May 14, 202531 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Sticker Shock: 6 Surprising Costs of Building a Custom Home Think building a luxury home is all about finishes and square footage? In this episode, Krista and Michael break down six surprising costs - three that are shockingly high and three that are lower than you'd expect. From $75K design fees to $23K window packages, we pull back the curtain on what really drives the budget in custom home construction. Whether you're a buyer, agent, or just curious, this episode offers real numbers, expert insight, and a few laughs along the way.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Ever wonder what really happens behind the scenes in construction, real estate and development? We pull back the curtain on the new home construction industry, the real estate market and the trends shaping it all. Discover the stories, insights and expertise behind the process of building a new home. Join us for Trust the Process podcast and let's build something great together. Welcome back to Trust the Process, the podcast where we talk about the real estate industry, new home construction. and everything in between. I'm

Krista joined again by Michael and today we want to kind of wanted to look at some of the things that might shock you about building a new home. Things that you may or may not realize or maybe the sticker shock. Sticker shock. Yeah. High and low sticker shock. Both ends of it. Yes. So sticker shock. Didn't know that cost that much or gosh I would expect that to cost more. So some of those things that might surprise you. Hopefully we can Show you some things you didn't know. Let's do three on the high side and three on the low side. This is apropos to what I've

been doing the last three or four days. I've been going through every project that are near completion. This is landing way higher than one project in the northwest part of town that's way over budget and just a disaster of a spreadsheet. and the comps aren't there to support. It's going to be a challenge. It's a beautiful house though. It might be a disaster of a spreadsheet, but it is not a disaster of a home. That's probably why it's a beautiful home because I built it as if it would be a $2 million or $2 .2 million home and it's just a small version of a $2 .2

million home. So can that area support a $900 ,000 value? I don't know. We're going to find out together and we'll have to kind of maybe check in on that after. I like to look at things as a percentage of the value of the home, not the value of the entire, or the cost of the entire project. I look at it, I'm basically creating, let's take a house in South Shore Lake, Las Vegas. We're creating a $2 million home. So then this line item is what percentage of that end of day. And I kind of took that and said, okay, what

percentage would shock people to say, I'm building a $2 million home. but this big thing only cost 2 % of the entire budget. Holy cow, I thought it'd be way more than that. Conversely, oh my god, this thing that I didn't even know was a cost center is 10 % of the budget. Holy cow, that's just insane. So, I don't have an example of that, Egregious, where something you didn't even know was a line item is that high of a percentage, but I wanna start with the bad news first. So, things that... still give me sticker shock to

this day, and I know would give a newbie or a person building their own custom home, a sticker shock, would be the design and engineering. You just don't realize, we've kind of talked about this in the past, but you just don't realize how much the architect, the mechanical engineer, the electrical and plumbing, the structural, calcs, the trust design, all those things that kind of come in to play before you even move your first speck of dirt. And then ongoing inspections after that, third party QAA as we call it, so

we might have to have our soil inspected after we excavate and we can re -compact. Those are called lifts. You know, we have to have that, a boring sample done and all the front end work before you break ground. So just when you consider all of that, when you factor in... everything that is not related to actually building the house but is related to the design and engineering and quality of the home it ends up being on the order of an average two million dollar home and it ends up being on the order of around seventy

five thousand dollars so that quick math that's around four percent of the end -of -day sales price of the home goes to the paper that the home is designed on. It goes to the third party. And nothing tangible that at the end of the process anybody could say, and here's my, you know, there isn't anything to, yeah. And every jurisdiction has different requirements. Some jurisdictions have a requirement that if it's under 3 ,000 square feet, it doesn't need a structural engineer. You can follow standard details. Not every city has these requirements. Some cities, novel concept,

