This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.volts.wtf/subscribe Are data centers raising everyone else’s electricity rates? The extremely unsatisfying answer is, it depends. A new report puts numbers on it: depending on circumstances, a large new load can cut other customers’ rates as much as 6 percent or raise them as much as 9 percent. The good news is that most of what makes the difference is under regulators’ control. I talk with authors Long Lam and Natalie Northrup about the tools available, from minimum bills to “bring your own power.” Chapters: 00:00 - Introduction 02:28 - Long Lam's background and the Berkeley Lab rates study 05:33 - Two intuitions, and how the model works 08:16 - Flexible data centers and how much grids trust them 11:35 - Factor one: spare capacity on the grid 16:47 - Who should get the spare capacity? 18:44 - Factor two: whether the load shows up 23:20 - Is capacity built for no-show loads wasted? 29:42 - Factor three: what kind of grid you're on 32:42 - Regional markets share costs and risks 36:46 - Minimum bills and collateral 41:53 - When data centers bring their own power 48:29 - Charging data centers twice 55:23 - Prioritizing spare capacity: Denmark, BC and auctions 1:00:59 - Growing the grid vs. lowering rates 1:02:59 - Tools for ratepayers and state policymakers
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
SPEAKER_02Greetings and salutations, everyone. This is Volts for November 25, 2026. The truth about data centers and electricity prices. I'm your host, David Roberts. According to the polls, Americans are quite angry at data centers for raising their electricity prices. But... Are data centers raising their electricity prices? If you've paid attention to the ongoing research and analysis around this question,
SPEAKER_02you're probably aware that the answer is an extremely unsatisfying It depends. A new report from the Brattle Group and the Energy Systems Integration Group tries to put some meat on the bones of that it depends. Its authors modeled one enormous new load hooking up to the grid under dozens of scenarios. Depending on the circumstances, that same load either cut everyone else's rates by around 6%, Or raised them by roughly 9%.
SPEAKER_02So what determines whether costs go up or down? It's mostly stuff we have under our control. Whether the grid has spare capacity, whether the big customer shows up as promised, And the rules governing what big new loads pay. The report puts rough numbers on each effect across four very different U.S. power markets. It's quite clarifying. My guests today are the report's lead author, Long Lamb, and his co-author, Natalie Northrup, both at the Brattle Group.
SPEAKER_02Long works on load growth from forecasting to tariffs. Natalie studies how flexible resources make money in power markets. Many state governments and the U.S. Congress are arguing over who pays for data centers. It's a big element in the much-discussed federal permitting bill. So it seems like a good moment To help all you Volts listeners get a somewhat more sophisticated understanding of just when data centers hurt the rest of us rate payers and when they help.
SPEAKER_02So let's get into it. All right. With no further ado, Longlam, Natalie Northrup, welcome to Volts. Thank you so much for coming.
SPEAKER_00Thanks for having us.
SPEAKER_02Thank you so much for having us. It's a pleasure. All right. Well, I'm going to start with you. You have been studying this basic issue for a while now. There was a big Lawrence Berkeley National Lab report around this a couple of years ago that made a big impression. Talk a little bit about your history with this issue and why this report now.
SPEAKER_01Yeah. So I have been working at Brattle for seven, eight years now. And over that time, I have done a lot of work on the retail side looking at electricity retail rates. There was a lot of interest in dynamic rates, time varying rates, for example, how to get more flexibility on the demand side in order to operate the power system more effectively.
SPEAKER_01And in recent years, there have been a lot of concerns, as you mentioned earlier in the intro about affordability. Things are just getting a lot more expensive for the everyday consumer, including electricity prices. And we, along with our colleagues at the Lawrence Berkeley Lab, put together this study that was published in 2005. I can't believe it was already almost two years ago.
SPEAKER_01I know that was 2025. thank you. I was going
SPEAKER_02to say, do we even have data centers in 2005?
SPEAKER_01I think we did, just not the size and the scale that we have today. And in that study, we untangled all of the different drivers that are behind the retail electricity price trends that we have observed in the last 15 years or so in the US. And that study was very timely because It coincided with this wave of interest in electricity rates in a way that I have never seen before.
SPEAKER_01It made me really happy. Of course, as an electricity nerd.
SPEAKER_02Yes, the public, all of a sudden the public cares. And here you come with this long report, the conclusion of which is some of this, some of that, a little bit of this, a little bit of that. It's complicated. It is complicated.
SPEAKER_01It is very complicated. And of course, data centers, large loads are a key part of the question that folks are having. And in order to untangle the impacts of large loads alone, we, along with our colleagues Ryan Liddick and TrueMy and W Liu at eSig, put together this study to put some meat on the bone. We put out a primer explaining how a large load can impact rates
SPEAKER_01for electricity customers earlier this year. And then with this study, we quantify the magnitude of that impact under the different conditions.
SPEAKER_02Right. And so people have these two very basic intuitions, conflicting intuitions, I think, depending on who you talk to. Some people say when you put a big new load on the grid and It's a bunch more stress on the grid. So the grid has to do a bunch of stuff to sort of prepare itself for that new load. That raises prices for everybody. And then there's the conflicting intuition, which is the grid's got a bunch of spare capacity that it's not using most
SPEAKER_02of the time. If a big load can come on and absorb some of that spare capacity, then you're spreading the fixed costs of that capacity over a larger customer group and everyone's costs go down. And so basically the spoiler, the outcome of the study here and every study into this that's happened so far is Both of those are basically true. Both of those do happen. It just depends on the circumstances. It depends on the grid circumstances and the utility circumstances, et cetera.
SPEAKER_02So Natalie, maybe you can tell us about just kind of the model that you built here to make this work, sort of a flight simulator, if you will. You can run a large load through several different kinds of circumstances. Talk about how you built this thing.
SPEAKER_00Yeah, you're totally right there about the rate impact depending on the balance between whether or not the large load brings in incremental revenue that is greater than the incremental costs that the system incurs to support that large load. And so what we built the model to do was to tease out how system conditions, so absent any tariff provisions, is there Transmission headroom that the system can leverage for the large load.
