Field Frequency

Field Frequency artwork

i-Charging: From Fixed Hardware to Adaptive Infrastructure

Sep 15, 202649 minAudio
  • Apple Podcasts
ShareXLinkedInFacebookWhatsAppEmail

Send us Fan Mail In this episode of Field Frequency, Jason Cortes sits down with Jeff Cohen, CEO of i-charging USA. For most of the last decade, EV charging ran on one question: how many chargers did you deploy? That era is over. The questions now are harder - is the site profitable, is the infrastructure scalable, and when something breaks, how fast is it back online? Jeff brings fourteen years in this industry - GE, ChargePoint, Tritium, and now a Portuguese DC charging manufacturer building out of Atlanta's Curiosity Lab. His read on the market comes down to three shifts. Profitability: the industry moved from land grab to site-by-site business case, and ROI now decides whether a site gets built at all. Serviceability: the old OEM question of "is it in warranty or out of warranty" was always the wrong question - the right one is whether the charger is operational and serviced on time. And scalability: fixed-output hardware forces operators to make kilowatts fit, while adaptive architecture sizes power to the site and grows with it. The conversation gets specific fast. Jason shares a unit that sat dead for nine months - abandoned by its manufacturer, costing the operator $300-400 a month in a single parking space - and took a day and a half to fix once someone actually showed up. Jeff walks through what i-charging does at the site design stage, including an RFP where reading the e-sheets first saved a fleet depot roughly a million dollars in DC cable runs. In this conversation: Land grab to site business case - why ROI, not availability, now decides where chargers go Why "in warranty or out of warranty" was always the wrong question Fixed-output hardware vs. architecture that scales from 50 kW to 1.6 MW Dynamic power allocation: moving power between vehicles in real time instead of stranding it 20-25% more power in 60-65% of the footprint - and why space is the real site constraint The nine-month outage that took 36 hours to fix Substituting AC runs for DC runs at the design stage to cut CapEx before a charger is ever ordered Availability, uptime, and charge session success - what to actually measure, and why 40% of service issues are comms Charging education as the industry's unfinished work - even a fourteen-year veteran had to call support eVTOL charging with Embraer's Eve Air Mobility, and one site serving cars, trucks, and aircraft Why the next five years bring convergence, not more segment-by-segment funding silos CONNECT WITH JEFF LinkedIn: Jeff Cohen Web: https://i-charging.tech

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_00The EV charging industry is rounding a maturation curve. For years the conversations were pretty simple, deploy more chargers, get more sites out, more ports operational, get more funding. But all that era is ending. Today the real questions are a little bit harder. Is the site profitable? Is the infrastructure scalable? And when something fails, how fast can you get it back online? In this episode with Jeff Cohen, CEO of iCharge in USA, we dig into why the winners in this industry will not be the companies that sold the most hardware. They'll be the ones that built the infrastructure that actually works in the real world.

SPEAKER_00Let's get into it. Jeff now leads iCharging USA as CEO and brings deep experience across EV charging infrastructure and all kinds of things like go-to-market strategy, deployment, you name it.

SPEAKER_00You've been around, Jeff. So you you you you know it in inside and out, right?

SPEAKER_01It's been a journey. It's been a great one too, Jason. Great to see you today, and thanks for having me on. I really look forward to this.

SPEAKER_00Yeah, I'm I'm excited to have this conversation with you, to talk about your background, talk about what iCharging is doing in the space. But let's let's get the conversation kicked off with your your personal journey into electrification. And then after that, if you could you know give us the iCharging story as well.

SPEAKER_01Absolutely. Hey, my my journey actually starts back in the summer of 2012. So about 14 years into this, I was commuting from one side of Atlanta to another, and everyone knows Atlanta is an hour from Atlanta. And my commute really was is I was working on the Alyssa West Side of Atlanta at the time for healthcare company, commuting in a really uh expensive gas guzzling car. And my fleet manager from my home office in New Jersey said, you know, you really should try the Chevrolet Volt. It's it's a cool little car, and it's, you know, your first step into electrification.

SPEAKER_01And so I went leased a volt at my local Chevrolet dealer and started driving that around and got my free home charging, a pretty cheap home charging from the first generation of Plink and uh start of the journey. And about two, two and a half years later, I really got an interest in joining the industry and uh through Twitter reached out to General Electric and a guy named Seth Cutler. And I said, Hey, I'd be interested in doing some selling for you. And he said, Well, I could use a national sales manager. And I got on board in the July of 2014 with Seth basically leading the commercial operation for the GE line of level two AC chargers.

SPEAKER_01They were barely networked, Jason. That I think the Watt Station and the Duras Station were just getting their first cellular connections, and uh that was kind of fun selling uh municipalities and we did a big deal with Bank of America and other such customers. GE made the decision to uh get out of the business in 2016, 2017, and I was able to join ChargePoint at that point. You know, I had a relationship with Doug Sorillo, also here in Atlanta, and Doug said, hey, you know, we could really use someone who knows distribution channels. You did that at GE.

SPEAKER_01We could really use your help. And that's what I joined ChargePoint in April 2017 to do and spent two years there building their distributor electrical contractor channel. I remember going to Texas and meeting with Lone Star Electric and going to, you know, Dallas, Houston, San Antonio. I think I covered the whole state, but that was part of the job. Built a small team there, and we focused on new construction and a lot of quoting and helped build that business for ChargePoint. In uh the summer of 2019, I really felt it was time to pivot into DC charging. I had gotten exposed to uh a company called Tritium through ChargePoint with CPE 100 and 200 products, the 200 product actually, and then uh joined uh Tritium in August, uh excuse me, September of 2019.