let you do, let your professional... electrician lay out and and vote out your home to say okay the load calcs are this and this for this do we really need to spend no offense to Mariana engineering do we need to spend six to seven thousand dollars calcing that house out when we don't even follow the plans anyway we don't follow the plans anyway we don't follow exactly every single outlet we add a lot of things we do a framing walk even on a home that's not sold I do a framing walk with the electrician to say add a box here add this here do this Let's upgrade

it in the box here, add this here, do this. Let's upgrade it in this way. So we don't follow it anyway. And there's just things that you can't know until you're standing in the home. We talked about that last time you came. Gallery lighting. You can't feel where lighting should be until you're actually in the flow. It's different on paper sometimes. It is. And a lot of times your engineer just kind of plots it out. Okay, four -can lights in every room and they just kind of figure it all out. Slightly over to be right above the... Yeah, exactly. Those are things that still surprise me, and no matter how much replication we try to do with our standard floor

plans, there's still a cost. Even replotting a home and changing the title block and changing the address and showing how it sits on that particular site, it's still a $15 ,000. By the time it's all said and done, to add up another $5 ,000 for quality assurance engineering for the actual site -specific conditions, you're at $20 ,000 on a plan that we've built six times. It just... To me, that's sticker shock. Topic of the conversation. Whether we could do an entire episode on arguing whether or not we should be doing those things or whether or not those things are needed. I

do find it interesting that not every jurisdiction requires it, so why do some and not others? I can't find a reasoning behind that. You know, we have something on certain permits, standard details. So you don't have to get a soils test to do an ingrown pool. You don't have to do a soils test for a wall, especially a fence. I mean, if you want to do a retaining wall. There are standard details, though, for Nevada soil. So I just find that interesting that we don't have that for a home and why that's so cost prohibitive

to do it that way. So that's sticker shock number one. So that would kind of be the design and engineering piece of it. Yeah, I kind of lumped those together. A lot of third party stuff are engineering firms, so they're going to come out and do the sample, the soil, and make sure they're compacting. So since it goes to a company that has engineering in the name, I call it engineering. So that's sticker shock number one. At what number again? Around 4%. That number changes as you get a bigger home. It might start to dwindle

or diminish. a topic we talked about a couple weeks ago was why it's so much riskier to build entry -level housing because that design and engineering becomes 10 % of it. If you're trying to build something for 450 ,000, what engineer, what firms, how are you gonna get all your engineering done inside 45? You can, but it's just. Challenging you have to start replicating and then getting those costs down on each individual home You're still gonna have probably ten thousand dollars on each individual home still a big line item

So you only get that percentage down on an entry -level home by replication That's why there's not so there's not many unique entry -level homes when you drive through drive through neighborhoods that are entry -level or mid -market There's a lot of replication. That's just you could not have that kind of money spent on on a $500 ,000. It has to be. It has to be a simple shape. It has to be a simple floor plan. It has to be a pad. It has to be poured in a simple square rectangular shape. So that's 4%. What else would you shock

us with? I would say permitting to me is a shock. Not in terms of a percentage, but just how much a building permit and impact fees and plan check fees can add up. for the average home. They go off of size and fixture count and things like that. But at the end of the day, it's going to be hard to get a permit and all the accessory fees done for under $15 ,000. So nothing less than probably seven and maybe nothing more than around 20. But to me, that is a lot of money. that changes per home? Or is that just as a standard?

It changes in terms of the fixture count. It changes in terms of the size. But it's incremental. A standard permit has X number of dollars. A plan check fee is usually always, let's say, $1 ,500. It's just the raw cost of it. All those jurisdiction -related fees that don't really go anywhere, they don't go into the home, it's just the city allowing you to build. Now, I'm not going to go down that rabbit hole of trashing the fees because I do know that that's a big revenue source for cities that are growing and it represents the fact that the city is growing,

