How to Use Timelines to Make You More Money

May 13, 202426 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Unlock the secret to maximizing your contracting business's profitability with our latest episode. We delve into the transformative power of Gantt charts (Timelines), and how they can turn project management from a dreaded chore into your competitive advantage. Discover the strategic finesse of job timelines that not only win over clients but also ensure your projects flow seamlessly from inception to completion. We're not just talking theory; we discuss the real-world application of ProStruct360 and how it can automate your scheduling and budget tracking for peak efficiency. đźš§ 2027 Growth Conference - Austin, TX | Jan 10-12. Two days diving deep into your company - what's working, what's broken - ending with your 2027 blueprint. Day 3: hands-on electives like financial management and estimate writing to make it real. Early Bird (very limited): 30% off + 3 hotel nights covered. Sign up at contractorcuts.com Contractor Cuts is a weekly podcast for contractors who want to build a better business - covering sales, operations, hiring, finances, and everything in between. đź”— Book a free call: contractorcuts.com đź”— ProStruct360 software + coaching: prostruct360.com

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Speaker 1Welcome to Contractor Cuts, where we cover the good, the bad and the ugly of growing a successful contracting company.

Speaker 2Welcome back to Contractor Cuts. My name is Clark Turner, I'm Jared Flo. Thanks for joining us again this week. So today we are talking about how job timelines make you more money. What a boring title this one is, but this is such a great one in terms of if you want to make more money this year, this is a simple way to do it, and it's more than just building a Gantt chart. So when we talk about job timelines, we're talking about Gantt charting. We're talking about plotting out every trade, every line item, everything you're doing on a schedule, on a calendar, and so today we're going to walk through how to do it really well, be efficient with it, be quick with it, but also make more money by doing this, and we're going to lay all that out.

Speaker 2Also, before we get into it, we want to tell you about ProStruck 360, the software that will do this for you. The software that will do this for you. We'll talk about this kind of later on in it, but as you're assigning out work to crews, it plots it on your Gantt chart automatically. You pick when you want them there and it drops it in. If you go to your Gantt chart and move the things around, it automatically updates their work order. It notifies the crews when they need to be there. It's super efficient in terms of handling your time and doing things for you, so you don't have to do it.

Speaker 2That's right. We'll talk about that a little bit later, but if you are looking for a software to build estimates, send invoices, collect payment, send work orders do everything that you need to do as a contractor. Check out ProStruck360.com. It's a fantastic software. Try it for two weeks for free. We even have a free version free forever version. That's sending invoices, taking online payments, that sort of thing. So great software. But leading it out from that, today we're talking about a Gantt chart, building the Gantt chart out and why we use them and how to use them efficiently.

Speaker 2So the Gantt charts we promise every single client at the beginning of the job that we are going to create a Gantt chart for them before we start and keep it updated weekly. And they say, wow, that's amazing that you're going to do that. So, yep, that's how we run our jobs. And so the Gantt chart is where we start. Obviously, you got to build your estimate first, but we take that and we start by building out who's doing what, when, where, and so once we lay that out on the Gantt chart and lay that out on our inside of our job, it's very easy to say, okay, this is going to be a four week project, this is going to be a four month project, this is going to be a eight month project and we can lay out why it's going to take that long.

Speaker 1Right. Well, and I think, when it comes to the estimating part of building or using a Gantt chart and estimating, I think what it will do for you is it's going to give you a visual of your job. Yeah, it's going to allow you to see where, you know, are there gaps that I forgot about? Right? Yeah, are there gaps that I forgot about? Right, if I have to have dry in on concrete or hardwood floors or you know that type of stuff and I need a gap in between that stuff, and if I forget, you know I can see that on the gantt chart.

Speaker 1Oh, I've got the painters coming in the day after the flooring's done I can't do that or the cleaners or the whatever, right, so it helps you on that side of it to be able to make sure that you can see. Okay, I told the client originally it's going to be 10 weeks, but I think now that I've looked at this, it's going to be more like 12. It allows you to be a little bit more accurate. But also one of the things that helps you build your Gantt chart is the way that you build your estimates as well.