SPEAKER_00Is there generation capacity? Are there utilization benefits that you could leverage to add incremental revenue without incremental costs? And then in the scenarios where that's not possible, where the utility or region has to spend Incremental capital to support the large load. Can we leverage the tariff mechanisms and policy solutions that are being thrown around in the industry to recover those costs from the large load appropriately and protect existing customers
SPEAKER_00from rate increases? And so the model really wanted to tease out what is that balance and how do different factors change? Like I just mentioned, system conditions, large load materialization is some of the load that's forecast speculative. Would customers be on the hook for that?
SPEAKER_02Right. Yeah. Here's my one question. Before we get into the factors that determine the large load's impact on rates, we're going to walk through those.
SPEAKER_01But one of my questions
SPEAKER_02is you sort of are modeling, at least in the model, a sort of a generic large load. It's 500 megawatt load on a three gigawatt utility area. These are just sort of kind of abstractions for the modeling purposes. And so the load is kind of generic, but I guess one of my intuitions is that the way the load behaves has some effect on On whether it will affect the rates, other people's rates or not.
SPEAKER_02In other words, what kind of load it is matters, but that's not really visible. So for instance, we've talked a lot on Volts about whether data centers can be flexible, whether they can use batteries for flexibility, whether they can dial down their computing at times of congestion all of a sudden, or whether they can't. Is that not a big factor? And is that not kind of missing from this model, the behavior of the load itself?
SPEAKER_00So I guess that's really what a lot of our scenarios we're looking to evaluate. In the base scenario, we assumed that the load was not responsive to market price signals, not leveraging flexibility and operating at a fairly high load factor. And that sort of setting the baseline of if there's no leverage of the Opportunity for flexibility that is controllable or irresponsible to price signals,
SPEAKER_00what would that rate impact look like? And then when we looked at bring your own new capacity and flexibility, one of the scenarios that we considered there was large load flexibility. And if the load is able to be flexible in its demand, either in response to price signals at events that are called, could that lower rate impacts by reducing the amount that the utility invests in capacity because it doesn't necessarily have the confidence
SPEAKER_00that that flexibility is going to show up when they need it. So I think a big piece that we Learned from modeling that is the balance between how that flexibility is accredited in planning processes and how it's used by the large load really matters for that rate impact. Because if they're using flexibility to reduce their billing demands, avoid a demand charge, but the utility doesn't know it's going to show up, they'll still build to cover that load.
SPEAKER_02Right. We'll get to that in more detail later, but just so people know what we're talking about. So if a load shows up with some flexibility, the grid credits it with some flexibility, i.e. builds that flexibility into its block. The level to which it does that is called accreditation. So like how much credit is it giving the large load for flexibility? And as you're saying, if the large load shows up with a bunch of flexibility, but the grid doesn't trust it or doesn't accredit that flexibility to it,
SPEAKER_02then the utility builds as though it didn't have flexibility and you get the rate impacts anyway. But we're getting So let's go through the factors that affect the impact a large load is going to have. Long, let's start with you. Let's just talk about spare room, spare what you call headroom. What does that mean and how does the amount of headroom affect the impact of a large load?
SPEAKER_01Yeah, so by system headroom we mean the available generation capacity and or transmission capacity that can be used to serve the new large load. If there is available capacity and no new transmission lines are needed, no new generators would be needed to serve this large load, you can just use the system as is. Then the total fixed costs of the system are now recovered
SPEAKER_01from a higher sales volume. Right. And we love the term peanut butter. Right.
SPEAKER_02When we worked on this project.
SPEAKER_01So all of those fixed costs are peanut butter across more customers, right? So what that means is that the electricity rates for existing customers are going to be lower. And this is sort of like, I don't know, carpooling, right? So if the three of us were to take a road trip from DC to Pittsburgh, And my husband heard about it and said, oh, hey, I want to join you guys too. So the total fuel costs are now split across four people instead of three people.
SPEAKER_01So it's going to be lower.
SPEAKER_02You don't need any additional fuel. You don't need any additional cars. You just have one additional person in the car. So everybody's costs go down a little bit.
SPEAKER_01Yeah, precisely.
SPEAKER_02A couple of questions about this. If a load comes on and it's always on load, if it's constant demand load, then it's going to be adding to the peak. And as we know, grids are built for the peaks. So even if a grid has headroom, If its peak goes up, doesn't it end up having to build more stuff to satisfy the peak? In other words, the effect you're talking about seems to me only to work if the load is flexible, if the load can avoid adding to the peaks.
SPEAKER_01Isn't that right? It doesn't have to be binary. It could be, for example, this 500 megawatt load that we looked at wants to interconnect and the utility has 300 megawatts of available generation capacity, for example. So it needs to build some more, maybe 200 megawatt of generation capacity to meet the entirety of the 500 megawat load. So some of that generation headroom can be used
SPEAKER_01to serve this 500 megawatts load.
SPEAKER_02So it doesn't have to be either or. Is it fair to say that We are evolving in a direction where headroom is disappearing in general across the country. As everyone surely knows by now, because I think we mentioned it at least once per episode on Volts, but we've had this 20 years of steady demand now, and all of a sudden demand is going up and up and up. So is it fair to say that The circumstance in which a grid is going to have tons of spare headroom to accommodate a data center are declining and are going
SPEAKER_02to disappear pretty at some point. Like how are we doing on headroom in general?
SPEAKER_01I think you're right. Headroom is becoming a precious commodity. If you are in a system with headroom, congratulations. You are among the few today. But that is not to say that you can also create headroom within existing system today, right? And we mentioned this in our primer and also in the quantitative analysis. For example, you can aggregate distributed energy resources that exist globally.
SPEAKER_01In that pocket of the grid and operate them in a way that would create some system headroom when they are pulled together.
SPEAKER_02And yes, a VPP creates capacity, basically creates more spare headroom. And so does like building a transmission line. I mean, so does anything. So does any building out of the grid. You can create more headroom, obviously. But I think it's fair to say that nationally speaking, we are soaking up headroom faster Then we are building new headroom, generally.
SPEAKER_01Yes, I would agree with that. And along with that, a question that we often get when people look at this study in our results is what is really the value of system headroom? What about the opportunity cost of using that system headroom, right? So for example, maybe because the large load is using that system headroom today, Other loads that are going to materialize in that same service territory are not going to have access to that system headroom.
