Skip to content
PodSubs
ShowsPeopleGuestsJobsNewsEvents
More
BlogPodCred
Menu
ShowsPeopleGuestsJobsNewsEventsBlogPodCredNetworksSign in
Join nowSign in
  • Shows
  • People
  • Jobs
  • News
  • More
    • Guests
    • Events
    • Blog
    • PodCred
    • Networks
    Join nowSign in

ELECTRIFY™ | Electrician Podcast

ELECTRIFY™ | Electrician Podcast artwork

Master The NEC | Episode 67 | What has changed in Article 300 from 2023 NEC to 2026 NEC?

Jul 3, 202645 minAudio
ShareXLinkedInFacebookWhatsAppEmail

This episode we talk about the 2026 National Electrical Code and the major changes in Article 300 from the 2023 NEC to the 2026 edition of the National Electrical Code. Listen as Paul breaks down some of the changes, renumbering, and subtle changes that all electricians need to be aware of as they venture into the last published edition of the National Electrical Code. Listen as Paul Abernathy, CEO, and Founder of Electrical Code Academy, Inc., the leading electrical educator in the country, discusses electrical code, electrical trade, and electrical business-related topics to help electricians maximize their knowledge and industry investment. If you are looking to learn more about the National Electrical Code, for electrical exam preparation, or to better your knowledge of the NEC then visits https://fasttraxsystem.com for all the electrical code training you will ever need by the leading electrical educator in the country with the best NEC learning program on the planet. Become a supporter of this podcast: https://www.spreaker.com/podcast/electrify-electrician-podcast--4131858/support.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Speaker 1Welcome to the Master of the NEEC podcast, the ultimate destination for anyone passionate about the electrical trade.

Speaker 2Whether you're a season electrician and eager apprentice, or.

Speaker 1Just someone who wants to dive deep into the world of electrical work, You've come to the right place.

Speaker 2Join your host, Paul.

Speaker 1Abernavi, a true authority in the industry with over thirty eight years of trade experience, as he electrifies your mind with in depth discussions, expertips, and.

Speaker 2Valuable insights that will keep you ahead of the curve.

Speaker 1Each episode, Paul will illuminate the complexities of the trade, decode the national electrical code, and share the latest industry trends, all while empowering you to take your electrical career to the next level.

Speaker 2So hear up, plug.

Speaker 1In, and get ready to supercharge your knowledge because with the Master of the NEEC podcast, the power is in your hands.

Speaker 2Now get ready. Here is your host, Paul Abernavi.

Speaker 3What up, everybody? Paul Labernati here, Welcome to another episode of Master the NEC, the podcast where we talk about just about anything electrical. Whatever you want to talk about and submit it through. Let's ask Paul over on fasttracksystem dot com. We're going to talk about it, and we're going to break things down, and today's no exception to that. We're going to be talking about some changes that have taken place to the article three hundred of the twenty twenty six edition of the National Electrical Code. Now, there's

Speaker 3been quite a bit of renumbering inside of article three hundred, and I think one of the things that happens. I get a lot of calls from people and they say, Paul, I'm studying for an electrical exam, and I really, you know, I don't. I don't have the twenty twenty six codebook yet, and but I you know, I'm going to be using the twenty twenty three to take an exam, but I really want to know what things have changed when it comes to the twenty twenty six. And so we've kind

Speaker 3of been doing some videos around that explaining some new articles, and if you haven't listened to it, I just recently did an episode explaining six twenty four versus six twenty five for EV vehicles and electric self propelled electric vehicles, and we kind of I kind of broke it down with them more of a sticking more towards what you're going to see, for the most part is EV vehicles, I like teslas and things like that. But today we're going to kind of look at Article three hundred and see some of the significant things that have taken place.

Speaker 3But we're going to start with the renumbering because I think it's one of the things that you have to remember that when you go look at the code, something may be there and then you turn around and it's all of a sudden it's gone, and you think that it's gone from the code. You think, oh, well, they must have removed it, and that may not be the case, especially when you're looking at twenty twenty six and there's a lot of restructuring. For example, calculations that we're in two twenty there is now going to be in one twenty energy management as coming to one thirty. So I

Speaker 3mean there's a lot of those shuffling around. And of course we're working already on the twenty twenty nine edition, which is going to rechange all of this and really shuffle the deck and add a bunch more chapters. And it's not to make it more complicated. The effort will be to try to make it easier to maneuver and understand the code. Technically, it's going to be the same technical material, but it's just how it's presented. It's going to probably try to make it a little more flowing format. But we start that journey in the twenty twenty six, so you do have to get familiar with some of

