And we're here today for our first 20-year-old watch town hall or exchange.
SPEAKER_03Give us a briefing on the county government center where things stand. It will open up to a discussion with the audience. Thank you, Digby.
SPEAKER_02Thank you all for being here. I really do appreciate you folks coming out. Some familiar faces, but some new faces too, and that's great. give you a little bit of background and I'm going to try to go through some of these slides pretty quickly. Some of you have seen them already. Uh, if you've seen any of the other town halls or any other public discussions on this topic, these are the exact same slides that have been discussed previously. It's the same story. It's not any different. Uh, I'll go through them quickly because I'd really like to just have some, some dialogue to answer questions that you might have.
SPEAKER_02That's really, I think my goal in this event, I think what Digby's trying to accomplish with this too. So, uh, My name is Brad Reinhart. I've been with the county for a little over 30 years. I worked with the police department for 25 plus years. I was chief there for seven years before I moved into this role about five years, a little over five years ago. When I came into this role, I oversaw public safety. So police, fire, social services are all under date. And then any other projects that came along. And, you know, as you can imagine, in government,
it's always stuff that comes along.
SPEAKER_02I was given this project at the end of 2022, which kind of talked about the importance of that date here in just a second. And I've been kind of overseeing this project since then. I'm going to say this right up front. You know, for me, it's my job, right? This is my job. I'm moving forward with this project as directed by the Board of Supervisors, and I'm going to do the best possible job I can with this project. I'm not a politician. I'm not an elected official. I'm probably one of the most nonpartisan people you'll ever meet.
SPEAKER_02Being the police chief for seven years, that's how you have to be. So I don't really want to get into much political type of talk. That's not really the goal. My goal here tonight is just give you information and answer questions that you guys might have. So I'm going to start, just kind of go through these slides, a little bit of history, sort of how we got to where we are today with the government center. Those who watch board meetings or are familiar with our board, Mr. Hipple, when he first came on the board over 12 years ago, first brought up the idea,
SPEAKER_02the concept of a consolidated government center. Back then, he talked about it in a public setting. It wasn't a lot of traction, wasn't much discussion with it, but that's when it really first came up. I think it really started to gain some attention from the rest of the board and others in the county when the social services building came up for renovation. That was in 2020. That was at a cost, I don't remember the exact amount then, it was somewhere in the $10 to $12 million range back then.
SPEAKER_02And that's what I think really got folks thinking about it. Okay, we're going to put that kind of money into renovating a building that's 25, 30 years old, or should we really start looking at something different? That's what started the conversation. So we hired an outside architect firm to come in and do a space needs study to look at all of our facilities, not just the ones that currently are in the proposed government center, but all county facilities to look at how much space we need today, 10 years,
SPEAKER_0220 years, 30 years down the road to make sure we know what we're going to need moving forward. I'm sure you all know. Let me ask this. Who was born and raised here in the Williamsburg area? back. So we all came here because we love it here, right? We all live here because, at least I'm assuming, we all really enjoy living here. I moved here over 30 years ago and I loved it. When I was in the police department, I taught our Citizens Police Academy for probably 20 years.
SPEAKER_02And the first night, I'd always ask that question. We were born and raised here. And the first few years, about half the people would raise their hand. And then over the years, it got to where I was maybe one person in the class. Because a lot of people move here, and our population has grown very substantially over the past 20 years. While that projected growth is slowing and is projected to slow, we're still growing. So those space needs exist. Future space needs exist.
SPEAKER_02We have to plan for future. So that's how we kind of got to that 2020 space needs study. We updated it a couple times. Post-COVID, we updated it, 22. Then we updated it in 2024, right before we got into the programming phase of the Consolidated Government Center. Same time in 2022, we did a facilities master plan. looking at all of our facilities and current sizes, what the space lead studies show we would need, and trying to develop a plan for all of our facilities. So we started having a more serious conversation.
SPEAKER_02Okay, do we really want to continue to renovate, add on, expand on our current facilities, or should we look at the potential for building a consolidated government center? And we were having those discussions. We were having those discussions publicly. We asked an outside group to come in and do a building consolidation study for us to look at what it would cost if we stayed in our current facilities and expanded and renovated and added on and did what we would need to do. Versus building a new consolidated government center.
Back then in 2022 when they did it, I don't remember the exact numbers, but it was comparable. It wasn't that much more to build a new center than it was to add on and renovate
SPEAKER_02the current facilities. And be mindful, those current facilities, some of them are pretty old. I was back in one of the rooms in the government center the other day looking at an old book, and it was the annual reports from James City County from 1974 to current. And I was reading the one from 1974. It was really interesting because they were then building the current county complex. They had an artist's rendering of what it was going to look like. And it was just kind of interesting to see that same problem
they were having back then.
SPEAKER_02We're kind of in that situation today. So that study came back. It's shown it was comparable. The board started to look at locations. If we're going to do this, where might we want to do it? So we had our mapping, our GIS people look at where is the geographic center of the county and where is the population center of the county. Because where we are today, it's a nice facility, it's a good location, but it's certainly not center, either geographically or by population of the county. The property we're at today was basically given to the county
by Anaheuser-Busch
SPEAKER_02when they developed Kickersville, the brewery, and the park. So that's why we ended up where we are today. So our GIS folks looked at the maps, figured out the geographical and population centers somewhere in the Route 199 Longville Road corridor. I think everybody's probably familiar with that. That's sort of the geographic and population center of the county. So we started looking at potential properties that we could build a facility on. We had a piece on Warhill that the county owned, Warhill Tract that the county owned,
SPEAKER_02which was a little bit further north from the center, but close. And then the Longville project spot where we're currently at today. We looked at things we already owned, so we wouldn't have to purchase property to be able to do this. We're having those discussions, having those questions. You know, the board had kind of settled on that Long Hill property as the potential vocation for it. And we were having those discussions. Then in December of 22, we received an unsolicited proposal. We didn't ask for it. Typically in the government,
when you ask for things, you put out an RFP and you get bids.
SPEAKER_02That's typically how it works. The PBA process is a little different. It allows private entities to make these proposals and work with us. And if we accept it or not, that's entirely up to the board to make that decision. So we got that proposal from the Henderson-Gilbane Group. There's local builder, national builder. local architect, more of a national architect, engineering group, submitted a proposal to build a new consolidated government center with really no input from us other than what they saw on public meetings and
just things they
SPEAKER_02might have read in the paper and things like that. So they had an idea of what we were looking for, but really no input from the county. What we did then, we formed an internal working group. We had six different county employees, the head of our general services union, head of finance, chief civil engineer, myself, community development director, and our IT director to look at that proposal and make a recommendation to the board. We were required to do that. Went through the proposal, made a recommendation to the board to accept that proposal.
SPEAKER_02That meant it was generally sort of kind of what we were looking for. It wasn't, yes, let's go build this. It was just, that's sort of kind of what we're looking for. It's worth having some further discussion about basically what that meant. By code, then, we were required to advertise to accept competing proposals because we want competition, right? I mean, we want competition. That drives the price down. So we were required to advertise for at least 30 days up to 120. We did the max. So we advertised for 120 days for competing proposals.
SPEAKER_02We don't have control over who puts in and who doesn't. We got one other competing proposal, and it was from Clancy Fays and David Nice, which is another local builder. The working group did the exact same thing with that proposal. Was it generally kind of what we were looking for? Made a recommendation to the board to accept that one as well, because it was. So we had two proposals, and the board did decide to accept both of those proposals. Then an outside consultant to help us because we need somebody else.
