We dive deep into the critical distinction between managing job site finances and company finances, revealing how separating these two areas creates the foundation for sustainable growth and profitability. Our systematic approach to money management transforms leaky financial buckets into predictable profit centers while eliminating the hidden costs that drain most contracting businesses. • Identifying the biggest job site financial leaks: poorly written estimates and unclear client agreements • Creating detailed estimates with clear scope boundaries prevents costly misunderstandings • Job templating saves time while ensuring nothing gets missed in estimates • Material management systems prevent multiple store trips and reduce PM time wasted on errands • Implementing phone sales for crew purchases maintains financial control while improving efficiency • Job costing connects every dollar spent to every dollar invoiced for complete financial visibility • Company cash flow requires separating project funds and never borrowing more than accounts receivable • Always Be Cutting (ABC) overhead even as profits grow to build financial stability • Properly planning for jobs with extended payment terms or retainage Go to ProStruct360.com and check the Contact Us link to set up a 30-minute phone call. We'd love to talk with you about your company and see if we're a good fit to help you implement these financial systems. 🚧 2027 Growth Conference - Austin, TX | Jan 10-12. Two days diving deep into your company - what's working, what's broken - ending with your 2027 blueprint. Day 3: hands-on electives like financial management and estimate writing to make it real. Early Bird (very limited): 30% off + 3 hotel nights covered. Sign up at contractorcuts.com Contractor Cuts is a weekly podcast for contractors who want to build a better business - covering sales, operations, hiring, finances, and everything in between. 🔗 Book a free call: contractorcuts.com 🔗 ProStruct360 software + coaching: prostruct360.com
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Welcome to Contractor Cuts, where we cover the good, the bad and the ugly of growing a successful contracting company.
Speaker 2Welcome to Contractor Cuts. My name is Clark Turner, I'm James McConnell Still, thanks for joining us All day, all right. So the last week or the last podcast that we did was about the six different steps, the six different steps of growing a successful contracting company. It's kind of the baseline stuff that you need to look out for that if you have these six things, you are going to be working towards success. With that being said, one of the items that we had on there was money management, financial management, knowing finances in and out, having systems and processes, job site and in-house.
Speaker 2Today we're going to dive deeper into that topic. This is going to be nothing but how to manage your money, how to manage job site money, client money specifically to jobs, and then separate which guys don't think about, how to manage money within the company. Most people see that all as one pot, but today we're diving into the two separate delineations of how we view each one and kind of viewed separately. So let's start with job site, james. So what is, in your opinion, the biggest leaky bucket running a job?
Speaker 2When you're looking at a project manager that's new or inefficient? Where do you think the biggest leaky bucket is of losing cash on the job site. Sorry to put you on the spot.
Speaker 1Honestly, I think it's probably something like materials and delivery, yeah, uh, and not necessarily like a straight line here's the, here's the loss cost. It's like opportunity cost, hidden, hidden, cost your gas, the, the time, the, the waste stuff that's not being returned, it's being thrown out I gotcha um, because what I notice is, you know if I'm in the background and I'm looking through quickbooks and I'm going through you know home dep Depot lows and looking at receipts and stuff, I see you know multiple trips to Home Depot in a week for the same job.
Speaker 1It's like man, I wish there was like an easy way to just have everything, order everything and deliver it to the site. You know we could do that, but there's always these trips and those trips tend, when you have a bunch of trips in the same week, you tend to see these just random purchases and that's when tools get thrown in and that's when I'll get a Snicker bar, I'll get a. Coke and that stuff is not a big deal, but at the end of the year it really starts to add up. I've spent $3,000 on Snicker bars.
Speaker 2I remember we once looked at I don't know if you, I think it was Jared and I we looked at how much we spent on the Home Depot bucket. So it was like five grand one year when we were going through our Home Depot account, just on guys using it as a shopping cart.
Speaker 1And then taking it with them. And I get it because when I go to Home Depot, guess what I do? You grab a bucket. I grab a Home Depot bucket because you can use them everything.
Speaker 2Yeah, so I what's funny and we haven't talked, we haven't prepped for this part of the podcast, which is great, because what I heard you say is an embarrassment of riches. You have so many things systemized and running well that that is kind of further down the road of losses, of losses of money, which is great. Um, now, you're working on that, fixing that, I think, with what you're saying, though, and we'll working on that, fixing that, I think with what you're saying, though, and we'll stay on it for a second. I think one of the biggest issues with it, too, is when we don't help our crews learn how to manage materials, buy materials, pick it up on your way in.
