Kipp Snow: Hello everybody, this is Kip here with the Two Guys Talking Ship Podcast. Welcome to episode 82. This is an anchor alert. We've got a special news alert today.
Mike Singer: Yep. Hey everybody, it's Mike from Baltimore and Chesapeake Bay Shipwatchers, sponsor of this here Two Guys Talking Ship Podcast, the definitive place for all news related to the port of Baltimore. so welcome today's episode. Hey, if you're new to the channel, give us a like, subscribe, and hit the bell to be alerted to new podcasts as they come available. So wow, big anchor alert, opportunity to get some news out today.
Kipp Snow: Yeah, yesterday there was a big announcement with the i issuance of a new contract for part of the what one of the phases of the Key Bridge rebuild.
Mike Singer: Yeah.
Kipp Snow: And so that was the down at dot headquarters they had their monthly meeting for bud
Mike Singer: Board meeting, yep.
Kipp Snow: budget meeting and went through the process and we're gonna have Jim Harkness, who is the lead engineer for the bridge, back on today and he's gonna talk a little bit about what that meant and what the next bit of work is going to take place down at the riversite.
Mike Singer: Yep.
Kipp Snow: So why don't we why don't we go ahead and move into that interview and we'll have Jim on here next. So stay tuned. There's a lot of information he's gonna provide and they got there are some schematics and and images of the of the work that's going to be done. So why don't we go ahead move on to
Mike Singer: Mm-hmm.
Kipp Snow: that.
Mike Singer: Let's do it.
Kipp Snow: All right, hello everybody. We have our special guest here. It's Jim Harkness from M.D.T.A. the Key Bridge Rebuild Project. And so welcome. you got I know, right?
Mike Singer: Special guest again.
Kipp Snow: So w so welcome to the podcast. You guys had a big announcement yesterday, didn't you?
Jim Harkness: Yeah, big day for for the Key Bridge rebuild. we were able to take the first of the four new procurements for the rebuild and take that to our MDTA board, present it to them, and they thankfully approved that contract. And and so that contract was for the demolition of the still standing portions of the former bridge. that that work essentially is is to finish up the the the demolition, right? So it's the the beginning of the end of demolition. so we had we had demolition that took place under the Kiwit contract and so we had that performed a year ago. that was ongoing. That that all the lamp base, yep, concrete
Mike Singer: Right. All that land base roadway abutment stuff. Right.
Jim Harkness: bridge deck, all that good stuff, that all occurred
Mike Singer: right, yeah.
Jim Harkness: last year wrapped up in Jan January, February of this year. And and then now we're able to get the contract out and approved for you know the remaining demolition. and in addition to the demolition, the the contract also had scope of work that included what we called miscellaneous marine work. essentially having to do some work on the large foundation piles that that the That Kiwit, our contractor, is currently installing. So that work is critical to us. it doesn't seem like much, but it's it's all part of what we call the critical path to delivering this bridge. And everything runs through those large, two large pylons. And so those 600-foot pylons that it will eventually have starts with this foundation. And so Kewitz work in that piece. Once they get those installed, now We'll have this contractor that's active and on board. We're still procuring a mainspan contractor, but this contractor will be able to come in, perform the work of removing the soils that are in the center of that eight-foot pile, get that out of there, get it cleaned out so that when the mainspan contractor comes on board, he's able to go in there and install that reinforced concrete plug in those piles without having to worry about the performing that clean out work himself so we can just it's a it's an efficiency and in order to way to continue to w to work that critical path towards del delivering the bridge.
Kipp Snow: So so so I wanna I wanna
Mike Singer: All right, cool.
Kipp Snow: make sure I I'm I'm understanding. This this contract that just got issued, you've got deconstruction of the rest of the bridge, all right. But this also includes the clean out of the pilings that were just driven into
Jim Harkness: Yes.
Kipp Snow: for the purpose of filling them with concrete. Okay, so it and and I'd s I had seen
Jim Harkness: That's right. yeah.
Kipp Snow: some comments you know, out out online and things that were talking about what is miscellaneous work. That just sounds like kind of a general term. Well no, these are actually
Jim Harkness: Yeah.
Kipp Snow: actual steps of work that need to be taken care of at this point in time. So I
Jim Harkness: Yeah. We use this as a opportunity. We viewed it as an opportunity to kind of be efficient in in being able to advance that critical path while we're taking the the you know the time to procure that main span contractor. this efficiency was such that because it's already a marine contractor that needs to be mobilized to do the demolition, right? Because we're we're talking about demolishing the spans over water. So we know it's a marine contractor in order to do the pile clean out or muck out.
Mike Singer: Mm-hmm.
Jim Harkness: That work has to be by a marine contractor. They can't do it just from the trestle we boug we built. So we knew that that fit, you know, with the kind of contractor that we were gonna be bringing on board for the demolition. So it just made sense to kind of get this efficiency into this contract and and so now they'll be able to go and and sort of set the table for the new main span contractor to really just start progressing that work where they're gonna start being able to f you know get that concrete. poured and then get their their footing underway.
Mike Singer: Awesome. Awesome. so let me I since you talked about it that way, let me I a question just came up. will they be waiting until all those piles are installed or will they be doing like will they start the muck out when like 24 is done or something? You know, what's the timing of
Jim Harkness: Yeah. Right.
Mike Singer: all this stuff that they're doing? Are they gonna be doing the you know the big steel removal sections? You know, can you kind of paint us a picture and how all this kind of works and times out?
Jim Harkness: Yeah, I think we don't have all the detail from our contractor yet because we just awarded it. So ultimately some of this depends on how they ultimately want to work the job. But the way we see it happening is starting with the steel removal. and they'll obviously gotta remove that steel before you do any of the concrete demolition, right? So they're gonna attack that steel removal. So very similar to the approach that we saw with the land. demolition.
Mike Singer: Mm-hmm.
Jim Harkness: except it's gonna be just barge mounted equipment.
Mike Singer: Mm-hmm.
Jim Harkness: so they'll go in there and they'll take that s that steel down. and then we anticipate that they'll s you know begin with that that chipping, the concrete chipping, using equipment very similar to what you saw on land. Again, just barge mounted. and
Mike Singer: Mm-hmm.
Jim Harkness: then ultimately
Mike Singer: I would imagine, if you're gonna for every action there's a equal and opposite reaction, right? So I mean these are gonna have to be barges with spuds. Okay. Right, right.
Jim Harkness: That's right. They're gonna be sputted down, gonna be held in place, yep, put up against the the pier and you know,
Mike Singer: Mm. Mm-hmm.