Speaker 1If you build your estimates kind of sporadically of like, okay, I'm going to do all of this in one spot and all of this in one spot and it's just kind of a sporadic estimate. It's got everything on it. It's going to be hard for you to get a good look at the timeline of the job.

Speaker 2The way that I always coach my project managers on how to write estimates, it's just think about what's the very first thing that you need to do on a job that should be at the very top Chronologically, right Chronologically. Start with the demo, start with the dumpsters you got to order. Start with the things that you're going to start with on the job.

Speaker 1That's right. And then you know there are some things like you know, if you've got a house that you're doing something in three different bedrooms and you've got different work that you're doing in bedroom one, bedroom two, bedroom three, and they can be done simultaneously, you can have a little variation through it, but it really is chronological top to bottom. And if you do that, once you build out your Gantt chart and assign everybody to where they're going, you can have a visual to see. Okay, is what I told the client going to be accurate?

Speaker 1And then you can ensure, and more importantly than that, if it's going to move. When you look at it and say I think it's actually going to be 12 weeks, not 10, do I have enough money in this job to run 12 weeks? Yeah? Right, it's two weeks of project management that I'm going to be doing, that I'm not getting paid any more money and my crews are going to have to work two weeks longer, but they need a thousand dollars a week or whatever they are used to getting paid. No-transcript, and also make sure that if you've got enough money budgeted to do the work, then you know that you have enough money charging to the client.

Speaker 2Well, and there's three phases that we use Gantt charts in. It's the estimating phase, which Jared's talking about, kind of covering how, in your estimating phase, you're utilizing it to make sure your money's there and everyone's accounted for. We know when and how much we need to pay people and where they're going to be. Then we go to the pre-construction phase, which we'll talk about next, and then how do you use a Gantt chart during the job, during the progress of the construction phase of the job? How do we use it there? So we're going to talk about those three, but I think, more importantly, bigger picture, before covering all of those, is what's the reason, what's the value?

Speaker 2How do we make more money this way and why are we doing it this way? Sure, it has proven time and time again that we take a four-week project if you don't have a Gantt chart and it easily becomes a five to six week project, right, right, if I'm not thinking about. Well, on Tuesday the painters are showing up, so I'm talking to sheetrock guy this Thursday. I need that sheetrock done by Monday because my painters show up Tuesday and so I'm talking through it. They understand why they got to be done, right, so they know I've got to be finished at this time. So I start the paint crew Now.

Speaker 2If they don't know that sense of urgency is there, that might turn into Tuesday, wednesday, thursday, before the sheetrock's actually done, because they had to swing by somewhere else and they missed the day here and then my paint crew couldn't show up on Friday. So now they push to next Monday. I just lost a week and so if you look at it, bigger picture than just one-off jobs, losing one week on a four-week job going to five weeks, that's a 25% increase in time spent on that project. You're going from four weeks to five weeks. So if I'm looking at that, but even that extra 20%. Really, if you're looking at the five-week time period. If I'm looking at that and I'm doing a million a year as a contractor, I could be doing 1.2 million a year.

Speaker 2I should be able to do that if I'm being efficient with my time, because I just lost a week at the end of this that I could have started another job and I'm not making any more money. I'm not all of a sudden, hey, unless you're charging weekly to project manage something, and even then, if you've committed to four weeks, they're not paying you for that fifth week because you're inefficient with your crews. And so it's something to where, if I can get efficient with my time and pick up one day, two days, three days on a job and start the next one, the bigger picture is zooming out as you grow your company, you're increasing by 20% to 25% of your revenue, and that's with the same work and the same overhead and the same labor, and so that revenue increase is straight profit.

Speaker 2Right, I'm making 30%, 35% of that extra $200,000. So I made $60,000 more this year when I'm only doing a million, only doing a million. I can do $60,000 more in my pocket by getting efficient, by going instead of going five weeks, getting it down to four weeks.

Speaker 1You could have gone on a vacation, you could have paid off your truck, you could have hired a new employee right, there's a ton of stuff that you could have done with that money, but because of inefficiencies, your company is not growing.