SPEAKER_02Yes, you have anticipated my very next question, which is like, even if there's headroom, given that headroom is disappearing everywhere, and given also that we're electrifying other parts of the economy, or we're supposed to be, the plan is to be electrifying the whole economy, so we want transportation to be We want heating and cooling to be coming onto the grid. And so even if there's headroom, even if it's having this rate lowering effect,
SPEAKER_02it doesn't necessarily always seem like a good thing to just give that new capacity to data centers instead of the other things that might want it. I'm glad you at least raised that question. I mean, I guess that's sort of a values question in the end and not really a technical question, but Insofar as there's spare capacity on grids, who gets it? Do we prioritize it?
SPEAKER_01We'll come back to this policy question later, but I just want to put it on the table for now.
SPEAKER_02But long story short, if there is spare capacity on a grid, The arrival of a data center can soak up some of that spare capacity and reduce rates, basically, for everybody else. That is a thing that can happen and has happened. I mean, Long, tell me if I'm wrong, but I feel like there are some places in the U.S. where this has happened, where this is a measurable effect, where data centers have actually brought down rates. I mean, this is not just a theoretical thing, right?
SPEAKER_01Yes, and we documented this in our study with LBNL folks that I mentioned earlier. In some states, we are seeing that the retail electricity price actually decreased as that state added more load. And yeah, there are a couple of other examples that utilities are citing and are making to demonstrate this outcome as well.
SPEAKER_02Okay, that's the first big factor is spare room. Natalie, let's talk about the second one, which is whether the load shows up on time at the size it projected and stays as long as it said it would. So spell that out a little bit for us. What is the nature of that factor? What is the effect on rates if it shows up faster than expected or slower than expected or less than expected, et cetera?
SPEAKER_00Yeah, so load materialization is key because the investments that are made to support the large load, the capital is spent before the load ever shows up. And so if you're committing capital to build a new power plant or a new transmission line, the capital investments are identified based on the forecast load. A piece of that is whether or not the load shows up as it's planned
SPEAKER_00because of potential permitting delays, whether or not the need for compute looks the same if we're talking about a data center. Also, there's a lot of speculative load where there's an element of how fast can we get speed to power this big topic that we're thinking about a lot.
SPEAKER_02Yeah, yeah.
SPEAKER_00Because the speed to power is a priority, sometimes they'll be double counting of a load because they're testing out one utility or another utility to see which they can get power in faster.
SPEAKER_02Yeah, this is worth spelling out a little bit. Because interconnection and queues are so slow, because it's so difficult to get hooked up at all, lots of large loads just sort of shop around and put themselves in line and At a bunch of different utilities, just waiting to see when or if a utility will interconnect them. But of course, if one utility interconnects them, they vanish out of the queues of those other. So a lot of, and I don't know if anybody's put a concrete number on this,
SPEAKER_02but some large proportion of the load that is waiting in line is fake This is fake. Or is not real, is not going to show up. And how do utilities... Well, let's just talk about the effect. If you plan for it and it doesn't show up, presumably you built some stuff for load that doesn't show up and you've raised costs for everybody. Is that simple?
SPEAKER_00So it depends on where you are in a vertically integrated utility model where the utility recovers the capital that it spends under its regulatory framework. If they've made capital investments to support this load growth and the load doesn't arrive, their other customers are on the hook to pay for those costs. And it looks a little bit different in restructured utilities that are participating
SPEAKER_00in regional markets because IPPs sometimes take on that risk where they're building generation to sell in markets if the load doesn't materialize. And thinking about PGA on the capacity market, if the load doesn't materialize and that gets taken out of the forecast, then you don't see the same price effect that you would have if the load were there because some of that risk is transferred. But in a vertically integrated utility, which the main focus of the body of the report, you...
SPEAKER_00Recover those costs from existing customers. And if there aren't tariff provisions that protect against that risk, the existing customers' rates will go up because the rate base increases.
SPEAKER_02And we've seen this. I mean, this, again, is not theoretical, too. Like, we've seen this happen. We've seen utilities build in anticipation of loads and loads not show up. Data centers not show up. I mean... Is this something we've seen happen yet or is this just a theoretical worry?
SPEAKER_01I have not seen that in recent years. It is a real worry because of the level of forecasted load that we are seeing. If you look at the Texas forecast, for example, there's just no way, there's just no way that we will see the total peak load is going to double by the end of the decade. That is just not imaginable to me.
SPEAKER_02So some of the load has got to be phantom load or else we're kind of screwed because there's no way we're keeping up with all that load in real life. This is a big question I have. And I just discussed this actually last week with Ketan Joshi about data centers, which is if a grid builds a bunch of new headroom, a bunch of new capacity, In anticipation of a big load showing up,
SPEAKER_02the big load doesn't show up or shows up slowly or shows up late. The other rate payers eat those costs, but it's not like that's waste, is it? I mean, demand is rising. We know we're electrifying the rest of the economy. We know demand for electricity is rising regardless. We know that utilities need to build capacity. Regardless, basically, like almost in any possible scenario in the next 20 years, almost every grid needs to build new headroom, needs to build new capacities.
SPEAKER_02So is that really the worst thing in the world? If a data center prompts a utility to build a bunch of capacity and the data center doesn't use it, we can be pretty confident that someone else will. I'm just asking like how bad of an outcome is that really in the end?
SPEAKER_01Yeah. In the scenario that you just described, I think one, they're Are tariff provisions and protections that can be put in place to protect existing customers from that stranded cost risk, number one. So it's not a guarantee that existing customers are going to have to pay for those stranded costs, number one. And number two, I think in your scenario, it is right that if the capacity originally built
SPEAKER_01for data centers can be repurposed and used to serve other loads, then yes, it can have a similar effect on rates and existing customers are protected from that risk. But I would think that there is a timing issue here, right? So when is that industrial electrification load going to show up? If it's going to show up, I don't know, let's say seven years from now and the capital commitment is made today
SPEAKER_01and the data center is not going to show up. So in those intervening years, who is going to bear those costs? So I think that annual view, that annual impact is also really important to consider.