Jim Harkness: they'll sort of serve a dual purpose of kind of catching some of that debris. Anything that doesn't get retained on a barge would would have to ultimately be dredged or clamshelled out and then and then bar and then
Mike Singer: Wow. Interesting.
Jim Harkness: barged you know, barged away that way. you know, we're gonna rubalize it all. be able to separate the rebar from the the concrete and recycle that. and then in terms of when the the pile clean out or would would occur, we did have to kind of be strategic about that a little bit because we had Kiwit working it and in order to avoid any kind of conflict between two two contractors working the same area at the same time, we set some start dates in the contract for the demo contractor about when they would allow to be allowed to have access so that when when they're planning their schedule, they know when they would have to have that equipment and that activity that when they could get get to that. And so I think we said March for for pylon or pier 24. And then I think
Mike Singer: Mm-hmm.
Jim Harkness: we might have said May or maybe even June for twenty five. And so
Mike Singer: 'Cause twenty four is quite f farther ahead than twenty five, right? Mm-hmm.
Jim Harkness: Yeah, that was where that was where we started, with with Kiwit really getting those piles underway. So so we felt comfortable with twenty-four going first and very comfortable that March we'd be clear and so that that contractor wouldn't be delayed by Kiwit having you know, still being in that area. and then and then so that contractor will will have that access and then be able to If they're choosing to work both at the same time, they can do that. We gave them, I think, more than 18 months on this contract. Not that they need it all, but we just wanted to make sure that they had plenty of time. You know, there are some if they want to, you know, but we weren't going to dictate how they went about their demolition. So if this contractor was interested in using explosives, let's say, they could have they could have done that. But then there are certain windows where you're not allowed to perform that kind of work. And so we would have we had to leave enough time in the schedule where they would be still inside that window. and so so some of that led to the contract duration, because where we were letting this contract, you they wouldn't have gotten that full window. and so then you have to wait all the time until you're allowed back in to do that underwater blasting. Now it it turns out that this contractor did not elect to go with subaqueous blasting.
Mike Singer: Mm-hmm.
Jim Harkness: So it's not an issue for them. They can do this work whenever. So it's unlikely that they're gonna use it th all this time. we we don't see it necessarily going that long, but it was available to them for those reasons just so we didn't we didn't inflate the price because they're like, man, we gotta get this done in two months, you know? And so so part of that laid it up.
Kipp Snow: I it it it it's it sounds like to me that you guys are really trying to build in some operational efficiencies. i it while taking advantage of the fact that you you're you split up the contract. I I'm assuming that was the intent that you'd be able to also not you know, possibly reduce the price, but also take advantage of the some of the timing wit with that. Is that
Jim Harkness: Yeah. So when we were looking at back in the spring, you know, how we were gonna deliver this now, we just started to look at how do we strategically divvy up these scopes of work while we're while we understand we gotta, you know, complete that design, get that design a hundred percent on these certain items, right? Because we're delivering this as a design bid build, we had to have all the design complete. So We have all the design complete for this demolition. We have all the design complete for the approach spans that come next. so we were,
Mike Singer: Mm.
Jim Harkness: you know, we knew that we were gonna have those in hand. so we were able to then think, okay, where does that scope of work best fit? How do we how do we still prioritize that that critical path to opening the bridge while you're at the same time lining up these procurements? And so identifying this piece. that we could do with with the procurement that we're able to get out the quickest just was a very good efficiency in terms of of moving the needle on the critical path and and not kind of just having a delay for any other reason than saying, well, it can just go into the main span contract. It could, but that's the first then the first order of work that that guy has to do as opposed to it being done while we're
Kipp Snow: Gotcha.
Jim Harkness: getting him on board. and so that's how we were able to attack that.
Mike Singer: Was there was there any concern about you know the large equipment for removing the steel being in the way of the next contractor who's gonna be building the bridge, quote unquote, right next door? or or d did the timing work out so well that you really
Jim Harkness: Yeah.
Mike Singer: didn't have to worry about?
Jim Harkness: Yeah, so th that was the benefit of the progressive design build. So, you know, we've touted the the you know, the speed with which we were able to do, you know, the design with the progressive design build and that team and going from zero percent to seventy percent in fourteen months. Well there were the other benefits that come along with it were understanding how they their approach to to kind of handling the demolition as well as the construction of the bridge. And so you saw that they were working these activities concurrently and how they were planning to do it. And then we said, Well, that's no I mean, if if you can do it you know, and you're managing it, we can do it with two separate contractors and manage that as well. And so then we
Mike Singer: Mm-hmm.
Jim Harkness: we looked at who needed access to the trestle. Okay, the main span needs access to the trestle. Does demolition contractor need the trestle? No. Okay, so they're gonna be barged. they can't work from the trestle anyway, it's too far away. Perfect.
Mike Singer: Mm-hmm. Right.
Jim Harkness: Okay, so how do we how do we maintain access for the mainspan guide to the trestle? Because it kind of goes through the the limits of work for the approach guys. And then we figured out, okay, well, we'll put a requirement in the approach contracts that you know they need to maintain a certain you know distance for Mainspan contractor to access the trestle. So now
Mike Singer: Got it.
Jim Harkness: when they go in and they bid that work, they know that requirements in place. They know that they have to plan their means and methods for what they need to do around the fact that they have to be able to maintain this access point for the contractor. and so that was some of the the thought and some of the detail that went into how we laid out each of these contracts and what we needed to put into them to make sure that they could all kind of overlap and work in a tight area. I mean it's a it's a o almost a two and a half mile bridge, so it's not that tight, but it, you know, they're overlapping. but we think we have
Mike Singer: Right. Right.
Jim Harkness: it pretty well laid out and the feedback that we've received so far from contractors is that, you know, th these things aren't presenting an issue. This contractor, the demo contractor, so we've talked about being over the the water being marine, but there is one still one pier on each side that's on the land. So they
Mike Singer: Yes.
Jim Harkness: have to they have to do that as well. so we have to allow for that. And certainly they understand that, you know, we'll be bringing on this land contractors on each side. So there's just a little bit of coordination necessary there, but nothing that you know, we can't handle. We've we we worked a a lot of highway jobs, we've done section one hundred northeast of Baltimore, section two hundred on the northbound side. Those we we're working multiple contracts that overlap each other. They're on top of each other for overpasses while we're working on we we we kind of have a a a good history of of being able to to coordinate those and manage those activities and and do so successfully. So
Kipp Snow: I I
Jim Harkness: it looks like things are gonna pan out for the key bridge as well on that.
