure and the integrity of that connection between the enclosure and the raceway were made. For me, I can't fathom it. Because I think if I'm going to use that method and I'm going to use lock nuts where I'm permitted
Speaker 3to do this, then I'm going to put one on the outside and one on the inside so that the connection is there. I'm not sure why I would put one on the outside only and certainly wouldn't have one on the inside only. It doesn't make sense.
Speaker 2So I don't know.
Speaker 3But obviously this was happening out there and I'm not here to say I know every situation of when that happened, but clearly that's happened out there somewhere. So, now, we're going to make you either use a fitting inside that's designed for it, or maybe some boxes have a threaded hub that goes in it, or if you're going to use threaded raceways, IMC, RMC, into a box, and you're going through non-threaded entry, you're now going to have to have, and again, we're permitted by code, you're going to have to have a lock nut on the outside and the inside. OK, again,
Speaker 3don't want to hear any people commenting.
Speaker 2About, well, you can't do that.
Speaker 3The services we get that. OK, we're talking about other applications where it would be applicable. Jesus, I got to sometimes clarify that stuff for people.
Speaker 2All right, folks, we're going to end that one here.
Speaker 3That's kind of going over part three and the changes that I felt were significant. Obviously, we're going to carry this on in another part. But hopefully you get something out of this. Share it with all your friends. Remember, our podcasts go back many years on many different topics. Encourage you to go searching through them. Listen to different ones. Share it with other people. If you don't like my podcast, move on somewhere else. You don't need to beat your chest and let me know you don't like it because I don't care.
Speaker 2All right. Till next time, folks. Stay safe. God bless. We'll catch you on the next episode of Master the NEC Podcast. Peace.
Speaker 1Thanks for tuning in to another electrifying episode of the Master the NDC Podcast. We hope you're feeling more powered up and ready to tackle the electrical world with the knowledge and confidence you need to succeed. Remember, in the electrical trade, knowledge is power, and we're here to make sure you stay plugged into the latest insights, tips, and code updates. If you enjoyed today's episode, don't forget to subscribe, leave us a review, and share the podcast with your fellow electricians and industry pros. Until next time, keep your
Speaker 1tools sharp, your circuits clear, and your mind focused, because here at the Master the NEC Podcast, we're all about sparking your success. Stay safe, stay smart, and keep mastering the trade. From all of us here at Electrical Code Academy, thank you for all your support, and we will see you on the next Amazing Master, the NEC podcast episode.
NiteNerds™ - The Future of Permanent Outdoor & Landscape Lighting Is Here! What if your home could look absolutely stunning every night of the year - with the touch of a button? Welcome to the world of NiteNerds™, where...
⚡ MASTER THE NEC PODCAST 🎙️ Hosted by Paul Abernathy Master Electrician | NEC Code Expert | Electrical Educator⏱️ Episode Length: 1 Hour, 23 Minutes ⚡ ABOUT THIS EPISODEWelcome to Episode 80 of Master The NEC, where...
⚡ MASTER THE NEC PODCAST 🎙️ Hosted by Paul Abernathy Master Electrician | NEC Code Expert | Electrical Educator ⚡ ABOUT THIS EPISODEWelcome to another episode of Master The NEC, the podcast dedicated to helping...
The National Electrical Code is a minimum standard - but what does that actually mean?In this episode of Master The NEC, Paul Abernathy takes a deeper look at one of the most misunderstood concepts in the electrical...
The 2026 NEC FastTrax Learning Program is a complete 12-month training experience for electricians, inspectors, contractors, instructors, and anyone preparing for an electrical licensing or certification exam. Taught by...