SPEAKER_02You know, the county has a lot of experienced folks with a lot of different expertise, but we really need a construction management type company to come in and help us go through these two proposals. That's what we did. We brought both groups in. I remember we had like 140 questions that we asked each of those groups. Each group came in, sat down in the class conference room at Building D, and we asked them questions. They explained things to us, you know, to our satisfaction, went back to the board with the recommendation, and the board had the choice to make.
SPEAKER_02We could accept both and move forward with both. We could accept one and move forward with one, or we could not accept any of them. Just scratch the whole thing. That's what we could have done. The board, the working group's recommendation to the board was to move forward with the Henderson-Gilbane proposal, which the board did. That got us in the early 2024, which is when the board authorized Mr. Stevens to enter into that first interim agreement, take us through the programming phase, and up to 35% schematic design.
SPEAKER_02That's what the board approved back in January of 2024. Again, all this was in meetings, other meetings. One of the things I heard a lot from folks, not a lot, but some things I heard from folks, we didn't know anything about this. Did this in the dark. He didn't let us know about it. We did our best. You know, could we have done? Sure. I guess you can always do better. In 2024, when you got your real estate tax bill, there was a flyer in there about the new government center. Meeting dates. We had public input sessions where the public could come in and comment.
SPEAKER_02We had multiple ones of those. So we made those efforts and tried to do that. So they did that in January 24th. We went through that programming phase, which if you think of a space needs study, it was very specific to this potential building. Because some of the other comments I heard was the space needs study showed you needed 235,000 square feet where you're building a building that's smaller than that. So you're going to be outgrowing it as soon as you move in. Well, that's because that space needs study was based on departments
that weren't going into this building and was based on the idea of all these buildings would remain
SPEAKER_02separate. By consolidating, we get a lot of efficiency of space. We share a lot of conference rooms. We share a cafeteria area, break areas. So we were able to get that programming phase down to just under 180,000 square feet with the departments that we decided we're going to go into the same facility. again, efficiency. You know, remember when they did the programming phase with all the departments, there were 38 conference rooms. Combining everybody into one building, it's down to like 20 conference rooms because they share.
SPEAKER_02You know, the conference room in building D that we use, you know, it's used probably 30 to 40 percent of the day. In this building, these conference rooms will be used 90 percent of the day. So you get a lot of efficiency by combining those folks into one building. So that's where we were, went through the schematic design phase, went through the programming phase. This will combine all the locations that are currently on Mounts Bay Road, all the offices that are on Mounts Bay Road,
SPEAKER_02the ones that are on Palmer Lane, off of Ironbound Road, and also the social services building off of Old Town Road, and also the fire administration, which is off of John Tyler Highway.
SPEAKER_03So that's all who would be in this facility. I'm going to go through some of this quick because you all want to get to some more
SPEAKER_02discussion or questions. I think pretty obvious some of the advantages of having everybody together under one roof, but you could read through some of those. Cost. So cost was a big issue. And again, some of the things that I heard, the initial proposal that Henderson Fieldbane provided, Yeah, with no input from the county, gave us a cost range between $98 and $120 million. That was their initial proposal. But again, no input from the county, didn't have all the units that we ended up putting into the space.
SPEAKER_02But that was the initial proposal. I've heard some things on social media. This building project went from cost of $70 million up to where it is today. That was never, it was never something. That range was 98 to 120. And again, that was with no input from us. And just not accurate information. So currently the cost right now is at $179 million. The CIP amount that you'll see in the capital improvement budget is for the 189.5.
SPEAKER_02But that includes all the fixtures, the furnishings, the equipment, all the door access control, security cameras, all the other things that you have to put into a facility when you build a facility. That's what's there. Early on in the programming, we talked about the potential of putting school administration as a wing to this government center. School administration currently is housed on the old side of James Blair Middle School. So James Blair, they needed middle school, an updated middle school. They tore down half of it,
built the current James Blair Middle School that you see.
SPEAKER_02The old side that you see there, that's where school administration is. The intent from the school division was once population increased more with students, that they had to add more middle school space. They would eventually knock down that and build more in middle school. School projections have changed. That number is relatively flat, going up small in small amounts. So the schools stopped asking for that in their camera improvement budget. They weren't asking for a new space for their school registration. And I think the sense from the board was,
SPEAKER_02well, if they're not asking us for space, we're not going to build the space. So then that conversation ensued with the library. The library had been asking for another branch library. They'd been asking for probably 15 years for another library. The board had considered at previous retreats and had talked about the potential, putting it somewhere like Newtown or somewhere else. But the library was asking for a standalone, 50,000 square foot new branch library. That's what the library was asking for.
We started considering it at this location as an addition to the government center. We knew we'd gain those same efficiencies we were gaining with all the other
SPEAKER_02departments with a library as well. Mr. Stevens and I went to the library board and kind of talked to them about it just to see how they felt. They were generally supportive of the concept. Went to the board, talked to the board about it. The board was generally supportive of that concept. They then signed, it's actually a change order to the second interim agreement to do the library design up to 35% of the programming, just like we did with the government staff, which we did. The library currently, as we sit today, is still in the design phase.
It's currently sitting right at $25,000 square feet, and it costs about $22.9 million.
SPEAKER_02That's where it's at today. Again, we're not finished with design. The design of the library is not nearly as far along as it is at the government center. But we're hoping to get there. That's it. That's going to be integrated with what building? Correct. And I haven't been sure. Okay. This is what was approved last year. So a new budget is getting ready to come out. I'm sure you all are aware you've probably seen that. It kind of puts a new budget out every year. The five-year capital improvement plan.
SPEAKER_02Those are the numbers that were in there from FY26 up through FY30. You see the consolidated government center. You see the library on there. The library, again, was a little over $49 million. That is not what the cost of libraries were. We talked a lot about debt service. This was a topic of conversation at board meetings. We talked about this at public presentations. The county always carries a certain amount of debt, just like you and your home and your mortgage or a car payment. The county carries debt,
SPEAKER_02whether it's building a new police station, a new fire station, new schools. The county carries debt. fortunate, and we're having some of the debt coming off in these next few years, and the intent is to add a lot of that debt back in. It's not just the government center. That previous slide that showed the capital premium budget, there's other stuff on there other than just the government center and the library. This shows the debt payments, what that would be. A lot of comments about the impact on the general fund. This has a relatively small impact on the general fund. You'll see in this column right here where it shows the actual
impact on the general fund.
SPEAKER_02We anticipated borrowing money this current fiscal year, getting money to build a government center this current fiscal year. We're probably not going to do that if we borrowed enough last year to get us through. So that's actually saving us quite a bit of money, those two numbers you see in parentheses, because we're not going to have to borrow as soon as we thought we were going to have to borrow. That just kind of shows you the impact on the general fund. So where we are today, the board has approved a third interim agreement, which was an early site work package to begin site work on the project.
SPEAKER_02If you drive by the site, you see it. The trees have been cleared. They're currently down to grade for the underground parking. So that's as deep as they're going in that portion. You'll see the stormwater retention pond is there, and they're out there working actively. The last Three weeks, probably not as actively, just because of the weather, the freezing temperatures and the snow have caused some delays there. Library has now approved up to 100% design. We're starting to get into those discussions in the next couple of weeks.