Speaker 2Yeah, and what we see a lot of contractors doing wrong with these inefficiencies that the Gantt chart helps drive your eye to, is that you're not thinking about two, three, four weeks down the road. I'm thinking about this week and next week. Right now, that's right, right. And so this week I've got my demo crew in there and next week we got framing. So I'm head down into that. And then I get to next week, framing is in the middle of it. Ok, great, oh, shoot into that. And then I get to next week, framing is in the middle of it. Okay, great, oh, shoot. I got to get sheetrock. In the following week I got to call a rep and they don't have delivery for two weeks on that drywall.

Speaker 2Right, there's all sorts of things that happen if I'm not thinking ahead. Two, three, five, seven, eight weeks down the road. Right that I'm not being efficient, knowing well, this is what am I going to need there which is hard to do if you don't have a visual.

Speaker 1It makes it way easier to have a visual of five, six, eight weeks down in the future. Oh yeah, it makes sense. Okay, I got to get these things in order and set them into play.

Speaker 2Well, and it's also when we're talking about time efficiency, when people are like, well, I don't have time to build a Gantt chart, first off, use ProStrux 360. It does it for you. Second off, if you don't have time to manage it that way, think about the time you're wasting along the rest of the job, right? So if I've got a Gantt chart and I'm looking at the next three to four weeks, I can quickly run my finger down that Gantt chart looking all right, framing in two weeks, sheetrock in three weeks, electrical finish out in four, and I can really see exactly what's coming up and know okay, I got to go and order that.

Speaker 2I don't need to order that, yet I got to order that. If I don't have that visual, I'm sitting at my job just scrolling down looking at all the job items. Do I need to do anything here? Nope, anything here, nope, anything here, nope. And I'm covering stuff that's three months out, because I'm having to look at it all right in front of me, right? And so I'm having to take in all of the information and make decisions as opposed to what's coming up next. What do I need to order? What do I need to prepare for? What crews do I need to make sure are lined up and ready. So it's saving you a ton of time. It's not a big time spend to do it and prepare it and create it if you're using our software. It's the time spend of organizing on the fly, missing timelines, forgetting to order.

Speaker 2You know I forgot to get my cabinets measured by the cabinet company. Now they're two weeks away from even coming out, so we've got a three-week delay on this job waiting for the cabinets.

Speaker 1How many times has that happened? Well, until the cabinets come in, there's literally no more work that I can do. Yep, so I'm just going to be sitting and it's just ticking away eating that money.

Speaker 2Yep, that's right. So getting the time down by 20%, 25% decrease in the amount of time you're spending on the job allows you to make more money. Now, today, when I'm looking at the job, getting it done a week early, I don't see necessarily the next job that's starting that quickly. But when you zoom out big picture, when you're growing a company, you have, you have two, three, four project managers that are running.

Speaker 2If I can get a 20 increase in all four of them and I'm going from five million a year to six million a year and that extra million I'm making straight profit, all 30 profit. I'm making hundreds of thousands of dollars because I'm organized and efficient using these gantt charts. Right, it's, it's a no-brainer and it's like I'll do that when I get big. Do it now. Set up the efficiencies today in your company.

Speaker 1Well, and I promise if you use this you'll find the jobs end up easier to run Yep and that your clients are happy. More happy about the jobs because there is even better clarity on what's happening Yep Right. Better clarity on what's happening Yep Right Because in the ProStrux software you can click a button, export it to an easy-to-read calendar view and just send that off to the client.

Speaker 2We put it in our document so I can attach it to my work orders. When I send a work order, you know, whatever you send it with the estimates, send it with change orders, just send it as its own Yep. So it's a great way to communicate with the client. So it's a great way to communicate with the client. So let's talk about the three phases. Jared already covered in the estimating phase how I use that Gantt chart yeah, my bad, I jumped ahead.

Speaker 1I jumped ahead. I couldn't help myself.

Speaker 2You're good, but it makes a lot of sense in terms of when I'm building that estimate.

Speaker 1This is how I look at it. This is how I need to double check on the G, like I'm afraid I'm just not going to make enough money. Yeah Right, Because they've been burned a lot of times in the past. And this is a really easy way Build your estimate, Then make a visual of it. You know enough about the business to look at the visual and find the key points of like. There's a choke point. I need to fix that. I need to fix that.