SPEAKER_01Same day we uh same week we opened the building in Torrance. We had a global training center. So one of the co-founders, Dave Finn, came out and gave us a lot of uh history lessons and taught us some great things about the company. And then we did the ribbon cutting and spent five years there, as you know, going through uh the founder stage. We call that phase one. Then we went public in January of 2022, so we'll call that kind of an Asdaq public phase. We opened the Lebanon, Tennessee facility, still proud of the work they do there, and then that's going today. We hit some rough patches and ended up in a phase no one likes to go through but was a good experience.

SPEAKER_01And that was the receivership phase, and then ultimately the sale of Tritium to Exacom. And uh at that point I saw an opportunity uh maybe to take a little time out of the industry. I'd been remote for 10 years, and I was given an opportunity to join a company in Atlanta that would allow me to kind of work back in an office setting, work with a team of people, get into an industry that I knew nothing about, but uh had some passion for what they were trying to do. But then I got a call last summer, almost a year ago, in June of 2025. Would I be interested in an opportunity to join this company iCharging?

SPEAKER_01Happened to be based in Atlanta, and they were looking for someone to come in and become the CEO in January 26th. And I said, Well, that's an offer that's uh too hard to refuse. And uh so here I am working with a small team here in uh in Georgia. I'll get into that in a little more detail. So that's kind of the journey of now almost 14 years in EV charging.

SPEAKER_00You know, that's that's not a that's not a testimony everybody has in the space to have over a decade worth of experience in in this uh naset industry, uh, but uh it just speaks to all the background. It's it's funny you mentioned uh Seth is is kind of the the catalyst that brings you into the space. Uh Seth uh episode with Iona actually released today of all things. Yeah, a little bit a little bit of kismet there, but um interesting on on the journey through uh through charge point and um you know on to on to tritium, which is is where we work together at as well.

SPEAKER_00Well, let's uh let's talk about iChargin. Um, you know, what what is the company building? What what is the role that iCharging has in the U.S. charging infrastructure? You know, kind of kind of give us a lay of the land.

SPEAKER_01Happy to do that. I iCharging is a really unique company. They're based in northern Portugal in a beautiful coastal city called Porto. I recommend everyone have a chance to go there. And it was founded in 2019 by a group of very experienced kind of electrocomponents uh company folks, and they formed this company also in Porto, and they were bringing together the expertise to literally design, manufacture, and produce all in Porto, Portugal or the areas around it, a line of DC chargers specifically focused on DC, and really the company's and a reason for being is built on a single architecture.

SPEAKER_01And it was a vision of our co-founder, one of our co-founders, uh Pedro Silva, to build an architecture that scales across every use case, whether it's urban charging, heavy-duty fleet, things that weren't even thought about back in 2019 when you know public charging was it. But to have a capability to scale, and even today, as we were growing into urban air mobility, the AM segment, is based on that single fundamental principle that you have architecture that can grow and sustain and be able to suit multiple use cases.

SPEAKER_01So I think that's really the brains of the company. Uh, we're about 120 strong. Uh the majority of the group there is in in Portugal. The engineering team, the design, the manufacturing team, quality, it's all done there. I've seen the manufacturing operation, uh, first-rate work that's done there. The quality and testing is done there, as well as kind of our service lead, and you know, that's some of the work we've done together, is all based there, but we work in a seamless partnership with them almost every day. We're on the phone with them. And part of the way we've set up our work office, and I'll talk about the USA, is essentially structured such that we're in the office when they're in the office, and they're about five hours ahead of us.

SPEAKER_01So we have a hybrid schedule here. So let me talk a little bit about the US business, if that's okay.

SPEAKER_00Yeah.

SPEAKER_01We U.S. business was founded in 2021, and over the last five years, you know, we're based here in a really cool place called the Curiosity Lab. It's an Atlanta technology park, and this is an innovation and incubation center. And I was just walking the hallways. Not only did I see a group of kids in a in our trading room learning about some online computer skills, there are people testing drones, they're people testing food delivery service, T-Mobile and Georgia Tech are here. And it seems like every week we have a conference that has international delegates. So it's kind of a cool vibe to be here.

SPEAKER_01And our team of five is here. Uh, we're in the office four days a week, and then uh we're remote on Fridays. But it's a great place to work. And in the period of time that we've been in business, we've been establishing positions in hospitality. Uh, we've got work in interstate highways, mixed use behind the fence, fleet, all the things you'd expect. And I'm really excited that uh the pipeline's coming to fruition. We're gonna see new activities in California, Colorado, New Jersey, and New Mexico. And they're gonna be in places where maybe people wouldn't quite expect to find chargers, but uh, we're gonna have them there and we're gonna talk a little bit more about kind of why that is.

SPEAKER_01So Portuguese company with an amazing, very welcoming kind of attitude and spirit valuing individuals and then working as a team kind of across the Atlantic to build a global company with our with our offices here in Atlantis.

SPEAKER_00Well, I'd like to here in a moment, I'm I'm gonna ask you about hardware and and types of of architecture that that iCharging has to offer. But I'd like to I'd like to talk about the industry evolution as you've seen it since you've been in in the space for quite a bit of time. And the market has spent years talking about how many chargers were being deployed, needed to be deployed, et cetera. But the conversation now is shifting towards whether those chargers are serviceable, scalable, profitable, and so forth. And so from from from your vantage point, your experience, what what have you seen change in the market and and maybe what needs to change or is is still, you know, we're just as an industry not getting it right when it comes to infrastructure quality.

SPEAKER_01Yeah, Jesse, you've really you really hit the proverbial nail on the head. And I think it really begs that long-standing analogy that not every problem requires a hammer to pound nails. It just seems like you know, things have changed. There were three points that I want to kind of make about that as I just thought through it. Uh, and maybe in a slightly different order, if that's okay. I think first and foremost, profitable. This industry has moved in the last several years from a land grab to site-based, site case ROI. And I think that's the single biggest mindset, mind shifts, mind shift set I've seen in years.