Speaker 3these things. So let's kind of let's kind of look at a little bit of the restructuring and we'll go through these quickly. Not no sense in making this overly complicated. So what I'll do is I will tell you what the code section was in the twenty twenty three edition and then tell you what it is in the twenty twenty six. So if you're somebody that's making notes and maybe you've got a twenty twenty six and you don't want to go get a twenty twenty three, but you're going to be taking an exam and you want to use your twenty twenty six, even though maybe the test

Speaker 3is not on the twenty twenty six. If you're in a state that allows you to write in your codebook, then you might want to write these numbers down and while you're studying, so it can make it easier when you're going back and forth between codebooks things like that. So anyway, let's go in and do some of these here and see if we can't just get us familiar with some of how things are moving around. So the first one, three hundred dot four, which is protection against physical damage. You're familiar with that, three hundred dot four dealing with board holes, parallel with framing members, through wood

Speaker 3framing members, all that protection rules. That was three hundred dot four in the twenty twenty three edition of the NEC. Well that is now three hundred dot six in the twenty twenty six edition of the NEC. So I just moved from three hundred dot four, just went up to three hundred dot six. The next one was three hundred dot five in the twenty twenty three addition, and that was underground installations. Well, three hundred dot five in the twenty twenty six edition is now for underground installation, it's

Speaker 3three hundred dot seven. Okay, So that's just a little change for you. It's it's you know, just moving a little bit, nothing dramatic as you see right now, just kind of jumping around a little bit for as far as the structure goes, keeping everything pretty close, but it's moving around a little bit. The next one the three hundred dot seven that was in the twenty twenty three edition of the NEC, which was raceways exposed to different temperatures. Now that is moved three hundred dot nine in the

Speaker 3twenty twenty six editions, So there's been a movement there from three hundred dot seven to three hundred dot nine, again generally in the same area, so it shouldn't throw too many people for loop. The next is three hundred dot eight under the twenty twenty three edition of the NEC that was other systems and raceways and cable trays. Well, that is now three hundred dot ten, okay. Next is three hundred dot nine in the twenty twenty three edition of the NEC that was raceways and wet locations above grade. Okay.

Speaker 3And by the way, all raceways outdoors below grade or above grade are wet locations and require wet location rated products like THHWN DASH two XHHW all those type of things. Okay, But the change is three hundred dot nine is now three hundred dot eleven in the twenty twenty six edition of the NEEC. Okay, So three hundred dot eleven used to be securing and supporting like above suspended ceilings, things like that. Well, that is now three hundred dot thirteen

Speaker 3in the twenty twenty sixth edition of the NEC. Remember you can pause this podcast at any time to catch up and kind of scrub back a little bit or whatever where you need. But what we're talking about is three hundred dot eleven, which is now three hundred dot thirteen, and that is securing and supporting. Uh. And again most of you're probably familiar with the securing and supporting what happens in the rules when you're above a suspended ceiling and those type of things. That's, you know, always been three hundred dot eleven, but now it's three hundred dot thirteen.

Speaker 3Next is three hundred dot fifteen, which is boxes, conduit bodies, and fittings. Right, that is now three hundred dot seventeen. So boxes, condo bodies, and fittings was three hundred dot fifteen, it is now three hundred dot seventeen. Next, three hundred dot eighteen, which was raceway installations, Well that has been moved to three hundred dot twenty, right, So three hundred

Speaker 3dot twenty is now raceway installation requirements where it used to be three hundred nine eighteen. Now that renumbering is important because someone that's applying a memorized twenty twenty three citation knowledge path, eventually you're going to have to conform to the twenty twenty six and these numbers change. So, you know, as a code guide, when I'm teaching seminars, I'm traveling around the country or whatever I'm doing, you know, we throw this rattle off these code references, and of

Speaker 3course for us it's changing, especially with the twenty twenty six, and of course again in the twenty twenty nine, it's going to be dramatically different. Those little parlor tricks that we use where we're throwing out these these code references because we work with them every day. It's going to get much more complicated, right because again things are shuffling around, things are moving, and you know it takes a while. I mean, we've been doing this current flow, this current format for over a decade really when it comes to the NEC. So this is a dramatic change, and it's

Speaker 3all kind of starting in the twenty twenty six to culminate in a very radically different looking twenty twenty nine version of the NEEC now again not removing the technical information, just restructuring everything. And for those that are upset about it, you know, again, you really didn't need to memorize the code anyway, just as long as you have access to a codebook and you know how to maneuver it. You know how to look up things, you know how to interpret things, you know how to use the index, the