Speaker 2Dollars in time are directly connected, right? Because if I have a paint crew that I need to have out on a job for two weeks because it's going to take two weeks to paint the inside and outside of this giant house, yeah, I can't pay him a thousand dollars for two weeks of work. I'm looking at that and usually if I've got a thousand dollars for the paint, I've got one to two days on my Gantt chart for it. And when I'm looking I'm like I don't know how this is all going to fit together because that's not enough time. Flags are starting to be raised when I'm looking at my pricing and so it's helping me in all aspects of the estimate. So that's the estimating phase going into pre-construction, right?

Speaker 2So I've got I kind of have an idea of when everything's happening, how it's going to happen. I go to my pre-construction. This is after I get a signature from the client and at this point part of the signature process is saying, once you sign this estimate, I'm going to spend a ton of time organizing this job, getting final prices from my vendors and trades, trying to nail down make sure that my electrical and plumbing and mechanicals are all in line with what my professional plumber is looking at. And so I'm looking at that and I'm saying, once I get this all finalized, I'm going to have a final Gantt chart of start date, completion date, start to finish. I don't care if it's a two-year project, you're going to know the exact date that I think we're going to be done.

Speaker 2And so we lay that out to the client. They know they're going to have that knowledge before we get going and every single week, if it changes, they're going to be updated. And so we take this during pre-construction and say, okay, here's my Gantt chart, jared the plumber, let's go walk this property. I want to make sure you understand we're doing a full replumb of an old house. It's top to bottom. Everything's being replaced. I've got this many days set aside and this is your price point on it, that that I know that we kind of have per square foot for replacement.

Speaker 2Take a look at it, jared, can you get it done for this price? And here's a key, here's the key second part of it. Can you get it also done within this time frame? I've laid out those are the two questions and we always forget that second one. Right, can you get it done for thirteen000? I've got a two week time period that I want, I'm going to give you the house for. Yeah. Only thing that's going to be happening is X, y and Z. Other than that, you are in there plumbing, whatever the timeline and the price point is. I'm laying those out for my plumber today before we start to make changes on the final estimate slash work orders that I'm creating that's right, that's right.

Speaker 2The. The pre-con is really the biggest use of of the gantt chart because I'm getting buy-in from my crews and now my gantt chart that says two weeks for the plumber to be in there. He knows and I know that after he's done, at the end of that second week I have someone else coming, not two weeks as long, but just for example, say at the end of that second week I've have someone else coming. Not two weeks is long, but just for example's sake, at the end of that second week I've got sheet rock coming in to cover up all of this plumbing Right. And so at that point he knows I have, I've committed to this and we have that conversation. It's not me trying to pull him to the job site.

Speaker 2It's hey, man, you've you spent a week. You had a week left and we're not halfway through here. I'm concerned about the timeline because I got crews coming in. Do I need to cut your work order back some and bring another plumber in to help you out? No, no, no, no, no, no, no, no, no, I've got.

Speaker 1I've got. Well, I mean, it's very easy because you've got a Gantt chart in front of you and you're you're looking at it. I'm having four pallets of sheetrock dropped on Saturday morning and it's going to be all in your way. You cannot be like you're not going to be able to function and work, right, because there's going to be sheetrock everywhere. Can you have it done by Friday? Right? You get that buy in and you also let them know, like, if you're not done, like you're not going to be able to come back and work on Saturday because this domino is happening, right, so this domino is happening.

Speaker 2So it helps create a sense of urgency where they make sure that they get it done. Yeah, it gives you an accountability spot where they've already bought in and agreed to do it, as opposed to having to drag them back and now we're four weeks in and the plumbing's still not done. That actually goes into the next one Crew buy-in, crew buy-in potential incentives. What we're talking about is that now that I've got them the pre-con done, they've bought into what we're doing, they've agreed I can now present that to the customer. This is our timeline. Obviously, it can expand and contract, depending on some factors.