Speaker 2We often have project managers that end up picking up that slack, and so a project manager that I'm spending way more money on than what a materials runner should be paid is now spending two, three, five trips a week running back and forth to Home Depot. So someone's getting paid really good money being a PM here, and then, all of a sudden, they're doing, you know, minimum wage work for five to seven hours a week, and so I think that's that's what you're saying too is like there's not a measurable on.
Speaker 2Well, my PM drove to three different job sites and hit Home Depot three separate times that day. That was a lost day, but he didn't have anything else to do, so it's not a big deal. Well, he should have something. He should be getting organized, he should be filling up on estimates, he should be visiting new job sites for us or new estimate job sites. Right, there's a lot of that kind of ghost loss that you don't see, uh, but affects the bottom line at the end and that's something as a nation we need to look at is ghost loss.
Speaker 1There haven't been. There haven't been new ghosts. I don't know if you've noticed that that's true.
Speaker 2like I, I've never heard about a haunting of someone from like 2008. Yeah, like Like that die, like it's always like in the 1920s.
Speaker 1Yeah, like some kid in the corner playing Pokemon.
Speaker 2Yeah, like there's not a Pokemon ghost, like looking for Pokemon. Yeah, all right, next week we'll cover this for sure, good. That being said, I think that is. It's great that that's what you think is your biggest loss, because that's there's so much loss before that that happens that I think you've really tightened up, because I think when I go back to the front end of where I see with guys I'm coaching that coming through here, their biggest loss starts out at the estimate of, not well, client engagement and estimate mixed together.
Speaker 2So the client engagement of what you're in charge of and what I'm in charge of and what I'm agreeing to do and what you're agreeing to do, combined with an estimate that doesn't have the detail, that doesn't have the scope right, that doesn't have really a definition around what the dollars are for those two things combined, a poorly written estimate, combined with no client engagement agreement, I think is the biggest loss that I see with guys. Again, you have a very tight client engagement agreement, you pitch it really well, you do it with every single client and your estimates are probably too detailed.
Speaker 2Like you're overpaid, I think, for the amount of time you spend on estimates Detailed. Like you're overpaid, I think, for the amount of time you spend on estimates. No, but you're like, like you said in the last podcast, I think it was something about like you spend an hour on an estimate that you just duplicated from another one. It was very similar. Most guys will spend 10 minutes and be fine. You get high detail on that because A it impresses, it sells and also that's where the money is. It CYA's you to where you're not having that leaky bucket.
Speaker 1I think that to me, is if I can solve someone's first problem, which your past is, solving those two things the CEA and writing a good estimate. You know, one good exercise that I would do when you're doing an estimate is you and you don't have to commit to it but think through what else can I charge for? Yeah, what can I charge for? What else can I charge for? And, like you think you're done, you're like what else could I charge for? How could I reword this, how could I break this out? And then you argue with yourself because you want to get it to a place where you can sell this job. So you build it to where you're like this is too much, I don't think, I'm not going to charge for that.
Speaker 1So then you start backing off of it and arguing with yourself about what is reasonable to charge for, what is not. And if you spend the time doing that, you'll create like in your mind, you'll have your way that you kind of think through an estimate so you don't miss the random things.
Speaker 2Well, and I I think that's the beauty of job templating to where you have in in pro short 360, a prebuilt job, and you could prebuild a bunch of different ones. So it's like kitchen renovation, bathroom, basement, addition, new construction, uh, flooring, or whatever it is. It's prebuilt with. I got the dumpster on there, I've got the porta potty on there, I've got the cleaning, I've got the landscaping, just to make sure I don't miss it yeah.
Speaker 1And obviously there's an infinite number of things that you can pre-build, like you could change one word and it'd be a different thing. But we all know in the industry there's things that are typical of guys missing. There's things typical that clients will misunderstand or misread. So like, for instance, if we're doing a patio that has a roof over top, um, that does not necessitate, uh, a roof or a ceiling under that roof, you could have it completely exposed.
Speaker 1There's no, there's no code for that. However, that's an easy thing to leave off, yeah, and that's an easy thing for a client to say well, I assumed that that would be part of it. And that's where you end up, in this gray area where you're like well, I don't want to.
Speaker 2At best you're doing it at cost. At best you're doing it at at cost. At worst you're eating it but you're not going to make money, no matter what, on that item usually.
Speaker 1And so say I don't know if they want to do that, I don't want to necessarily add another $5,000 to my estimate. I'm going to put in the notes of that line. Item Does not include any ceiling. This is open rafters. Let's talk about that when we review this estimate.