Speaker 3table of contents. It's really not going to matter. Things just get moved around. But the technical part's going to stay the same, right, you still submit technical changes like you always did through public inputs, public comment stages, knit mams. That's not going to change. It's just the structure. It's just a little different. Now, let's talk about some significant changes that you just people have to be aware of, because I want to kind of dip your toe in some of these twenty twenty six changes. When it comes

Speaker 3to Article three hundred, the first one that's really going to come to mind that it's not you know, it's not really a like some of the changes that you might see are basic just verbiage changes to make things flow better, more clarification. These are significant changes that we're going to talk about because they cover areas that either weren't covered before or needed additional clarity. Okay, so the first one is three hundred dot four C. This is damaged conductors and wiring methods. Now, this is probably the

Speaker 3most important change in Article three hundred. Why because this new rule states that conductors and wiring methods that are no longer suitable for use because of damage. And this can be from overheating, fire, corrosive influences, water exposure, whether it's new installation or an inspector encounters this on a subsequent inspection and they notice this deterioration due to conditions of use, that they can say that it is no longer suitable for use and then it has to be removed.

Speaker 3So important words are no longer suitable for use. This rule does not necessarily say that every cable that gets damp must be automatically replaced. There must be damage sufficient to make the conductor or the cable or the wiring method unsuitable for continued use. Now, this is going to be something that it's going to have to at least we have it now, and as a wiring cable manufacturer, this gives us something to point to because again, there

Speaker 3are certain products that are designed for wet locations. There's certain products that are limited only to dry locations, like nonmetallic sheath cable, and so having this clarification and then understanding exposure can really be important for manu factors to give guidance, but also for the installer. Now, I want to make sure that everybody's clear that there are two informational notes that have been added here, and they're talking about the nma's Evaluating Water Damage Guide as well as

Speaker 3the anema's Fire and Heat Damage Guide. Now, ANEMA is not a they don't put out standards that are enforceable. However, these are what's used to determine a lot of things and the suitability of use continued use because these documents are put out by NEMA, and NEMA represents over four hundred of the major manufacturers around the world and collectively

Speaker 3the vast majority here in the United States. And you know, I can tell you where Prismium is part of NEMA, South wire Neck Sans, all of the major manufacturers are Wiring Cable are part of NEMA, Schneider is part of NEMA, Eaton's part of NEMA, siemens Ge all of them are members of NEMA. And they have cod and standards professionals who will come together and give collective guidance, and they create these guides, and these guides will give recommendations for

Speaker 3certain types of exposure. So now in the twenty twenty six edition we do have reference to these. Now, remember informational notes are not enforceable alone. But if I'm an inspector and I'm looking at something and i would see a product that's being used in a condition that it was not rated for, and I know that the NIMA Evaluating Damage Guide tells me that it needs to be replaced based on the manufacturer, then that pretty much is something that I'm going to say. You know what, I'm not relying on those NIMA guides, So don't get on

Speaker 3me about being in informational note. No, I am not relying on it because I think it's now damaged. Prior to three hundred dot four C being introduced, that created a lot of arguments in the field. Now with three hunderd dot four C, there is teeth behind it for a manufacturer to make certain recommendations about removing it, replacing it, or even given permission to continue to use something based on it the condition of use. So this is important, right.

Speaker 3So what's important to understand is this gives the AHJ direct enforcement language rather than HIMEN to rely on general workmanship listings and installation integrity provisions or guesswork. Okay, So it's extremely important to have this provision in there. Now. A meg ometer alone does not automatically override the requirement. That's important. Things. Somebody does a meg test and they come back and say, oh, it's damaged. No, that does not mean that. Okay. That means that it may need

Speaker 3to reach out to the manufacturer to give additional guidance. Because y'all know my position on these megging I believe a lot of it is misunderstood. I believe that if everything is insulated and all the turn paths are non conductive, then there's really You may get a number due to capacitance, you may get a number due to sheer distance and resistance or impedance, and you may get something that makes you feel warm and fuzzy. But at the end of the day, it's in many cases it's useless information. But you need to reach out to the manufacturer rather than

Speaker 3just look at a number alone. And if I haven't said that, for the last fifteen years until I'm blue in the face. I know a lot of installations where the meg O and ratings were low and the product still works fine and it's been in service and it's perfectly fine, but nobody freaked out, Okay. So I'm just saying, the manufacturers can be your friend. If you have the right connection, you can reach out to them. Most of the manufacturers want to help you, okay. But if the product is no longer suitable because of its contamination, exposure, corrosion,

