
Contango Silver & Gold (TSX:CTGO) - $150M Free Cash Flow as Three Projects Advance
Interview with Rick Van Nieuwenhuyse, Director & CEO of Contango Silver & Gold Our previous interview: https://www.cruxinvestor.com/posts/contango-silver-gold-tsxctgo-direct-shipping-cash-flow-funds-path-to-200kozyear-gold-plan-12186 Recording date: 9th November 2026 Contango Silver & Gold is a gold producer with a growth pipeline across Alaska and British Columbia. Its cash comes from a 30% interest in the Manh Choh mine, which Kinross operates and owns 70% of. Manh Choh uses a direct shipping ore (DSO) model: ore is trucked about 240 miles to Kinross’s Fort Knox mill, so Contango did not build a mill or tailings facility. In 2025, Contango’s share was 59,500 oz of gold, and it received a $102 million distribution. CEO Rick Van Nieuwenhuyse restated the five-year target of 200,000 oz of gold and 5 Moz of silver a year. Each asset funds the next. Manh Choh funds Lucky Shot, and the two together fund Johnson Tract and Kitsault Valley to production decisions. Manh Choh is weaker in 2026. Production will be near the low end of the 40,000 to 45,000 oz guidance after heavy September rain paused Fort Knox’s heap leach. The remaining ore moves into the fourth processing campaign, starting in November. Costs are higher because all-sulfide ore uses more cyanide and lime, and diesel and salaries have risen. Published 2027 guidance is 75,000 to 80,000 oz at $1,200 to $1,300 per oz. Van Nieuwenhuyse gave a lower preliminary figure of about 70,000 oz and around $150 million in free cash flow to Contango, with formal guidance due in December. He put remaining mine life at this year plus three more. Lucky Shot is 100% owned and fully permitted. It holds about 110,000 oz at 14.5 g/t gold. Drilling runs into February 2027, an MRE is targeted for May 2027, and a tolling-based feasibility study follows, most likely using Fort Knox. The company is targeting 40,000 to 50,000 oz a year from 2028, at cash costs near $2,000 per oz at $4,000 gold. Drilling in the 2070 East and 2300 East drifts is testing the vein system’s eastern extent for the first time in the modern era. The larger growth comes from two polymetallic deposits. Johnson Tract holds about 1.1 Moz at 9.4 g/t AuEq. Its May 2025 Initial Assessment estimated a post-tax NPV5% of $615.4 million and an IRR above 60% at $4,000 gold. Road and port permits are targeted for May 2028 and production for 2030. Kitsault’s September 2026 MRE reported 89.5 Moz AgEq Indicated at 363 g/t and 64.92 Moz AgEq Inferred at 320 g/t. It excludes the 56,492 m drilled in 2026, which will feed an update in the first half of 2027 and an Initial Assessment later that year. Both deposits need a sulfide mill. Contango is choosing between buying an idle mill and building on a permitted site near Kitsault, and Van Nieuwenhuyse said this will need some equity. Contango had $89 million in cash at June 2026, against $45.3 million of bank debt and a $20 million convertible. It has no hedges and about 33 million shares outstanding, which management wants to keep low. Catalysts to watch are 2027 guidance in December, the Lucky Shot MRE in May 2027, the Kitsault update in the first half of 2027, and the processing decision. View Contango Silver & Gold's company profile: https://www.cruxinvestor.com/companies/contango-silver-gold-inc Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