SPEAKER_02We want to catch the library up, right? We're going to build both at the same time. You want to build them both at the same time. We've got to get the design of the library up to where the government center is. The board also approved in December the first phase of the comprehensive agreement. That was up to $46 million. That was for a lot of the work, a lot of the pre-roughing stuff, a lot of the stormwater stuff, steel, ordering the steel for the project. That's all what was included, that first part of that comprehensive agreement. So that's sort of where we are today with it.
Like I said, if you go by the site, it's currently active, working pretty much daily.
SPEAKER_02This is a basic overview of the site plan for the government center. So this government center, this EOC and board space, video space, this is the library location. The site plan, so the library's size is a little smaller now that's shown on this. Yep, that site plan has that on. I'm going to show you a couple of renderings. You've probably seen them if you haven't. This will be the first time seeing them. This is the main entrance to the government center for phones.
SPEAKER_02This is the lobby of the government center. To the right over here is the boardroom and the EOC space is above that. Uh, currently EOC, and I'm sorry, I use acronyms sometimes. Don't realize it. Emergency operations center. Okay. It's what we staff when we have an incident, whether it be that major snowstorm, hurricane, tornado, whatever the case may be, Surrey drills, Surrey exercise, do a lot of training at our emergency operations center. It's currently up in Toronto, uh, next to the old dispatch center up there. Uh, And it's a challenge. It's a challenge to get everybody together there because they
come from all different places. And it's just, it's a challenge to have everybody there also in that one building. In the building where you normally operate, it's going to be a huge advantage for folks as well.
SPEAKER_02This is the backside. So I'll be looking at Depew. If you're on Depew, kind of looking back towards the government center. This is an overhead view as if you were kind of over the rec center looking down. This was the original library design. The library design has changed. Again, it's shrunk down a little bit. They had a lot more two-story open space than the original design. Shrunk that down a little bit for cost. Same exaggeration. The outside's changed slightly, but it's still a similar
SPEAKER_02I've done this exact same presentation. I usually take a lot longer. My contact information is there. I encourage people to come and call, come and see me. I'd love to sit down. I'd love the opportunity to do this and have these conversations. I had two people last week come in, two different times, come in and just sit down and talk about the government center. You may not think it's needed. You may not like it. You may think it's a costume. I understand that. I'm not going to dispute anybody's opinions and how they look at it.
SPEAKER_02I just want to give you the information that I can give you. You make that decision on your own. So that's my contact information. I'd love to hear people, love to have that information. Another thing I always include on these slides, again, one of the things that we were told is we weren't at, nobody knew about it. And this is the amount of times articles appeared in the Gazette and Daily Press, the Government Center. These aren't updated. These were done back in the fall, so there's more than that now. There are watches even on there, and I know he's got a lot more.
These are actual board meetings, or information that we put out, news flashes that we put out.
SPEAKER_02These are the board meetings where it was actually talked about. Again, I know people in the county who lives here for over 30 years, and a lot of times we don't really pay attention unless it really directly impacts us, right? We've tried to get it out there. We've tried to make sure people knew about this, but a lot of people didn't. I'm not placing blame on anybody, but sometimes we just don't pay much attention. As a resident, sometimes you don't pay much attention until it's going to impact you. I totally understand that.
SPEAKER_02There's no fault with that. To hear the accusations that we did this in the dark and it was secretive and we weren't telling anybody about it, that's just simply not accurate.
SPEAKER_03We did a lot of it. So that was all I had from a slide. Thank you.
SPEAKER_02I finally remember what I wanted to tell you folks at the beginning, which is because we want this to be more of a conversation. If you'll find it's not a public hearing, but. if you have a question,
SPEAKER_03just raise your hand and then just give me your name and, you know, where in the County you live or if you live outside the County, whatever. Um, I will, um, I want to start off with one question for you. Uh, and it's relating to what you just talked about, because even though I say pretty self-worth,
SPEAKER_02I checked out for a couple of years. I mean, I, I wasn't, I was reading the news video, but I, you brought me up to date two years ago. I will say as a journalist, um, Any institution is, you know, they want to tell the story their way, the way they believe it. But I have covered a lot of organizations. And I will tell you, frankly, the James City County folks are the most transparent organization in this
SPEAKER_03community. They're school boards compared to the city of Williamsburg.
SPEAKER_02They've always answered my calls. They've always given me the information. There's one thing, though, Brad, maybe during that check down period that
SPEAKER_03I thought we could kick off with. I'm still not clear. Is it still a proposed government center after all the money?
SPEAKER_02Or have it, I mean, did the supervisors approve it and then they just have to approve other stages? Or bring us up to date on that? Because of the process, the PPA process, the way we did it. PPA. PPA. In public, private, as a chief law. state code that allows private entities to submit these proposals and you work in partnership with that private entity the whole time. Okay. Typically you do design bill or design bid bill. So design build is you hire an architectural firm to design
what you want,
SPEAKER_02then you put it out and We work with the same group right from the start. Same architects working with the builders. So it gives you, it's intended to be faster. It's intended to produce a better product. I don't know if those things are true. It's the first companies I've ever attempted to build. But that's the intent. That's really what the process is all about. Is it still a proposed government? Yeah. To answer that question, because of the way we went,
so we had several points for the board to make a decision whether they wanted to
SPEAKER_02move forward with it or not. There were several voting times where they could say yay or nay. They still have the opportunity technically to say yay or nay. They're committed to probably around $68, $69 million right now. That's what they're committed to through this first phase of the comprehensive agreement. The next phase of the comprehensive agreement will probably be for the remainder of the construction. So I still sort of say proposed because the board technically hasn't approved the funding for the entire project.
SPEAKER_02You know, it would be a lot of money wasted. It would be a lot of money wasted because you threw it out of the grain. So, you know, take that for how you want to take it. But that opportunity still exists. And, you know, we've had something that, you know, the elections. Elections in November. I think if they had gone a certain way, it might have stopped. And we wouldn't put out a good amount of money that we'd already put in behind the stuff. So, you know, anything can happen. Certainly, you know. the economy could tank, you know, other COVID, whatever. Things could happen that could still derail the project and
make it pause or stop.
SPEAKER_02And you don't,
SPEAKER_03I want to mess up the technical part, so please correct me,
SPEAKER_02but there's a final stage here before you know, I think you said it was going to be by April, you might know what the actual drop that, here's the amount that things are going to cost you, what you call it, there's a term. So the guaranteed maximum price. So again, depending on what process you go through, right? Depending on what process you utilize to do this construction, the guaranteed maximum price will come at a different time depending on what process you go through. Because they couldn't give us a guaranteed maximum price until
we were 100% done
SPEAKER_02with the construction documents, which I understand that, right? If you're a builder and you're going to build some building, you want to know exactly what you're going to build before you tell me how much it's going to cost. Understood that. But for the board and for the citizens to accept, okay, well, then how much is it going to cost? You can't expect us to approve something. We don't know how much it's going to cost, right? I wouldn't go to the board with that. So we put language in all the resolutions that have been passed.
SPEAKER_02to design it not to exceed that $179 mark. So that's what we put in every resolution that the board has approved. So when that GMP comes in, that GMP will be under, at or under that $179. It will not be more. Question on that, Craig. So let's say something happens and we go into where we have issues with supply chains and prices go up like we all experienced during COVID. And you have a ceiling of $179 million. We achieved that $179 million, but we're still $10 million away from completion.