Kipp Snow: I I I think it's important to to stress that major projects like this are going to have, no matter what, multiple contractors and subcontractors and things and I know w when you look at terms and conditions of a contract it it'll lay out what's allowed or or what have you, but when you go build a building, you typically have multiple contractors, electrical plumbing, whatever, that are all in amongst
Jim Harkness: That's right.
Kipp Snow: each other, working together, all trying to accomplish the same thing. So it's it's going to you know So this this does happen all the time.
Jim Harkness: That's right. And in in a in vertical construction, it's you know, it's that that's that's magnified. That's a you know, that's a a real challenge for each project. In our horizontal, you know, construction here, we're building this thing in three in three sections. And those sections do have an inner you know, in an interface, but it's it's more like a just a a a point in space. and these these guys can work their areas really with minimal overlap and really it's just that interface point. And then you start to lay in at that, on top of that a schedule and those land based activities are not nearly duration of the of the main span. And so, you know, I th I said this the other day, I think the land based contractors are come in, build their job and they'll be gone and then eventually the main span guy will need to, interface with what they built and and it should be should be plenty of separation between the two and we're we won't we're not gonna be getting to the point where that l you know, mainspan guy is sitting around waiting for the land contractor to to complete the work. So
Mike Singer: Cool.
Jim Harkness: yeah.
Mike Singer: Hey, so real quickly you just said so for that one pier that's on land, so that's gonna be like a separate little sub or
Jim Harkness: They're they they're they're not subbing that out. They're just it's the fact is they're just gonna have to get access to that from land. So
Mike Singer: okay.
Jim Harkness: yeah. so probably the way they'll work it is the same piece of equipment that they'll have on the barge will be land based, and so they'll just, you know, have it on land, take that down, work the marine or vice versa, work the marine first and take it down on land.
Kipp Snow: Why don't I
Mike Singer: Right.
Kipp Snow: pull up the map that you sent over so that we can explain r
Mike Singer: Okay.
Kipp Snow: really quick what you know what what what this
Mike Singer: Great idea.
Kipp Snow: little area is. the area that we're talking about is is right here.
Mike Singer: Mm-hmm.
Kipp Snow: So if we take if we look here, we've got this is the wet western or or we do it or is this west or s south. Okay, north north and south. All right. So this is the southern
Jim Harkness: Call that South. South. Mm-hmm. Yep.
Kipp Snow: approach, this is the northern approach
Jim Harkness: That's right.
Kipp Snow: here, and these are the two two spans that everybody can see driving around the town, that's up in the air.
Jim Harkness: Yeah.
Kipp Snow: But if you see this line right here, this water line or the the water line here and then the the the ground line here, this this is the one piling right there that we're that's on land and you can see the the
Jim Harkness: That's right.
Kipp Snow: approximate distance in and everything that's involved with with j just from the from the schematic here.
Mike Singer: Mm-hmm.
Jim Harkness: That's right. so as you said, yeah, you can kind of see from this elevation view, the portions of the former bridge, all of the piers, from the last land pier on each side to all the marine piers. And so
Kipp Snow: These are all these are all these are all the the remaining these are the the remaining marine piers and then there are the two the
Jim Harkness: Yeah.
Kipp Snow: two towers right there.
Jim Harkness: That's correct. So they each have a a peer number and so that's what the P13, 14, 15, 16, that's what that is
Mike Singer: Mm-hmm.
Jim Harkness: referring to. And then so the
Mike Singer: Mm-hmm.
Jim Harkness: scope of work as we kind of talked about is to steel those concrete piers themselves then above and below water for those. So we have to take those those foundations down all the way to the mud line. So that's what that dashed line is that you were highlighting earlier what we call the mud line. So our permit requires us to remove those obstructions down to the mudline. Now pier 17 is the former main span pier, as well as pier 18. And so 17
Mike Singer: Right. Right.
Jim Harkness: was the one that was struck by the dolly.
Mike Singer: Right.
Jim Harkness: 18 remained intact, but we are removing portions of that, the top of it. That's right.
Mike Singer: top of it. You're gonna remove the A and just leave the the four or the box or
Jim Harkness: Correct. We're c remove the A frame essentially and and then that that very large bent that's on top of it and it'll look very similar to what 17 looks like we'll clean 17 up because it has kind of that rebar left over from the the emergency project so we'll
Mike Singer: Yeah. Right.
Jim Harkness: clean that up and those two will remain so we don't have to remove those those are very substantial foundations and that would have been quite disturbing to the you know in marine environment and just quite an effort to remove those. So thankfully our permitting with the Coast Guard, you know, their cooperation allowed us to to keep
Mike Singer: Awesome.
Jim Harkness: those and not have to go through the effort to remove those. But
Mike Singer: Now I forget what the term is, but will you be putting the wood new wood protections around them?
Jim Harkness: Yeah. So it's we're not we're not gonna be using wood necessarily. It'll be like a a fiber reinforced plastic. and
Mike Singer: okay.
Jim Harkness: so but yeah, it all they're fenders essentially. and and so
Mike Singer: Yeah, sure, sure.
Jim Harkness: yeah, they'll they had the timber fender before. I think we're coming back with that FRP, the fiber reinforced plastic or p yeah.
Mike Singer: Interesting.
Kipp Snow: Now le
Mike Singer: Interesting.
Kipp Snow: leaving those there doesn't impact the federal channel, does it?
Mike Singer: No.
Jim Harkness: No, right? Because nothing changed
Mike Singer: They're
Jim Harkness: about the feder federal channel because of our project. So it was permitted at eight hundred, it's dredged at seven hundred. You know, the the the
Mike Singer: that's the difference between seven and eight that I've been I haven't heard that recently, but I've seen
Jim Harkness: Yeah.
Mike Singer: the two different numbers and I'm like, why do they keep saying eight? So thank you very much. Yeah.
Jim Harkness: That that's the difference. so so those
Mike Singer: So we can always go to eight later in theory.
Jim Harkness: That was what that was the I guess the original thinking there
Mike Singer: Mm-hmm.
Jim Harkness: was that they didn't need the seven hundred or near need the eight hundred. you know, it kinda because th they excavate about fifteen feet, you know, from about the the natural ripper beds, I think thirty-five in this area. So they
Mike Singer: Mm-hmm.
Jim Harkness: the the with the cut back, you know, from the cut back down,
Mike Singer: Right. Sure.
Jim Harkness: they go from the eight hundred to the seven hundred.
Mike Singer: Got it. Okay. I understand.
Jim Harkness: yeah, and so then we have, you know, if we continue past Pier 18, you have Pier 19, 20, and 21, those suffered collapse during the during the the bridge collapse. And so there's
Mike Singer: Mm-hmm.