Speaker 2New PMs I always train on. This includes this does not include I want those things on every line item for now, and once you get better you can take those off. But then also like a $0 line item that says, hey, if you want this, it's going to be $5,000. That way they don't see the sticker shock at the bottom of well, that's way too much, I can't afford that. But they've got a quote in there to do it. Well, if you also want a roof, not just go straight up to the rafters, it's going to be $5,000 extra or whatever. It is Right. And so I think that's, with the estimate writing side, a good thing.
Speaker 2You know one one thing that I I have guys struggle with and I struggle with coaching guys on that. Maybe you could give some insight on how much time do you spend on an estimate? Right, and I think we I mean not to answer it yet, but but to expand the question we coach on desk estimate, site revision, final revisions at minimum, minimum three estimates there's probably on larger jobs there's four to five mixed in. That being said, when do you spend three hours on a desk estimate and when do you spend one hour on a site estimate on two jobs that are exactly the same.
Speaker 2Yeah, like, how do you differentiate the time spent that you're going to put into the? Because I can spend eight hours on a kitchen estimate to get all the details in there and then lose it. Right, I can also spend 10 minutes on a kitchen estimate and win it and then be screwed financially if I didn't put what I needed to put in there brain when you're assessing and I think there's an art to it of assessing the reality of the client converting, assessing the financial abilities of the customer and how they're the cues that you pick up on.
Speaker 2But is there anything that you could tie a string to? Well, I spend more time when this happens. I spend less time when this happens, but I think, at the end of the day not to go to the end of the conversation, but at the end of the day we need to spend that time before it converts, no matter what. Yeah Right, so how do you start deciding when to give free time out before we get to that spot?
Speaker 1If I haven't communicated with the client other than an email, they're going to get the least of my time. Yeah, in an email they're going to get the least of my time. Yeah, unless they sent me like a set of drawings and like this, really detailed, like it really is an art, because if somebody sends me a well thought through email that I can tell is not chat GPT generated you. If you work with chat GPT, it's a lot easier to see Drawings.
Speaker 2Define scope timeline. Hey, we're looking to get started around June 15th, yeah.
Speaker 1Especially if they give you a budget like some people will surprise you like this is the budget we want to be in. I will spend. I'll say when. When do you need this for me to be considered for this project Because I'd like to spend some time with it and I'll spend hours. I mean, if it's that legitimate, and I look at the bottom line price and I say I think we can do that. I will spend a lot of time trying to figure that out, but I don't just I don't start from square one and go down. I'll do my own preliminary estimate for myself.
Speaker 1I'll just write out you know, this is the general process and I'll fill in some of the big chunks and then I'll start looking through those and editing those. But I'm I'm the whole time I'm like okay, here's a number. It's going to be higher than that. We're still below that. Let me start filling in, filling this in. I'm going to start with the cabinets, because that's where a lot of the money is. I'm going to go to the MEPs, because that's where a lot of the money is, and I'll find the areas where I would. If it were me, this is where I would save money and not pursue this and this is.
Speaker 1But when you're given very little to start with, there's really not a whole lot to talk about unless you. You need a conversation. You need to have a conversation and from that conversation I'm determining how viable is this client. It's our prequalification. If I'm asking them questions and they're really reluctant to give me information, they don't want to, they really don't want to talk about the budget, but they also don't want to give me any details on to like what they are really want and they're like oh, we're still kind of up in the air.
Speaker 1It's like you guys need a designer, yeah, uh, happy to help you with that. But like, for instance, the lady, uh, she's got a kitchen renovation she wants to do. But she, we had a conversation on the phone and she's like I really, I really don't know what to do with this. This kitchen's a weird shape and great. What's your timeline? Six months to a year? Okay, not a problem, we can slow roll that one. I don't know where you're at yet, I don't know how reasonable a client you are yet, but I've got enough time, you know, in a two week span to put this put together something pretty considerable for you.
Speaker 1But we're going to start off by figuring out what would we do for a layout?
Speaker 2How would we mess with?
Speaker 1this and she might need a designer at some point. But I think it's a little premature to bring that person in, and if she's going to be paying any money up front, I'd rather it be with me. How can I get engaged initially to be your partner in this, and maybe we bring in the designer? You work with them separately.
Speaker 2Pay me two grand and I'm going to help you design this and lay it out from my side and then we'll bring a designer in as needed. Yeah, but let's spend some time kind of refining and fitting in your price point to your scope and trying to make it all match up. Yeah, I think two things that you do well. If I can compliment you, um one with what you just said, that conversation, the rhetoric of how you say it, saying what you want to say so they hear it the right way, is so important and you're great at it, so it's not a well until I get a score.