Speaker 3evidence of heat damage, compromised construction, uh, then replacement is going to be required now based on three hundred dot four C. So that's a that's a good thing. It gives some guidance now rather than that gray area. Okay. The next change is three hundred dot six E. This is the roof death Deck protection now applies to all roof decking, Okay, so not just to metal corrugated sheet roof decking. So in the twenty twenty three edition, three

Speaker 3hundred dot four E, which what it was in the twenty twenty three edition. And I told you earlier that NAT's now three hundred dot six is covering all of those things. It's said that primarily address the wiring installed under metal corrugated sheet roof decking. Well, the twenty twenty sixth edition of the EEC says that requires wiring methods and materials installed under roof decking generally to maintain at least one and a half inches of separation from the lowest surface of the roof decking. Therefore, the protection no

Speaker 3longer is limited to just metal corrugated roof decks. It can be applied broadly right to wood decking, OSB floor roof decking, plywood roof sheeting, metal decking of various types, and other roof decking systems. So what does this do The prohibition against installing wiring methods concealed inside metal corrgated sheet decking that remains a new exception permits wiring methods and materials in concealed locations where encased in at least

Speaker 3two inches of concrete, subject to accessibility requirements for boxes and obviously conduit bodies as well. So we still have those provisions in there, but again we've expanded it out a little bit when it comes to protecting those wiring methods that are under roof decking to not just be limited to metal corrugated ok Now, why does this even matter. Well, roofing nails, reroofing screws, PV mounting, the hardware for PV

Speaker 3mounting can penetrate the wood decking just as easily as it can metal decking. So it just made sense. So this is a major expansion that affects residential as well as commercial. So it's not just going to be limited to these metal corrugated sheet sheet metal type decking. It's very broad now, Okay, so that's a to me, that's a significant change because we're seeing a lot more PV applications, we're seeing a lot more roofing that it's not just metal corrugated sheet decking other types. And you know what,

Speaker 3it's very hard to regulate the length of screws they use and when they're putting in that doing a reroofing or putting down some I mean, they just jam these things in there and you just you don't know what's on the other side. Okay, So it makes sense, Okay, all right. The next one to be aware of is three hundred dot seven D three. This is the warning ribbon expressly required over service raceways. Now, this formally was three hundred dot five D three. But as you remember, the three hundred dot five rules got moved to three

Speaker 3hundred dot seven. So the twenty twenty six language expressly requires that the warning ribbon over both one direct buried service conductors and two raceways containing service conductors. Okay. So again direct bary se okay. So you could be used a HASH two directly buried in the earth or raceways that happened to have service conductors inside of it. It doesn't matter. We're still gonna have this warning ribbon over

Speaker 3either of those. Now, the requirement applies where the installation is not encased in concrete, is buried eighteen inches on more below the grade, and has the warning ribbon installed at least twelve inches above the underground installation. Now, the twenty twenty three wording referred to underground service conductors, but did not clearly resolve whether the parent language extended the requirement to service inductors installed in raceways or was that

Speaker 3only for direct bary type of installations like a USC cable. Okay, So that was removed, and that argument is removed with the twenty twenty six edition. This is important because this is not a general warning ribbon requirements in every underground brand circuit and feeder. This is specific provision that addresses underground service conductors and service raceways. So let's not confuse this now. If you want to use a ribbon for feeders or brand circuits and that's just your standard practice

Speaker 3and you want to do that, that's a classic example of going above what the code requires as a minimum. You can put damn ribon all you want, but it at least is required here when it comes to services, whether they're again direct barry or they're in a raceway. When we're talking about service conductors. Okay, so it makes sense. So that's kind of kind of picking up somewhere that could be an argumentative thing between an electoral inspector and an installer and interpretation and service conductors. And it says, well, what if they're in a raceway, because it didn't say

Speaker 3it only applied to direct burial, you know what I'm saying. So now the clarity is there. It doesn't matter either or still got to have that ribon if it's service conductors. The next one is three hundred dot eleven B and this is above ground raceways and wet locations must drain now three hundred DOT eleven now covers raceways and wet locations above grade. The existing concept remains that the interior of a raceway installed in a wet location is itself

Speaker 3considered a wet location. Now, the new drainage requirements say that raceways in above ground wet locations must be arranged to drain. Okay, Now think about the application here. This affects raceways installed in locations such as washdown rooms, because again that's above grade, okay, food processing areas, car wash facilities, indoor pools, and similar wet environments, certain agricultural and industrial areas. Okay,

Speaker 3So how would I comply with this? Well? Compliance might involve proper raceway slope, drainage style fittings, weep openings provided as part of the appropriate enclosure. That these raceways drained too, or another approved insallation that allows accumulation of moisture to escape. Maybe it's some type of fitting, or maybe it drained raceways with proper slope it drains to an enclosure with how to quit we poles that type of thing. Okay.

