Municipality Whisperers: Engineering Update EP34

Nov 8, 202526 minAudio

Episode 34, Trust the Process Podcast: Thank you to Taney Engineering, Jeff Thompson & Team! A behind-the-scenes check-in with our engineering team - what moved this week, what’s pending, and what it actually takes to go from NOFA to final map. What we cover: Studies & submittals in motion (drainage, traffic, utilities, grading) Agency coordination: city/county plan check, comments, resubmits Utility lineup (NV Energy, SW Gas, water district) and off-site work Permits, fees, and conditions of approval on the path to recordation Timelines, risks, and how we keep momentum between meetings Have a question for next week’s sync? Drop it in the comments.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Yeah, we've been through a lot on this one and I'll go through it with our listeners or our viewers as Arger's journey, but we got it done. Pretty much on schedule too. Yeah, no, it was a journey. You guys are municipality whispers. Hopefully we get there soon. together. Welcome

back to Trust the Process podcast where we talk about new home construction, the housing industry, real estate market, and all things in between. Today's a little bit different. So I'm gonna do a little introduction here, let you know what we're doing. It's a slightly different format. I've mentioned a few times that we would start bringing in some of our vendors and subcontractors and opening up conversations with other people as well. We get a lot of questions about how we get things done and how we move through things and, you know, decisions are being made on large

scale levels. And so how is all of that coming together? And one of the ways that that's coming together is through a lot of our great partners. We've got external teams that work with us and that we just couldn't get it accomplished without them. And you guys have heard numerous times, Michael mentioned our engineering team. Engineering is such a huge part of what we put together in the building process. And so giving you guys kind of a glimpse into that. The things that we talk about with them, it's Taney Engineering, Jeff Thompson and Jasmine, and we meet with them

weekly by phone calls and often in person, but more often than not, now there's Zoom calls. And that's how a lot of these decisions are made and things move forward. So that'd be kind of cool to let you peek into how that goes. So we'll put together a list of all of the homes that are in our current build cycle at any point, and then they just touch on each of those. happened in the last week or last two weeks, however long it's been movement that has happened movement that's pending. And I'm going to give you guys

a chance to look at that. So As our podcast audience, you guys have been around for long enough to know sort of the ins and outs of most of these projects, but there are a few that you may not have heard of. Just know they're coming. More information will be coming about them. Some are really at the infancy stages and so we haven't mentioned them on the podcast yet, but others that are already in full swing, you'll be familiar with. So consider this an introduction on the new guys and a wrap up on what we know about our existing projects. So hope you enjoy the call. I'd be curious to hear your feedback. So

please let me know if this is interesting to you or if you feel like you get any information from this. We can do more and look forward to continuing to grow the channel and offer great insights for you guys. So I already have them on the call. Go ahead and tap us in. I'm just going to get real quiet and let them do what they do and hope you guys enjoy the call. We appreciate you being open to being on camera. No problem. And you look handsome as hell. The hair's looking, he's got his tanning engineering

shirt on. He's just looking good. Anyway, and maybe when we get some good news on our granny plans, you'll look even better. In your eyes, hopefully, at least. Yeah, probably. So, um, I emailed Chris to the project agenda. I have the agenda in front of me. I figured we could just go down the agenda with Westridge. Yeah. Awesome. And I'll share my screen too. Oh, great. Okay. All right. Um, so Western Horizon is the first project. Um, entitlements are approved.

Drainage study was resubmitted on 9 -23. We should see that back here this week, hopefully. Um, and if it does get approved at that point, then we'll have to submit for concurrence at regional, but that can happen concurrently while we submit to the city of Henderson as well. Okay. What is that entity called? What are those abbreviations? Clark County Regional Flood Control Districts. Okay, perfect. All right. So they have jurisdiction

on anything in Clark County that has to do with water movement, basically, right? Only if they have a facility. So they're kind of in charge of all the major public storm drain facilities that storm drain detention basins, such like that. So there's actually a website. I don't know if you ever used it, but it's actually good to know. Okay. It's called flood view advance, and I'll bring it up here in a second. Flood view advance. But this is the site that's governed by regional flood control. Let me share. All

these different colors on here are storm drain, facilities, or detention basins that are governed by the regional flood control district. Now. Blue is what is constructed. Green is what's in the next five -year plan. And then red is what's in the 10 -year plan. Oh, okay. So if we go to your site on Horizon and Westridge,

you can see that this blue line that's adjacent to your site. is a regional facility. So that's why we have to submit to them. I see. Okay. So our other project - So you only have to submit to them when you're adjacent to a regional facility. If you're not adjacent to a regional facility, then you don't need their concurrence. Then it just comes down to whatever building department or local jurisdiction you're falling under and their review of the drainage. Okay. Correct. Okay. So we drew the short straw on this site.