SPEAKER_02Yeah, I guess one of the things I wanna get clarity on in coming years is just what amount of that capacity that you build in anticipation of a data center Is going to be useful for something else eventually versus stranded. And I don't know if there's any sort of like pat way to answer that in advance, but I'll just say that my instinct is that almost any new grid capacity you build is gonna be useful at some point for someone, right? Like I can't imagine any of it being Totally stranded.
SPEAKER_02Unless you're just like building a specialized transmission line out, you know, to a data center in the middle of nowhere and the data center doesn't show up. Maybe that's stranded. But it's hard for me to imagine much new grid capacity being stranded in a time of rising demand and capacity scarcity. Like most of it will be useful.
SPEAKER_01Do you agree with the basic intuition? Yeah.
SPEAKER_02Hey there, everybody. Don't worry. I'm not going to tell you about a new mattress or push a credit card on you. This isn't an ad. There are no ads on Volts. It is supported entirely by listeners like you. If you'll indulge me for a second, I'd like to ask for your support. I started Volts because we're all surrounded by depressing news about climate change and misinformation about clean energy. And it's never been more important to share the stories of the real people on the ground doing the real work of transition. And all the ingenuity and courage and public spirit they are bringing to it.
SPEAKER_02People are hungry to hear these stories, to learn from and find inspiration in them. I've heard from people who change majors or careers after hearing episodes of Volts. People using it in classrooms, community groups, even state legislators who have passed bills inspired by specific episodes. Sharing these stories matters. It makes a difference. If you have found value in it and want to help me continue doing it, I hope you will join the community of paid subscribers at volts.wtf. It's about the cost of a cup of coffee a month.
SPEAKER_02If you don't like subscriptions, you can make a one-time contribution, leave a review on Apple or Spotify, or just tell a friend about Volts. I am grateful for any and all support. If you're already a paid subscriber, thank you. And now, back to the show. Do you agree with the basic intuition?
SPEAKER_00Yeah, I think part of it is... Circling back to opportunity costs and existing system headroom, right? We have headroom on the system and sort of if you build, you know, for a load that doesn't materialize, then there is headroom. That can be utilized by another load. I think part of what makes this moment unique is the scale of the load, where, yes, we're expecting electrification load growth. Ideally, there's some reshoring of manufacturing and industrial processes in the United States.
SPEAKER_00But if the magnitude of that doesn't match, like we were just talking about, the size of the large load growth forecast is so big. Maybe the scale of this other load growth, the electrification load growth, the industrial load growth doesn't match that. I think that's also a risk.
SPEAKER_02Yeah. Although if you have spare capacity, in some sense, I feel like that's going to accelerate that other load growth. You know what I mean? The non-large load growth. Insofar as it's cheaper to electrify and you have more spare headroom, maybe... Transportation, electrification will speed up a little bit or like maybe manufacturing will speed up a little bit. So it's really hard to say how that nets out.
SPEAKER_01Yeah, and I think that's a really important point, Dave, which is that it really depends on the economics of that available capacity in that scenario, right? So if, again, the data center is responsible for the stranded costs, pay some of it, most of it, all of it, then that available capacity is now very cheap and you can offer... Economic development rates, for example, or industrial facilities to electrify in your service territory, then I think it is a big plus.
SPEAKER_01But then if that available capacity is at a very high premium as we're seeing today, then it's not going to be very attractive to these other loads, right?
SPEAKER_00And another thing to throw out here is like specifically the generation capacity that we're building now, it's very gas heavy. And another thing to think about is with electrification goals, you know, is there a goal to pair that with renewable and clean power? And so this capacity that's being built might also not be the right type of capacity for those goals.
SPEAKER_02Yes. You might be locking in a lot of gas. I mean, it sucks to lock in gas, period, but it would really suck to lock in gas for loads that don't show up. So you sort of like built the gas system. Okay, so one big factor is the amount of spare headroom on the grid. Another big factor is whether the loads show up at the size and on the time they are promised so that utility building matches eventual load. Then the third big factor is where you live, what kind of grid you're on.
SPEAKER_02Maybe Natalie, you could just explain how that feeds into this. You went over it a little bit earlier. What sort of utility regime You're in is going to determine where these spare costs go. Yeah.
SPEAKER_00So we modeled prototypical utilities in the study, a vertically integrated southeast prototypical utility, MISO utility that's vertically integrated but has the opportunity to participate in regional markets where needed. And we modeled the PJM prototypical utility as fully market exposed, buying from the capacity auction and paying for transmission costs at the regional scale.
SPEAKER_00And then an ERCOT utility, an ERCOT has a different model than PJM in that it doesn't have an explicit pricing mechanism for generation capacity.
SPEAKER_02Right, no capacity market.
SPEAKER_00No capacity market. But I think the key thing that we were trying to tease out there Vertically integrated utilities can build generation capacity and recover it from their customers. And their capacity that they already have is part of their embedded average cost. And so if they built generation capacity or transmission capacity to serve their existing customers, the cost of that is fixed. It doesn't change when you add a new customer.
SPEAKER_00And so maybe you're building new generation or transmission at a higher cost. Because of inflationary pressures, supply chain constraints. But the capacity that already exists doesn't become more expensive. And I think a big thing that we're seeing, especially in PJM, there's just a lot of discussion about this and attention to it right now, is that for utilities that don't have a physical hedge, like a vertically integrated utility would, or a financial hedge in some sort of PPA or long-term contract,
SPEAKER_00that Every year they have to pay for all of the generation capacity to serve all of their customers. And if that price increases, everyone's paying more and not just in the utility that's serving the large load, but all of the other utilities exposed to that regional price.
SPEAKER_02Right, right, right. So a new load can raise rates for, in PJM, a dozen utilities, a dozen whatever. I don't know how many states PJM is, eight, something like that. They raise rates for everyone.
SPEAKER_00Yes. So a data center in Virginia might raise rates for customers in Delaware.
SPEAKER_02Right, right. As opposed to if I just am in a utility territory with a vertically integrated utility, all those costs in a sense are internal to the utility area. If you're in a regional market, what's the significance of that? Is it worse to be in PJM then somehow because you're in a sense stuck on a boat with everybody else and paying these increased costs, whether or not you're benefiting from that new large load?