SPEAKER_02Did we stop construction? No, and that's a great question. In the agreement, there's contingencies, a lot of different contingencies. When we design contingency to construction contingency, we even have an owner contingency in there. We have an escalation amount that's in there. So we built a lot of that into the agreement. So even if supply chain issues are there, even if tariffs impact things, we still believe that's covered. That doesn't cover another COVID, right?
SPEAKER_02Another major serious issue. But for what we're seeing and what we see in the future, we have that covered. Even so, again, we're still only designed to $179 million. So say, for instance, a new tariff came in on copper and it quadrupled the price, we would design the building differently. We would cut some sections off the building if we had to because we could do that. I'm not saying that's what the board would do. That's what we could do.
That GMP, that guaranteed maximum price, will come to us sometime April, May timeframe. Those 100% construction documents are supposed to be completed in the next couple of weeks.
SPEAKER_02And it comes back to the county and our construction management company, and we go through those. At 50%, it was 377 pages. So it'll be at least that if not. We'll spend some time going through those, looking at everything. We did hire a construction management company. That was one of the things I need to touch off to help us manage this project. I am not a construction manager. That is not my background. I was very involved when we built the law enforcement center. That's kind of how I got this project.
But when you get down to details like rigid inclusions and foundational stuff,
SPEAKER_02I can't help with that. That's where we brought that construction management company on to help us. And I met with them. I told them on our first meeting, I expect you to save us what we're paying. Their first round, they saved us $600,000. But they're doing a lot of work to try to save us. That's good. Do you mind me again?
SPEAKER_03What does it mean? Construction management, project management to oversee the project. Yeah. Well, no. How much did it be? 1.7. That's for the government center and library. So.
SPEAKER_01The work processes looked at when this building was put together, for example, you know, I know you're saving conference rooms, et cetera, but there's been a lot that's changed with the county processes over the last 10 years. True. And in some cases, you may not have as many people in one location as you did. And I was just curious if any of that was looked at.
SPEAKER_02Absolutely. In the new building where departments are located, it's because of the working relationships they might have with each other.
SPEAKER_03Right.
SPEAKER_02You know, we absolutely did look at that. You know, one of the things I hear a lot from folks, nobody goes to the government center. Why are you in the building? I don't dispute the fact that fewer people come to the government center, but a lot of people still come to the government center. You know, we know that. We see it. We live it every day. You know, with the last update we got, for all the departments that will be in this building, there's about 200 people that visit every day between Social Services Commission, Treasury Development,
SPEAKER_02resources. A lot of people still do. May that change down the years, you know, as the younger generation grows. May that change? Sure, that may change. But we still need the employee workspace.
SPEAKER_01Well, yeah, but he may not be as large to employ workspace. That's my point.
SPEAKER_02Again, and I talked about this at some of the meetings. I wish I couldn't predict 20 years from now what the workforce is going to look like. I wish I could. I don't know. We did, you know, in trying to reduce the size of the building, we went to a kind of a different concept for government for us, open workstations. So if you're not a supervisor, you don't have an office, pretty much. So we are able to get a lot of space savings by that. And those open spaces are what we can expand or contract
depending on the amount of
SPEAKER_02workers that we have. Yes, sir?
SPEAKER_03You threw out a number of $68 million that's already been spent on this. But that's not $68 million of the $175 million or $179 million, however you want it.
SPEAKER_02Yes. So we're only spending another $110 million? Roughly. No, because what the CIP is is the $189.5. Okay. Yes. So $189 minus $68 is what you're saying. Well, that's not including the library, but the library is a separate project. Right. That is correct, yes. What's going to be the relationship between the Williamsburg Library and the new
SPEAKER_01James City County? What's happening with that?
SPEAKER_02So we have a Williamsburg Regional Library System. So our library system is a regional system. Williamsburg and James City County are the two primary partners. York County is a partner, but at a slightly reduced level. As I'm sure you've seen, Williamsburg is proposing to tear down this building that we're in and put it over where the police station currently is. That's Williamsburg's project. It's in the city of Williamsburg. Our library agreement says we're responsible for their own projects in our own localities.
SPEAKER_02So while it is a regional system, Williamsburg will be responsible for building this library, just like James City will be responsible financially for building the new library at the government center. That's for capital improvement. For operating costs, it's based on usage. So James City County is by far the lion's share user of the entire library system, somewhere between 70 and 75%. So that's what the county pays towards operating costs.
SPEAKER_03Does that answer your question? Yeah. So it will be, that annex,
SPEAKER_02it will be part of the police for a regional library system like Croker. Today there's two branches for the Williamsburg Regional Library. The one we're sitting in and the one off Kroger Road. Those are the two parts of the Williamsburg Regional Library. With us adding this third library, there'll be three parts.
SPEAKER_01So the York County piece is not part of it?
SPEAKER_02York County doesn't have any physical building as part of it. They are a part of the agreement, just not They're a reduced partner. They don't get all the same services as Williamsburg and Jameson County residents get because they don't pay the same portion into it as we do.
SPEAKER_03And the executive director of the library system explained to me, York County has its own library because, I mean, most of their residents live south of here.
SPEAKER_02And, you know, she said there was some funding issue. They get funding from the state,
SPEAKER_03and if they paid more into the regional library system, that funding, would be at risk for your county. But they are actually looking now at maybe building an annex to serve the folks up here.
SPEAKER_02Yeah, you may have seen it in the media, some of the reports your county is looking at, whether they want to stay in being a part of the regional library system. That's a decision for that board to make. Our branches certainly serve a lot of York County residents, but they are mostly the upper end of York County. The lower end is where their libraries are, and that's what mostly serves us. You mentioned that originally the school board was going to go in a new center,
SPEAKER_02the school board had put on their CIP like $14 million to,
SPEAKER_03I don't know, rehab their current facility, understand that it's scrapped, and that Mr. Stevens wants them to go out to Mounts Bay Drive. My question here is, if it costs so much money to fix Mounts Bay Drive for our county employees, how is it going to be the same expense to put the school board
people out there?
SPEAKER_02And I don't know if I'd say anything's been scrapped, right? The way the budget process works, the school board submits their budgets to the city and the county. That decision's not been made yet. What gets included in the capital improvement budget and what doesn't get included
SPEAKER_03in the capital improvement budget? I have a very credible source who makes it quite clear that it's been taken away. Well, I think the board votes on that. The board has not voted on that.
SPEAKER_02So... That's all I get at risk. So what happens to Mouse Bay Drive in any way? Sure. And that's a great question. And that was a topic at the retreat. Our board recently had a workshop, a retreat workshop. They talked about all the facilities that we'll be vacating moving into the new government center. Mouse Bay Complex, should you know, the county actually owns about 120 acres there on that site. The board will make that decision on what to do with that space.
SPEAKER_02Obviously, they have several options. They can sell the whole thing. They can sell part of it. They can just keep it. I mean, it's kind of up to them to make that decision. They haven't decided to finish it yet, what they're going to do with it. That's a decision.
SPEAKER_01Is that something they're asking for citizen input on?
SPEAKER_02I think you can always provide citizen input on anything. Absolutely.