Speaker 2How am I supposed to price this out? Like, why don't you get a designer? Why don't you get that? Once you get me that stuff, I can get you some numbers. Yeah, Verse, instead of them being your problem. Instead it's like we got to solve this together as our problem, right? Like, hey, so first what we need is like this and I can't even get numbers around. So if we it's saying the exact same thing, but it's our problem that we're solving, as opposed to you are my problem.
Speaker 1And until you get me the stuff, I can't get you numbers, yeah, it's like I mean, yeah, I could throw numbers at the wall all day, but really, when it comes down to it, you need to do something for me, yeah.
Speaker 2I think the second thing you do really well is on those write-ups, the dialing up and down of time that you spend. I think you spend a little too much time on some of them, but that's okay because that's the sales side. But I think the dialing of time up and down, you still prep yourself for the next revision. So you're putting line items in the description that you need to answer next time. Right, you're writing it up of. This is open, but we need to solve this problem. So when you sit down in three weeks after the homeowner gets you some information, you can then sit down with your estimate, refresh your brain and be like oh yeah, that's where I got to pick up this line.
Speaker 2This is where the cabinets they I know that they said they don't want shaker, but they want blah, blah, blah, blah, blah. I can then, okay, that's where we're at, I'm going to pick it up to where you're not having to spend an hour catching up to where you left off three weeks ago. I think that's an important hidden kind of skill in and of itself.
Speaker 1I'll tell you why. Number one, you're wrong about spending too much time because and I've talked about this in previous episodes I'm looking for twofers. So when I'm doing an estimate for this person and I spend two hours on it and it's like a kitchen renovation, that's because I'm generating new line items. For, okay, you didn't want shaker, they wanted the flat panel, whatever, and that's a trend that's happening. Okay, I'm going to create I have a line item that's been in here forever that is the standard shaker.
Speaker 1Blah, blah, blah, blah. I'm going to create a new line item. I'm going to create a new line item I'm going to detail it out differently for these flat panel. Blah, blah, blah. Yeah, I spent too much time on this one $50,000 estimate to come up with this line item, but now I have a line item that's going to save me all the time in the future.
Speaker 2You're saying like a prebuilt. I'm prebuilding.
Speaker 1In the software you just save the item with the detail, with the numbers. We might have done some research on cost. I might have spoken with my vendor, I might have sent him a drawing and said it's something like this give me an idea of cost for something like six weeks from now.
Speaker 2Someone wants the same estimate and it takes you 30 seconds to build that, or just something similar that I can augment that to to fit what it is.
Speaker 1And so whenever I'm spending that time, I really don't like to think of it as like how much time am I giving this person? Yeah, I'm like how valuable is this estimate to me? How can I use this and break it apart in its components?
Speaker 2even if they say no, even if I'm still building value, it's a win I'm working on the processes while I'm serving them and a PM can come in and price out an estimate with your numbers and verbiage that you've already written out, where you're not having to answer questions anymore.
Speaker 1So that's great.
Speaker 2No time wasted baby, I like it. So, that being said, estimate CEA, getting the client engagement agreement, getting all that stuff done, we land the job. I think part of that and why deepening the loss of money and how that happens is when I have broad line items and a single line item that three different or even two different companies are handling is not good. It's a big thing Because the way we've built the software is one line item is for one person and might have seven line items for one person, that's okay. Is one line item is for one person and might have seven line items for one person, that's okay.
Speaker 2I can have seven line items in time to one work order and they combine into one price. But I'm never going to have two crews working on one line item because I can only pay one person per line item and we'd set that up intentionally because I need to tie every dollar that I'm spending to every dollar that I'm invoicing and so if I'm paying that guy a thousand and that guy 800, I can't just say you know $1,800 on this line item, because then if that guy doesn't show up and that guy does, and now I got to switch money around or I've got to hire someone else.
Speaker 2That's more expensive. All that goes sideways, and so identifying every single dollar that I'm invoicing is detailed out to what I'm spending. Number one, on labor. Number two same with materials. I'm going to have material line items. I'm going to have what you've done really well on the material side is we're going to do allowances in line items. We've got a thousand dollar allowance for a vanity Great. And so if the customer goes and picks one out and it's $1,200, great, you're going to pay the extra.
Speaker 2That's fine. But I'm not going to just say, hey, install vanity, this includes the vanity cost. And they pick out one. And I was expecting to spend less and now I'm spending more because I wasn't organized with it, right, yeah, also, building in, one PMs did a ton. It was he would have tile surround and pre-built in that line item, sku 87645 from Home Depot. That's the backer board, that's the red guard, that's the, and all of that's already pre-priced and pre-spelled out by SKU in the line item.