SPEAKER_00I'm going to go back to the unsatisfactory. It depends. The downside risk that costs increase, there are two pieces of it. One is that you're exposed to costs from other utilities serving large loads. So the cost exposure risk is higher and it changes what policies and tariff mechanisms are most effective. So the regulatory toolkit in that environment is different
SPEAKER_00because in a vertically integrated utility, you can Ring fence or contain the incremental costs and make sure the large load pays for them because they're easy to identify or easier to identify.
SPEAKER_02Right, right, right. A large load comes along in a particular utility territory. What you need to build to accommodate that new large load is pretty clear and pretty contained and under your control and can be assigned to the new load. Technically, like you can just charge it to the new load. It's pretty straightforward.
SPEAKER_00Yes. And in a regional market, the price effects, so the increase in what utilities are paying in the market, you can't necessarily, or in the current regulatory construct, a utility can't charge the large load and then take that money back, reallocate it through the regional cost allocation mechanism to other utilities. It's just, you know, a different regulatory structure. And I guess there are flip sides of that. There's a beauty of regional cost sharing.
SPEAKER_00When we looked at the 500 megawatt load independently, when you add one incremental 500 megawatt load, the rate impact is actually lower because you get to share those incremental costs over a broader region. But when you have regional load growth, We assumed proportional regional load growth, so 16.7% of the regional peak load, which is the same ratio as the 500 megawatts in a 3 gigawatt utility. If the region has proportional load growth, yes,
SPEAKER_00you get to share those costs for serving your utility's large load with the rest of the region, but also you share all of the costs driven by other interconnections. And that's, I think, where that balance, you know, whether or not it's a good or bad thing, I think, depends partially on that. And the other thing that is an it depends is that the risk of the load materializing smaller than forecast is actually much smaller in a market, in regional markets.
SPEAKER_00Because thinking about if we assume that the markets have a simple supply demand, you know, they intersect, you get a price. If the demand is lower than expected, but you've built new generation, you're on a cheaper part of the supply curve when that market clears. And so the supply elasticity can make it that over forecasting risk can be smaller in a regional market where those costs don't have to be recovered
SPEAKER_00from the utility customers like they do in a vertically integrated utility.
SPEAKER_01Whereas in a vertically integrated utility, if you make capital commitments to build a new generator and you actually build it now and then it's added to the rate base, then you will have it in the rate base for 20 years, 30 years, however long the depreciable life is of that asset. Whereas in a market, if load is lower, then we have thought in the next capacity auction, it will be adjusted.
SPEAKER_02Right, right. That is indeed the entire point of markets is to absorb and accommodate changes in supply and demand. Let's talk about fixes or policy tools that can address these things because obviously the tools available to you are going to be different in these different contexts. If you are in a vertically integrated utility situation, then it's pretty straightforward that you have state policy tools They can directly control that. If you're in one of these regional markets,
SPEAKER_02how far and how much purchase state policy has is a more complicated question. So let's talk about the fixes. Long, one is what's called a minimum bill. Talk about what that is and what is the impetus for it.
SPEAKER_01Yeah, so minimum billing demand is a requirement for these large load customers when they interconnect to pay for their costs based on a fixed percentage of their contracted capacity. So, for example, this 500 megawatt load is required in our model to pay for 80%, at least 80% of its billing demand.
SPEAKER_02Whether or not the full 500 megawatts of load actually shows up. Yes, that's correct. A contractual thing from the utility saying you're going to pay 80%, at least 80% of your 500 megawatt demand, no matter how much of the demand actually shows up.
SPEAKER_01Yes, exactly. And that is also sometimes called the take or pay provision. And we, based on another study that we just did with the LP&L folks, we work a lot with them. We see that this sort of provision, this sort of requirement is becoming increasingly popular among tariffs for large loads.
SPEAKER_02And in your modeling, this basically cuts the rate impact on other rate payers. In half or more. This comes close to solving the problem of rate impacts on other rate payers, basically. I mean, that's why the people are doing it, right?
SPEAKER_01Right. Exactly. Because the large load has to pay this amount regardless of whether they will materialize as anticipated or even if they leave early.
SPEAKER_02One question about that is like, Obviously, one of the fears hovering in the background here, and maybe we'll talk a little bit more later, is that there's a giant bubble at work and that for whatever reason, a lot of these big loads, you know, the bubble is going to pop in a lot of this Demand is going to vanish. And then a lot of utilities are going to be stuck with these contracts where they built a bunch of stuff for load that doesn't show up. I mean, that's one of the worries hovering here. And so one of the things you can do is just say, for the 15 years of our contract,
SPEAKER_02you're going to pay at least 80% of that demand that you're promising, no matter what you do, no matter whether you show up or not. But my question is, if the bubble pops and the data center developer vanishes, goes bankrupt, gets bought, no longer exists, who is then the counterparty to that contract for 15 years? In other words, how can a corporate entity promise to pay X amount of a fee for 15 years if it doesn't even know for sure it's going to exist for 15 years?
SPEAKER_02Is that a dumb question?
SPEAKER_01No, not at all. And that is a very valid concern that many regulators and also utilities have in mind when they develop these large load tariffs. And a solution that has been implemented across the country in these large load tariffs is to put in place what's called a collateral requirement. So basically, it is a term in a tariff that would require the new customer to provide Collateral in the form of letters of credit or some sort
SPEAKER_01of parental guarantees or cash. The amount of that collateral is based on say the monthly minimum bill or some other calculations so that there will be somebody to collect that money from, or there will be a pot of money to collect that money.
SPEAKER_02I see a hedge, a hedge against the possibility that they disappear basically. Is that also becoming more popular, I would imagine?
SPEAKER_01Yes. That is also becoming very popular in these large load tariffs. And it is a pretty well-established practice along with the minimum billing demand that we just discussed. And in general, regulators, utilities are deploying a combination of tools in order to protect against these risks that we have talked about.
SPEAKER_02Natalie, let's talk about Beyonce. Bring your own new capacity. I think what a lot of the hyperscalers and what a lot of data center developers are saying to the public is, look, We'll just build our own power plant, satisfy our own power needs. We won't bother your grid at all. So leave us alone with all these special tariffs and everything like this will basically satisfy your fears.
