From Vision to Victory: Turning a Zoning Nightmare into a Luxury Community EP29

Jul 31, 202524 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Episode 29: How do you take an overlooked parcel of land with outdated zoning and turn it into a future luxury neighborhood? In this episode, Michael and Krista pull back the curtain on the long, winding process behind their latest infill development - sharing real-time wins, unexpected roadblocks, and the behind-the-scenes decisions that shaped the outcome. 👉 If you missed the first part of this topic, catch up here: https://rss.com/podcasts/breaking-ground-introduction-to-trust-the-process From pushing through city council approvals to battling over cul-de-sac dimensions, this is a firsthand look at what it really takes to bring a project to life. They also share why infill lots are some of the most challenging - but rewarding - opportunities for boutique builders like Trust Home Builders. 🔹 Why their original 23-townhome plan got scrapped 🔹 The surprising cul-de-sac rule that cost them a lot 🔹 How this luxury micro-community will take shape by 2027 🔹 Lessons learned about timing, zoning, and perseverance It’s not always glamorous, but it’s always real. This is Trust the Process.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

We're bullish on Las Vegas. 60 ,000 people a year move here. 22 ,000 households are created every year, and about 13 ,000 homes are built, including multifamily. So we'll be OK as developers. It's just a... Ever wonder what really happens behind the scenes in construction, real estate, and development? We pull back the curtain on the new home construction industry, the real estate market, and the trends shaping it all. Discover the stories, insights, and expertise

behind the process of building a new home. Join us for Trust the Process podcast, and let's build something great together. Welcome back to Trust the Process, podcast where we talk about new homes, the real estate industry, the market, and everything in between. Had a little bit of a different look today. Still have Michael joining me. Our resident expert with all of the good information. And we've gone to kind of a more remote platform. Couple of reasons we've done

this. First, because it's not always convenient to get together. But secondly, we're thinking it will be a good way to introduce guests as we go. Other speakers that we bring in or other experts in other fields that we'd like to start including into the information in the podcast we share with you. So this is kind of our trial run. Though we have... We have a great topic to follow up on. Previously we spoke about the project that we're working on and some of the obstacles that we faced with permitting and making sure that it works well. And I can go ahead and

I'll link that first one in the body of the content here and then you guys can go back. If you didn't catch the first half, this is the follow up. So update us on the latest if you will, Michael. Well, we had a thanks for the intro and I always love being called a resident expert. I'm taking that any day of the week. I know it's my favorite. Resident could also mean that I'm inpatient and inpatient psych ward. So this last week we had

our rubber stamp city council meeting where they. essentially approved this subdivision that we've been working on for about seven months and That represented several meetings that represented two neighborhood meetings that represented When I say that that represents meaning that represented the culmination of multiple neighborhood meetings multiple meetings of my engineer I meet with the engineering team every other week and we've been doing that since about January February So that's a lot of for midway through the year. So that's about 13 That's about, yeah, about

seven or eight meetings at this point. No, more than that. Yeah, probably 15 meetings at this point. And then you meet with them because you meet with them and then you meet with us to download the team on the latest updates. So you spend a lot of time. Each meeting is an hour and then I spend an hour talking with the team and I spend an hour thinking about it for the next week. Maybe they gave me something to chew on and we'll kind of talk about that when I pull the map over and we can show the audience what was technically fully approved. It's satisfying. It's a very

satisfying win that we got through all of these hurdles. When the parcel came to me, it was zoned for public use. It was privately owned, but zoned for public use. So think something like a church. Think about something like maybe a rec center. And it was wedged between two residential housing developments, and it was only two acres. So it's not some massive site. It was right way between two residential housing projects. And then on the other side of the street was more residential.

It didn't have the infrastructure for walking. It didn't have any other draws. There was not really a ton of density in the area that would justify it being some sort of public use. So the owners of the parcel came to me in a joint venture and said, if you can get this switched over and pulled out of that public use master plan. So the city has a master plan. not a master plan community in the sense that we think of them but the city itself has a master plan where they have every parcel zoned accordingly to what their vision for the city is and what they feel

the citizen vision of the city is right because they're all elected officials for the most part so or at least the tone is set by the elected officials so it's a big hurdle the reason i go into that detail is it's a really really really big hurdle to get something pulled out of the master plan so we had to make a really compelling argument i .e. This is why we need to do it. What do you need from us to let us do it? And essentially, we started with wanting to do a 23 -home townhome community. We had a map for