therefore our maintenance costs are going to be higher and I understand there's a calculus that goes into that. And those permit fees pay for your inspections. So if you're spending, let's say, $2 ,000 ,000 or $4 ,000 square foot home, a permit with a plan check and everything is impact fees around $15 ,000. So yeah, not a huge percentage of the budget, not even, or the end of day value of the home, maybe about .75%. But to me, that just seems like a strikingly big number. And anyone I've worked with on the build the suit side, if I've had a client that

came to me to build them a home, the permit just shocked them. They just weren't prepared that a permit would cost that much money. And it's a good point because kind of what do you get for that, right? I mean you get permission to build. You get permission to build. But you also get the inspections. You get the inspections. So there is a labor. There is a cost to the city. There's about, in our jurisdiction, about $1 ,500 worth of plan check. So I get that, that they're kind of auditing the plans for code. So, and then the engine. city inspector is auditing

the bill to the plans. It's just kind of cascades down. That being said, the amount of deviation away from the plans and the amount of things that are either not caught in plan check or called out as simple labeling conventions is astounding, kind of like a job justification. It feels like I'll have to find something in this plan because I have to justify the fact that I'm, you know, getting $1 ,500 per plan to audit set plans for code. And if you're right. So I do think that there's a lot of kind of overlap there that might be unnecessary. But if they don't have a value

add, then it's harder to justify those fees without calling them just flat out impact fees. I mean, they could just do that and just say it's $10 ,000 impact fee because you're adding a rooftop to our city. I'm not going to mention that they get to tax it forever. Yeah, that's true. They're getting a tax on it, but it's okay. I'm double dipping a little bit, but that's we've created a model of growth that is really throws a lot of the weight on the individual cities and counties to maintain those roads and the stir affairs

and schools and there's a lot of strain that comes in you know it's a city and a jurisdiction is a business too so I give them grace on that but it's to me it's a sticker shock so I'm not indicating that it'd be lower but you know it's and then there's also the cost of just running the building department which a department that I love so much. Okay, so that's one. Okay, so that's two. What would be the third sticker shop?

I'd say the best for last. I sandwich permitting in the middle. Don't get me wrong, there's a lot of things that would probably shock a lot of home buyers or bill to suit clients to say, oh that seems more. I just picked either the highest percentage or the most surprising. So the third one, is exteriors, not the exterior of the house, but the exterior. Now, we have a bit of a skewed lens because we build custom homes, completely move -in ready. 99 % of our

builds have... pools and spas and outdoor kitchens and fully landscaped backyards. And we obviously fence everything and build stucco block walls and cap them and build view fencing. And we developed the entire lot. So my lens is a little skewed on that, but we haven't, I've done other projects where we haven't and the exterior spend is always higher than you expect. So on one of our customs that sells for around $2 million, if it has a pool and most do. 10 % or more of my budget is

just the outside. The driveway, the back patio pavers, the pool, the spa. 10%. 10%. So we're around $210 ,000, $215 ,000 on a $2 million home for the outside. Yeah. The fence, the landscape. Right, hardscape. Hardscape and pool. And a pool. So. We're spending, at our cost, we build pools at our own cost, and we're spending around $90 ,000 just in hard costs. Equipment, excavation, gun ice. I mean, we do a nice, we upgrade a lot

of things. They're all smart pools and telecenter run by your phone. But even if I were to trim it down to bare bones, I'd still be spending in the 70s, probably 71, 72, probably around, I would say, 75 ,000. I don't think you could put a pool in anymore for under 70, and that's just a basic hole in the ground. Yeah, exactly. There's things you could cut, you could not heat it, and you could probably get those numbers down, but it just seems like once you move your shovel, just figure $70 ,000 and then go up from there. And that's our cost. That's not a company being greedy. That's us paying the excavator,

us paying the ... the rebar people. That's paying the pool plumbers directly. So those are our costs. I'm talking about pulling back the curtain. I mean, that shows you. Those are our true costs. That's what we're spending on a pool. And 10 years ago, companies were retailing pools for $40 ,000. Isn't that crazy? It's crazy. And there is a recession in the pool building industry. So I don't know if... Some of those costs might come down. I don't know, but you hear you talk to pool companies anymore and sometimes it's a little slow. Business isn't what it used to