Jim Harkness: you know still portions of them there, and so we will be removing those as well and taking those to mudline.
Mike Singer: Okay, so can we talk about those taller piers that have the steel on top of Can you go to one of those pages, Kip?
Kipp Snow: so here's the here's the peer schematic.
Mike Singer: Mm-hmm. So I was wondering, Jim, how they do this. So, above the waterline, they're gonna be, mechanical hammering at these things, pulverizing, breaking it down. And then
Jim Harkness: That's right. Yep.
Mike Singer: that stops somewhere near the waterline, and then how do they remove like they're doing like a giant diamond saw like
Jim Harkness: Yeah.
Mike Singer: above the mudline? And then how does all that Structure, how do they take care of the difference between the mudline and the water line? How d how does all that
Jim Harkness: Sure. They yeah, so I mean you kind of detailed out two of the methods that contractors could utilize and so some of the variation that we saw in our bids might have been from the way that one contractor was approaching the the met the the removal. So you could in theory, you know, rig it up, use a a wiresall, wire saw it, and then and then you know lift it down in larger sections and then rubbelize it, you know, on land or on a barge. And you could take that approach. you could also just chip away at it with a long reach excavator with like a a pulverizing you know attachment.
Mike Singer: Mm-hmm. Mm-hmm.
Jim Harkness: that's what that's what the Sessler company did for us, Kiwitz subcontractor.
Mike Singer: Right.
Jim Harkness: That's how they approached it. and so
Mike Singer: Right.
Jim Harkness: And then, one other variation is as we talked about just rigging it and doing subaqueous blasting, right? You could you could blast it. so there those are the three primary approaches to doing the demolition. And so th the JB Fay company, their approach is gonna be just to do the mechanical for all of it. So they'll use that long reach excavator and they'll you know start at the top, start working their way down.
Mike Singer: Right.
Jim Harkness: They'll get to that water and then they'll just continue underwater. And then they'll Yep.
Mike Singer: see it didn't even occur to me that they could or would wanna or that it was even possible to keep
Jim Harkness: Yes.
Mike Singer: doing that underwater.
Jim Harkness: They can. Yep, so they can take that they can take that hammer, that attachment right underwater, keep going. they'll break up the as you can see the the design sort of had these the two columns that went into then that pier cap. And unlike our pier caps on the new bridge, these pier caps were down underwater. They had a coffer dam that they had built to allow
Mike Singer: Mm.
Jim Harkness: them to to form that up. So so they had you know, so we'll break that up as well in order to get to the mudline.
Mike Singer: Wow, that's interesting. You can't leave the cap. You can't just cut the legs off and leave the cap?
Jim Harkness: Not if it's above the mudline.
Mike Singer: Wow.
Jim Harkness: So,
Mike Singer: Wow.
Jim Harkness: so some of it, you know, maybe below mudline, and then it would just be a matter of getting what we needed to get. At that point, you're employing divers to go down and and kind of confirm
Mike Singer: Right.
Jim Harkness: you know the status of not having, you know, straight rebar. you may so there may be some underwater torching and cutting that's necessary
Mike Singer: Sure.
Jim Harkness: just for the, you know, kind of the final fine. touches that needed to happen in order to to get to meet the criteria of being removed to b mudline.
Mike Singer: Right, 'cause that whatever hammer pulverizing demo just seems okay. Seems so much more difficult underwater in we what we already know is a dark turbid environment, right? It's not
Jim Harkness: That's right. Yep.
Mike Singer: like you're doing this in Lake Tahoe where you can see down
Jim Harkness: No.
Mike Singer: to fifty feet. and so you know, when you're above the water, it's easy to see what you're dealing with. you can put a guy up there on a scissor lift with a cutter and, cut the rebar pieces off, but wow, just that's wow, that sounds really difficult to do underwater when you can't see what the heck you're doing.
Jim Harkness: Yeah, they'll use some some imaging technology to kinda guide them along.
Mike Singer: Mm. Mm.
Jim Harkness: Right. So when we were in the the the days of the emergency cu and we were working in that main channel and we were, you know, finding, you know, trusts and connections and were they still together
Mike Singer: Mm.
Jim Harkness: or had they separated. that we were using divers and and the divers were being supplemented by some sonar imaging that could essentially help guide them, right? So they were
Mike Singer: Right.
Jim Harkness: doing it a lot by hand. And so that sonar operator was able to be in the ears of the diver and say, no, move a couple feet to your right and check there. And then they could just kind of use that. And so there are abil you know, they'll have that ability to kind of s probably be able to see where the equipment is working and then kind of guide them like, hey, you're right on the the corner there. you know, hey, you know,
Mike Singer: Wow.
Jim Harkness: we have to go over here and get a little bit more. And then at the same time utilize divers to make sure things are clean.
Mike Singer: Yeah, that's that's really interesting to get a picture of what it's gonna take to do that. Hey, can we go back just to like awarding this contract, right? So was due on the eighth, then you bumped it to the twenty second, and then it took about a month to you know, go in front of the board and get that approval, right? And can we Can we talk about that process and then is that an expected timeline for the contracts going forward? That okay.
Jim Harkness: Yes. That's a good that's that cadence is a little s typical for us for these for the our our low bid contracts, our design bid build contracts. so We'll be able to open the bids. you have to do work to check references on the contractor. You have to confirm that the bids are all appropriate, that they're all acceptable bids. and so there's work that is involved in that. And then of course for MDTA, we have a board. And so we have to, you know, that's ultimately who has the approval authority for our contracts. And so then we have to go through that formal process of being able to present it to them. And so
Mike Singer: Mm-hmm.
Jim Harkness: It lays out in that where it it's about that month, month and a
Mike Singer: Okay.
Jim Harkness: half when we open bids, when we're c able to confirm that they're good, and then be able to take that to our board. And so you'll see a very similar timeline on
Mike Singer: Okay.
Jim Harkness: the future bids as well. So
Kipp Snow: And and and the transparency
Mike Singer: And
Kipp Snow: is there. I watched the the the meeting yesterday online and and it you know,
Mike Singer: Right. Me too.
Kipp Snow: and they went through and they asked the question, the hard questions and and y they had to be able to answer it in order to get that approval. So it's
Jim Harkness: Yeah. Our board is made up of you know, various backgrounds, but we have a financial side and we have the contract and and engineering side. So we have an a professional engineer on the board that has you know seen contracts like this. And so that's very good to be able to make sure that we have the proper checks and balances in place and you know being responsible for the funds and you know the funds on this project, right? Are they they're gonna this is gonna be the federal ER money that's funding this project. the the way that we're approaching this is this project will receive the the federal fund the ER funds the you know we did receive that settlement from the owners of the Dolly
Mike Singer: Right.