SPEAKER_01That really it was as we started, put a charger on any quarter, wherever we can get someone to take a charger, you know, and predominantly it was level two, but we're also seeing that with DC charging as well, put a charger anywhere. Now it's up as you move to, and I'm really happy about this, ROI is what leads to whether or not a site should even be built on. Now it's kind of a classic construction mindset. You don't just put a building up anywhere because you get the property. You do all the proper, you know, investment analysis, return on investment, all those types of things. And we're seeing that now. And when I work with CPO partners in particular, and we have people say, Oh, I've got some great sites, and they'll go through a tool like EVPin, for example, and determine if it is a good site.

SPEAKER_01But then it's a database decision and not a just kind of a land grab because the site's available. We have too many abandoned sites, underutilized sites to make that sustainable. So, first and foremost, profitable, really from land grab to site business case. Second is kind of serviceability, and this is something you know so well. I think the Achilles CEO, the industry, truly has been inoperative chargers and chargers that take very long time to repair. And I think that has been kind of the second mind shift. And I think with the real characterization that is moving from an OEM thinking it's warranty or non-warranty, and you and I have fought those battles together.

SPEAKER_01Is it in warranty or out of warranty? That really was the wrong question to be asking. The question was really: is it operational and is it being serviced on time? And that's a big, big mind shift. And I think the industry has had to take a lot of lumps and hard knocks to move from it's a hardware warranty, non-warranty issue to it's about service and uptime and whether Nevi helped drive that or other factors, that mind shift has changed dramatically. And uh, as we've talked, one of the first things I did when I got here at iCharging was to build out a third-party field service network with you and a few other partners.

SPEAKER_01Because while I've got two great you know guys here as support engineers and senior service engineers, they can't be everywhere. And customer expectations around serviceability, as you know, have really arisen. Right. Before you can get away with best efforts, well, you know, we'll get there when we get there. Oh, the parts are coming from Australia or Portugal or the UK or Italy, and there were all these reasons why, right? Well, now those none of that's tolerated because it's back to the ROI. So you pivot back to serviceability, turns on profitability. When a site is down now, I don't hear when are you getting the parts.

SPEAKER_01I hear I'm losing revenue and profit. And that's a big shift. So profitability, serviceability, and then of course scalability. And I think one of the aspects of iCarging that excites me is such a major shift in uh in scalability. And what I mean by that essentially really is moving from fixed output hardware and solutions to hardware that basically scales with current and future needs, and that's absolutely critical.

SPEAKER_01I think that's something that hasn't really been thought about as directly. It's been more like, well, why don't you just make do with what I offer you? If it's a 150 charger, I guess that'll have to do. If it's a you know, 200 charger or a 400 charger, see how you can make those kilowatts fit. That's what we offer. It's kind of like we made it, and now you got to see if it works. And now it's this, as we're gonna chat more about the site, is all about what power do we have and what's the use case and what's the man gonna be. And you got to figure out the right power for it as opposed to selling fixed blocks of power, which I think is an industry we've learned isn't particularly scalable when you have fixed point solutions and you need to replicate boxes, that gets very expensive.

SPEAKER_01So I think those are the kind of the three things profitability, serviceability, and scalability.

SPEAKER_00You mentioned kind of the the basis early on and thought, you know, and it's very myopic uh approaches in warranty, out of warranty. And yet that perspective is is really myopic to the to the OEM, and it's really not customer-centric. It's more like, well, you know, you're and and I've experienced this, and we won't name brands, but as a service provider, we're working with all kinds of manufacturers. And so we we'll it's it's kind of like while you're while you're in warranty as an operator, you're safe. When you're out of warranty, who knows what's going to happen.

SPEAKER_00And we had this and that's not fair to the operator, and it's not good for our industry as a whole. We had one customer that their unit had been down for nine months, and they had been basically abandoned by by their manufacturing partner, and they had just kind of given up and and and an EMSP looped us in and said, Hey, this is our end customer. Hardware is not res hardware manufacturers not responsive. Can you just go out there and figure out what's wrong with it? And we were out there a day and a half and we had it fixed. And this was a unit, and this unit, I think the the operators told us that that parking space was was netting them around$300,$400 a month.

SPEAKER_01That's the serious money.

SPEAKER_00Yeah, I mean, that's and and that's what they lost over a period of nine months. Right. And and it's unboundable. Yeah, and it took a day and a half to get them back on operational. And so, you know, that's that's a key point when you're talking about it's not in warranty, out of warranty, it's about that serviceability and and and how we how we're helping the operators be profitable.

SPEAKER_01So that's exactly right. So that whole mindset, I think, is really now one that is is emergent and that separates winners from losers. No, yeah. I think you asked me one other question. I did want to make sure I answered it. What's the what's the question really? What's still unanswered or not answered effectively? And in my my point of view, giving this a little thought here, driver education. Now, you might say, wait a minute, that's the dealer's job. It's all about how the EV operates. You know, that's the easy part because you can go online, you can get your Chevy Equinox tutorial or your Tesla, you know, a tutorial, or or your Hyundai, you know, Ionic 5.

SPEAKER_01But that's the easy part. That's how how cars are sold today. Cars, whether it's an EV or non-EV. The education gap is on how to use chargers. What's the right charger? What do I need? Do I need a home charger? Maybe I do, maybe I don't. When's level two appropriate? When's DC appropriate? How do I use a DC charger? I actually went to a site for a brand I won't mention with a charger I'd never used before. And sure enough, I had to call their customer support team because they had a screen configuration that I wasn't familiar with, and I've been in this industry a long time.

SPEAKER_01It's like the screen goes blank and tells me that you know to push a button to charge my start my charge session, but I thought I had. And so I called. Fortunately, I got a live voice, and he's like, Oh, yeah, you're actively charging our screen defaults to something. And if if that's happening to me, and I, you know, you see on Facebook or other social media channels all the time, I try to charge, it didn't work. I still don't understand it. I I'm a new owner of a of a new of an EV, or I'm at a I'm using a different type of charger. It seems to me we as the charging industry still owe our customers charging education.