The other site we have down east of here won't have that issue. I don't think. I don't know. So as you see here, your other side that we'll talk about here in a second. Okay. There's not a regional facility located in the vicinity. There's one over here, but that's not close enough to warrant us to have to submit to them. Okay. Awesome. Okay. Good to know. And you were saying that can be concurrent and you don't foresee any issues with this project and. No. The regional flood. Okay. No, cause especially that we're not like if we were extending the storm drain or something. Okay. Then regional would make

a lot more in depth. look at it, whereas we're basically just showing them, look, we're trying to stay away from it and not touch your stuff. So. Yeah. Do you agree with that? So hopefully it's a little less. So I don't foresee any issues, but again, we'll see when we actually submit, but I do not foresee any issues with that. Okay. Cool. Awesome. Let me bring up my agenda back here. Okay. So. Next on the list is the traffic

study. The traffic study was submitted on 10 -2. I believe the fee was sent to you. So we're just waiting for that fee to be paid so that it can be accepted and then reviewed. Okay. Let me take a look at that. And then the water network analysis was submitted back in August and was approved last month. So we're good on the water network analysis. Okay. Awesome. The traffic fee is an internal study that you guys do, or is that something that a regional jurisdiction does? No. So we did it and we submitted it. So

we are submitting our analysis to State Harrison to make sure that they're okay with our traffic counts and that nothing, no other improvements would be needed due to the traffic increase. Right. Okay. Perfect. So the right hand turn onto Horizon Ridge, even though that was part of our... Approval notice a final action. That'd be where something like that would come up and they'd say, whoa, wait a minute You got too many people turning right? Yeah, or if like a stop

or or like a traffic signal was warranted or something like that because you're adding so much more We are in this case. So that's I'm not worried about right But the things as such as that would be yeah showing this traffic and now especially commercial developments larger housing tracks things like that Yeah, especially like multi -family and just when you get higher unit counts. Okay. Perfect. All right. And the network analysis is just, are we, did they have a water supply in the area essentially to let

us tap in? Yeah, do our water pressures meet the minimum so that when you turn on your faucet, like it's not just a drip system, it's going to flow out and you can wash your hands. So. Perfect. All right. And now again, that was approved. So which. We need that and the traffic study approved before we can submit our plans to CF Harrison. So we can get that fee paid so that we can get that done so that when that driving study comes back out, it'll hold us up, then that'd be great. Right, right, right. Okay. Awesome.

All right. I'll have Janelle look into that. And then again, once all those three things are approved, Then we will submit our plans to the city of Harrison to go through their review of all their their internal departments as utilities. Right. Okay. Do you have a, a draft or a study set of the utility plan so I can get my head around it? Yeah. So I will send this to you as me. Okay. No problem. No problem. And that'll just be the wets basically water and sewer. Nevada

Energy would go directly with that. Correct. I'll send you the entire improvement plan set, and included in that will be the utility plans that will show the water and the sewer that will not include dries. Right. Those dries have to be designed by the dry utility companies, such as MBE and Southwest Gas and Zentra. Okay. Perfect. Or COX. Or COX, yep. All right. Cool. Any other questions you have on Horizon Rays and West Rays? So we'll pay that traffic fee, then they have

to still review that and approve it? Yes. Okay. And then all the other things are done. You'll send me the draft study set of the, basically the whole civil improvement plans. Then those will be all submitted. We'll say traffic has given their blessing. Water network has, you know, SNWA has given their blessing. And then that all gets kind of approved as one big civil improvement plan review set. utilities, all that. Yeah, so that what we need all three of those transit traffic bar in our analysis to be approved and then we can submit that whole plan set to

the City of Henderson so that they can then review it through their internal departments. Okay, awesome. Then when those are approved, they're basically saying... So they'll review our utility plan. because our utility plan hasn't been reviewed yet at all. They'll review our actual traffic plan that shows the improvements that we're calling out, as well as they'll review the grading and make sure that we're matching the drainage study and all that jazz. Right, right, right. OK, perfect. And then if that's approved, that's probably a minimum one round of corrections, I would imagine. Yeah, minimum one round. Minimum one round. So

we're looking at every three weeks. So if I were to say two corrections, we're looking at about nine weeks before they would... we'd be kind of ready to go to the next step. Yeah. So I would say, so let's say in a perfect world, right? That fee gets paid for traffic this week. Traffic takes a couple of weeks to review. And then drainage study would be, we're hoping to get that back this week, but if not early next week. So the traffic will be the outlander thing at that point.