that. We didn't have enough common space per the city requirements, so we nixed the townhome zoning. The city was okay with that density. They actually want the density. They just weren't, we weren't able to get a waiver of all the other standards that they make every other developer do. So I thought that was pretty fair. to say, if you could get that density in, great, but I don't think you're going to be able to without bending a lot of the other rules and we're not prepared to bend those rules for you because it's going to start a cascade and then every other major builder is going to come to us and say, why don't you make us do park spaces and

roundabouts and things like this to get the townhome density? And we'd say, oh, I don't know. Why would we let Trostone Builders do it? They're a convincing man, but I'll marry that company. Very compelling. So essentially, we drew several maps up and that was our first phase was just getting in front of the staff advises the Planning Commission. Planning Commission are appointed or elected and then obviously City Council is fully elected. So we start with the staff and they kind of usher you through it and say okay

we're going to be okay with it we're going to do a staff recommend. If you can get those two golden words that is you're halfway there. If you can get those words staff recommends on any of your staff reports or kind of any of your documentation you're going to have hope. far greater odds of getting it through neighborhood meetings, getting it through planning commission, and then obviously whatever planning commission and staff says, city council pretty much rubber stamps, you would, and that's what was last week, last Tuesday. So that being said, we knew going

into last week that we were going to be fine because we had satisfied all those things. So I didn't even go to that city council meeting. I left the engineering firm that we hired to do the tentative map and they advised us legally on some of the certain processes to get through those maps getting recorded. So I let them kind of handle it through and through and I just got an email the next day. City Council had no problem with it. I noticed the final action was issued which essentially means get this map recorded once you get your civil plans done and that becomes

six parcels a right away and some common spaces. So we're generating, I think, nine unique new parcel numbers, and then a public right -of -way. That will be the opposite to call it a sack. So it's quite a feat. It's pretty rewarding to think that we took a hillside, which was an eyesore and a blight on the community for years, and odd zoning. It was just kind of this hangover of an old master plan that they never changed, right? And the residents didn't want it to be

public use. The residents wanted it to be residential. around them the lower impact use right in fact when we went to we you have to send up postcards to a thousand foot radius i want to say roughly a quarter mile all the rooftops in a quarter mile radius with a postcard that says this is what we're planning on doing and this is the density we're going for and all that yeah so we send that over we had to reserve a spot at the community rec center to have this meeting and about eight people showed up from the newer neighborhood that were more luxury homes to the

west of my parcel, the immediate western boundary. And there really wasn't any major pushback. It was mostly they were upset about the process this was going to take. And I told them to trust the process. And they called them. They were worried about the dust. They were worried about the bugs. They were worried about typical, you know, if you ever watch Parks and Recreation, the types of people that show up to the city council meetings. I don't want a new park here because it's going to generate dust and noise

and kids playing basketball and all this stuff. So you'd rather have a ditch there. You know, the residents don't think that way. They just they know what they have. They don't want it to change. So I get it. We had already had staff approval or sorry, recommended staff approval by that point. So I really wasn't even worried then. I would have been worried, let's say, if I were going from residential to public space. because I'm fucking the trends of the entire street and I'm not being cohesive to what the

neighborhood already has. So I think that being said, I didn't have a lot of angst. It was frustrating to get there though. So originally I had a 23 -home plot or scheme worked up for town homes that was nixed. By the way, every time you do that, it's two weeks. So you apply, you send in your map. You say we'd like to get this waiver, we'd like to get this, and then they essentially have a week to review it. So you send it in, the deadline hits, let's say it's a Tuesday,

you send it in by Friday, they have a full week to review it, and then they have three days to get it back to you. So it's not quite two weeks, but usually you're not going to wait until the 11th hour to submit it. So you're going to submit it Monday and get it back the following Friday. So you lose a lot of time. And then if you're beholden to your engineering team, thankfully I have phenomenal engineering team. Jeff Thompson at Taney engineering in Las Vegas is just second to none and it's why this project happened in six months and not 12 months or 18 months because they're just he and his assistant are on the

ball and the whole firm is on the ball and I think that's why yeah pretty phenomenal team. So they also got on zoom calls with the city of Henderson with us I mean they were there with us and this wasn't a commercial for them but I just couldn't have done it without them and it was owner I mean, it was, like I said, it was several months of, okay, now the city wants to get on its own call with public works and with traffic. And I'm sitting here going, there's 15 to 16 city executives over a six home, well,