SPEAKER_01And I know other people, some people have tried, we know someone well in Houston who we love dearly, but it we need more of that. We need people still holding more clinics, doing more things online. And I think that would take more anxiety out of the, oh my gosh, I got the CV, what do I do now? How do I really plan a trip? And can I even comfortably rely on public charging? And what do I do if I'm stuck? I was in Ohio and I happened to uh go to a fabulous place, the the naval uh naval museum, so wanted to see a couple of aircraft there. And this guy had been given a car like mine, a Genesis G V60, and he's sitting at a broken level two charger, absolutely panicking because no one told him what to do.

SPEAKER_01Yeah. Yeah. Got online, found uh, I think there was a ready nearby. It's at 10 miles down the road is a ready, here's all you got to do. And uh, but I can't be everywhere. But it's like we really need to help with with driver education. And I think it could actually be something online versus necessarily holding kind of in-person webinars. So wanted to share that with you. I still think EV charging education is still missing.

SPEAKER_00Yeah, no, I I agree. And that's you know, that's why you know groups like uh I'm trying one that comes to mind, Perceptus, you know, has stood up a whole program around educating the driver and get you know, that operator, that that owner, excuse me, is getting a phone call seven days from from into owning their new EV and you know, getting re kind of getting those touch points around education, but absolutely agree with that, Jeff. Uh education is so key. And you know, there's our friends over at uh was it Chargeway with their educational platform and and simplifying the the electric fuel that's out there is important.

SPEAKER_00But well, I want to go back to something about around iCharging. You mentioned iCharging has has has been in the U.S. market since I think you said two 2021. So that's right. You know, five years, five years down the road, you know, one year in this space is a lot of time. So five years, you know, it goes quick. It goes so quick. But I'm I'm curious about how iCharging's approach to the market. Obviously, a healthy business outside of the U.S., but coming into the U.S. market, in in what how did iChargin avoid the the bane of being just another OEM coming into the space?

SPEAKER_00And you know, to that, to that, I'd you know, I'd like your opinion. Is that is the US DC fast charging market? Is it crowded? Is it is it is there plenty of room? Is what does that look like? And and where does iCharging want to be meaningfully different? How is you know it's it's beyond feature set? How is iCharging distinguishing itself? Because it is.

SPEAKER_01Oh, I appreciate that. So first let's talk about kind of the the the market. Is it crowded? And I think while there are a lot of competitors I've seen, just a lot of focus and specialization. Somebody's into fleets and somebody's into V2G, and someone else is the CPO, someone else may be, you know, hospitality. It's it seems like people are like, well, I I've got to pick a segment and own one. I'm gonna be the medium heavy duty charger. And there are there are still others that of course will scale across segments, but I do see a lot more focus than I recall seeing before when everybody was again back to land grab.

SPEAKER_01So now when you're specializing, you're building an ROI model. So yeah, it's crowded, but I think in a different way. And I think, you know, thinking about one of the things that excited me about joining iCharging, what I'm seeing here as we're building the business together, is that that the fundamental principle of our of our company and our founder is that electric mobility, while it's scaling faster, you know, and faster, it has to have infrastructure built to support change and adapt. And one of the things that I really resonate with is that iCharging was founded on the single conviction.

SPEAKER_01Infrastructure that creates the most value is infrastructure that can adapt to the conditions it finds itself in. And you know, when I talk to our our our founder, uh Pedro Silva, and we sit down and talk, and it's like he said, you know, every decision, you know, since we founded the company, it's been about the adaptability of infrastructure. It's really not a design principle, and some people could take it that way. Well, you're just designing for that. It's the foundation of an ecosystem. And I think that's the other distinguishing feature is that we believe in the ecosystem of charging, that we don't just this widget that plugs in, oh, that's the charging.

SPEAKER_01Now we got to worry about everything else. We design around energy storage, energy management, digital management, and platform energy management. I mean, I was thrilled to come here and find out that we have an energy management system that has MODBUS. And as you know from one of our former colleagues who was educating us on Modbus, which I guess started in the 70s, and it was very hard for charging manufacturers to jump on that. We'd already design that in so we could integrate with building management systems. So it's about the it really is about the ecosystem and essentially building the infrastructure that adapts and grows with the site and changing needs, whether it's actually Going forward in power, or maybe in some cases going backwards, whereas where sites have restrictions.

SPEAKER_01So that's kind of what I wanted to share about us. Maybe you can share a little bit about kind of the way we approach that and our approach the market through our platform is really kind of threefold. You know, we offer and launch the company with uh aligned products uh that are all-in-one solutions. You know, we started with kind of a public charging 50 kilowatt product, that's what everybody started with, and grew that product to uh to 150. And just uh a few weeks ago, we launched uh as part of this all-in-one, a 500 kilowatt product that essentially can scale up to 500.

SPEAKER_01And you know, it's kind of playing around with looking at this this product, which is really cool. And you might say, well, everybody's got a everybody's got a 400 or 500, and now somebody's got a 600. And that's true. But what's important is the amount of power you can deliver in the least amount of space. And as we've started to look at kind of just the competitive set out there, we're putting out kind of 20, 25 more power in about maybe 60, 65% of the space. And that's what we we do really well.

SPEAKER_01And what's been impressive to me about iCarging is multiple generations of power electronics that enable power density to increase and the footprint of the power electronics to decrease, enabling us to either increase output or shrink footput, or ideally do both. So that line is all about where you do need point or a grade of point solutions, yeah, we offer that in a very compact form. The other piece of the of the portfolio is really about distributed systems, you know, some people like that. And that's where obviously we'll be able to separate the interfaces of power units and be able to then dispense that out to kiosk or dispensers.