SPEAKER_03I came away and it's got with the impression that they're thinking maybe they ought to hold on to it because
SPEAKER_02if it's a point they need to do middle school, I think Jim Eisenhower said, half of all the kids who are middle school age live south of Montel Avenue, so that area would exit. So that's the last I've heard. And that's the impression. That's the impression. There was no vote. Right. That decision will be made down the road. Once the government center will not have the building or vacated. Well, wasn't that decision already made? Because that was part of the calculus of whether it was more cost-effective to
SPEAKER_02build or to renovate. And part of the savings, or if you will, reduction in the building cost, was that we were going to reap $20 million from the sale of Mounts Bay. And that's what brought the two somewhat close. If we're saying that we don't want to sell Mounts Bay, and we've heard that actually for a long time, that we're not going to, that changes the calculus. So suddenly, renovate is a much better option than Ville. Certainly changes the calculus.
SPEAKER_02So that decision was made a while back, isn't it? No, that decision was not made a while That's a board decision. They have not made that decision. It wasn't $20 million. Well, what I'm saying is that it was part of the decision to go forward to Bill because they said, because we're going to get the $20 million, that saves us $20 million on the building. And now we're saying, well, we're not going to, then that tips it. It doesn't make sense. I think the $20 million referred to was the sale of all the properties,
SPEAKER_02not just the mountains of Baycon. and the Mountsbank complex property has value. Now, whether they sell it or maintain it, the county still maintains that value. And again, that's a decision that the board would make. It's the same group of folks making the decision that made the decision looking at the cost of their analysis. That's a decision they would make. Would they gain, I don't know what the fair market value of that property would be by itself, but I don't know what that would be. What they estimated in that was included with the other
buildings that we're looking at selling. That's, I think, what I'm not sure, but I think that's where you get that.
SPEAKER_02I did out of your slides, yeah. That's all the current facilities that would be vacant. That includes the Human Services Building, Homer Lane Buildings as well. It seems like there's kind of a bait switch on that. Mr. Maines, you and I have had this conversation before, had this exact same conversation. You know that it's a board decision to make. They'll make that decision at some point. People certainly welcome to give the board their input on what they think they should do with that property.
SPEAKER_02I know some members of the board feel like, like Mr. Solomon said, it's hard to come across a good-sized chunk in a primary service area that could support a middle school or a high school or an elementary school. To sell it now, while you may reap some benefit back, to have to buy that type of space 25 or 30 years down the road, might end up paying a whole lot more for it. But again, that's a decision the board will make. Certainly provide that input to the board if everybody wants to do that.
SPEAKER_03But again, you and I have had this conversation. I can give a compliment. I was very pleased to see Davenport had done. decided, or recommended, and the board decided to defer borrowing until the next fiscal year and then borrow the whole amount. And it was a bank that hit the interest on that money, which would significantly reduce.
SPEAKER_03Well, that's what they said. That's what the board said.
SPEAKER_02Yeah, and I'm an accountant. Yes, borrowing all the money at once. That's not really the intent, right? But not having to borrow it until you have to borrow it, right? Because we cannot borrow it, sit it in the bank, and collect all those interests and not have to pay arbitrage. I'm not an accountant. That's what our FMS director tells us. It can't sit there so long. The idea was to have the money come in
SPEAKER_02Maybe you're earning interest as you draw it down to build everything. For a certain time, you can. Our FMS directory has to be able to answer this much better than I can. But at some point, you get penalized for that. I'm important to point that out in this profound presentation to the floor. And typically, you borrow it and you spend it within, I want to say it's either 24 or 36 months. You have to spend it there. And typically, that happens. big project that takes 36 months to complete,
you run that risk if you borrow it all at once.
SPEAKER_03Again, I'm Harry from the news. Traffic, has a traffic study been done out on Long Hill, Depew, in front of us there?
SPEAKER_02Sure, absolutely. So we've done multiple traffic studies. the initiation of the project when the school administration was to propose their occupant on there. We did a traffic study. The engineers come back and D-Dot and they all make recommendations on road improvements to keep All the intersections that accept grades, VDOT grade intersections, they give them a letter today. It's like when you're in school, right? To maintain acceptable levels, we're going to have to put in some turn lanes off of Long Hill
onto Ashbury,
SPEAKER_02the turn lane out of Ashbury onto DePue. That was the recommendation. That's what we anticipated Habit to do. School admin went out and the library came in, the numbers changed. So we did another traffic study using the library numbers, and that changed what was going to be required. That required more off-site roads. Hence what you see today, the roundabouts that are being proposed at Maumhill and Depew and Ashbury and Depew. Those are really because of the addition of the library,
SPEAKER_02that's Cosmos have to make those changes. Yes, absolutely. I've done traffic studies in terms of the recommendations from Maddox. Is it still going to be a single lane at Long Hill and Pew or a single lane circle and a double lane circle at Ashbury? It's a single lane at Ashbury. It's a double lane at Long Hill. Oh, yeah. I thought it was, yeah. One of the things, and Mr. Everson's on the Planning Commission, one of the things that we got out of discussions with the Planning Commission, and it was very beneficial for us, We originally were looking at, okay, we're going to do what we need to do for our facility and not
worry about what may
SPEAKER_02come next, which I'm sure a lot of you know there's potential for development on the Eastern State property. We were just building what we needed for our development. Discussions with the Planning Commission, that was very good information. We went back to our engineer and said, hey, let's design it so if there is development that comes along on the Eastern State site, we don't have to tear up what we just did. can be added on to. So they re-engineered the roundabouts that we're doing so if development does come
SPEAKER_02and the board has not side. Those roundabouts will just have to be that pew section related to a four-lane road all the way through. That will be a two-lane roundabout then instead of a one. But it can just be added on to what we're doing. Gotcha. So basically, we're moving our roundabouts so there's enough room to add that additional lane on the outside. So that wouldn't be part of the, since that state, that's not part of the CDA if in fact the CDA was passed If the CDA gets passed and that work gets approved,
SPEAKER_02I would assume the off-site road improvements would be part of that. The developer would pay for that, not VDOT.
SPEAKER_03It's like we're paying for the off-site road improvement. VDOT's not. Okay. I appreciate your comments about Long Hill Road. Let's talk about the other end. It feels like the neighborhood may be one of the two neighborhoods most impacted by the facility
SPEAKER_02to skip with. First of all, thank you to the county. We're the city, so thanks for letting us come to your county meeting, which is being held to the city, so welcome to the city. When you talk about traffic studies or even engagement with a community like Skipwith, I'm just wondering when that's going to happen. Sure. And we've had multiple public input meetings on this topic. Oh, with Skipwith? Well, not specifically with Skipwith. Oh, okay. But we had them and invited the public, and we had more people from Skipwith than we had from Jake City
County at those
SPEAKER_02meetings. So we have talked to a lot of folks in your community. Good, bad, or indifferent, we have little to no people really no control over the roads in the city of Williamsburg. We have little control over the roads in James City County because, you know, VDOT maintains the roads in the county. The city maintains the roads in the city. One of the things we heard from residents of Skipwith and along that, of course, was the speed limit. And we had that discussion with VDOT.
SPEAKER_02They have pledged to us when the construction is done, they will re-examine that section and see if the lower speed limit is right or not. As far as any traffic calming measures, such as speed bumps or anything else that folks want, once it gets into the city, that is entirely up to the city of Williamsburg to decide on that. We certainly notified the city, notified some surrounding neighborhoods of what we were doing, and we have gotten a lot of input from folks in Skipwood.