So we need that to be approved. Let's say it gets approved by the end of the month. So then at the beginning of next month, November, we submit to CDF Henderson. They take three weeks to review. And then we address those comments for, let's say, a week to two weeks, depending on how difficult they are. In our timeline, we give ourselves two weeks. But if they're not very difficult, we can get them done in a week. And then we submit back to them for another three week review. Hopefully at that point I'll come

back approved and then or with some minor comments and then we address those and get those submitted so we're looking at about I Don't know at least two months. Yeah, once we submit the for first review of that process to go through Okay, and then after that point we can submit for Parcel map or the actual parcel numbers and the mapping To be recorded. Yeah, and actually actually we can submit So when we submit to Steve Henderson the first time with our improvement plans, it

always gets a little bit different with all the entities, but it's either we are, once they accept our improvement plans, then we can actually submit the final map for review or I can't, I can't remember which entity, but there's one of them that requires you to go through one review of your improvement plans before you can submit the final map. But either way, we can submit the final map as our plans are being. reviewed as well, so it's not like the approved plans have to be approved. And then we spend our final map. They're more of a concurrent thing. Okay. Perfect. So we'll get some overlap. There's a world where first part of January, we potentially

have a final map recorded. Usually the final map would be, it would, it would usually is delayed about a month after the improvement plans, because you do need the improvement plans approved before they'll sign up on the final map. The reviews can happen concurrently, but again, you have to. have the improvement plans approved before then they'll record the map. Okay. And what I'm hearing is I really, really have to dial in on the product for this. I keep kicking the can down the road and because I'm so indecisive on

what to put here. I need to finalize that because honestly that takes me, we have five houses. I probably might do some replication, but they're still going to have different elevations. That's probably a 10 week ordeal for me to To get the architectures done, get the MEPs and the structurals done. Um, you'll want to know the footprints I imagine, right? To show the lot fits on there. Yeah. And I don't, I mean, personally for me, I don't need to do a lot. Like the lot fit is just provided to you as a developer. Um, it's,

it's not needed for any type of smell to see at the moment. So it wouldn't hold anything up. Okay. For my. architectural for the actual vertical permits though, they would need to see exactly where it sits, right? Yes, sir. Yes. So yeah, I mean, I have to by the end of the month, I have to have everything finalized so that the architect architect takes at least five to six weeks to do five houses at minimum. And then the engineering is at least another four to six weeks for MEPs. So there we go. there, I mean,

that takes us to the end of January that, and then it's going to be through the holidays. So I really want, once I have APNs and addressing, I mean, I've got to, yeah, I snuck up on me. Yeah. You're not going to have APNs or addressing probably till the first quarter of next year, but, um, yes, it's, and just so you think you have time, you never do. So I know it's very true. I mean, It's another two weeks before I even finalize, send anything over to the architect with a vision. And then like, it's five weeks.

It takes us to the middle of December. Engineers get it in the middle of December. Probably don't even really get much done until the end of January. Yeah. It's, there it is. Yeah. Wild. So. Yeah. Okay. Anything else with the West region horizon? No, we're good. Okay. Moving on to Horizon Ridge and Yorogi. Entitlements are approved, received the NOFA back in July, so we're good there. Drainage study, anticipating to get submitted by the end

of the month. We are going through the crane plan and all the hydraulics and stuff right now. I'm hoping to have a set to you next week, just to review, to make sure you're aware of everything that's going on. Then we'll be able to design in case you want to change anything. But that is being worked on right now, um, as we speak. Okay. We received the traffic scope, so we'll have to create a, uh, do a traffic study on this

one as well and get that submitted. But we do have, again, we do have a little bit of time on this, but this is being worked on too. Not sure if you have a souls report on this yet. Hmm. I'll write that. I'll check up on that. I don't know if, uh. No worries. You have a little bit of time. We don't need it to submit or anything, but, um, at some point we will need it before we submit to City of Harrison. I remember why I was stalling on that and because they expire. So I was trying to do it as late as we - Oh, that's right. No, that's right. Um, technically

you can probably like on this one, if you wait till. Let's see here. If we submit the third year. If you want to wait till like. December ish beginning of December, then you shot you probably okay Okay, awesome Okay, perfect will do This one's running about two months behind Westridge I would imagine so we're looking at

maybe map recorded by very early q2 maybe Yeah, probably two yeah three months, but yeah something like that Depending on how fast this one goes. Okay. Did this get approved? The water network analysis get approved on this one as well? No, so this one was not approved yet. We actually have completed it or just We just need to get it submitted. So, okay But we want to get the drainage rate submitted first and then we'll submit the WNA. Right, right. Okay All right.