Speaker 2So if I, if I'm doing a tile surround, I click tile surround, this many square feet, all the numbers are done, all my materials are budgeted for and my pre-negotiated price with my tile installer is there. That way, all I have to do is put that in. I know exactly how much it's going to cost me and I know exactly how much I'm going to charge. So I'm giving my best price the first time, every single time, because I can't do it for any money less and I can make great money to make my profit on this price point. So the organization of the estimates, the price points and all that stuff, I think is the basis for the biggest hole, sealing up the biggest hole in your financial bucket, because that allows you knowing where your dollars are going, allows you to do job costing.
Speaker 2Knowing where your dollars are going allows you to do job costing. Job costing is something that is very simple, but it takes some time to do and it takes organization to understand it. What I want to do with job costing is understand labor how much I paid, how much I budgeted and materials what did I spend, what did I budget, how much did it cost, how much did I invoice for and understanding all of my numbers. Like I always say, it's a math game, this isn't a gamble, this isn't a guess, this is all math. And so, if I'm putting in the equations correctly, I'm making the exact amount of money I need to be making to grow this company.
Speaker 2That being said, when we do job costing now on the job site I want to be looking at two things and kind of getting in the weeds. Prostruck 360, the software. I send out work orders I create, I say, hey, that's done, that's done, that's done and that creates a payment for my crew and then I can print a check or do a direct. But however you want to pay them and that's processed and that all pushes the QuickBooks. It's tied in QuickBooks to the crew, to the job. I can see all the reporting QuickBooks. But also I've got all the reporting in ProStruct as well. All I got to do is do it in ProStruct and it keeps your QuickBooks updated.
Speaker 2Going backwards though materials is what you do on a weekly basis for our different locations is tying the purchases together To the jobs. That's the only thing you got to do in QuickBooks is taking your bank account and your credit cards and making sure that you were categorizing every dollar that we spend. Every swipe of the credit card is categorized weekly. What the heck was that? We just heard a big. But Did you do it from here, did you?
Speaker 2Yeah, it's fine, we'll keep going Anyways. No what the heck was that? We need answers. No, what you?
Speaker 2No, what the heck was that? We need answers. No, what you want to do, you download this. Quickbooks, captures your whole credit card and tries to tie it to stuff for you. So all you have to do is pull up your Home Depot account or your Lowe's account or your 84 Lumber whatever it is. It's okay. That purchase was for 123 Main Street, was 4123 Main Street? As soon as you say that in QuickBooks, it sucks right back into the software and tells you on the job card exactly how much you've spent in materials and how much you have in overages if you've gone over your budget. That is what we're talking about of job costing and money management on job sites.
Speaker 2What else are you doing to keep an eye on spending, budgeting all that stuff, job site site wise, to make sure what I budgeted is what I spent and I've got to spend more, I charge more and can justify it to the customer. How do you deal with all of that side of it?
Speaker 1Well, that's, that's a pretty. It's a pretty broad question. Yeah, one small thing that I do is when I'm putting materials onto a job, I always put in the memo kind of like. You know, not for like the $25 purchase, maybe it just depends on how froggy I'm feeling, but bigger purchases, you know, $1,000, $1,500, $7,000. I'm putting a memo in there kind of what it's for $1,500, $7,000.
Speaker 1I'm putting a memo in there kind of what it's for. So when I pull up the materials in ProStruct I can see what's been purchased, because it's not when guys make purchases. If you have it broken out into labor and material, it's not always easy to know when that's been purchased. We try to set it up to where. Hey, once you make that purchase, this is just a material line item. Assign yourself to it and when you've made the purchase completed, that way I know it's been completed.
Speaker 2The level of detail that you're putting per purchase is going to help you manage it in the future. So if you because if QuickBooks says you bought a thousand dollars at home Depot for one Home Depot for 123 Main Street, that's what comes into the ProStruct, right, yeah. But if you say in the description this was for sheetrock, when it comes across in ProStruct it says Home Depot sheetrock $1,000 on this date, and so you can look at that and say, okay, we've already bought that. We've already bought that. Yeah, oh crap, we've got like $800 left and I haven't even bought the paint or the flooring.
Speaker 1Yeah, and then it's like, you know, three weeks later, another thousand dollars for sheetrock. You're like, hey, we just we've already gone over our budget for sheetrock. This one is another thousand dollars for sheetrock. What's going on? Oh, that was not for that job that the guy did it wrong. It's for this job. Yeah great, I wouldn't have known that unless, like, it wouldn't have been an immediate flag for me, unless I had kept a little bit of a record of that.
Speaker 2uh, inside of quick or quick books, pro struck, whatever the case, yeah well, I think a great example that is like that allows you to catch change orders on the fly. If you get to the end of the job three months later, you can't be like, hey, we also bought an extra. Like I remember a job where we painted a room we're doing like a kitchen and the side room we kind of scuffed up the walls but we could have probably fixed it. And the homeowner was like, well, you guys repaint it and and just repaint that, that room.