SPEAKER_02But as you find in the modeling, A data center bringing its own power in and of itself does not necessarily shield other ratepayers from having increased rates. So talk about that dynamic a little bit, what effect it has to bring your own new capacity and what it actually takes on the utilities part to protect its other ratepayers.
SPEAKER_00So there are two General approach is to bring you a new capacity. And the simplest, the first one is islanding, which I think is, you know, could satisfy that need where the data center says, you know what, we're actually not going to connect to the grid. We'll build all the generation we need. We'll control it.
SPEAKER_02None of them do that, though. None of them are really going to do that. Has a single data center in the world actually fully islanded? Do you know? I'm skeptical.
SPEAKER_00I don't know. And I don't think that they want to because there are all sorts of benefits from connecting to the grid.
SPEAKER_02Yes, grids are awesome.
SPEAKER_00Yeah, grids are awesome. And so I think that's where, you know, the second piece of it that we... And our analysis really comes into play where the bring your own new capacity can look different ways, both to the load and to the system planners. And it provides value maybe for a generation capacity, but not necessarily for a transmission system capacity needs. So what we found, I guess, depending on the model, but if you assume that the large load can bring sufficient capacity Capacity,
SPEAKER_00paired capacity to meet its generation capacity needs.
SPEAKER_01So it's peak load
SPEAKER_00that it can reduce the amount of incremental capacity investments that the utility or, you know, others in the system make. And I mean, that's great. We found that with that approach, the rate impact, you know, decreases from 0.4 cents per kilowatt hour for existing customers to 0.1 cent per kilowatt hour. So a significant reduction. It does help. The thing that, you know, we have to consider is,
SPEAKER_00does that provide transmission system value? Are there energy needs? Part of what's great about being connected to the grid is that if your generator goes on outage because you have maintenance or... Its capacity factor doesn't match your load factor, so it's not generating all the time that you need energy. You can use the system for resource diversity benefits as backup if something were to happen, that some of those embedded costs benefit you as a large load.
SPEAKER_00And especially for the transmission system, where it's great to have, if the Capacity that they bring is co-located. You can reduce your transmission system needs, but you're still relying on the transmission system.
SPEAKER_02Right. So even if they build enough generation that they never have to ask for any power from the grid on a day-to-day basis, they're still getting a lot of value from the grid. They're still getting a lot of backup value, a lot of transmission capacity value. It's not like they've divorced themselves from the grid. Even if they're providing their own power.
SPEAKER_00Exactly.
SPEAKER_02So what are the tools in regulators' hands here? How should they think about this? I see one proposal floating around is to have them pay this minimum bill even if they do bring their own capacity.
SPEAKER_00Yeah, I think the minimum bill is a potential option here. And it's something that we studied earlier. In the report that can take it from a reduction in the rate increase to a decrease in existing customer rates because you're sharing existing system costs. I think the things that we have to really be careful about are, one, how is the capacity that the load is bringing being considered in system planning?
SPEAKER_00Is it flexibility or capacity that Is responsive to operator signals? Is it providing that value or is it actually an additional operational risk where you don't necessarily know when it's going to be flexible or when they're going to use that generation?
SPEAKER_02Right. If you as a grid operator cannot fully rely on it, cannot deploy it when you need it or dial it back when you need to, then it is as good as useless to you. And you end up having to build your own capacity that you can rely on regardless, even if they bring some capacity. And that just depends on contractual arrangements between the utility and the load. Like, is it possible for a data center to make its behind the meter capacity? Sort of available to grid operators in that way that makes them happy?
SPEAKER_01Yeah, they totally can. And some have actually tried to do this. And I think it was in Wyoming where a Microsoft data center Allowed the local utility to have access to their backup generators. And I think this was done in 2018, so a long time ago in our industry. So it is definitely possible. And if we extend this to look
SPEAKER_01at things like demand response programs, for example, and how utilities assign How system operators assign capacity credit to these programs, it is a very similar construct. It is new, it is definitely new, but that is not to say that it is unprecedented. I think we have gone down this path before and there are tools, there are protocols and processes that can guide that collaboration
SPEAKER_01between the large load and the system operator and the utilities.
SPEAKER_02Let me ask this. If you're asking a new load, a data center, to pay for the incremental capacity it requires a utility to build, and via minimum bill you're asking it to pay for a share of the existing grid costs, does that not break kind of one of the rules of the regulatory compact? Aren't you kind of... Making them pay twice. Don't you run into regulatory or legal issues there? Because the reason I'm asking about this is,
SPEAKER_02I don't know if you guys have been following the federal permitting bill, but there's a provision in the federal permitting bill that basically does this, that double charges data centers. It says for any new data center, they have to pay for the incremental payment. Capacity that they require, and they have to pay for their share of the fixed cost of the grid. Basically, they have to pay more than what it costs to hook them up. I'm just curious, Long, what you think of that strategy and whether that is sort of legally solid and safe strategy.
SPEAKER_01Yeah, I think what you are referring to is called by some people and pricing, A-N-D.
SPEAKER_02And pricing, yes.
SPEAKER_01Yeah. Before I came on to the show, my husband told me to not use jargon.
SPEAKER_02He's a lawyer also.
SPEAKER_01But I hope that that was the only jargon that we have used.
SPEAKER_02But this is far from the worst jargon I've encountered on this pod. It's and pricing. It just means you're paying your incremental costs and your share of the fixed existing grid costs and pricing.
SPEAKER_01Yes, precisely. And it is very attractive. It is very enticing, right, to make these large loads to pay for more and therefore lowering the cost for existing customers.
SPEAKER_02I mean, I see why it's attractive to the utility and maybe to other ratepayers and maybe to policymakers. Doesn't seem like it's going to be super attractive to the data centers themselves who are paying twice.
SPEAKER_01No, exactly. And it is a departure from, like you mentioned, our traditional approach to cost of service where we recover costs from parties that cost them.
SPEAKER_02Right, which is the incremental cost, right? I mean, that's the traditional method is we recover costs from you, new load, that you are causing, i.e. additional stuff we're having to build to serve you, the incremental cost that you are causing. And pricing goes beyond that.