Speaker 2Let's talk about what those are and then I say listen, this is a living organism as a job site and so there are going to be things that happen. So I'm going to send you updates weekly on what we're doing, where we're at, and if there's any changes in the timeline, I'm going to let you know that this is, if you're committing to do that, you need to be able to do that Right, and so that goes into during the job in progress job. We now have incentives for the crews. Hey, if you get done by Friday, I got an extra 200 bucks for you that sort of thing to make sure that they stay on task.

Speaker 2A lot of times I'll take 200 bucks off what I want to pay them and tell them I'll give them 200 extra dollars that they finish.

Speaker 1So they get paid what they want. You can stay in budget.

Speaker 2Exactly, and so that's how we're looking at it in the pre-con, going into the onsite during the construction with those incentives in place. I'm now looking at my gantt chart every single week. I'm sitting down at my desk during my office time, uh, and usually we do these on fridays, you know, if you go back a a month or two on our podcasts, uh, we talk about office time and job site time, and in the office we're doing gantt chart uh assessments, because what I'm doing is not paperwork. What I'm doing is saying who do I need to talk to about work in the next few weeks?

Speaker 2What materials do I need to get ordered? What do I need to switch around? Oh, that paint crew actually sucked the last two jobs. I'm going to find a new one because we're three weeks out from paint, right, whatever it is, I can start thinking through using that Gantt chart as my visual for what's happening next and who do I need to be talking to? And so I'm looking at that. Maybe we came into a problem. We open up a wall. There's termites in the wall that we now have to pause and bring our framer out, get some handyman work done and reframe one of the walls.

Speaker 2So now I'm looking at that saying, oh shoot, that pushed all of this stuff. Well, that's going to push these three days, which is going to now push this four days. So now we're actually seven days behind because of a two day pause in work, and homeowners don't understand that at the end of the job when you're two months behind they don't remember it and they don't want to know. But in this moment I can say hey, mr Homeowner, listen, let me explain to you. We had to pause to fix that rot that's in the termite damage in that wall. Because of that, that pushed us over to Monday before we can start X, and because of that my flooring crew can't get into Y right, and so I'm showing them how the waterfall affects the timeline expanding and I say, okay, so I've got a new.

Speaker 2You know, I've lined those crews up in our software, in ProStrux 360. If I go to my Gantt chart and move one of the thing, one of the job items for a crew, it says do you want to send that crew a new work order? Yes, I do. So we'll send them a new work order, updated dates, and I'll have the old dates crossed out and the new dates on there. And then I'm usually calling my crew saying, hey, I had you scheduled for monday. I pushed it three days. You're now going out there on wednesday. Uh, you know, whatever it is, you shouldn't have to do that but you do you got a work order that matches this in your inbox.

Speaker 2Let me know if there's any issues, but it's all organized for you. But then I'm sending those weekly updates to the homeowner, right, right, I'm saying, hey, homeowner, this is what's changed, this is what you need to know, as opposed to at the end of the job well, we're three months behind and I can say well, remember, we're not three months behind. You didn't pick out X, y and Z. That delayed us two weeks. This happened. You also added on us painting the exterior of the house. That added a week can start laying out all of those email communications which, if you're doing it from the software, they're all listed right there. Yeah, so you've got all the CYA stuff you need because you're doing it in this fashion of weekly updates using that Gantt chart.

Speaker 1One of the other things that I really like about having a Gantt chart is for us and our GC company. When we have we've mentioned before on previous podcasts the PAL meetings and there's kind of a prep work that we have for the project managers to come in with projections of what they think they're going to have to be paying out and how much they're going to be invoicing week over week, right. And when I look at a Gantt chart I can go through and say, ok, here's this week and by the end of this week that should be completed, that should be completed and that should be completed.

Speaker 1That's a total value of twenty five thousand dollars worth of line items. Great, so I should invoice twenty five grand, right. So it's an easy way to go in and look at when you're going to be getting money in. But if you're not doing the weekly updates and adjusting that to where it needs to be, that's not going to work for you.

Speaker 2I don't know what I'm invoicing.

Speaker 1That's right. So it's a really helpful thing to make sure that you're staying. We work really hard. Cash flow is incredibly difficult and we work really hard to stay in front of that and keep the cash flow minimal so we're not out a ton of money all the time, but also make sure that the money that we're bringing in is being applied to the job and not elsewhere, and doing the borrowing from Peter to pay Paul. This is one of the ways that it helps us do that. I can look into the future. How much money am I going to get by the end of next week? Well, the end of next week, nothing's getting completed.