Speaker 3So the key here is that wet location conductors alone are not the entire answer. When we're dealing with above grade. The raceway must also be installed so that the water does not become trapped indefinitely inside of the raceway. Okay, makes sense. Well, yeah, and so there's many ways to achieve that, whether it's again draining, to equipment draining, to slope draining to a box that has we poles. There's many ways to do this, but you're gonna have to

Speaker 3make sure that it is put in place that way. Okay. The next one we'll look at is three hundred thirteen E. Now, this one says cable ties used for support must be listed and identified. Now, cable ties used merely to bundle conductors are different from cable ties being relied upon for securement or support of wiring methods. Okay. Now, under the new three hundred dot thirteen EK, cable ties used to

Speaker 3secure or support cables, flexible conduits, or flexible tubing must be listed and identified. For securing and supporting cable ties, fixed devices used for that purpose must also be listed identified. Okay, So cable tie fixed devices or the cable ties themselves almost be listed for that application. Now, there is an informational note, and it explains that a type two S and a twenty one S are evaluated for securing and

Speaker 3supporting cable, flexible conduit and flexible tubing. Ordinary inexpensive nylon herberfreight zip ties cannot automatically be treated as structural cable supports, So and inspect is most certainly now going to be looking for these listings look for this type two S or twenty one S markings when it's going to be used to support cables. Right. Doesn't mean you can't use cable ties, but it just means that you're now going to have to look for this listing. Now, why does

Speaker 3this create an inspection problem? Because the listening and type designation may be shown on the package rather than molded into each tie because the code is in the standard. Uel have allowed this for very long time. As the components get smaller, there's really nowhere to put these markings, So the packaging has to have the markings. But that means that the inspector is not going to be able to look at that tie rap, for example, and determine whether or not that one is a Type two S or twenty one S versus a just a plain old

Speaker 3generic tie rap that you may be using for bundling, but you're not really using it for securing and supporting. So when that comes into play, the contractor may need to retain that packaging to be able to show the inspector. And this is not a new thing. This has been done a lot. There's a lot of smaller components that require the packaging to be retained in case the inspector asks something about it. So this isn't something really dramatically new when it comes to that, but it is something

Speaker 3that you have to be aware of that's going to come your way. Okay, So that is definitely don't get caught by that one. And again this is very specific to that. So there's two things. There's a cable ties and there's cable tie fixed devices, both of which, okay, both of which I'll be listening identified for securing and supporting if they're going to be used to support cables, flexible conduits, and flexible tubings. So just don't get nailed

Speaker 3by that one. Put all these tie wraps up and then you're not able to show that they meet that type two S or twenty one s. Okay, Okay. The next one may just seem like a no brainer to most people. This is three hundred dot twenty B and previously this was three hundred and eighteen. This is welding raceways is now completely prohibited. The twenty twenty six NEC states that raceways are not permitted to be connected or supported by welding. Okay, now, some people have looked at this through the years and it's like, how can it

Speaker 3be not better supported or better connected by by spot welding it. Well, previous language contained qualifications involving installations permitted elsewhere or raceways designed for welding. Okay, now those are now removed. The rule now says do not weld a raceway to connect it, terminate it, or support it. This addresses listings conductor damage, mechanical integrity, and fault current path concerns.

Speaker 3And this was all addressed by the Steel Tube Institute. So again, do not confuse this with welded supports or welding supports. This has to do with welding of the raceway. Welding a separate structural support a bracket or iraq is not necessarily the same as welding a raceway itself. So again you need to differentiate what we're talking about here. You're not really welding the wiring method the raceway to

Speaker 3secure it to something you actually can weld supports, but ultimately the supports are doing what they're holding the wiring method. Now, welding a separate structural support, like we said a bracket or iraq, is not necessarily the same as welding the raceway itself. The prohibition is directed at connecting or supporting the raceway by welding to the raceway, not to another separate type of support that may be okay to weld, Okay,

Speaker 3like a rack or a bracket. That's different. That's not the raceway. And this rule here is dealing with metal raceways. Okay, keep that in mind. It should be obvious. But again sometimes it takes that language to clarify that a bracket is not a raceway. By the way, a cable tray is not a raceway. It's a support system. Okay, very

Speaker 3important distinction that you just because a wireant, just because you look at a cable tray, that you assume that that's a raceway. It is not. Granted, it's got its own rules that have to be followed, but it is not in itself a raceway. It is a support system. Okay, distinction, And of course you can learn all that by joining our fast tracks program and learning the NEEC. So I encourage anybody out there if you really want to learn the National Electrical Code. We have some great programs over on fasttracksystem dot com. You don't have to be doing