SPEAKER_01Right. In some cases, if you also use some of the existing system, I do think that you should pay And I think the NIPSCO, Genco model does a little bit of this where they ring fence all of the new generation capacity costs to serve the new large load blocks. But if that new large load taps into the existing transmission system, for example, they will have to pay for that access, for that usage as well.
SPEAKER_01So I think in that case, it makes sense. But in general, I think we would just have to be really, really careful because there are some unintended consequences that could arrive in relying on and pricing, right? So for example, reverse cost shifting can occur. And you may cause a free ridership problem where people don't want to be the person, the entity who triggers that incremental network upgrade and pay for all of it.
SPEAKER_01You just wait for somebody else to do that. And so who is going to perform that network upgrade?
SPEAKER_02Yes, but I think the instinct people have is, That would be a danger normally, but there are so many of these things, and they have so much money, and they are in such a hurry that basically you can charge them, you can milk them for whatever you want to milk them for, and they'll pay it because they're in such a hurry. These are not normal loads, right? That's the instinct, I think.
SPEAKER_01Yeah, and if they want to pay for that premium to get that access, great. But again, I think we would just have to be very careful in its implementation because of the unintended consequences that I mentioned earlier. And I'm not a lawyer, so I'm not sure how that would fare with our current legal precedents as well. The last thing that we would want, I think, is to get mired in some long legal battles over this thing and nothing gets built.
SPEAKER_02Well, that's the thing is like the data centers don't want that either. Even if they feel like they're being overcharged, I think if you do something national like the permitting bill where this and pricing just becomes the default, And it guarantees a road to getting hooked up to the grid, right? If it gives data centers some predictability and speed, I think they'll pay anything for that, basically. Like they'll pay as much as you want them to pay if they get predictability and speed to power.
SPEAKER_02I think that's the political calculation being made.
SPEAKER_01Yeah, ultimately, it is a political and policy question for our policymakers. And I guess the last thing that I would add on that topic is that does this policy apply only to data centers with a lot of money? What about large industrial or manufacturing facilities who may get swept up in this? And we know that they're really important for our national economic competitiveness, our technological competitiveness, right? So I guess that would be the question that I would raise as well.
SPEAKER_02Yeah, I do know some utility geeks who are worried about this along those lines, which is like, fine, data centers are unique. You want to make unique rules that just apply to them. But once you do that, you're opening the door To like bespoke rate design for each new class of load. If you follow that road, you're going to get into a mess. Kind of part of the whole premise of the grid is we treat all loads So that's
SPEAKER_02a constant tension on the policy side of this is these seem like new and different and unique loads. So logic says you kind of want to treat them differently, but then where does that lead? And are you going to be able to restrain yourself from following that trail down into, you know, where you have all of a sudden 50 different kinds of tariffs for 50 different kinds of loads and you have a mess?
SPEAKER_01You know, that would be great for consultants like us, but it would be a big mess.
SPEAKER_02It would be a lawyer renaissance, truly. We need to wrap up soon, but one more policy question. I guess I'll put it to you, Natalie, first, but I'm interested in both your thoughts. And this gets back to one of our very first questions, which is, you have a grid with some spare headroom on it. We are in a context, I think, everybody agrees, where electrification is happening, not as fast as we might like it, But in the fullness of time, it's happening, which means existing capacity is going to get soaked up.
SPEAKER_02We're going to have to build new capacity. We're on a road to a bigger grid and far more grid demand, which means that any grid that has spare headroom, that is in some sense temporary. We know it's temporary. We know that headroom is in the midst of going. So then the question comes back again to, Do we stick to this principle of treating all new load equally, which is a longstanding principle of kind of grid administration,
SPEAKER_02all new large loads, all new industrial loads equally, or do we prioritize demands for that spare headroom? The reason I'm asking is I just got back from Denmark a few weeks ago and they just passed this law explicitly setting a priority tiers For spare headroom, basically. They say first it goes to residential, then it goes to commercial, then it goes to storage. What's left over after those three are satisfied goes to data centers.
SPEAKER_02So explicitly prioritizing some loads over others because the danger, I think, that Denmark sees and everybody else sees is that if you just let headroom go to whoever's first in line and whoever has the most money to pay for it, Data centers are going to soak all of it up. Like there's just a gajillion data centers and they're rich and they're in a hurry. So you soak up all that spare headroom and then all of a sudden you're having more trouble electrifying the rest of stuff.
SPEAKER_02So anyway, I'm just curious if you have any thoughts on that type of policy, whether you think that's possible in the U.S., whether anybody's talking about that, whether it makes sense to you. What do you think, Nellie?
SPEAKER_00Yeah, it's interesting. And I think in the U.S. you see moratoriums on data center interconnection in several states. So it's definitely a concept that people are thinking about, especially because zoning's not up to speed and all sorts of regulations. I think undeniable that data centers are a different type of load than the loads that we've seen before. And I think One thing that I would maybe think about before necessarily putting
SPEAKER_00in a strict priority, the data centers have a really high willingness to pay. And can we leverage that not just to avoid adverse effects for existing customers, but to create beneficial opportunities for electrification and updating the grid that has a lot of old infrastructure? And I think that maybe there's a way to Meet this demand for data center development while making sure that they come in a way that also allows for these other goals
SPEAKER_00that we have here, like electrification, like reshoring of manufacturing to benefit from what the data centers can bring and are willing to put into the system as a whole.
SPEAKER_01A framework that our neighbors up north in BC and British Columbia have used to prioritize or to determine what type of load is going to get interconnected into their grid is to use a multi -criteria framework in order to evaluate these load requests. And the criteria could include, for example, economic impact. How many jobs will this load generate? What is the greenhouse gas emissions impact of this load, for instance? So that is a framework that I have seen elsewhere Personally,
SPEAKER_01I think it would be great if we can have some sort of auction for the spare headroom that we have and we can pass the difference between the clearing price in that auction and the actual cost. There are a lot of issues with running an auction like that in the US that I think our lawyer friends can enumerate. But a version of that could be, for example, an interconnection queue auction, for example.