Speaker 2And I remember I and so we did it and our pm on site was like, well, if you buy the materials, we'll, we'll cover the labor. Since we scuffed up some of these walls, homer was like great, fine, right. And so I saw a purchase at sherwin williams, like three weeks after we bought all the paint, and so I was able to look at it sherman williams, sherman williams, interesting, uh. But I was able to look at and it's Sherman Williams, sherman Williams, interesting. But I was able to look at it and say, hey, why is there an extra $85,? Whatever it was, it wasn't a lot Purchase Like, do we mess something up? Yeah, this is what happened.
Speaker 2Okay, so we need to do a change order for that oh yeah, yeah, I never updated that. So we caught. I mean, it's $100, it's not a big deal, but that's how you catch those change orders, especially when you're managing employees and if you're not doing it as a one-man show, you can't hire and continue. We've got to build the company that we want to use in the future now. So when we do hire people in, it's operated as a successful company, so I think that's great. Is that money management? So we want to do job costs and we want to know exactly what we're spending where that's on the outside.
Speaker 2The other part of that is purchasing materials. We went a little bit into this last week as well, where we try and do the front end purchased for the job site. I like to walk the job site with my crew, identify what needs to be purchased, get an order put in. Maybe I've got lumber coming from one place and paint coming from another place and all my main materials from Home Depot, whatever it is, and I'm going to line up those deliveries or guys that go pick them up and I'm going to help out my crews with that. Once we do that initial purchase unless it's a large job, I'm putting it on my crews to do all the small buys.
Speaker 2I got to go and buy two tubes of caulk. I got to go get this, I got to go get that. Great, that's on you. But I'm going to do a phone sale and I train the crews on how to do it one time a day so they're not going seven times a day when it's like, okay, what I want you to do, when you get here in the morning, walk around, do not leave to go to Home Depot until you take a full assessment of what's going to be done today and tomorrow and try to buy everything for what you're doing. They go to Home Depot or Lowe's, they make the purchase and they do a phone sale with me or with my project manager.
Speaker 2My project manager has a set of questions. Do they buy tools, food, drinks? No, can you tell me the job name? Because if Home Depot or Lowe's puts the job name in the job description, it's then going to be on my online account and so I can match up the materials real quick and easy. So what's the job name? What's the crew that's standing there? I want to know their name. So we go through this whole list of questions to verify. So the crew is standing there in front of the Home Depot guy saying, oh crap, they ask these every time. I can't get by, I can't.
Speaker 2So they're hearing that and we're not losing money on the purchase. But I'm also not driving out to the job site, then to Home Depot, then back to the job site to deliver the materials and then back to my office. Instead they just hit it on the way in to the job, made a phone sale and it cost me five minutes. And so identifying and managing the purchasing side and controlling it is where that leaky bucket is also stopped, and that's kind of some of the material talk costs that you were talking about earlier. But making sure that we're doing the phone sales properly We've got a systematic way to do that and that the crews understand and know their responsibility for verse what I'm going to do for them.
Speaker 2I think 90% of guys coming into coaching are the errand boys for their crews. They go and run materials, they go and I'm going to go buy everything, just tell me what you need and they go to every single job site every day or every other day to deliver materials and walk it. And your time is way more valuable. I'd rather pay the crewmaster 500 bucks to do all those purchases than for me to spend all that time running back and forth. I don't have that time. You're never going to grow your company that way. So, understanding purchases and putting it on the cruise for the majority of those small purchases, but also making sure that they can't take advantage and that I'm protecting my money in those purchases so that's job site, we can go.
Speaker 2We can probably talk another hour about that. My money in those purchases so that's job site. We can probably talk another hour about that. Let's switch to company cash flow, cash management, keeping your books tight. First and foremost, my main rule accounts receivable and loans. I never want you to take a loan more than your accounts receivable. If you have a line of credit or a loan, this is a spot that will take your company down. If you've got a line of credit, I'm only going to pay off outstanding accounts receivable, outstanding invoices that are owed to me, and pay that out of my line of credit. So when the customer pays, it goes straight back on the line of credit.
Speaker 2This is a good way, like a VA loan or some sort of loan that's coming a 30, 60, 90 day pay. Maybe you're a sub for a large commercial GC that has 90-day net terms. That's fine. Use your line of credit for that. I invoiced $30,000. I'm going to pay that invoice, quote unquote, from that line of credit. As soon as that GC pays me, in 90 days, that $30,000, it goes straight back on the line of credit. I don't even realize that that money's there. That's the only way I want you managing loans first and foremost. All right. Going into cash flow management, though, how are you looking at managing project managers?
