
Blossom Gold (TSX:BGAU) - Nevada Developer Nears Gold Resource Estimate Targeted by Q1 2027
Interview with Rick Winters, CEO of Blossom Gold Our previous interview: https://www.cruxinvestor.com/posts/made-in-america-blossom-gold-tsxvbgau-visiting-the-rosebud-project-10965 Recording date: 18th November 2026 Blossom Gold (TSX:BGAU) is nine months into work at the Rosebud Project in Pershing County, Nevada. It has drilled about 30,000m and reopened the historic underground, and it has its first metallurgical results. The company is targeting an updated resource estimate in Q1 2027 towards construction in 2029 and production in 2030. Metallurgy is now driving the flowsheet decision. Preliminary oxide bottle rolls averaged about 73% Au recovery at a 25mm crush. Fresh rock returned around 36%. CEO Rick Winters says the weaker-leaching zones reflect liberation, possibly silica encapsulation, not refractory ore, and that historic data show these zones are discrete. They can therefore be mapped and mine-planned. Winters says even 28% fresh-rock recovery would still return roughly a 100% EBITDA margin per ton mined at current gold prices. The company is still testing whether higher-grade fresh rock earns a mill. KCA leads the heap leach and feasibility work, and McClelland Laboratories handles milling and flotation tests. Silver is the surprise. Blossom assumed 25% Ag recovery internally, and preliminary tests are averaging above 60%. In situ, Rosebud carries about 10oz Ag per oz Au. Winters estimates a silver credit at these recoveries would cover about one-third of heap leach opex. Silver is not yet in the company’s economics. Cutoff grades define two flowsheets. On a full-cost basis, the heap leach cutoff is about 0.17 g/t. The current inferred resource at that cutoff is 70.8 Mtons at 0.62 g/t Au and 6.49 g/t Ag, for 1.28 Moz Au and 13.4 Moz Ag. A CIL cutoff of about 0.4 g/t leaves about 45 Mtons at 1.1 g/t. Management describes either route as roughly a $500M project: a ~15 Mtons/yr heap leach or a 7 Mtons/yr CIL plant. Both would produce about 200,000 oz Au a year at current grades. The likely outcome is a large heap leach with a smaller mill. Drilling for the resource update has grown from 28,000m planned to 46,000m. The search radius was tightened from 220ft to 160ft. The remaining ~12,000m surface and ~8,000m underground program targets at least 70% measured and indicated. Management expects a gross resource on the order of 150 Mtons. Underground rehab is about one-third complete, and Timberline Drilling is targeting infill drilling in the first half of December. A 23,000-ton bulk sample permit and toll-milling talks offer possible early cash flow from plus-3 g/t material. While water is a main risk, Pershing County’s basin is over-allocated but under-pumped: about 32,000 AF appropriated, about 31,000 AF recharge and only about 11,000 AF pumped. Hycroft controls most mining rights. Blossom is pursuing waivers, a 275 AF purchase, state engineer applications and a possible Hycroft lease, and it expects a two-year process with protests. On valuation, Winters says peer P/NAV multiples have roughly halved since mid-2026. Blossom trades at about 0.08x NAV, around one-third of its peer average. Catalysts are column results from December, underground infill drilling, the Q1 2027 resource update and the June 2027 Plan of Operations filing. View Blossom Gold's company profile: https://www.cruxinvestor.com/companies/blossom-gold Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