Speaker 3it for exam prep. We have a Mastering the NEC program where you can just learn more about the NEEC and just make you better and more proficient at your job. And again, the easier things are to do, or the more you learn, the easier they are, the less it feels like you're working. Okay, you're just doing it, so okay. The next one is we're gonna look at three hundred twenty four. That's the three hundred and sixty degree rule continues through raceway transitions. Now, this is an excellent code

Speaker 3change that we need to talk about here because previously, each individual raceway article contained its own three hundred and sixty degree limitation right, so it didn't matter rate which one you were in, whether it was EMT, whether it was rigid metal, intermediate, medal PVC, they all had their own specific rules to for individual raceways where you not have more than three hundred and sixty degrees worth of bins between pull points. So basically, from pull point A to poll point B, you can't have more than four nineties,

Speaker 3or you could have accumulation of offsets and angles and nineties. You couldn't exceed three hundred and sixty degree okay, But previously somebody could. Somebody could argue that three hundred six degrees of bends an EMT transition to RMC, then another three hundred and sixty degrees before the next pull point, okay, because they could argue that it was only per the different type of wiring method or raceway. So if you changed raceways, then it caused the map to start over again.

Speaker 3So if I had three hundred and sixty degrees VMT and then I used a transition fitting instead of a box which wasn't a pull point, and then transition to RMC, that I could also do another three hundred and sixty degrees before I got that pull point. That is not what was meant to say, Okay, So three D twenty four closes that argument. Now, the total bends in any combination of conduit or tubing wiring methods used for a single run cannot exceed three hundred and sixty degrees between

Speaker 3pull points. Yeah. Again, the pull points when you're transitioning between one wiring method to another, that is not a pull point. So it should have never been an argument. It's in the run itself. But you can see where people want to you know, people want to bring these arguments up. And then of course, if that's the case, then we need clarity and that's why we clarify. So if I have to give a visual a mental picture for this, if we have two pullboxes, so we have

Speaker 3two ninety degree EMT bins that's one hundred and eighty to each ninety is one eighty, and then we transition, let's say over to RMC, depending on where it's going to go. Uh, maybe it needs to transition and now it needs to go to an area that needs a little more protection, so it transitions to RMC, and then it has two additional ninety degree binds in the RMC. That's another one hundred and eighty degrees for a total of three hundred and sixty degrees. So no additional binds is permitted before another pull point. Okay, so the raceway

Speaker 3type transition does not reset that bend count, so that is significant because there are people that have challenged that. Now you may not challenge it. I may not challenge it. And I can promise you the more binds you have, the harder as hell that pull is going to be. But if I had to go and have four bends in an EMT and I transition to an RMC and I put four more bins in it, we're talking eight nineties in a pool. You get hard press to get anything through there. And if you could get it through, there's a high probability you're going to damage the sidewall

Speaker 3of that conductor anyway, and you're you're you're asking for a problem. Okay, So this just makes it a little easier to uh to to to be able to make sure that this is enforced properly the way it was supposed to be enforced. Okay, all right, now we're going to go an honorable mention right here because I think this is significant for many people. The previous requirement in the twenty twenty three under three hundred dot four G you might remember, it's the fitting requirement where in the

Speaker 3twenty twenty three edition of the NEC and I'm actually read this to you, it's fittings. It says where raceways contained four AWG and larger insulated circuit conductors, and these conductors enter a cabinet, a box, an enclosure, or a raceway. Now here's the part that was added in the twenty twenty three. It says, prior to the installation of the conductors, the conductors shall be protected in accordance with any of the following. So prior to the installation you had to make sure that you had the fitting on there. And

Speaker 3in most cases this was a bushing in order to protect the conductors prior to the actual installation. Okay, So in the twenty twenty sixth edition of the nec has the twenty twenty six removed the timing language. Okay, So in the twenty twenty three you had to have when you're pulling conductors in the raceway and they were for gauge in larger insulate conductors, you had to have a bushing in place. Now, this doesn't remove the bushing requirements. Let's not get confused here. It's all about the timing of the bushing. So it used to say that you

Speaker 3had to have everything in place prior and so some of the manufacturers came out with those you know, kind of those hinged type of bushings, and you couldn't use them because it needed to be in place before you pulled the conductors. But a lot of the pulling equipment actually had a sleeve that fit down actually into the actual raceway and so you really had the protection there. So one of the big changes here is it removed the statement about being in place prior. Okay, so this