Jim Harkness: so that that money is going to be utilized for the main span contract and so that's
Mike Singer: I see.
Jim Harkness: gonna be utilized there the ER funds will be utilized for the other contracts and and we have received so far in ER funds, we've had approval for six hundred and eighty five million dollars of ER funds. And so we've been utilizing those for funding the Kiwit design effort, the Kewit effort on the trestle construction and Kewit
Mike Singer: Mm-hmm.
Jim Harkness: effort on on the foundation, the peer pile installations. So we're gonna now
Mike Singer: Mm-hmm.
Jim Harkness: we also have some of those funds go towards paying this thirty eight million and and it the other efforts to get these other procurements out. And so we'll continue to have requests for from the ER program and they'll continue to be able to authorize funds as we need them.
Mike Singer: Mm-hmm.
Jim Harkness: and then the as I said, the the settlement dollars will will come into play when we bring that main span contract around. We'll start utilizing those settlement funds to to to fund that activity. So
Mike Singer: And do we think that's, in the one point five to two billion dollar range? Can you talk about that or?
Jim Harkness: The for the cost for the main span? yeah, I think we
Mike Singer: Yes. Is that a
Jim Harkness: put our our you know, when we w kind of went public with our approaches, you know, some of the information. So we had estimated, you know, this this demo contract at like fifty to a hundred million. And so we actually came in under under what we estimated. So that was good. the main span we had estimated at, you know, three point five to four.
Mike Singer: Wow.
Jim Harkness: billion and so we have two billion of that in the settlement funds and so there will be,
Mike Singer: Mm.
Jim Harkness: you know, a a a continued ask from the federal ER funds as well.
Mike Singer: I see. Okay. That's a that's a interesting picture.
Kipp Snow: remote.
Mike Singer: Okay.
Kipp Snow: Re related to this and and some and and the cost. We had we had a we had a question sent in from a viewer and so I'd like to like to ask I'll I'll do the preface on it. MDTA stated that their reasoning for off-ramping from Kiwit was an inability for the two parties to come to an agreement on the price. and then MDTA stated that delivering this via four f separate contracts could potentially lower the cost.
Jim Harkness: Yes.
Kipp Snow: And with this first of the four contracts awarded, does MDTA feel like they're seeing the pricing that is more desirable based on what they were expecting?
Jim Harkness: Yeah, w I w we'll we were very encouraged, I'll say, by the We we received three bids on the project. And so
Mike Singer: Mm-hmm.
Jim Harkness: that showed that there was good interest in this demolition, right? It's a specialized specialized area, this marine contractor
Mike Singer: Right. Right.
Kipp Snow: Sure.
Jim Harkness: work. So to have three good, reputable marine contractors show interest and submit a bid, take the time to put the bid together and and and submit that. That we were we were very pleased by that. I mean that was you know, we saw that as a very positive sign. And then To receive three bids that were all under our estimate was just another positive sign to us that,
Mike Singer: Mm-hmm.
Jim Harkness: you know, that that you know they were competitive, that this work is, you know, i of interest to contractors. and so you know, on on our main span contract, that's being delivered as design built. So it's it's not the same bidding process. It's this proposal process that has to happen. So first in in July
Mike Singer: Mm.
Jim Harkness: we put out the request for qualifications. Then we received, you know, those those qualifications from interested firms. We've
Mike Singer: Mm-hmm.
Jim Harkness: since then been able to create a reduced candidates list of three three companies that were qualified.
Mike Singer: Very interesting.
Jim Harkness: And so now we have three companies that are all looking to put in proposals for the new bridge. so that's also mainspan. And so that's
Mike Singer: Main span specifically. Mm-hmm.
Jim Harkness: encouraging to us as well, because
Kipp Snow: Yeah.
Mike Singer: Wow.
Jim Harkness: we wanted, you know, three and we got three. And so that's that's good for us in terms of the same idea that the competition.
Mike Singer: Because the Facebook engineers were like, Who can possibly do it now that Kiwit can't do it? it just People like to complain.
Jim Harkness: There are a couple other there's a couple other games in town. so a couple other people have built bridges, not just Kiwit. So
Mike Singer: Yeah.
Jim Harkness: yeah, we have we have three good three good teams and we can't really share too much about that because we're in active procurement, but
Mike Singer: Understood. Understood.
Jim Harkness: but it w we're we're pleased there and then so you know, it really sets us up. we're he we're hearing some interest in in from industry, right? We're hearing rumblings about the new about the land contracts as well. You know, and so it i it's looking good. we're we're happy, we're encouraged that we're gonna have good results for those two contracts as well. And so we're we're looking
Mike Singer: That's awesome advanced information that you're sharing with us. I appreciate that.
Jim Harkness: Yeah. I mean we're looking to, you know, obviously advertise those in the first one being in December. So
Mike Singer: Mm-hmm.
Jim Harkness: a month from now we hope to be able to have that going out and then we'll see how much interest and and w we're anticipating good interest in that as well. Again, that interest if it turns into competition, that usually turns into good pricing and
Kipp Snow: Mm. Yeah. Yeah.
Jim Harkness: good schedule. So that's what we're that's what we're driving towards. That was part of what we needed to do coming out of the decision to offer it. Right? Because we just
Mike Singer: Mm-hmm.
Jim Harkness: couldn't get a get to a good place on price and schedule with with Kiwitt. So we we hope to be able to improve upon both.
Mike Singer: Right. And when I well so I had jury duty, I don't know, three or four weeks ago. And, you know, I'm sitting in my seat and I hear this couple back here talking about the bridge. Right. So I'm like, Okay, do I say anything or don't I say so I jump up, hand my card, you know, said, Hey, I heard you talking about the bridge and you know, so I was able to do a little bit of education there. Right. And when I told them that, you guys spent, whatever it was weeks trying to hammer out an agreement. Nobody knows that. Like you know. so it's in it's it is interesting to see how much folks don't know
Jim Harkness: Yeah.
Mike Singer: when you when you at least the people who are willing to listen and they just w don't wanna kinda complain.
Jim Harkness: Yeah. And we've we try to we've tried to be very transparent on this project. we
Mike Singer: Mm-hmm.
Jim Harkness: try to create a lot of content, get a lot of information out, try to be open about it. But there are there are pieces that
Mike Singer: here's my favorite, Jim.
Jim Harkness: people miss. So
Mike Singer: Right, here's my favorite. how much money are they spending on putting all this content and shouldn't those people be out there working on the cranes instead of sitting there? I'm like, they're not the same.