Speaker 2How are you managing cash flow on a weekly basis and I know it's kind of a broad question and we could probably talk a couple hours about this alone but when you're looking at Jobs' 30,000000 foot view, when you're meeting with a project manager looking at his seven jobs that he's running, how are you making sure that we're collecting enough and we are paying the people that need to get paid and all the bills are paid and that we're ending up with dollars in the bank account at the end of the day?
Speaker 1that's an easy one for me. Uh, because we invoice. We invoice clients a week ahead of time for the work that's about to take place. So the money that we receive that week is going to be paid out to the crews. The following seven days and the leftover is the gross profit. Yep, and then, because I did that initially, it's tight. It's tight when you start operating that way and you don't have a loan. It's just money in the background. It is money in, money out.
Speaker 1You are having to be very fastidious with your bookkeeping. Once you've done that for a little bit, there is a little bit of wiggle room where you can start to hurt yourself again, and so you do need to keep that tethered where, okay, we've got you know, we got $60,000, that kind of stays in the bank. That's great. That's essentially profit that we just have there sitting as our operating capital. Yeah, so when we take on a job, like a va job or a um, you know, a any type of loan that is going to hold, retainers or not?
Speaker 1pay up front. They're all different so it's hard to kind of nail it down. But a va is a good example because the way they have that set up is essentially you're not, you're not taking any profit unless until the very end of the project, because they don't give you any money up front and there's a 20% retainage on every invoice that they do pay you and that can be a stressful. That can be a stressful way to run it, except for at the very end of the project you're receiving a lump sum of cash.
Speaker 1That is essentially all profit. Yeah, so the way that I look at it is if we've got $60,000 in the bank that is our kind of operating, you know rotating money then I can. I can run a project that's maybe a two, three-month project under those terms. Anything outside of that. If I've got like a $200,000 job that I need to run, then I need to look at a different financing option because I don't have $100,000 sitting in the background, I only have $60,000.
Speaker 1So I'm going to run out of money unless I've got three other jobs operating at the same time money unless I've got three other jobs operating at the same time. So knowing what jobs you're able to take is an important part of job costing. How long of a runway do we have until the payments are going to come due? And even if you've got that money sitting there, it doesn't feel good. It doesn't feel like you've got that money sitting there. It's like I got to make. I got to cut checks, I got to pay bills, I got to pay the credit card down, I got to pay my subscriptions.
Speaker 1This is going to be a really stressful two months. Like that's never fun. So I think there are ways to prepare yourself against that, and I'm not a fan of loans, but if I was going to take a loan, it would be to service projects like that, where the money is spoken for it's a government entity. I know that they've got it and I'm not going to get screwed on the back end of this. I just need to make it to the back end, I know.
Speaker 2I got a 10 percent payment of 40 K coming in at the end of this job so I can take out of the loan up to 40 K, because as soon as that comes in it goes back. But what often happens what I see with guys is that 40 K comes in and we'll put 20 back on the line, but I got to pay this and I got to pay that, and so it's easier to steal from that profit that you should put back than to steal from the loan. For some reason, right, I've pulled the money out of the loan cause I'm going to pay it back and then, when it's time to think.
Speaker 2A great example of what you're saying too is is our Lexington branch. We're doing a new construction long story on it of it's a takeover from another company. We're doing it. It's a full new construction. We're doing it cost plus and I think it's like we're going to end up making about 14 to 15% on it at the most and that's going to be covering most of our expenses and costs and overhead. It's not a profitable job, but we want to be in the area. We want to impress these clients. The clients have siblings that are going to build on the same plot of land. So we want to get future work with them.
Speaker 2So we might end up making 12% to 13% on this job, but we made the decision to say yes to it because of what it's going to mean for the company. But our game plan on that job is for the company. But our game plan on that job is every dollar that the bank retains 10%. So the bank is going to owe us a lot of money before we finish, and so the way we're running that job is we are going to do that at cost from now until the end of the job, and I need two to three other smaller jobs running at the same time that are going to pay our paychecks and bills.
Speaker 2So we might have a small amount of money covering overhead like gas and insurance, but we're not paying our employees out of that big new build. Instead we're going to have all these other jobs that fund it, and then at the end of the job, we'll get a six figure check for the 10% retainage and boom, that's all. That's straight profit, yeah. Now we're in business Now we're in business and so it's the understanding and then also keying. We just got to draw for $68,000 for this job. I need to not touch that and put that maybe even in a side account and make sure, when it's time to pay the concrete guys, that $68,000 is there because they're going to need all of it.