Speaker 3change means that permanent protective fittings or insulated material does not necessarily have to be physically installed before the actual pull. For example, when pulling equipment provides that protection based on how that they would go, you know, have maybe the end of it goes down in the raceway and you could end up putting a split or a hinged bushing on after the installation, not prior to the installation. Still have to have the bushing, still have to follow the

Speaker 3rules under three hundred dot five G for fittings, you still have to follow that, and it could be integral into the fitting. Bushing could provide this, and you still also have other types of bushing requirements in the other specific code articles for those types of wiring methods. But this is just a timing thing means that you can put the bushing on after because the pulling equipment would add that protection during the pull itself. Now, if you're just pulling by hand and things like that, then I'd

Speaker 3say be careful because obviously you damage it. Then you saw what we said earlier. When inspector thinks it's damaged, then it's going to be removed, So just be careful. But this removed the timing aspect of it. And some pulling equipment do have sleeves that go down it that literally will protect it as it comes through. And a lot of the fittings today still have protection rounded edges on them and things like that. So again this is just a little common sense. But it just removed the timing aspect. It did not remove the protection requirements. It

Speaker 3just removed the timing of when you would need to use them. You get what I'm saying. Okay, that's why I just wanted to be like a like an honorable mention rather than something significant. Okay, let's see here three nine A Additional Methods to prevent condensation. Now, formally this was in three hundred dot seven A, and it mainly relied on sealing the raceway or sleeve to prevent warm air circulation into the colder section in creating moisture. Now,

Speaker 3the twenty twenty six edition permits either one. You can have appropriate sealant, and there's a lot of manufacturers that ducts seal. Polywater makes some great products that can change or break that air exchange to prevent condensation. But it also says a listed fitting or other approved means identified for preventing condensation and warm air circulation is fine. So a thermal brake coupling is identified as an example of this. Now,

Speaker 3this is an allowance rather than a new burdeny. It didn't change the fact that you have that condensation issue for the warm air the qulder. It's just giving you more options to be able to apply that seal. That's it, Okay, that's all that's really doing there. Next three hundred dot ten, which is formally three hundred dot eight, and this is the foreign system prohibition now especially includes cables. So what are we talking about now? In three hundred dot eight

Speaker 3it prohibited non electrical piping or tubing in raceways or cable trays containing electrical conductors. Now, in the twenty twenty six wording, now expressly includes raceways and cable t containing electrical conductors or cables. Therefore, placing an NM cable, an NC cable, an SE cable, or similar cable assembly inside a raceway does not create a loophole allowing water, gas, pneumatic,

Speaker 3or drainage piping in that raceway. You get what I'm saying. So in the past, you could have tried to circumvent this by putting an NM cable with its own sheathing inside of it and creating a separation and saying, well, it's a cable assembly and it's in the same raceway, but it's separated because the cable has its own sheathing or armor. That loophole that was in there is gone now, okay, So you're not going to be able to put gas, water, pneumatic,

Speaker 3drain piping and all that stuff in the raceway, even if you have a different type of cable assembly in there and you try to play that game and saying well, I can put it in there because the cable is in its own wiring method and it's inside of the raceway, it's not gonna work, okay, So that doesn't create a loophole allowing you to put water gas pneumatic case. So just keep that in mind. And again that was something that was clarified by the Steel Tube Institute in kind

Speaker 3of making that thing clear, and of course it got into the National Electrical Code just for clarity. Next three hundred dot seventeen F, which is accessibility depends on whether the fitting is used as a poll point. Now former three hundred fifteen F require that fittings to remain accessible unless listed for concealment installations. Okay, So again a good sample of this fitting. Fitting may be a ninety degree fitting,

Speaker 3and it was required to be accessible unless it was actually listed for concealment application. Now the twenty six language says that the fitting must be accessible if it is used as a pull point. A fitting used only as a transition and not relied upon as a pull point may be concealed were otherwise permitted. So removes the fact that you could have had this this fitting and maybe a ninety fitting that was transition fitting, but it wasn't

Speaker 3going to be used as a pull point, So it removes the requirement for that to now be considered accessible okay, or listed for concealment. Example, FMC nineties used as a pull point. They must still remain accessible if you're using that FMC ninety as a legitimate pull point. Okay. Now, underground PVC to RMC transition fitting assembly before burial and not used as a pull point, accessibility is not automatically

Speaker 3required by this provision. So that's just a transition fitting. There's many people that have argued if you're going from a PVC to RMC as a transition fitting, then it needs to be assembled before burial and not used as a pull point. Then it does not trigger the fact that it needs to have accessibility. Just do it, put it together, follow instructions, and bury it. Okay. So again, extremely important to separate the two. Okay, all right, So