SPEAKER_01So I think there are many creative policy ideas out there for how to think about this available system headroom. That said, I don't think we can headroom ourselves out of this Problem. I don't think we can purely rely on system headroom in order to serve this surge in electricity demand from data centers, from manufacturing facilities, from transportation and electrification, building electrification.
SPEAKER_01We do need to build more supply resources and build them at a lower cost than what we are seeing today. And that means of the efforts that our friends are working on permitting reforms, for example, I think those are all really, really important policies that we all need to pursue.
SPEAKER_02Yeah, we definitely need to be building new grid. It just sort of circles around and around to timing, right? Like who builds what when and who pays for the new grid. Like this is one of my, not to get off on a tangent here, one of my kind of worries about this sort of populist affordability politics that's running rampant now is my druthers would be If I were in charge,
SPEAKER_02I would be squeezing all the money I can out of these data centers and out of these hyperscalers. And I would be using that money to build grid capacity. I would not be using it necessarily to lower rates for other rate payers. Do you know what I mean? Like I want to grow the grid. My priority is growing the grid. And there is, I think, at least a tension there. Whether you use that data center money to grow the grid or to reduce electricity rates for other customers.
SPEAKER_02Do you see that tension?
SPEAKER_01The affordability pressure is coming from those factors, as we mentioned before. Maintaining and upgrading our transmission and distribution network. Is one, in doing so at a time when inflation is very high. Yeah. Where transformer costs and wires and cable costs have increased two times, three times for example, where generation Equipment costs have also increased.
SPEAKER_01It's really, really challenging. Yes, the data center piece, the large load piece is one piece. But at the same time, we got to look at all of these other drivers that we as an industry are facing and see how, for example, can we get cheaper transformers? How can we get cheaper switchgear, for example?
SPEAKER_02Yeah, that's a whole other pod. All right, well, I need to wrap it up. So let's bring this down out of the theoretical ether into a normal person's perspective. I mean, in some sense, if you're just an ordinary U.S. citizen and there's a data center proposed near you, this research is not going to give you a clear... You're going to get it depends from researchers, no matter who you ask. But like... This does, I think, offer some clarity to people.
SPEAKER_02Like, is there a way for ordinary people to know where I live, the utility system in which I live, the grid on which I'm connected, a data center here would have what effects on my rates? Are there tools ordinary people can use to figure that out? I feel like this ought to be a public service or something. Like somebody ought to make a database or something. Like you put in your address and it will tell you, here's your utility. Here's the kind of utility system you're in.
SPEAKER_02Here's how much headroom your utility has, et cetera, et cetera. There's nothing... Like that? Like, is there any way for ordinary people to use this information to their benefit long?
SPEAKER_01We are putting together an online tool with the folks at eSig, and hopefully we will have that available. And in that tool, you can select the region of interest, for example, and you can play around with inputs that we use in order to calculate what the rate impacts be for a customer in these different regions. So there are lots of toggles and lots of buttons that people can play around with.
SPEAKER_01So hopefully, that will be available soon. We are working on it, fingers crossed. Aside from that, you know, if folks are interested in how their electricity prices have evolved over the last decade, for example, I think the heat map resource is a great one. If you're listeners are not aware of it. I think it's definitely worth checking out there. They show how prices and bills also,
SPEAKER_01electricity bills have changed over the years and what are the different contributors to that change, be it a generation piece or transmission piece of distribution piece? I think that's an awesome resource and they do it across the US
SPEAKER_02so it has wide coverage. And for policymakers, kind of a similar question. I mean in some sense If you're a policymaker
SPEAKER_01in a vertically integrated utility area,
SPEAKER_02you have some pretty straightforward tools at your hands. Your PUC can just tell the utility to implement these tariffs or whatever, or recover these costs from proposed large loads. Pretty straightforward. If you're a policymaker in PJM, in a restructured area... In a big regional utility market, what do you do with this information? State policy has, it seems to me, very limited purchase
SPEAKER_02on the operation of these regional grids. What can you do as a state policymaker if you're in one of those areas and you want to protect your rate payers?
SPEAKER_00I think there are things that they can do to control some of the controllables. So, for example, in Pennsylvania, I don't know if it was law that was passed in the legislature, but the large loads are responsible for directly paying for transmission costs that are allocated to them if they're built in the state of Pennsylvania. And so there's still exposure to other states in the region, but... You can put some solutions in place that provide some level of protection.
SPEAKER_00And I think another thing is really to engage in regional processes, engage in, you know, PJMs doing a lot of work rethinking what its capacity or resource adequacy construct should look like. I think really tapping into those proceedings, it can be really helpful.
SPEAKER_01Yeah, I think it was a model large load utility put out by the Pennsylvania Regulatory Commission. And I absolutely agree with Natalie that folks at the state level can get more involved in these regional proceedings. And in the years that I have been working in this space, I have seen people A tremendous growth in capability and capacity for state policy makers getting involved in solving these very complex
SPEAKER_01and vulcanized issues. I'm very encouraged by that.
SPEAKER_02All right. Well, we'll wrap it up there. Thank you two so much. I know a lot of people kind of had roughly my knowledge of this, which is that it depends, but...
SPEAKER_01Super clear on what it depends on. Now you know what are all the things that it depends on.
SPEAKER_02Yeah, now we know what it depends on. Thank you for the work and for walking us through it.
SPEAKER_01Yeah, thank you so much for having us on.
SPEAKER_00Yeah, thanks for having us.
SPEAKER_02Thanks, everybody. You've been listening to Volts, founded and hosted by me, David Roberts, produced by Nate Peavy, and supported entirely through the generosity of listeners like you. If you value conversations like this, please consider joining our community of paid subscribers at volts.wtf. See you next time. [music]
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.volts.wtf/subscribe When people push for better data centers, they picture hyperscalers - Amazon,...
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.volts.wtf/subscribe America’s first big wave of solar power installations, built between 15 and...
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.volts.wtf/subscribe The Senate’s bipartisan permitting bill got a manager’s amendment last week -...
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.volts.wtf/subscribe Last week’s election was a blue wave all the way down the ballot: Democrats...
This is a free preview of a paid episode. To hear more, visit www.volts.wtf Volts published eight conversations in October, which is a lot for anyone to listen to. We’ve rounded up the highlights into less than an hour....