SPEAKER_03just a general comment. It feels like you guys are washing your hands a little bit of that part of Long Hill down in the street from the proposed center, uh, where everything's been cut and all those sidewalks have been closed. Um, It feels a little disingenuous, if I'm being honest.
SPEAKER_02And while I understand the code and, you know, you're building right up on the line, it seems to me that it doesn't really show an integrated sense of how the community as a whole is going to be developing. I think it's a missed opportunity to talk about kind of collaboration across the city and the county. And we do have those conversations. The city did provide input to us on the project. So we do have those discussions, but any actual improvements that would have to be made or want
to be made,
SPEAKER_02that would have to be the city that would incur that call.
SPEAKER_03What did the city say?
SPEAKER_02I don't remember exactly what the comments were.
SPEAKER_03Wow. I mean, were they expressing concerns? Some concern. Yeah, they had some concern. I know the speed limit is certainly 45 right there, and it goes to, I think, 25.
SPEAKER_02That's great point. 35 to 45. I think really a volume question, to be honest with you. I mean, we are already seeing probably 40% of the vehicles going from Richmond Road over
SPEAKER_03Long Hill through the neighborhood. Um... You know, probably 40% of the cars that come through the neighborhood are already cutting
SPEAKER_02across. So we're really talking about the volume on what is now a two-lane road coming through the neighborhood. And so I just didn't know if you guys had, like, discussed a strategy with the city. It sounds like the answer is no. We've had discussions, you know, the traffic engineers who do these traffic studies. You know, people think of the government center creating all this huge traffic issue. There's not that many vehicles. Like I said, 200 people throughout the day would come and go from the health center. The employees that come typically stay there most of the day.
SPEAKER_02It doesn't generate that much more traffic trips. That's how they calculate the numbers or the letters that they assign. And the library is very different, right? The library controls... vehicle traffic by programming. And that was one of the conversations we had with the library folks is that you can't be doing kids' reading time Monday through Friday between 8 and 5, right? You can't be bringing in speakers during those times. They control that through their programming. So while on the weekends when there's nobody at the government center,
SPEAKER_02that's when they have the larger programs or after hours, which again will certainly add traffic, but you don't have the government center traffic included in that. And they looked at all that when they did the traffic saying, I am not a traffic engineer,
SPEAKER_03but those are the recommendations that came from that. Yeah. Sorry, go ahead. I was just, I'm going. No, I was just going to say, I wasn't about it. I was going to say, I'll look forward. We had that test sasket.
SPEAKER_02Just a question about how the contingencies work. I think you mentioned a variety of contingencies, but in the guaranteed maximum price, let's say it comes in at $179. Does the contractor have contingencies built in in case he runs to say bad soil
SPEAKER_03conditions,
SPEAKER_02or is that coming out of the extract? So those contingencies are incorporated into that. So what we have today, we have a design contingency, which we've gone back and changed things. And we have gone back and changed things. Other things have come up where we had to change the design a little bit. So we used some of that design contingency. Instruction contingency, we've used some of that. We found some unsuitable soil on the site, so we've used some of that. But there's plenty of money in those contingencies that we feel
were covered.
SPEAKER_02And then again, that owner contingency that we have for things that we might want to add as we go through the process. So you are saying a contract with contingency? It would include the contingency. And they did an escalation amount too, which we're seeing this in other projects where they don't include any sort of escalation amount. So every year it gets delayed, price is going up, price is going up. Well, that's because you didn't include any sort of escalation when you gave us the original cost.
SPEAKER_02Credit to everyone on this project, we included escalation right from the start. Uh, so even though things have gone up, you know, prices have gone up, the cost of the young attorney hasn't, has come to get up to have that escalation. I just want you to follow up. Uh, who are the architects that are involved in this project? So Guernsey Tingle is the local architect. Uh, they're really doing the exterior of the building. Clark Nexon, that's the other architect.
SPEAKER_03They're not really doing the interior.
SPEAKER_01I was just going to ask. I attended a lot of the Board of Supervisors meetings last year. And with all due respect, it seemed like there were a lot of people saying they did not want the government center. But I never heard anybody say they want it other than the Board of Supervisors. How did that balance out?
SPEAKER_02Yeah, that's a really good question. And I'm going to give you my take on it.
SPEAKER_03So I was the police chief. Told you that.
SPEAKER_02And back when we were making the switch to wearing body-worn cameras, one of the police officers who was sort of one of the leaders came up to my office and said, Chief, I think you just need to pull the officers, see if they want body-worn cameras or not. Make your decision based on whether they vote yes or no. I'm not going to do that. Do what I think is best with the police department. We're going to body-worn cameras. And we did. Today, I think 95% of the officers are glad that we did. the government center,
and I'm going to use the library as a good example. So we did input meetings on the government center for folks to come in and provide input.
SPEAKER_02I think we had Maybe 30 people attend those meetings the first time in 2024. We had some more in 2025, some town halls where we had more folks. The library had input meetings, and they had over 100 people come out to their meetings. And 90% of them, very supportive, love the library, love going to the library, enjoy it. There is nobody that loves going to the government center, right? It's just a fact, right? I mean, people don't love going to the government center.
SPEAKER_02They love going to the library. So, you know, the folks that did come out and speak against it, they should. I'm glad they do. The board does a lot of behind-the-scenes discussion with residents, right? I mean, I know when Mr. Eistow was running for election, he visited, told me I don't remember how many of this. And the vast majority of folks that he said he spoke to weren't opposed to the government center. Folks that were opposed to it were opposed to it, and they wanted to come out and speak about it. Just don't know how many you're going to find out there are going to say, absolutely,
SPEAKER_02we need to do this. It's the best thing. I love going to it. This will be great to go. It's just not really there. It's just a different type of animal than something like a library. The board makes their decision, and they vote the way they feel they should vote. Hope that's based on what they think the majority of folks in their district believed. But you're right. Most of the people that came out and spoke were not supportive of it.
SPEAKER_03That's how that went.
SPEAKER_01I know, I think hearing all about how the Mounts Bay area has fallen down and, you know, it's an old building. I worked 30 years in a school that was 60 years old, and they did eventually come in and put new windows in and all, but it wasn't falling down. It's like, this is Williamsburg. These buildings have been around for a long time.
SPEAKER_02And it's funny you say that, because that was one of the things I gleaned from the annual report that I read in 1974. They intentionally built those homes on a residential structure scale. Oh, not the homes. The buildings in the government center. Because that's how they wanted it to look. Schools are built a lot differently. Yeah. And those buildings were built back in the 70s. They weren't built to last 50 years. Schools typically are built to last a lot longer. And the new government said it wasn't built to last a lot longer.
SPEAKER_01That's a good deal.
SPEAKER_02Those buildings at Mouth Bay, we've already torn one of them down. Those who remember building C, you had to come down and walk crooked as you walked through it. They tore down. Just structurally, it was falling apart. Those buildings just weren't built. Be those 50-year types of buildings like schools are.
SPEAKER_01as this new one is.
SPEAKER_02That's correct. I just want to add something to all of this. My wife and I travel a lot. We did not see, and we're as guilty as anybody about not seeing all of the information that was put out in newspapers and following up on it with board meetings and so forth like that. First time I saw you was after everything was pretty much the slide at the, I forget where it was, but nonetheless. And You came then to the muse and spoke to us along with your patriots and talked to us
SPEAKER_02just like you're talking to this group. So those of us that didn't see this, I only have myself to blame. And John McLennan, he wrote a very nice article in, I think, the Gazette about all what you had up here, all the opportunities we had to see this. I'm guilty in not seeing it. But I wanted to thank you for, one, presenting it so carefully at our, in the news, we only have 109 homes. And so really appreciate it. And I want to comment one more thing. You said that the supervisors will reach out, talk to you.