SPEAKER_01And the core principle here is dynamic power allocation that essentially, based on the state of charge of vehicles plugging in, plugging out, we can in real time move 50 kilowatts of increments of power. It's not a fixed, well, you gotta wait, you gotta wait. It's like if it's powered available, it's gonna move to the second vehicle or the third vehicle or the fourth vehicle. So that enables us really to scale out power at uh, you know, as we manage CapEx and OpEx, get the right power at the site, rebuild our power units so there's actually upgradability. You have a 200 kilowatt power unit, and you could actually buy a cabinet that holds 300 and scale that up.

SPEAKER_01You could take 200 or 300 kilowatt power units and scale them together to get up to 900 kilowatts of power. So, again, what's the right output for the site? And can you add more power over time? And then recently we introduced a 1.6 megawatt power cabinet, and that can support up to eight cords. And you know, as we've gotten involved in some newer RFPs, that's been what we've led with. It's like, well, this is really the right combination of power, dynamic power allocation for efficiency, and and getting the right power into the chargers, and having the minimal footprint that's needed.

SPEAKER_01So this is going to be what we're built on. All in ones, distributed, dynamic power allocation, and having a range that goes from 50 to 1.6 megawatts.

SPEAKER_00Yeah, that's uh that's quite a range of products. And so basically what you've what you've said, and there was there was a couple of things that you said that really stuck out to me. One was the the the kind of the 20% factor and 60% less spacing, because that is uh green space is a constraint. And so the optionality around the configuration, and like you said, there are some profiles, especially in a fleet context, where where the route accommodates a lower power output. And so that's a that's a feature that the operator in that fleet context needs that maybe a retail sector doesn't need to be.

SPEAKER_00That's right. That's exactly right. Everyone has differing needs. I mean, you look at the retail space with especially in a petroleum uh retailing context with their limited green space and their site constraints around that. I you know, you you laid out the product kind of family and and and kind of the scope of what that is. I I I can see that you, you know, iCharging is built a built a system around modularity, dynamic power allocation, and and and optionality around site configuration needs. That's right. What what choices matter most when you're trying to support your customers, your and their end customers, while not you know, stranding the customer as like heavy, heavier duty?

SPEAKER_00I know you mentioned the the the higher the one what would you say 1.6 1.6 megawatts that'll support up to eight cords. Yeah, and and is there is that the platform for maybe MCS as well?

SPEAKER_01It is actually, and that's another piece that uh you know I want to talk about in terms of the fact that we actually have what I call form follow function design.

SPEAKER_00Okay.

SPEAKER_01So we have retail hospitality-oriented chargers like the one kind of on screen behind me with a 32-inch screen for advertiser and community messaging. I think at one of the shows you recently saw that we have our eye light unit with the 37-inch display so the driver can sit in their cab and see their charging session. And I think that's another hallmark of the company is to ensure we have the right dispensing systems pulling off that power unit that meets the use case. And we can actually mix those and uh we'll talk a bit about that. But I wanted to maybe just follow follow your question because you're talking about design choices, as I recall.

SPEAKER_01If you follow any of my LinkedIn posts, you'll see that I consistently use the phrase sustainable technology, which is one of the hallmarks of the company as well. And that's because of the very heart of eye charging. It's we want to deploy DC charging, really, it's capable of efficiently meeting the sighting use case today while providing the capacity and capability to expand tomorrow. And so people might think, well, sustainable is all about being green. And yes, that is crucial to us. My eight-year-old grandson asked me uh what I was doing at work, and I told him, he says, Well, gosh, I wish you would keep working because we need to we need to keep the air clean.

SPEAKER_01And I thought, well, that's great. He's getting it at eight. Well, I appreciated that a lot. But it really is about a technology that can evolve to meet the sites as it's as it changes. And I think that's something that is different versus a couple of years ago. Sites can grow and change organically based on site power, the types of vehicles that are coming in, the change and mix of batteries. I mean, as we see more 800 volt, you know, back in the day, you and I would put proposals together and we'd tucked out the Porsche Sikan as the 800 volt product. Well, now, you know, lots of products are coming with that.

SPEAKER_01So we do this in such a way that with a thousand up to a thousand volt VDC capabilities, you don't have to obsolete the hardware. You can add more, which is great. You can add more power units, you can add more kiosks, you can add more power within the power units themselves, you can ultimately upsize the power units. And I think that's what's really cool about this company. As a result, you know, we've designed, engineered, and manufacture that range of products, but again, not fixed-point solutions. They're uh there are a series of solutions that you can use based on what's what's needed at the site.

SPEAKER_01You know, I think that is just really cool. And that's one of the things when we get in and help with site design, we can get different options.

SPEAKER_00Yeah, absolutely. R right sizing, that's that's that's where it's at. And you know, we we kind of laugh at the idea of the the early DC fast charger being a 50 kilowatt and really not even true 50 kilowatts of output, more like 40s at you know, peak maybe at 50, if you're lucky, depending on the architecture of the vehicle. But you know, the the right sizing is is key. And you said you said it's like basically being able to scale up as as the need demands, or or hold, hold a pattern and and not not a fixed solution.

SPEAKER_00And that's the thing. Creating that optionality is important to the operator because they have different site needs. And so I imagine when you are working with your customers, working with your partners, right-sized architecture is is key versus chasing the output. It seems like at some point once we once we moved past the 50 and we got into this, you know, the 100s and the 120s, and then 150, and everything, it was like there was this race to be at the higher outputs when that may be off message for the sites.

SPEAKER_00I mean, we understand we we can we've seen EA sites early on with 350 kilowatts, and everybody's like, who's gonna use that? That's a dust collector, and and it was just you know, future-proof and et cetera. But but today we've we've learned through experience, and our operators have learned through experience, our customers have learned that it's not just about output. Yeah, it output is important, but it's also the right sizing of the architecture. And so I'm sure you're having to guide your your customers about that right sizing. You're having to work through maybe relearning and and re-education with them.