Very good Yeah, we've been through a lot on this one and I'll go through it with our listeners or our viewers It was Arger's journey, but we got it done. Pretty much on schedule too. Yeah, no, it was a journey. You guys are municipality whispers. Hopefully we get there soon. But yeah, and then once we get that journey study in. Um,

for the first review, then we'll start working on the rest of improvement plans, such as utilities and traffic plans and. Okay. To get those up to date so that once the drainage should eat after a couple of reviews comes back and approve, we can start to see if as soon as we can. Beautiful. Okay. Um, you don't have earth work on this yet, right? No, well, I bet you I can get you a halfway decent number by the end of the week. Okay. Cool. Not super duper urgent. Just got more FYI kind of for me. So I can kind of, it's good to know

as much as I can upfront to then help figure out what I want to do product wise. Right? If I kind of, if I get forced into a pigeonhole of a lot of site work and a lot of utility work, then it forces me into a luxury product. If I can keep my land costs down, I have a lot more options. So that's the only reason I kind of ask about it. It's not going to move the needle at all. Right? I mean, it is what it is. There's literally not much we can do when it comes to earth work. Yeah, I said, well, hopefully we have you number by the end of the week. Okay.

Okay. All right. Anything else with Horizon Ridge and Irogi? No. No news is good news. Last on the list is 48 Grand Miramar and 50. I should be sending those to you in the next 10 minutes after we get off our call. Those are completed. And so I will have those sent to you here shortly. Beautiful. Okay. Nothing crazy on those that you saw? No. Okay. Awesome. The only thing that's going to be a little tricky is just that wall

thing. Yeah. The existing walls and seeing if they crap about that. But other than that, there's nothing too complicated. So. Okay. Awesome. I appreciate it. And I'm sorry. They're just such sticklers. They really are. They really. want to know exactly where every wall is and where new walls are going to be added. And they have all these regulations on where the walls have to be. And yeah. And the quality of the walls have to be called out that they're stuccoed and capped. But the neighbor at 50, that house is

one of the first ones I think we went through two weeks ago. They don't even have capped. Their walls are not in compliance. So I don't know how I extend a wall. And then as my wall in compliance, then I'm going to have a decorative stucco caps and do you know what I mean? And, but then it's going to stop at their wall. Then it's going to go back down to a regular, just regular stuccoed wall. Yeah, it'll be interesting. So I'm hoping that I'll wait and see what you have come up with. Cause I can't picture exactly where they are depending on where that returns. I don't know. I mean, I would like to just return it

right where their wall ends, but their wall starts pretty far back. So I don't know where, how you drew it, but I'll take a look at it when, when I get it. So remember we talked about, we're trying not to touch their wall right now. Yeah. Yep. And see what they go through review because otherwise you have to tear up all their landscaping and stuff. Terrible. Because in order to get to the wall, it's just gonna be a nightmare. It's gonna be a mess. So we've called it out to wherever the existing wall is, we're leaving it and we're leaving the existing one in France. And obviously our new wall that we're putting in between the two lots are just being proposed to being whatever that length is on each one.

But all the other ones we're leaving the way it is and seeing what they say. Okay. Perfect. That works for me. It's just like you said, especially if the material is different. It's going to look. Yeah. Yeah. Yeah. We'll see. All right. Well, that's great. I appreciate you guys getting those back to me. And this is huge, uh, that we can have this submitted with our first review with those, with the association, the deadline for the submission is Friday for a Wednesday meeting. And we're going to have a grading plan, which is amazing as we normally never there. And then

from a permitting standpoint, I have all my structurals. I have your stuff. The architectures are done. I'm waiting on MEPs, which are, they told me by Wednesday study set, stamp set by October 31st. So there's a chance I have an entire permit set on this, on these two projects by the end of the month, which is huge. That's impressive. It's impressive. Yeah. Um, it's good. It's a good team. Um, so we'll see. That's probably a record. I think that's. Ownership of the land was about three weeks ago. So about five weeks

of ownership. You have a full set of permits. And one of those houses is a brand new plan that I came up with. The other one at least is a recycle, but we still made some changes. Um, so it's pretty, pretty cool. Yeah. But you see, even, even speed running this son of a bitch, uh, it took me five weeks. So that's why with rest, see, I couldn't keep it together. I made it 21 minutes. Just don't bring up only fair. Stupid. So dumb. Krista, stop recording. It shows me on Westridge that