SPEAKER_02You and I spoke earlier this evening. You know this too. All five of the supervisors came to my house on three different locations, on three different timeframes. Jim first, and then two, and then two, to talk about Cardinal Rich, because I am the spear point on, you know, working against the Cardinal Ridge, but they came and talked to me and my wife and several other people from the Mewes. And I could not say enough good about the information that they passed on to us and listened to us. Whether Cardinal Ridge goes through or not, I'm not here to discuss that.
SPEAKER_02The fact of it is, they were there. And I got to give the Board of Supervisors credit for that. And, you know, so how it goes, I don't know. But right now, you know, the battle is waged. Sure. And Thank you for saying that. I think that is very true. Our foreign supervisor absolutely wants to talk to residents. We want community involvement. I always say that's what makes James City County such a great place. Because all of us, all of us in this room came here from somewhere else,
right?
SPEAKER_02But we want to keep it beautiful. We want to keep the community like it is. I'm not saying you stop all growth, because we really can't do that. But you want to keep it, keep the high-quality service, keep the things that we have that made you love it here. We want to keep that. And you stay involved. That's really what makes James City County a great community. Yeah. I love it here. The board loves it here. I mean, all of our board members, they do this job for the right reasons. They just want citizen feedback.
SPEAKER_03And I appreciate you saying that. Brett, when would the center open? So right now, the schedule has an opening in summer of 2020. It seems like VAP's summer. A little over two years, I think. Are a lot of the materials that are going into the building sourced locally or, you know, as close as possible from these contractors, you know,
SPEAKER_02or labor? So a lot of the labor certainly is. The materials, you know, I don't know how much of those types of materials are produced locally. So I don't get much of it at all. They do their own bidding process. We actually see their bids when they come in. We actually can give a yay or a nay if something's out of whack. But I can't say for sure. A lot of the workforce I know is local. Anderson certainly is local.
The other companies that are on the project, most of their folks start bidding.
SPEAKER_02And honestly, that was one of the big things for our working group. When we were looking at the two proposals, remember there was the Henderson-Gilbane and the Clancy-Phase-David Nice one. That was one of the things we really liked about the Henderson-Gilbane proposal. A lot more local involvement. The other one, while David Nice, who was a local builder, was a leader in that, they were only doing the site work. They weren't doing anything beyond that. That was one of the things we really liked about this, is the local Henderson Cooperative. Be involved from start to finish.
SPEAKER_02I knew they were building a law enforcement center, and David Nice's company built the law enforcement center. They take great pride in that building. They're local. That's what they want to see. They want a building that they'll be proud of and that residents will be proud of, and I knew we'd get that from a local like Henderson. So far, I haven't been missing. Well, no, I just want one more thing on infrastructure. I didn't realize you said an underground garage. Somewhere along the line, I missed that whole thing. But the drawing,
artist rendering up there showed a massive amount of asphalt.
SPEAKER_03And, you know, asphalt is... The runoff. Well, it's... Let me find.
SPEAKER_02So just while you're looking for that, you know, think about what the maximum number of parking spaces is going to be both above and below ground. Yeah, so it's 551 bases that are currently on the site. The underground parking and, you know, I've talked to folks about the underground parking deck.
SPEAKER_03You know, that actually came with an idea that Chris Henderson brought to us about the
SPEAKER_02underground parking. The site is the site, right? It's only so big. able to get as many parking spaces as we wanted, we were going to have to either do a vertical parking garage or an underground parking deck. Those were our options. The underground parking deck is a little bit more, although is more expensive than the above-ground car deck garage, but it also gives us really nice outdoor space that I know employees and the public will be able to utilize, which I think is going to be a very nice benefit.
SPEAKER_02And one of the things that While we did public input meetings, we also did employee input meetings, multiple employee input meetings. I was sort of surprised. Well, not sort of. I was surprised. that the number one concern I heard from our employees was safety and security.
SPEAKER_03Absolutely.
SPEAKER_02You know, as a police officer and police chief, I don't know. I don't think of it the same way, I guess. So when we held all those, we had a lot of employees come in and give input. That was the number one comment. This certainly provides a little more safety and security, because this will be only. I was just going to ask the whole thing.
SPEAKER_03So it helps with that as well.
SPEAKER_02You're kind of parking spill over into the rec center area. So, you know, we talked with the rec center folks about that. I truly don't believe there'll be a time other than, well, I don't think there'll be a time. I can't remember a time when we would have that many people at the government center. The gun thing. But that was after five. Right. But you're right. Right. So all the employees are gone. So there's a lot more space. Yeah. I don't really know the time. I think the government center parking lot would probably serve
more as an overflow for the rec center on weekends when they have big tournaments going on or things
SPEAKER_02like that at the rec center. Right. Because there won't be anybody other than the library folks at the government center parking lot. We don't anticipate it being a parking issue for the government center having to use. That might actually work. They bring them voting. The registrar's office, that's all stained. Yeah, the registrar's office is stained where they're at. We bought that building a few years ago and renovated it. So they're good to have it.
SPEAKER_03That's a beautiful building. They're a great spot on your room.
SPEAKER_01I'm just laughing. Can you say more about employee only? How are we supposed to enjoy the government center if we can't hang out there?
SPEAKER_02We just can't go down to the podium parking. That's all.
SPEAKER_01Oh, okay.
SPEAKER_02Let me show you. How many employees are there? So this, obviously, you can't see. This is the underground coordinates over here. This is what we believe will be mostly the public parking. So this is where the public will park. So that's where folks will come in. There's a straight shot here out to the podium, outdoor space, which we do anticipate. There's community conference rooms, public
SPEAKER_02like that. So you'll still, trust me, you'll be able to enjoy the space. This is probably more for the employee parking. Probably, again, we're not going to restrict, but just in general, folks that come to the government center, this is where you come in. You're going to park here. And the library parking would be? The library parking would be a combination of those two. Where's the entrance to the library? The main entrance to the library is right here. There's a kind of a test to be able to exit to the government center. I don't think either of these pictures show that.
SPEAKER_02That's fine.
SPEAKER_01What's the boy population that'll be in there?
SPEAKER_03Sure. So the building, again, which I think is a great thing. We're building this building to last for decades.
SPEAKER_02I think historically, that's not how government often builds things. You build for what you need. We did that. Building F over the county complex, when we built that, they moved into that, it was full. It's since cut conference rooms, state offices, I don't know much of what they've done. Law enforcement center, we built for growth. That was a great thing. This building's being built for growth. So it can accommodate up to, it's 480 employees. That's 320 workstation spaces, 160 offices.
SPEAKER_02day we move in, there'll be about 330, somewhere around there. Uh, so that's what it'll look like.
SPEAKER_01And how many parking spaces are underneath?
SPEAKER_02There's 170. So I know that that doesn't include everybody, but a lot of people don't like parked garages. I drive a big truck and they're hard. Well, as a citizen, I like it because I don't have to look at all those cars.
SPEAKER_01You know, so I think it's a good thing. But I understand people, some people don't like garages.
SPEAKER_03Regarding stormwater management, where is the outflow going to go?