Jim Harkness: They don't they don't have their operators cards. Yeah. Yeah. No, yeah. I I think,
Mike Singer: I'm sorry, just had to that one's funny. So
Jim Harkness: you know, we've we we continue to to, you know, try to get feedback from people about how to share the information, how to make it digestible.
Mike Singer: Mm.
Jim Harkness: So recently we've done a couple of things where we created a dashboard for the for the project and we put that on our project webpage.
Mike Singer: I love that.
Jim Harkness: so that was we launched that at beginning of October.
Mike Singer: And can I can I
Jim Harkness: So w y
Mike Singer: give you kudos because it what is it update every two weeks or every month? Right. And so if you were having that thing update every day, everybody
Jim Harkness: We it'll be monthly at at a minimum. Yeah.
Mike Singer: out there would be filling out a piece of paperwork at the end of every day and you know, it'd be just crazy. So,
Jim Harkness: Faith. Yeah. All right.
Mike Singer: I I think it's great.
Jim Harkness: Yeah, we we're trying we were trying to find that right, cadence when
Mike Singer: Balance.
Jim Harkness: the the level of effort to update plus when is it really meaningful anyway. So we're right now we're at the we're at the monthly update. We may up is something big happens, we may update it. there. But and then now that we're bringing on the new contractor, we'll have additional things to start tracking. So there'll some be be some more measures starting to show up in terms of
Mike Singer: cool.
Jim Harkness: of tracking some of the activities of this new contractor plus we bring the land span guy on. So you we'll start to get some pretty good measures up there. in addition to the dashboard, y yesterday we also launched an interactive feature on the on the web page. And so it it's takes that design information that we've had up there and it it just
Mike Singer: Mm-hmm.
Jim Harkness: packages it in a way that w allows you to really jump in and interact with with those features a little bit more. And so it gives instead of scrolling it down, kind of get
Mike Singer: Instead of just scrolling you down the page and looking at the graphics that have the numbers, you can actually click on and
Jim Harkness: into like a little bit of a 3D model of it. and start to see
Mike Singer: Whoa.
Jim Harkness: some buttons that allow you to click into features of the bridge. you know we're we're gonna continue to develop that
Mike Singer: Nice.
Jim Harkness: as as things go along. But right now we have a a couple pieces of information in there you can start to find out. again, just you know it turns out that sometimes people still don't realize, you know, that we're building a cable state bridge. And so, you know, we just give you know continue to be allow different ways to have access to that information that you know might enable them to really understand the project a little bit better.
Mike Singer: Right, right. And not good, Kip.
Kipp Snow: No, no, I so y along kind of along with that and the timing and the timelines, I I wanted to compare. Yeah,
Jim Harkness: I love those.
Kipp Snow: compare this project to the
Mike Singer: This one this one's kinda good though.
Kipp Snow: the most recent cable stay bridges that were that
Jim Harkness: huh.
Kipp Snow: were built.
Mike Singer: So and this was my idea, well, this was Kip's idea, but my idea was to take the development and total time, which is you see in the red, fourteen to eighteen years, eleven to fifteen, seven to five, right?
Jim Harkness: Mm.
Mike Singer: And then down the bottom, little old two to six.
Kipp Snow: Yeah, so I I know that I know that the Detroit bridge is probably an anomaly here. All right. So we can't we can't really
Mike Singer: Right.
Jim Harkness: Yeah.
Kipp Snow: use that one as the best example. But if I look at everything else,
Jim Harkness: Yeah. Poor Gordy Howe.
Kipp Snow: you there's a significant amount of planning, environmental review, and procurement that took place in all the other ones. We're gonna get this thing built faster
Jim Harkness: That's right.
Kipp Snow: than any of the other four.
Jim Harkness: That's right. yeah, I mean when when our governor and the secretary of of USB OT said that this was, you know, the fastest moving infrastructure it was because of of that, you know, short period of time where we were going from zero percent design, so essentially the planning level, through planning, and you know into that design, getting to that 70% where we could get an estimate. Well meanwhile, we're starting with meaningful construction activities. and so, you know, we continue to be, you know, trying to push this as fast as we can. We want to certainly underscore with our contractors that, you know, s schedule has to be a the consideration. But, as we demonstrated with Kewit, cost is also a concern to us. So we are doing things the best we can to be good stewards of the the you know federal dollars that are going into this project. and so you know we're gonna tr try to focus on both. but yeah, this graphic, I think, you know, we created one similar to this for our our purposes you know, a year ago when we were talking about the you know, when we updated the cost and schedule for the project. That was a year ago. So we had a we had a few comparisons like this. so we yeah, we were pretty well aware. Gordy Howe, you know, that was certainly there's a lot of backstory there between
Kipp Snow: Right, yeah.
Mike Singer: Right, right.
Jim Harkness: that. But yeah, you know, we have you know in other projects because MDTA does have some other projects, we recently received the the signed record of decision, the final environmental impact statement for or study for the bay crossing for the bay bridge. And so
Mike Singer: Right, right.
Jim Harkness: that project itself had taken from the notice of intent that we filed on the project, that was in November of twenty four. It took two years to get to where we had a r signed record of decision. So just just
Mike Singer: Mm.
Jim Harkness: on that project alone, there was a two year period when we had already done a a lot of planning leading up to that. and but just two years to go from where w you filed a notice of intent to where you are getting your assigned record of decision. So these
Kipp Snow: Sure. Okay.
Jim Harkness: projects these projects, you know, that they take a long time and the I think that misconception of how quick some of these things go is because they only look at I think it was green on your on your graphic. that construction period,
Kipp Snow: Right, right.
Mike Singer: Right.
Jim Harkness: right? 'Cause that's what's visible to people. The procurement of these things, design,
Mike Singer: Right. Exactly.
Jim Harkness: the planning, that by and large, unless you're really paying attention to it, you just don't know how long that's taking. And so because we were so visible, we knew we were out on in, you know, in in at the forefront of people's minds and and constantly under that vision. But that, you know, trying to get people to understand that fourteen months on a project like this to go from zero percent, that is
Mike Singer: Mm-hmm.
Jim Harkness: is an enormous feat and we are is something that at D T A we're immensely proud of, the the being the having the ability to do that. it's something
Mike Singer: And I'm I'm hoping that at some point people can grasp that and maybe this graphic will help them. I really don't have
Jim Harkness: At some, yeah.
Mike Singer: a whole lot of faith in that, Jim, but we we're gonna keep trying.
Kipp Snow: We're gonna keep trying.