be. Yeah. And this is Las Vegas. Everybody wants a pool, so you can imagine that there isn't a desire. There's not a demand in terms of people that can afford it, but there's a desire for it. Right. They kind of price themselves out of the market for a while. I wonder. Yeah. It's not a depression, but it's definitely a pool recession. So it's been good for us. We're able to schedule our people. It's much easier to keep a pool going. Our in -house person who manages it all, I know she can get a pool done in about eight weeks, which is crazy. So we kind of line

it up with the last 12 weeks of construction of the home. We kind of work backwards from there. So we don't have too much, number one, cost outlay. Right. And people aren't on top of each other. Exactly. We want the outside done ideally as much as possible. and then as we're finishing the inside, we're getting the pool going. Exactly, because you can imagine if the scaffolding were up for the stucco or the exterior, and you've got a pool, you know, putting it back there, somebody trying to dig a hole. You have to manage those things in a way that lines up. Yeah, get the outside down. Okay, so those are the top three. So quick wrap up the design and engineering.

the permitting and fees and impact fees, and then the outside, the hardscape and landscape on the exterior. And even a basic, we have a six -home project coming that I have no intention of building out the backyards. And just the driveways and the back patio still will have pavers. It just won't do anything beyond the end of the back patio. But by code, I have to have landscape planned for the city, for the front. So we have to budget and still probably spend around $40

,000 to $50 ,000 for all the hardscape and landscape. And that's just a house with a basic front yard. And the driveway and the back patio done in pavers. You don't think about that driveway, but it's an expense. It's an expense. Whether you do a paver or whether you do a concrete slab, it's either way. Either way. And driveways are big. They're covering a lot of space. I mean, it's always a minimum of a 500 square foot driveway, but most of our homes have three car garages or more. And then we send them back from the street a little bit. We're usually a thousand to 1200 in total between the little back covered patio that will have pavers, the front sidewalk

and the driveway. And pavers are... $8 to $10 per square with the product and the labor and all the accessories. So you multiply that by that. So $12 ,000 and then that's just a driveway sitting in the middle of dirt leading to your house. So just, it's just a lot of, it's just a big cost. So when you're starting that as your basis and then you got to figure out all the irrigation and everything on all the plants and the ground cover. It adds up. So you pull up and that's what $40 ,000 bought me. Okay. When I pull up, how about $2 million? $215 ,000. I

got a driveway and some trees and some, okay. So it's just sticker shock. So those are the ones that would shock us in terms of the high prices. What about the other end of it? Where would you drop down and maybe let us see that there isn't as big an expense as you might originally imagine? Yeah, right. Some of these are actually bigger line items than the first three, but they're such integral parts of the house, you would expect them to be higher. So I consider it reverse sticker shock. That's brilliant. Well, I still spent 1 .7 in build cost, but the lumber was only X number of dollars. So that leads me to the first

one is lumber and lumber is a hot button and lumber is the skeleton of the house and I get it. People feel like, oh, you know, it's going to be a huge dollar amount, but a lumber package, assuming kind of average lumber prices of three to $400 per thousand board feet, which is kind of where they hover and average. We have spikes and up and down, but for the most part, that's where they're at. So with lumber prices around that price point, it's a lumber package on a 4 ,000 square foot home might be around $50 ,000 to about $10 a square foot on a home that will

sell for five to $600 a square foot. So we're talking, that's a shock. It's around. Quick math, 2 % of the end -of -day value, one fiftieth of the value of the home is lumber. It feels like it'd be, to me, it feels like it'd be 10%. I just, I mean, I'm a seasoned builder and I still feel like, oh wow, that was only 50 ,000, including - We had that come up in another issue and that you mentioned the cost and we got a lot of feedback out of people like, what? So yeah, it is a shock