SPEAKER_02So the outflow is where it currently is, the same place as it is now. Where does it empty to? So it empties over on the eastern state property. Into the chisel run eventually? Chisel run? No. Interstate? Chisel run. Now, where on eastern state, I think it ends up in... at the beginning of Powhatan Creek. Well, it did. Yeah, it was Powhatan Creek.
SPEAKER_03Right, at the very end of Chisel, into that little reservoir there and into the Powhatan, correct. I know about Chisel. Yeah. But years ago, under, into that stormwater apocalypse they currently have, but not the state.
SPEAKER_02And, you know, I want to get into eastern state property. No, no, I think that's where it's going to go. And, you know, our goal required to do it. We have to have less outflow coming off this property than is there today. So with the stormwater retention pond that we have, the underground stormwater stores that we're going to have, that's our charge, to have less stormwater flowing off that property than there is today.
SPEAKER_03Good. Where is it here? Oh, I'm sorry. It comes right about, well, I guess it's right here. That's the line right there. That would be it.
SPEAKER_02There's a lot of underground storage, stormwater storage on the site. That certainly contributed to a lot of the cost. There's a lot of underground storage for stormwater. No idea. That's interesting. It's not plastic. So those who know about the fire through room outlets, it's not plastic.
SPEAKER_03Is that under the structure or under the asphalt? It's under the park. None of it's under the structure. It's all over the park. Yes, sir. Y'all are talking with the team about any energy efficiency features. I see you've got the flat roofs and it doesn't look like you're trying to put your
SPEAKER_02solar panels on or anything. We are, actually. Yeah, we actually, Mr. Stevens, signed an agreement just about a month ago. The government center and this portion will have solar panels on the roof. County mode requires that we build all county government facilities to be either LEED certified or equivalent. We're in the LEED process with LEED certified building, certainly a lot of energy efficiency, certain solar panels,
SPEAKER_02but just the actual construction itself.
SPEAKER_01They won't be visible from the street, any solar panels?
SPEAKER_02No, they won't be visible from the street. Just the height of the building itself and the outside the building design. Is Dominion leasing that roof space? I know sometimes that's a thing or what's that? Yeah, so it's a power purchase agreement that we enter with Dominion. So they install them. No cost to us. We don't pay anything for it. They maintain them. It's not a cost to the county. Over the course of the 25-year agreement, it saves the county about
SPEAKER_02We had to add some extra steel in the structure to support them,
SPEAKER_03but still it'll save us over half. That was a good question. Okay, right now you have a tree barrier remaining both the wall, mostly on the pew, but at the corner. Of course, they're pints. They don't offer much of a barrier as far as site. Is there any opportunity to change that?
SPEAKER_02create more of a site assessment barrier. Yeah, so that is a concern of ours. The county has requirements. You need buffers off of these roadways. You can't touch, you know, other than putting in the driveway or work entrance. Can't do anything in those areas. Yes, that site is almost entirely pine. The county planted those trees. You know, if you've been here long enough, there was a water tower on that site. But before that, it was just an open field. There weren't any trees on it. The county planted those trees about 30 years ago, so they're all pines.
SPEAKER_02Yes, we do want to make it look better. During the construction process, we can't go in and disturb those areas. We'll have nice landscaping around the site. I do think it'll be a very attractive site. Yeah, those buffers, especially today, because they knock down, familiar with how pines grow, right? They grow to a point and then they start blocking off the sun toward the other pines or any other trees that grow. Nothing else will grow. That's all there was pine. floor of the forest itself is all pine needle.
SPEAKER_02There was no undergrowth, no shrubbery, no nothing. They block out all the sun. Clearing that lot, clearing those buffers now has thinned it out enough that I do think there'll be other trees and other growth that comes up. That just couldn't grow before. I'm a professional tree pruner. And a master gardener, and I take care of the Williamsburg Botanical Garden, all the pruning efforts out there. So I know the pines that you're up against. Also, the plus is the pines. But it just looks really ragged right now.
SPEAKER_02It's out there to do site visits and go out there for needing to stop it. A lot of those trees, it looked like they chopped half of them off. They didn't. There was just no branches on it. There was no growth on that side. We've opened it up now, so I think you'll see them come in better. But we do hope to be able to have. So we won't be able to see the building on the drive-by. No, I'm not saying that. That would be next to what Stuart Taylor was just saying. We can't see anything.
SPEAKER_02We can't see anything. And as you know, Mr. Anderson, a lot of the development in the county is exactly that way.
SPEAKER_03Can't see it. How often does James City County receive an unsolicited proposal for a $20 to $160 million bill there?
SPEAKER_02You know, I don't know the answer to that question. I don't ever remember them getting one. I really don't. And that law, relatively, it couldn't really do it. But I don't remember that happening. Not to say it didn't. I just, I wasn't involved in that process.
SPEAKER_03So I can't answer that. The architects live here. Roger Guernsey and Tom, right? Tingle? They would know about this. They probably got up with the Henderson operations and said, let's go for them.
SPEAKER_02Yeah, I mean, as a local business contractor, I mean, yeah, I guess that's probably exactly how it would happen. It's kind of a unique, I guess, thing to say, hey, let's Let's gin up a proposal, take it to the county. The county says, yeah, we'll do this, get it passed through in two years. Yeah, but that's pretty aggressive. Yeah, but remember, that's not really how it is. The way you say it, it's not really how it is. They submit that proposal. It's highly up to the county whether they accept it or not.
SPEAKER_02The county doesn't have to accept it. And it is not what I still have all those proposals in my office. It was very different. I think you could equate that to a salesman walking in and trying to make a sale. It's the same thing that they did. They just sent in this plan, and hopefully they make the sale. That's essentially whether you're selling shirts or clothes. You know, we complained that nobody knew anything about this,
SPEAKER_03but guys like him, you know, they monitor this stuff all the time. If you're a business, you know, there's a middle school, of course they're going to You know, see if they can get to work.
SPEAKER_02I'm trying to figure if I can get like a toll booth on Longfield. I may bring the county a proposal that's unsolicited for that. That's all BDOT. Yeah. It works.
SPEAKER_03Any other questions? I have... fact sheet here that we created to kind of help you answer some of the questions
SPEAKER_02you might have. I have some of my business cards right here. And then I have a card that we created that as a QR code, it takes you right to the government center site. So you go on there, all the board meetings where it's been talked about, there's links to those board meetings that are on there. All the studies we've done, traffic study, all that stuff is on this site. It has the renderings more than what you just saw tonight. All that information is here. So please board one night, take a look at it. If you have questions, seriously, call me.
SPEAKER_02Mr. Mays, you know I'm happy to come and talk to groups. I do it. I've done it. I want to talk about it. I'm excited about the project. It is the largest project I've ever done. I want it to be the best that it can be. So take some of these if you like. I even talked to me when I came up to them unannounced.
SPEAKER_03Absolutely. For an hour. Absolutely. Happy to do it. Happy to do it. Well, thank you very much. You're welcome. Thank you. One minute. My system, do you not have to turn it off? No. That's why they make editing software. Yeah. That's right. You don't want to wrap it up. Of course. All right. All right.
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.williamsburgwatch.com/subscribe
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.williamsburgwatch.com/subscribe
Week in Review May 23 This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.williamsburgwatch.com/subscribe
Thank you to everyone who tuned into my live video! Join me for my next live video in the app. This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit...
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.williamsburgwatch.com/subscribe