Jim Harkness: Yeah, I know that I'm proud of my team, and so I try to convey that to them and tell them, don't read those comments.
Mike Singer: Right, exactly. Do we have time for one more question or no? Okay, So that was adjusted, right? what was included in that initial trestle work was adjusted because it used to have like outriggers or fingers that went out to the piers, and now it's just pretty much a straight shot, and you're gonna let the next contractor like do their own custom additions or okay.
Jim Harkness: That's right. Yeah. So when we started out with that what we called an early work package under the Progressive Design Build, we were still,
Mike Singer: Right. Mm-hmm.
Jim Harkness: you know, fully intending to continue with Kiwit into phase two. So we had a, you know, a it was obviously a keywit design for this trestle. So we were authorizing them to do, you know, Once we realized that we were, or once we off-ramped, we said, well, this is a Kywit design. This is how Keywit wanted to build things. It may not necessarily work with what a new contractor wants to do. so let's let's back off some of that, let's r de scope what they had been authorized for.
Mike Singer: Is that mm-hmm.
Jim Harkness: We also, that just meant spending less money with them, kind of just kind of getting things to a good spot to stop. Now so we call that mainline trestle.
Mike Singer: Right.
Jim Harkness: so mainline trestle, it's all in place, it's all good for them, they can start utilizing it, but what they they'll be able to do is then locate those future fingers wherever they want. And so,
Kipp Snow: Hmm.
Jim Harkness: you know, if if some guy wanted to come up at it in a different way. I it's hard to imagine much of a different way, but however they w you know, it'll be the main line trestle's there for them to work from and do that, you know, s almost immediately. so we have we have that and and that was so that was the reason. So the full scope of a trestle has these fingers at each of the marine piers. and so
Mike Singer: Right. Right.
Jim Harkness: one of the things that we also wanted to do was part of the decision to go design build was to, we we wanna have that cable stay. So we were very directive with the the new teams. You're building the cable stay, you're building the one we have designed, you tell us how you build it, you're s the way you wanna build it, but we what we design is what we wanna see and we don't wanna change that. it's we we're not losing time for no reason. so we want you to stick with that. Now there's other things that you can look at. You can look at, you know, our our span lengths were 300 feet. and and so if
Mike Singer: Between the cables, you mean?
Jim Harkness: no between the marine the other piers on the marine approaches, there are 300 feet spans. So
Mike Singer: okay. I see.
Jim Harkness: if they want to make that longer, they can. So if they make it longer, they may eliminate a pier. Now if you if we had gone and constructed those fingers, you'd now have
Mike Singer: Mm.
Jim Harkness: the fingers in the wrong spot and
Mike Singer: Right.
Jim Harkness: and then you would have wasted money doing that. So
Mike Singer: Great point.
Jim Harkness: so that's part of the reason why we s cut that. We said, hold on, let let the team that ultimately is building the thing build these pieces that that are subject to whatever they're doing. So while they're going through their process of looking at how can we be very competitive on cost. And so if I eliminate an entire marine pier, that's substantial savings. you know, we're we're allowing that. we're allowing that. So yeah, so you make a longer, say if you go 400 instead of 300,
Mike Singer: Trading that against longer Interesting. Yeah.
Jim Harkness: right? You you you by the time you multiply that ow over the 2,000 sub feet we have, you've lost, you know, you've lost one pier in the water. And so that's a big if you could do that, that's a big savings. And so so that's some of the flexibility that we wanted from the design builder, the innovation. again,
Mike Singer: Mm-hmm.
Jim Harkness: also whatever they want to do with those vessel protections, they can propose that to us as well. So KeWit was gonna build those fenders if the the elder contractor comes in and and can meet our requirements.
Mike Singer: You mean the other four?
Jim Harkness: The other four, right? So the the two at the pylons, they're set. We're getting we're getting those very large, football sized
Mike Singer: Yes, okay. Yes. Mm-hmm.
Jim Harkness: fenders, concrete re reinforced concrete fenders. We know that. It's the other four, it's up to you. What do you wanna do? How do you wanna do it? and so
Mike Singer: But it obviously has to meet that code or that requirement.
Jim Harkness: it would all be subject to our approval. and you know, we're gonna meet the bridge code. So
Mike Singer: Right, of course.
Jim Harkness: yeah. So nothing nothing that's not gonna be up to code. It's just one contractor's way of doing it versus another contractor and another
Mike Singer: Mm-hmm.
Jim Harkness: p now another designer looking at it as who so we have them you know we we retain the services of the the designers from the bridge team from Kiwitz team so we have those they're under contract with with us. We were able to get that contract approved and so we have those critical design teams on contract with the state so any changes that these proposers want to make they're going to the engineers of record and they're the ones that can review it and say, yep, that's good, it works, you know.
Mike Singer: Interesting.
Jim Harkness: and so w we have that ability to kind of really make a good determination on the appropriateness of the things that they're proposing.
Mike Singer: I think that's a really big nugget. I didn't realize that it makes sense now that you said it that
Kipp Snow: Yeah, yeah.
Mike Singer: they would be retained, but
Jim Harkness: Yeah.
Mike Singer: I I don't think I knew that. And so that that's
Jim Harkness: Yeah.
Mike Singer: a real I think that's a really interesting nugget. Thanks for sharing that.
Jim Harkness: It it was it was that was it was a key for us to identify that was that was one of the things that we had to identify when we were making that decision about the procurements. because when you start to put design build teams together, obviously if if you if we're not retaining them and they're available to some proposer, they're gonna have an advantage over any other proposer because they're gonna have intimate knowledge of the development of the design. So we said, you know, we can't have that possibility getting out there and throwing a legal issue into our procurement. We can't afford that. And it just makes sense, because we're being directive, we're saying take this design that we have and build it. And that's a big, you know, liability issue for them. and for us and something that they'd have to really price a bunch of risk into, but wait, we have the engineers of record that you can, you know, refer to. So that was one of our risk mitigation measures.
Mike Singer: Good stuff, man. Thank you so much.
Kipp Snow: Wow, that was th that all of that was a lot of information. and I know you guys are are you know, actively moving forward. you know, y you're going through all of the steps. This is just one one more step in the process, but it was a big, you know, big announcement yesterday and I appreciate you coming on and and spending some time with us, answering some questions and you know, explaining some things out for us.
Jim Harkness: Absolutely, always a pleasure.
Mike Singer: What what might be the quick time f the quickly explain what the next time frame might be for the next award?
Jim Harkness: so we would look to advertise in a month and
Mike Singer: Mm-hmm.