SPEAKER_01Absolutely. You know, as I as I think about that, you know, I was just recently uh on a uh site visit. Our company on charging has built a partnership with Embraer's Eve Air Mobility, and I got a chance to go to the one of the first sites that's going to be a test site for Vertiport. Fascinating uh in Central Florida. And one of the questions they asked me is they kind of just thought about charging. They're like, you know, do you think we could actually use a bank of chargers for passengers' EVs and at the same time draw on that to recharge the E VTOL?

SPEAKER_01And like, as they would say at Staples, yeah, we got that. And that's the ability to basically for me to quickly think about we got power units and we have kiosks that the EV driver could use, and we have what we call a general uh service equipment GSE that we've designed uh for E VTOLs that could actually still pull off that same power. You think about a 1.6 meg max unit, it could easily do the customer charging side and the EVTAL side. So that's what people are thinking about is how do I get the most out of my sight and basically use the most number of vehicles?

SPEAKER_01I mean, throw in a box truck or or maybe in a class eight that just needs to do some quick charging, you could do that as well. If you had a add-on a megawatt charger at the end of that uh row of chargers, you could do truck charging as well. So customers are kind of pulling us forward and saying, wait a minute, I got this much land, I've got these use cases. Can you accomplish that for me as opposed to I need 10, 350 kilowatts for the future? Yeah. That's the difference. And I think that leads to a lot of great new creative opportunities in the industry.

SPEAKER_00Right, right. And it and it, you know, to your example with Evatol, and I guess maybe for the audience, we ought to add a translation layer in just because someone may not know what we're talking about with Evitol, but uh you want to you want to you want to tell the audience what that is?

SPEAKER_01Evitol is a uh is a new class of aircraft. It's called electric vertical takeoff and landing. These are all electric uh four to six passenger uh aircraft, and they're really designed to span short distances, maybe up to 50 miles where you're in a suburb or a rural location and you need to transit to an air station, whether it be a regional airport or even a major airport. So these aircraft are filling that, but they also run mission critical types of things to get medical supplies into remote areas or or areas where critical time makes the difference.

SPEAKER_01And they can't always get a fixed wing, uh, you know, traditionally propulsion uh aircraft. So these are very capable. Uh it's a whole new class that's coming in, and uh they're they're very quiet because they're electric, and so they bring those benefits as well into the operating environment. So we're pleased to be partnered with Embraer's Air Uh Eve Air Mobility Group. And this again opens up a way to take technology that we've developed and be able to apply it into a whole new segment. So you're looking for EVTALs, a lot is going on in the space right now.

SPEAKER_00Yep. Yeah, interesting. That's that's uh that's good good translation layer there that you you brought in for the audience that may not know. And yeah, so let's uh you you mentioned earlier on the conversation about site optimization, site selection. A charger purchase is only one item in in a much larger infrastructure to that's one piece, and it's it can it's an expensive piece, but it's one piece. And so how how does iCarging help customers think through total deployed costs, utilization, all upgrades? Yeah.

SPEAKER_01Yeah, let me let me kind of unpack that for you. There's a couple of things here. You know, we think about uh first, first I'll talk about scaling, you know, power without uh without overbuilding sites. There's really three three things I would want to share with them that is I've thought about it. I mean, first and foremost, you have to have power that never sits idle. And when you're talking about again optimizing sites and using the right equipment, you want to make sure that, again, through whether it's dynamic power allocation, you know, and using the available capacity in all active sessions. So we kind of started that as a fundamental building block is power that never sits idle.

SPEAKER_01And that's supported by infrastructure that grows, you know, with starting over. Again, another major fundamental building block that essentially we can scale that infrastructure over time and be able to upsize it or even downsize it, or as you said earlier, holding it, you know, infrastructure that adapts so that initial investment retains its full value. And then kind of the third piece in the building block is visibility that you know really reduces intervention. And that is using a system in the uh we call it my iCarging, so that we always know and our customers know the status of their charging, charging sessions.

SPEAKER_01Is it up? Is it down? Is there a part that's that's needed? We are able to get into kind of real-time diagnostics, some of the work we've done together, which is exciting. So we use those as the building blocks to then kind of get into this, you know, how do we think about total deployed cost and utilization? I'm gonna give you a couple of examples on that, you know, as I think about it. And again, there'll be there'll be two unidentified examples, but I think they'll help. You know, under kind of this banner of sustainable technology, you know, one of the partners we've worked with is about to deploy probably close to 40 sites.

SPEAKER_01Uh, and this will be in public charging. And what we did was to help them look at each site, the parking lot, the power that's available, the future power plan, handicapped accessibility, uh type of venue. Was it an educational venue, a hospitality venue, a park, things of that nature? And then each site has its own configuration. Now it's using the building blocks of our dispensers and our uh power units. And in some cases, we brought in an additional unit for handicap that has a single cord, but no two sites are alike.

SPEAKER_01And so there's nearly no clickie-cutter approach here. And so the uh the purchasing entity basically bought off on a site plan that had the right charging infrastructure for that specific use case. How long would people stay there? Is this a fast turnover retail or a long-term dwelling location like a hospitality venue? So we really helped them try to optimize the CapEx and therefore then the downstream opEx by having right chargers at the right sites at the right time. And then if they have more power, we've already planned because they've already laid in the spaces for the future proof of those, and we've already set the tower units up in such a way that they can be expanded over time as well.