that it's as low as it is. Right, you would think, oh, framing and lumber, that must just be a huge - And it really isn't. How far you can get on 10 % of the budget, you can be walking through a house, the slab is done, everything, you get really far in. And then the expensive stuff starts. And don't get me wrong, there's a lot of 30 ,000 here, 40 ,000. Trust packages are around 25 ,000 for a 4 ,000 square foot two story home. By the

time you buy the floor trusses and the roof trusses. So that's a small footprint. small, relatively small for how much square footage you're getting. Yeah. And you're spending around $25 ,000. And that doesn't factor into your lumber costs? I mean, they are both a wood. It's both a wood. I break them out differently. But yeah, you could argue that it should be. So even if you were to add in trusses, let's take our Briel floor plan, which is a 30 -acre square foot two -story. Lumber package is around $43 ,000. So around $10 square. The truss package is $25 ,000. So we're at around $70 ,000. for all the lumber

and trusses and then include specialty lumber, glulam beams, LBLs, everything that would go into all the hardware, the tie downs, the straps, everything. Trust play to me. Compare that to the landscape that we just talked about. That's the whole house and the stability and the function of the living quarters. The landscape might die next year. You might take it out and say, I don't like these magnolias. I'm going to take them out. But relative perspective. Right. When you're not even at 10 % of the end of day sales price, ideally. Yeah, I find that interesting every

time I look at a budget, yet I still spend over a million. Oh, this is good. Our lumber and framing and everything is like a hundred and thirty thousand. This is great. We're going to be so under budget when we never are under. Under budget. That's not my vocabulary. What else is lower than you think we might expect? To me, windows and exterior compound sliding doors. OK, if we do a low E really high quality vinyl window, which is one of the most affordable windows you can get. So

granted that it's not the most high end window, but it's a really great window and it works really well and it will last for a really long time. It rarely discolors. It's just a good product. Let's go back to that Brielle floor plan. That house has four huge sliders, four huge sliders and 24 windows. And that entire package was $23 ,500 with install. To me, that seems really cheap because when you walk through a home that doesn't

have windows in it yet and then you come back and visit a week later and all the windows are in it feels like a different house it just feels like a home and to me that's always surprising now for reference if we were to go to a bronze thermally broken aluminum window and slider those can get up there but even if we took this to the tippy top most high -end window I still would not spend more than $80 ,000 For the highest end window for 20 plus windows and those 20 plus windows and four huge sliders to me That just

seems that does see right and then as a developer We make decisions on how to spec homes for right for those reasons. Okay, what kind of lot does this have? What kind of day sells price? Can I cut a little bit here the end -of -day buyer? I will tell you that I've never had A buyer dismiss a home based on the windows as far as I've known they that is never a deciding factor So I will do it and we've upgraded some of our specs in like Las Vegas with better doors and windows just because I feel that the home and the lot

deserves it and then if I Upgrade a couple other things then maybe that buyer that's shopping me against another builder on the other side of the lake Might come in and say oh their toll brothers is doing black aluminum and you're at 2 .4 and they're at 2 .2 and so you just do things because you don't want to not do it because you've over specked the home and other aspects but it's one of the last things that I upgrade I mean to pull back the curtain but it's one of the last things I upgrade because I know from experience that it does not move the needle in sales price

so given the option many buyers will elect to upgrade it with us They at least want it on the high touch point sliders. I want those upgraded the thermally broken. Sometimes you you know, we'll mix and match Rarely do you touch your windows? I don't touch them. You just don't really open I mean just not that they're not a high touch point. So But buyers will choose to upgrade them but never dismiss a spec cone that already has. And the whole point to a window is that you're looking through it. So you're not looking at it. Right. That's a good point. That's a good way to put it. That's the last thing you notice.