Jim Harkness: then we would look to be taking that to our board as early as the end of February.
Mike Singer: Wow.
Jim Harkness: or it could, depending on questions and things that come up during procurement, could be March.
Mike Singer: Okay.
Kipp Snow: Okay. Well you heard you heard it there. So we will
Mike Singer: All right. You say you're coming back for Valentine's Day or Saint Patrick's Day. We have it on record.
Jim Harkness: That's that's right. Sounds like it.
Kipp Snow: All right.
Mike Singer: All right, Jim, thanks so much for joining us today, man. Really appreciate it.
Jim Harkness: Anytime. I appreciate you guys.
Kipp Snow: Yep. Appre appreciate it and we look forward to having you back on. Jim Harkness on the Two Guys Talking Shit podcast. That was a lot of information. I th
Mike Singer: That was. And he kinda went above and beyond
Kipp Snow: Yeah.
Mike Singer: you know, the demo contract, covered some other stuff, which was great.
Kipp Snow: Yeah, I didn't I didn't realize I didn't realize all the pilings in the concrete fill was part of that all or some of that was part of that also. I I
Mike Singer: Yes, yes.
Kipp Snow: I know that I know that the discussion around miscellaneous marine work in the in the publications you may have thrown some some some of the general public for a loop, but there's ac there's a good bit of work that's scheduled in that particular contract, so
Mike Singer: Mm-hmm. Yeah, and I again I I wanted to ask him this, but you know, in in my perception, in my engineering perception, you know, if you've got an empty tube and you've got forces on it, right? If that tube is now filled with concrete, well, now it's a lot stronger and a lot steadier.
Kipp Snow: Sure, sure.
Mike Singer: It's a lot less likely to kind of, you know, fold like a paper towel tube.
Kipp Snow: Yeah, yeah.
Mike Singer: Right? with nothing inside of it. Now you go put a broomstick inside the paper towel tube, you're not gonna be able to bend it as much. I don't know. I I guess that's how it works.
Kipp Snow: It's not yeah, it's not moving. Yeah.
Mike Singer: but yeah, that was some really good stuff. there he's he's always bringing more details and more things that we didn't think about, which would be hey, that would be why we have Jim on to learn to learn about stuff.
Kipp Snow: Yeah. Yeah, that was like i and he kept he kept giving several explanations or reasons, why certain things are happening.
Mike Singer: Mm-hmm.
Kipp Snow: So I appreciated that, some of those candid comments that right.
Mike Singer: Yeah, the background to why things are happening. Not just this is how it happens or this has to happen, but here's the mechanics of why it was happening and why the timing was such. Right. So I think that's key to no pun intended. I almost got I almost got him on that. I almost got him on that.
Kipp Snow: I was thank you. I was like I was like
Mike Singer: I think that's key to, you know, helping folks understand what is going on out there and
Kipp Snow: Yeah.
Mike Singer: what are the mechanisms that make things work? yeah, what a great opportunity to have them on for the fourth time. I mean
Kipp Snow: I know, right? right after the recording, they wanted to make sure that that everybody knew that the Key Bridge Rebuild website i is up. It has all of this information in that was talked about today. If
Mike Singer: Mm-hmm. Mm-hmm.
Kipp Snow: you have any questions about where the project is or what's going, they have the their pro their their progress dashboard. And so
Mike Singer: Right.
Kipp Snow: this is this gives you
Mike Singer: And then right across the top there, a bunch of key metrics, right?
Kipp Snow: Correct.
Mike Singer: how tall is it, how long is it, how tall are the tallest p pilings, those two, those two main pylons, and then this progress dashboard of all these different s groups of work and what the progress is in each area. So there's and look at that and what are the foundation piles and y there's a graphic there and and it right
Kipp Snow: It's actu yeah, it's actually explaining
Mike Singer: and it explains and shows you and you can see how many piles are going in and what it's gonna look like. so I know people just wanna be upset and yell and scream. But if you really wanna know what's going on, there is an awful lot of information in this website. they keep adding more and more info. And well, I'll go back to one of my favorite things and we'd have to find it. But there is a fly through
Kipp Snow: Yeah.
Mike Singer: like where I don't know, somebody flew a drone like twenty feet above a tractor trailer and kind of drives across the bridge. that is a really cool thing, if you know. If you can you can go find that, that is a that is a great video. But yeah, just a lot of information here.
Kipp Snow: So it they they wanted to make sure that hey, you can come here to to this site, you can see the
Mike Singer: Mm-hmm.
Kipp Snow: current status of the projects, you can get definitions and explanations as to what the what's involved in each step of the project. And then if you really want to see some some current fairly current current pictures of that particular
Mike Singer: Mm-hmm.
Kipp Snow: transaction, I clicked here and it took me over to another site that had their their pictures that they've talked about through the whole process and it's timestamped.
Mike Singer: Mm-hmm.
Kipp Snow: So it's make sure that you go out to keybridgerebuild dot com and then you'll get all of the information that that Jim was talking about today.
Mike Singer: And just as a quick little aside, and if you want to see live what they're doing, you know, we also have our camera that pretty much shows them driving these piles every day. and what's really cool is they've moved one of the cranes over and so they're driving two of these almost
Kipp Snow: wow.
Mike Singer: every day at the same time. They've taken those those giant yellow hydraulic hammers. and move them both to one location with two cranes. And so they're they're constantly driving two of these at the same time because Pier 24, which is the south end, is way further along than twenty five. And so I guess now they're trying to catch up.
Kipp Snow: Catch up, right.
Mike Singer: and so you can watch it live. Baltimore Shipwatchers dot com go to the camera link. And you'll be able to pull that up and check it out and be able to, have it in the background, watch k then be build the key bridge all day long.
Kipp Snow: All right, we know that there were some other things that took place in the port. Mike and I were down at the the Baltimore Port Alliance meeting at the pilot's office this morning and there was some news that came out of there and there's
Mike Singer: Mm-hmm. Right?
Kipp Snow: there's a number of other things that have taken place. We'll be back with episode eighty three here shortly, with all of those news nuggets in the port of Baltimore, but we're make sure that we gave Jim opportunity to come on and and talk about all the things that happened in yesterday's announcements. So
Mike Singer: Yep, yep. That was that was that was a good one. That was a heck of an opportunity.
Kipp Snow: Alright. That was. Alright, we don't want to count this one off.
Mike Singer: Let's do it.
Kipp Snow: Ready? Three, two, one. Happy shipwatching.
Mike Singer: Happy shipwatching. I joked around we were gonna say happy dashboard. Give a plug. All right, everybody. Thanks for watching. we'll see you on the next one.