Speaker 2So I can't take that into my account, spend it on this, pay my truck, make sure that these guys are happy and now the concrete's due for this new construction. I don't have that 68K. It's down to 20. So where am I coming up with the other 48? Well, I've got to invoice somebody. You get in this cycle of mismanaging that money because, well, the sun's going to shine tomorrow, so I'll get it then. Instead, what we need to do is have it identified separately. I love separate bank accounts. Get 12 bank accounts if your bank will let you set it up and put that money in that account and only pull it out when invoices come that you're paying.
Speaker 2Because for us, if I can do that and live off these other jobs and just maintain that job, we got a big paycheck at the end of the job that will then launch us into the next one yeah, right then you could buy your fleet vehicles.
Speaker 1You could immediately buy your own truck. Like you've got a hundred thousand dollars, I think we need like all new trucks for everybody.
Speaker 2Get them on like lifts, giant wheels, yeah, some like lighting underneath.
Speaker 1It'll be really cool, dude and maybe like a bubble gum machine in your car.
Speaker 2Dude, have you ever seen exhibit you talking about pimp my ride? I'm talking about pimp my ride. We're going on, pimp my ride, all right. Last thing that I have on on the money management is I view this differently than most people. I'm trying to always cut overhead. Not most people, most guys that are in this that are struggling, they view, hey, our profits grew, now I can spend more. I love looking at overhead and saying, okay, we don't need that, I don't need that, I don't need that. My wife calls me cheat, but I'm like if it ain't broke, don't fix it.
Speaker 2Let's get rid of that. Like I remember we used to have fleet vehicles for the company and we're like hey, insurance, we got sued because one of our guys ran into someone and like, let's just get rid of it, pay the guys a little extra, let them have their own vehicles, have some. Like, let's save that cash. And so we saved it. We put some magnets on cars. Honestly, we got more calls off our fleet vehicles of complaining about driving and ruining our reputation than we did calls off people looking for work. Yeah, right, and again, that was us, that was our market. I'm not saying don't do fleet vehicles If that fits what you're doing for a general contracting company doing residential general contracting.
Speaker 2I don't love it outside of your own vehicle running through the company. That's my opinion. That's my opinion. That's not fact, that's not the way you got to go, but stuff like that. To where it's like where can I spend less? I know we're making more money this year. Can I spend less this year? Because every dollar I don't spend is a dollar in my bank and every dollar in my bank is a job I can say yes to so I can fund it through that money. So that's part of it Job costing, managing your money and again, we didn't go too deep into that but really making sure that you have a time block every week to look at QuickBooks, to look at the money coming in, the money going out and making sure that we aren't overspending or spending money that's not ours to spend, any money that's not ours to spend.
Speaker 2That is something that guys back burner and end up not doing until the end of the month or the three months in because it's not on fire. The customer's calling. I don't run it to the job. I got a new estimate, I got to go do that and they don't spend time organizing their finances, and that is where they're going to get in trouble.
Speaker 1I just had a great idea for you. It's the ABCs of overhead. I love it. Always be cutting.
Speaker 2It's great TM. Yes, I got it. Shoot Got it before you.
Speaker 1Well, no, I did it, I gave it for you. I TM'd it, so it's mine now, I know, but I intended for you to take it, but I'm going to sell them.
Speaker 2I'm going to put on shirts. It's going to be awesome. You're going to be so jealous All right. Thank you for listening. If you want to have a conversation about managing your money and your company, go to ProStruck360.com. Go to the Contact Us. There should be a link on there that you can set up a 30-minute phone call with me. I'd love to talk with you about your company, what you're doing, see if we're even a good fit for you. We don't have to help. You Love doing this. So, anyways, thanks for listening. We'll talk to you next week. Bye, bye.
Every December, contractors look back and decide whether the year was a success or a failure - usually based on revenue. But revenue is the result of a well-built company, not the goal. In this episode of Contractor...
Two listener-submitted stories, two very different clients. The Nice Guy: Dave is friendly, knowledgeable, and has seen Mark’s truck around the neighborhood for years. Then he asks for 10% off, starts pulling paint,...
You spent ten hours on pre-con. Selections are done, the Gantt chart is built, your plumber has quoted everything. Then on day one the client says, “Actually, can we do a tub instead of a shower?” - and expects it to...
When you’re a one-man show, every decision runs through you - that’s the job. But once you hire, if every question still lands on your phone, you haven’t built a company. You’ve built a bigger job with assistants. In...
You know he’s not working out. You’ve known for months. But you like him, his kids come by the office, and if he leaves, all his work lands back on your plate. So you wait. Clark and James have counted the cost of that...