Speaker 3that's gonna wrap it up for this episode. Folks. Hopefully you saw obviously to be more familiar with the National Electrical Code, take the time. Maybe I didn't go into some of these as deep as you wanted me to go into. Obviously I can't cover every aspect of the changes that are in three hundred, but I encourage you to take the time to look at it, and of course if there's any questions you have, you can always go to the let's ask Paul Form And also, by the way, since I am going to be writing articles and doing videos and doing podcasts for EC and M magazine,

Speaker 3is there any consultant, feel free to email me something and it may appear in one of those episodes in uh, you know, where we can basically clear up what maybe the masses don't understand about certain things of the National Electrical Code. But that's we're going to use that platform for. I think E C and N Magazine is a great platform to teach people the electrical code and applications, and we're going to do our best to kind of bridge the gap between electrical inspectors and electricians and we're going to get into all of that. We're going to make

Speaker 3it exciting. So we want to move from this point one as of July of twenty twenty six, we're gonna make E C and N Magazine broaden them a little bit. We're gonna get into inspections and talk about all those things. I'm excited about the opportunity. There's great folks over there, and I encourage you to subscribe to E C and M Magazine in you know, it's gonna be some great things. Ryan Jackson's going to be doing some articles for them as well. He's very knowledgeable individuals, so that's going to be great. But again, we can't cover every thing, and

Speaker 3some people would like us to cover every topic, but again we have to pick and choose, and we have to make sure that we keep it flowing. So we'll do the best we can. So until next time, folks, stay safe, God bless and catch us all on the next episode of Master the NEC the podcast. Till next time, stay safe.

Speaker 1Thanks for tuning into another electrifying episode of the Master the ANEC podcast. We hope you're feeling more powered up and ready to tackle the electrical world with the knowledge and confidence you need to succeed. Remember, in the electrical trade, knowledge is power, and we're here to make sure you stay flooded into the latest insides, tips and code updates. If you enjoy today's episode, don't forget to subscribe, leave us a review, and share the podcast with your.

Speaker 2Fellow electricians and industry pros.

Speaker 1Until next time, keep your tools sharp, your circuits clear, and you're my focus because here at the Master of the ANEC podcast, we're all about out sparking your success. Stay safe, stay smart, and keep mastering the Trade from all of us here at Electrical Code Academy. Thank you for all your support and we will see you on the next amazing Master of THENEC podcast episode

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. NiteNerds™ — The Future of Permanent Outdoor & Landscape Lighting Is Here!

    Nov 12, 202631 minAudio

    NiteNerds™ - The Future of Permanent Outdoor & Landscape Lighting Is Here! What if your home could look absolutely stunning every night of the year - with the touch of a button? Welcome to the world of NiteNerds™, where...

    Credit the people on this episode

  2. MASTER THE NEC PODCAST | E81 | Electrical Code Knowledge and 2026 NEC Updates PT 3

    Oct 18, 202655 minAudio

    ⚡ MASTER THE NEC PODCAST 🎙️ Hosted by Paul Abernathy Master Electrician | National Electrical Code Expert | Electrical Educator ⏱️ Episode Length: 55 Minutes ⚡ ABOUT THIS EPISODEWelcome to Episode 81 of Master The NEC,...

    Credit the people on this episode

  3. MASTER THE NEC PODCAST | E80 | Electrical Code Knowledge and 2026 NEC Updates PT 2

    Oct 18, 20261 hr 23 minAudio

    ⚡ MASTER THE NEC PODCAST 🎙️ Hosted by Paul Abernathy Master Electrician | NEC Code Expert | Electrical Educator⏱️ Episode Length: 1 Hour, 23 Minutes ⚡ ABOUT THIS EPISODEWelcome to Episode 80 of Master The NEC, where...

    Credit the people on this episode

  4. MASTER THE NEC PODCAST | E79 | Electrical Code Knowledge and 2026 NEC Updates PT 1

    Oct 18, 20261 hr 4 minAudio

    ⚡ MASTER THE NEC PODCAST 🎙️ Hosted by Paul Abernathy Master Electrician | NEC Code Expert | Electrical Educator ⚡ ABOUT THIS EPISODEWelcome to another episode of Master The NEC, the podcast dedicated to helping...

    Credit the people on this episode

  5. What The HECK? Do you have a 2026 National Electrical Code Course?

    Oct 3, 202641 minAudio

    The National Electrical Code is a minimum standard - but what does that actually mean? In this episode of Master The NEC, Paul Abernathy takes a deeper look at one of the most misunderstood concepts in the electrical...

    Credit the people on this episode