SPEAKER_01So that's one example where essentially we try to work with the all the way early up at the site design. Love working with electric professional engineering firms and contracting firms to help them think through how to optimize the site because, as you know, they don't do chargers every day. They're using, they're doing something else. So that's one example. The other example is in the Fleet Depot charging and construct. And we had a chance to work with uh a uh a Fleet Depot operator on one of their FPs. And one of the things that I'm really proud of is the fact that when we looked at the site, we not only gave them charger recommendations, we went into the infrastructure and basically did everything we could to minimize the expensive DC cabling runs and were able to locate chargers and power units for these uh pull-through truck lanes in such a way that we were substituting less costly AC runs for more costly DC runs, freeing up more real estate by co-locating the uh the charging infrastructure on the islands.

SPEAKER_01We kind of took a page out of uh our customer in Switzerland's book. That's what they did. They read to put the power power units next to the dispensers and save all that DC cabling, and then they ran a retail unit on the side for light duty customers. So we applied that thinking as well. And again, the goal here is not only CapEx, but then reduce the cost of OpEx by helping them think through site optimization. And we again were able to mix and match the type of dispensers where they needed for fleet. They also wanted to do some light duty, and we were able to provide that as well.

SPEAKER_01So I think it's really about helping the customer all the way at the site design phase, yeah, as opposed to say, and and one of the things that we asked for in a question, so this is going to give away a secret here. When we get an RFP, and this happened in this particular one, I asked for the e-sheets. I asked for the site plan, and people don't, and they don't always put those in the RFP. And they're like, well, we don't know what we're designing to if we can't see what you're dealing with. Incoming power, expectations of future power, um, what your site plan looks like. And we looked at this particular site plan, we're like, wow, those DC runs are going to cost them a million dollars or some astronomical number.

SPEAKER_01So we'd really try to work right early up with the site design to help come up with the right design, the right decisions, and ultimately hardware that's sustainable for them.

SPEAKER_00Wow. That's that's impressive, Jeff. You and I have been in this space a long time, and we we've been around different companies that it's just the focus is here's the widget, buy the widget. When are you going to buy more widgets? And that is the value add that you just shared, and in that you're working with the customer to the point of getting granular around you're reducing their capex by minimizing cabling runs. That is a value-added service that you don't see, especially not at the manufacturing level, especially not at the hardware level, because everyone's kind of just focused on, you know, okay, I I work with you for my charger, I work with you for my background network.

SPEAKER_00I worked, you know, and and that's uh that's a huge value add. And I think for the listeners that that heard that, that's going to resonate and and and probably be a differentiator in terms of how eye charging is viewed. And so I think it's great that you shared that example.

SPEAKER_01And and we do that, we do that every every day. There's this project going on at one of the major airports, same thing, and constant contact with the uh with the contractors about where they're laying cable and comms and and things again to minimize opEx and CapEx. So it's kind of fun.

SPEAKER_00Yeah, that's well, and that's huge. And that's uh that's gonna pay off in dividends later for for when it time comes to customer act uh you know retention. You know, customers don't forget that type of service, and that's really good. You you mentioned uh iCharg's platform kind of back end that's monitoring and you can you can share that name again.

SPEAKER_01I I didn't catch it, but it's my my.icharging.com. My.

SPEAKER_01Yeah, that's what I would call the hundred million dollar question. And that is the the question. I think that's that's right. And so we break the pieces apart, and it really comes down to what does each member of the ecosystem control and and what don't they control? And from a hardware OEM standpoint, the work we do is we really focus with our after sales and service team on availability. You know, what percent of the time is the charger available? So that's A. But more importantly, as we kind of get through that, what's the what is the uptime? When we look at the total available time that's that that we we see, what percent is uptime, and we then look at charge test and success.

SPEAKER_01And so when I I do a uh, you know, every every two weeks we do a review of every site because you know we can see it real time and the service team is is addressing any real-time issues, but we look at what the uptime is based on that availability factor. What can we control? And in that, you know, essentially 98, 99% uptime. We see sessions that have terminated, we understand where a charger might be down. How quickly do we take action to resolve it? But we're trying to control what we can control, but then educate our ecosystem partners on where there may be issues.

SPEAKER_01And service team was just in talking to me yesterday about the charges up, but the app is not properly talking to the CPO layer. And we've gone back to both partners and said, guys, this is a comms issue between the app and the CPO, which is unfortunately leading to a failed chart session because they're not talking properly. So we also try to make it our business to help our partners understand where there are gaps in their performance, whether it's an app or it's uh the CPO layer. Uh, we want to make sure they see that.

SPEAKER_01Our CPO partners have access to my dot icharging.com so they can see the diagnostics as well. And uh, you know, we do run our own comms to every charger. So, you know, there'll be there'll be two SIM cards. The CPO will have their SIM and then we have ours uh to enable us to have that real-time access to charging. And uh, we've been working with uh a couple of sim providers, and we're really excited. Can't announce in the end about a sim provider that has demonstrated because we know 40% of the service issues are comms related. Yes, they are. And so we are seeking to eliminate or reduce that as a variable so that we can have that high availability, high uptime.

SPEAKER_01But that's what I'm looking at. There's percentage time and percent of the Yeah.

SPEAKER_00Well, you know, Jeff, I feel like we could just keep talking. There's uh there's a lot, a lot of people. There's a lot of stuff we've covered here. And we should. You know, I uh I'd like to kind of zoom out and uh kind of round out the conversation here as we get ready to to bring it to a close. When you uh one is kind of maybe an industry, you know, kind of broad industry question. Sure. And and the other one's maybe future outlook. But uh when you are considering public charging, fleet charging, urban rural deployment conversations, where where as an industry veteran, where do you see demand as becoming more concrete?

SPEAKER_00Or maybe it's all, or maybe it's it's both end. I don't know. What's your comments on that?

SPEAKER_01That's a great question. You know, I think I'm seeing commonality across e-mobility markets and segments, whether it's you know, a mission dependent, you know, fleet driver in a class A truck, or mom and dad have got to get the kids to school on time and have things they have to do. Everybody relies on charging that is a reliable, dependable. Yeah, it works every time. And that hasn't changed. And the Demand for that, I think, is continuing to grow. I think this year alone, I think Cox Automotive said we have something like, I don't know, it's I can't remember the number 300,000 or some huge number of VVs.