Speaker 1I've got line items that are running for 10 days straight, so I'm not going to be able to invoice for anything. Okay, so how do I?

Speaker 2accommodate for that cash? How do I take my check? How do I pay for the insurance bill that's coming up next week? So yeah, you can project all of that. Start looking at it using that Gantt chart. I mean it's super simple. So that's it. I mean that's our big push with the Gantt charts. It feels like very overwhelming to start doing a chart on every single job.

Speaker 1It feels unnecessary busy work, it does.

Speaker 2It does. And I have felt that myself when I was running projects Like I pushed hard against doing it this way because I can cut that corner Right. And as soon as I started doing it I was like oh, oh, okay, I'm tasting what's what's coming from it, because I'm now affecting me two, three months down the road in a positive way, because I did this up front.

Speaker 1Yeah, it's one of those things that really does. It's. It seems counterintuitive. It seems like this I'm just wasting my time. Why am I doing this? I need to be out on the streets just beating the pavement and just making it happen, right? But I promise, if you spend the time to be organized and be able to visually see your jobs, it is going to stop you from making mistakes because you're able to see them before they come in front of you, right? The more that you do that, the more opportunity that you're going to have to close the job out when you said you were going to close it out, and the more opportunity you're going to be able to add more business into your year, because you are efficient with your time and you didn't end up going two, three, four, five weeks over on four or five jobs and all of a sudden, you've got a month and a half, two months worth of work that you didn't get paid for.

Speaker 1That's right, right. That's right, right.

Speaker 2That's right. So if you want to get on trying this, just try to Gantt chart one job. Just try and do that. Sign up for our software. Starting at the $89 version it's the light subscription you get Gantt charting, that's work orders, and Gantt chart. So you're sending work orders to crews. You've got also at our $89 level. You can customize your estimates with colors and logos, all that stuff. Try it out for free right now. If you go to our website ProStruct360, you can sign up for the light or the complete or the unlimited Light and complete.

Speaker 2You get two weeks for free right now. The complete's $199. It's our entire software, anything you need or have access to everything that we have on that level. So go ahead and go try it for free right now. Try to build one estimate in our software and use the Gantt chart and I promise you you're going to be so much more efficient in what you're doing and it'll make you more money. That's right, all right. Thank you so much for listening this week and we'll talk to you next week. See you, bye, you.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Grade Your Contracting Company: Day 1 of Our Conference

    Nov 16, 202648 minAudio

    Every December, contractors look back and decide whether the year was a success or a failure - usually based on revenue. But revenue is the result of a well-built company, not the goal. In this episode of Contractor...

    Credit the people on this episode

  2. Who’s Wrong Is It Anyway? The Nice Guy and the Burned Couple

    Nov 9, 202639 minAudio

    Two listener-submitted stories, two very different clients. The Nice Guy: Dave is friendly, knowledgeable, and has seen Mark’s truck around the neighborhood for years. Then he asks for 10% off, starts pulling paint,...

    Credit the people on this episode

  3. What to Do When a Client Changes Their Mind After Pre-Construction

    Nov 2, 202637 minAudio

    You spent ten hours on pre-con. Selections are done, the Gantt chart is built, your plumber has quoted everything. Then on day one the client says, “Actually, can we do a tub instead of a shower?” - and expects it to...

    Credit the people on this episode

  4. Are You the Bottleneck in Your Contracting Company?

    Oct 26, 202636 minAudio

    When you’re a one-man show, every decision runs through you - that’s the job. But once you hire, if every question still lands on your phone, you haven’t built a company. You’ve built a bigger job with assistants. In...

    Credit the people on this episode

  5. Are You Too Loyal to Fire? How to Know When It’s Time to Let an Employee Go

    Oct 19, 202641 minAudio

    You know he’s not working out. You’ve known for months. But you like him, his kids come by the office, and if he leaves, all his work lands back on your plate. So you wait. Clark and James have counted the cost of that...

    Credit the people on this episode