Do you notice that? It's still a beautiful glass scene outside. Right. And then the outside, I mean I look for those things but I would never... not buy a home because of its window type. I look at those things too, but I don't think the average person does. We also have a podcast about home building. So yes, we do pay attention to those details, but I don't know that the average buyer would. I don't think. It's definitely not a decision maker. Right. Okay, so that's two. So the third one I would say, again, in relation, this is a huge line item and this is really hard

to track, but it's labor. So it's hard to track because if I hire a sub, the windows for instance. Okay. How much of that 23 .5 is labor? Probably around $6 ,000. Maybe not even that much. So I can, I roughly know how much those things cost. If my HVAC ductwork and the condensers and everything's around 38 ,000, I know that around probably 8 ,000 of that was labor. So on a home that might cost around $300 a square to build with an end

of day value of around $500 per square foot. Your labor is probably only $100 a square. And that is generous, actually. Really? Yeah. Because labor is less than half of the total cost of construction costs and about 20 % of the end -of -day value of the home. And I find that alarming. Because it wouldn't come together if it weren't for the labor. Right. And when you walk one of our sites, sometimes you'll see 15 to 20 guys.

They're working with all their equipment. and all their knowledge, and their work ethic, and sometimes it's July, and it's 115 in Las Vegas, and they're still there working. Sometimes our roofs tend to land in June and July. Oh, sorry, you're gonna be putting this roof tile on in August. And we go into a house sometimes, and I've often, it feels almost like a beehive, it's just bustling. It's a beehive. Everybody's everywhere, and people are coming and going, and everybody's got their job, their mission, their point, and they're all working in unison, but individual, it is mind blowing. It's mind blowing. How much

can be happening in one time? How much can be happening? How many man hours? They generally say an average home is about generates three full -time jobs for the economy. So if you just were to say how many, what's a full -time jobs are up $2 ,200 a year. So that's about 6 ,600 man hours that goes into the average home. And if our homes are twice the average, we probably have about 12 ,000 man hours in a home. And to think that that's only 20 % of the end -of -the -day sales price to me is just crazy. That's wild. Yeah. That is. Yeah. And what about the

pretty stuff inside the surfaces, the flooring, the countertops? In terms of sticker shock? Yeah, I mean where do those fall? Are those higher than you'd expect or are they right where you might imagine it to be? I think that's why I didn't include them because I feel that they're... Generally, if you're interested in home building or considering building in a home or you're a homeowner or you're interested in even renovation, those are really transparent things to get the pricing on. Appliances, very transparent. You can go on to a great appliance vendor, Appliance by Design. You can go to these places and see,

okay, this high end range is $19 ,000. We know it. Yeah, that sticker shocks me to have a $19 ,000 range, but it's a knowable and you expect it. I'm not saying you expect it to cost as much as a car, but you know it's not cheap. So that's why I didn't include it, but the pretty stuff to me is, in my opinion, I think I've become so numb to it. Maybe I should be surprised that we can spend 80 to $100 ,000 in a cabinet package for an entire house, but that doesn't shock me.

It shocks me a little. Yeah, I mean, don't get me wrong. To me, it's not top three. And I know the cost, but it's still, it's every time I'm like, really? It is, it is astounding. So we had a house that was, cabinets are thought of in boxes. You break them into a box. Even if it's, you know, a whole bank of cabinets, it's how many boxes made up that bank of cabinets. We had a house that's just not finishing. that when I really broke it down, this one did sticker shock me, it was $1 ,200 per box. It was 49 boxes

and it was a $62 ,000 cabinet package. So it worked out to be $1 ,200. A troll in the comment section is going to do that. It's actually $1 ,134. Get a life. Go start a cabinet company and make yourself useful. Yeah, go get busy. Yeah, go get busy. So yes, when I really broke it down and you walk through the house and think... Really that box is open and that's an average some boxes are more expensive than others But at the end of the day we have a data set of 49. That's a pretty big data set So the average is pretty reliable in my opinion so that yes, so