SPEAKER_01I think it's 300,000 coming off lease, coming into the market at very attractive prices. But people, the demand is for reliable charging. And I know that my charging works at home and sometimes you get power outages and it doesn't, but I want to know when I go up the street or I go across town or I go to another city, the charging's going to work. And that doesn't change whether you're a class 8 over-the-road driver or a box truck driver or you're driving the family vehicle to be able to get all of life accomplished. That's what I'm seeing. I'm not really seeing much difference there.

SPEAKER_01While charging curves and technology, you know, may be different. The underlying demand for reliable charging has not gone unabated. And I think that's just put a fine point on what we're seeing in the marketplace.

SPEAKER_00Thank you. You know, you you shared uh you shared some of the some of the value propositions around distinguishing oneself in this space. But when you look five years out, what what do you think will separate the companies that that just sold chargers during funding cycles, Nevi, VW money, versus those that that brought to market a durable, uh a durable solution and and showed up for the for the for the operator, for the for the CPO as a a durable infrastructure partner? What do you think what what do you think that looks like you know five years out from now where where you've got some that were just trying to sell something and others that were trying to be a true partner?

SPEAKER_01When I think about you know five years from now, particularly when I'm seeing you know here in the short term to inform that, I think we're not gonna see these fine distinctions among segments, which is where the money was coming in. Well, you know, you've got to have a you're gonna be in a Cali VIP program, you're gonna be in an EV program, or you're gonna be a state utility or state of utility funding program, which I think in some ways might be creating some arbitrary, you know, artificial distinctions. And I think that's all gonna go away because essentially electrification is going to just be a ubiquitous way to fuel transportation.

SPEAKER_01And I think if I hearken back to the question that was asked of me at the Verdeport uh developer, you know, it's gonna be electrification for all vehicles and all battery types and different all use cases. I think they're gonna emerge, you know, kind of merge together around economically attractive sites to investors, to users serving multiple types of electrification, you know, from ground, air, and sea. And the and the winners in the future are those that are gonna basically be able to rise above what I think are temporary and artificial distinctions and turn them into a sustainable approach to the market.

SPEAKER_01This is what we've done at iCharging. Uh, we're basically taking our capabilities and power electronics and power conversion and power distribution and created this general service equipment for EVTALs, you know, literally in a very short period of time, as opposed to something, okay, we're going to start from a white sheet of paper, and then what's the segment and what's the total addressable market and what's the future forecast? A lot of that's going to really, I think, go out the window as the funding subsides, capital markets take over, and we really see underlying demand and convergence of segments is really what I see.

SPEAKER_01So again, I think it comes down to our vision at eye charging. The infrastructure that creates the most value is the infrastructure that adapts. And again, that conviction has shaped every decision we've made. And I think it's going to continue to shape every decision we make in the future. So look for a convergence as opposed to a divergence in the next couple of years. And then we're positioned to really uh help drive that with iCharging.

SPEAKER_00Well said, Jeff. Well said. Well, this has been a this has been a great episode, and I appreciate you sharing your insights, sharing with the audience iCharging kind of its uh, you know, it's a place in the market and all your industry insights. It's been a great conversation. Uh, for those that are listening and and want to connect with you directly, want to learn more about iCharching, et cetera, what's the best methods and mediums to connect with you?

SPEAKER_01Well, they can certainly go to our website, we have a, which is iCharging.tech. There's a contact us form, and that'll come directly to our uh commercial and sales lead. You can certainly reach out to me on LinkedIn if you'd like as well, and uh have a lot of conversations with people there. Delighted to talk to you about opportunities to support your charging needs.

SPEAKER_00Jeff Cohen with iCharging on Field Frequency. It was a pleasure to have you. Thank you. Thank you, Jason, so much. I've enjoyed our time together. This episode was produced and edited by the team at Atozi. To find out more, visit autosy.co a u t o z y dotco.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Charged EV Hubs: Emerging Operator, Proven Network

    Nov 18, 202638 minAudio

    Send us Fan Mail What does it take to build a charging business around an established network? In Season 2, Episode 7 of Field Frequency, Jason Cortes sits down with Jeremy Watrous, founder of Charged EV Hubs, for an...

    • Apple Podcasts

    Credit the people on this episode

  2. Mike Calise on the Convergence of Energy, Transportation and AI

    Nov 11, 202650 minAudio

    Send us Fan Mail EV charging is no longer just about putting energy into a vehicle. As AI, transportation and the grid start drawing on the same power, EVs are becoming energy assets that can store, dispatch and earn...

    • Apple Podcasts

    Credit the people on this episode

  3. EV Wire | Electric Trucks, Robotaxis, and the Business Between

    Nov 4, 20261 hr 9 minAudio

    Send us Fan Mail The companies that built charging for electric trucks are now building depots for robotaxis. They already know how to bring power to a site and design around a fleet. So what does today's infrastructure...

    • Apple Podcasts

    Credit the people on this episode

  4. EVSTAR Part 2: What It Actually Takes to Restore Uptime

    Oct 28, 202629 minAudio

    Send us Fan Mail Transferring the financial risk doesn’t fix the charger. Someone still has to diagnose the failure, find the right parts, coordinate with the site, and get a qualified technician there to complete the...

    • Apple Podcasts

    Credit the people on this episode

  5. EVSTAR Part 1: Who Carries the Risk When Chargers Fail?

    Oct 21, 202634 minAudio

    Send us Fan Mail EV chargers fail. That part isn't up for debate. The real question is who pays when they do, and most of the industry still isn't answering it when the deal is being made. In Part 1 of a two-part...

    • Apple Podcasts

    Credit the people on this episode