I have to, those are, there's five of those things. So, and they're all kind of different lots. I really think I probably need to do five different houses. So there's just, yeah, it's. Oh, you have three other ones in this area? Oh, no. I mean on Westridge five. Oh, yeah. Yeah. And then, cool. And then you got. The other one so I know I'm hoping there can be some overlap between the two but you you know These lots well, they're all kind of different. Yeah, but I yeah Yeah,

it's tough. I mean, it depends on what does a lot sizes are so different the lot I'm very yeah lay out They're so different. Well three at Westridge is really shallow lot four is a is a gem but I can't design everything to fit lot four. And then they each have different views. Just really depends on what direction I want to take. Take this. If these are true custom bespoke homes, then every house really should be different to take advantage of the views and the situations on site. So we'll see. Right. That's what I'm really torn on right now. And when I see the utility plan for Westridge, that is, and I can

kind of figure out what the costs are. If the land basis is low, then I can just take the safe route out and go. 110 % of the median sales price for the area and be fine, because there'll be new construction and it'll sell. But if the plans are more in depth and the costs are more in depth to get these five lots pad ready, then it's going to force me down that pigeonhole. Should have done this due diligence before I bought it. No, it'll be fine. The zip code will carry it. Zip code will carry any direction. It's just a matter of what vision and how fast do we blow out all

five of them? Do we just start with two? that has its own challenges. Cause then people ask, well, what's going on lots three, four and five. And how do I know that that's going to be vacant or they pictured, you know, I have projects in South shore and there's a vacant lot next to one of them. And my sales agent got so tired of answering the question, what's going next door. She just started saying Taco Bell and it's in a custom guard gated country club. She's just like, what do you think is going to go there? Just like a Taco Bell or a CVS pharmacy and the drive through is going to be right on your side of your house. Speaker's going to be facing you.

Speaker's facing you. You're going to know all the specials. So anyway. All right, boss. Well, I appreciate your time. Thanks for being, you know, doing this. This is a huge, huge help. Not a problem. Yeah. People, some of our viewers really get in the weeds on our stuff. So it should be helpful. Yeah. Not a problem. Yeah. Thank you very much. Appreciate it. Yeah, that's great. All right, I'll see you guys in two weeks and I'll look out for those emails. Sounds good. Thanks, Michael. Thanks, Krista. Thanks, guys.

Thanks, Jasmine. I appreciate it. Yeah. See ya. Bye. Thanks for tuning into the Press the Process podcast. Make sure to follow us on Spotify to stay in the loop with the latest insights, project updates, and everything in between. See you next time.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. More Than Rates: How Builders and Lenders Create Affordable Pathways to Ownership EP 45

    Sep 23, 20261 hr 2 minAudio

    Trust the Process Podcast | Episode 45 You see the finished homes. We show you the steps it took to get there. Today, one of the steps nobody puts on a highlight reel. The financing. Krista and Michael sit down with...

    Credit the people on this episode

  2. When the Market Changes: How Builders Have to Change With It | Episode 44

    Aug 30, 202633 minAudio

    The 2026 housing market is showing more activity, but that doesn’t necessarily mean it’s getting easier. In this episode of Trust the Process, Krista and Michael take a mid-year look at the Las Vegas housing market -...

    Credit the people on this episode

  3. The Evolution of Mesa Verde EP 43

    Jun 23, 202639 minAudio

    Every community has a starting point, and often, it begins with a conversation. In this episode of Trust the Process, Michael and Krista take listeners behind the scenes of Mesa Verde Enclave, a proposed four-home...

    Credit the people on this episode

  4. Underspec'ing a Build: The Costs You Don't See Coming EP42

    Apr 29, 202631 minAudio

    S2 Episode 42: Trust the Process Podcast Building a home involves hundreds of decisions, and not all cost-saving choices carry the same impact. In this episode of Trust the Process Podcast, we explore the concept of...

    Credit the people on this episode

  5. How Do Small Teams Mange Big Builds? EP41

    Mar 30, 202628 minAudio

    Episode 41: In this episode of Trust the Process Podcast, we pull back the curtain on how our business actually runs day to day. From the outside, it can look like a large operation with endless resources - but in...

    Credit the people on this episode