I would say among the pretty stuff I think cabinets have carry really high sticker shock in a luxury home to me Appliances always carry a really high sticker shock in terms of the pretty stuff I mean, there are Thermador refrigerators that are $18 ,000. I know. I mean, it's just... I know. I've been shopping them for my own home. Or I was, you know, when I was shopping them for my own home, I was like, gosh, I know what these cost. I sell them. I see them. I share them with people. I help people choose them for their home. But when it's your dollar, you're like, well... It really is a... When you add

that... Well, that's a lot. Yeah. I haven't had a home that sold for north of $2 million that didn't have at least $30 ,000 worth of appliances in it. Because where do you stop? we should probably have an ice maker, an under counter ice maker that's plumbed in and we should probably have fridge columns and we should probably make them panel ready and do the cabinet panels. And the nicer you make those fridge columns now this has to match and now that has to go and this has you know you kind of do you want to keep the same brand and then you're right that's right and before you know it you've spent forty to fifty thousand. The most I've ever spent was

seventy thousand on an appliance package for a three million dollar home. But that home warranted it. It did, 100%. It had to. It did, 100%. And the end -of -day buyer actually noted the high -end appliance package that tipped him over from buying a home. And it was good. It was really great. So if I shared it over time, it was a fun one. It was a good package. But he cited that, that the home he was shopping us against was a resale. So we had a point there. We were in guard gated. This one wasn't. We were custom

in new construction. Obviously that one wasn't. And then the fourth point was the appliance package. And he was an amateur chef, a retired guy that had taken an interest in culinary arts after his retirement. That's perfect then. Obviously he didn't need to do it for the money. Right. Yeah, exactly. He had it. So those are them. All right. Well, thanks. You're welcome. You're breaking that down for us. It's just interesting. You know what is in the home when you walk through it at the end of the day or if you go see a model, but you sometimes don't think about the cost

that's associated with each of them, how it lays out and maybe it's more or less. And so thanks for pointing those out for us. Appreciate it. Learned some good stuff. Yes. Thank you for joining us and we will see you again next time on another episode of Trust the Process podcast. Bye -bye. Thanks for tuning into the Press the Process podcast. Make sure to follow us on Spotify to stay in the loop with the latest insights, project updates, and everything in between. See you next time.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. More Than Rates: How Builders and Lenders Create Affordable Pathways to Ownership EP 45

    Sep 23, 20261 hr 2 minAudio

    Trust the Process Podcast | Episode 45 You see the finished homes. We show you the steps it took to get there. Today, one of the steps nobody puts on a highlight reel. The financing. Krista and Michael sit down with...

    Credit the people on this episode

  2. When the Market Changes: How Builders Have to Change With It | Episode 44

    Aug 30, 202633 minAudio

    The 2026 housing market is showing more activity, but that doesn’t necessarily mean it’s getting easier. In this episode of Trust the Process, Krista and Michael take a mid-year look at the Las Vegas housing market -...

    Credit the people on this episode

  3. The Evolution of Mesa Verde EP 43

    Jun 23, 202639 minAudio

    Every community has a starting point, and often, it begins with a conversation. In this episode of Trust the Process, Michael and Krista take listeners behind the scenes of Mesa Verde Enclave, a proposed four-home...

    Credit the people on this episode

  4. Underspec'ing a Build: The Costs You Don't See Coming EP42

    Apr 29, 202631 minAudio

    S2 Episode 42: Trust the Process Podcast Building a home involves hundreds of decisions, and not all cost-saving choices carry the same impact. In this episode of Trust the Process Podcast, we explore the concept of...

    Credit the people on this episode

  5. How Do Small Teams Mange Big Builds? EP41

    Mar 30, 202628 minAudio

    Episode 41: In this episode of Trust the Process Podcast, we pull back the curtain on how our business actually runs day to day. From the outside, it can look like a large operation with endless resources - but in...

    Credit the people on this episode