at that time it was eight, over an eight home subdivision. And my engineering team is there as three of us. I think you were on that call at one point. So two people from Trust, three people from Taney Engineering, 15 people from the city of Henderson, all in a team's call. In fact, the Henderson people were in a boardroom, remember, and then we were just on a screen watching them with our faces up there. Yeah. Okay, this seems like a lot of pomp and circumstance for an eight -home subdivision, but you had that traffic pipe in and fire pipe in and sewer pipe

in and public works pipe in and ecology pipe in and zoning and planning commitments. All these things had to pipe in on it. So I definitely understand. Yeah, it was wild. So that being said, I did want to kind of, you know, one of the benefits of doing this on this format would be that we could kind of show the screen and kind of get an idea of what I was up against. So I did want to go ahead and show the audience

that. So I'm going to share my screen. Alright, so here's the site and I believe we've shared this in the past and I've certainly shared it on social media if anyone follows me there. This is Horizon Ridge. And then this was the parcel right here. This is a mountain. So we didn't disturb the mountain. We kept the mountain intact. But we also lost the square footage, right? So when we deal with the city, everything's about minimum lot sizes and minimum common area spaces. I'm sorry. We have two unique common area spaces

and then six parcels. So we're going to have a total of eight. And then this will be annexed into the right of way. So here's our cul -de -sac. We're in RS6 zoning, so minimum of 6 ,000 square foot home sites. So that was also the tricky part. So the smallest one has to be at least 6 ,000. So you can see we're kind of squished on this one because it's longer, but then this one's wider. So it's more than 6 ,000, but then you have minimum width that you want in order to build a product that's marketable. And then

you didn't want this one to be too crazy. So it ended up just being a lot, right? It ended up just being a lot of work. to go back and forth considering we had about 15 to 20 different versions of this map and then we would submit something and they would say actually we want this landscape buffer to be here for sure this whole thing here is landscaping even though these are town homes and you're going to a lower intensity technically the books say you don't need it but they wanted it because again we're taking it out of their

master plan so they could pretty much tell us whatever they want right okay if you do it we want this landscape buffer here well then we lost 10 feet of lot frontage here okay we don't want you to mess with this mountain otherwise you're gonna have to get a hillside overlay okay well you can see right here that's 21 000 square feet that's a quarter at the half of an acre of hillside that i lost i had just had to basically forfeit then they wanted this landscape buffer which we understood even though we weren't going from uh we weren't going to a higher intensity

we were keeping the same intensity as the neighbors They wanted it on both sides. And then we lost 20 feet total here. We lost all the square footage of this common element here. And then to add a little cherry on top, normally cul -de -sac. Check out this cul -de -sac, Chris. Look how small and modest that cul -de -sac is, right? That's 87 feet, roughly. This is 100 feet from end to end. So then it just cut this whole thing up. So we lost another... roughly seven feet

this way and We kind of moved the street back this way to have seven feet. So we were we were too short and then the the road the little knuckles here was 43 they wanted 47 so we lost more square footage on lot six from lot five You can see where we started at Originally 23. Okay, then we'll go single -family. Okay, I can do 10 and I'll do 10 RS eight zoning, which is 4 ,000 square foot home sites. And I was off by 150 square

feet on one of the lots, which was the whole reason why we could not go to eight. We had to go to six. So it was pretty wild when you think back and forth of what was going on and what the conversations were. But this is the scheme we ended up with. You've drawn the homes, right? You've drawn the homes to fit those envelopes. And you've got all the utilities laid out. So when they take a home away or when a home site doesn't work out, now you have to go back to the drawing board. You have to redraw the house.

You have to relay it out. All the utilities have to come in at a different port. I mean, it's a big deal. It's a big deal. And it's heart wrenching because you think you've got a home. Start over. Yeah. Start over. Yeah. So it's okay. I have no, no regrets. It's going to end up being a great project. It's going to be probably our, uh, like maybe a 2027 delivery. So we're going to be delivering that with some other early 27, hopefully early 27, uh, 27. There'll be kind of the tail end of our Westridge subdivision

and we'll probably be long gone out of serene. So we'll be kind of the way it worked. It just worked really, really well. Um, From a timing perspective, I'm excited about the product. Would I have loved to get eight in? Yeah, but they would have been smaller homes, smaller home sites. I would have been limited on my exit prices. I would have been limited on what I can do. And ultimately we have to remember that we're luxury home builders. As much as I would love to get into more of the middle market, ultimately we are luxury builders and this is going to be a

luxury product. This is our wheelhouse and I find it. kind of comforting in that, that I know how to do the, I can deliver a luxury home and I know how to make a luxury home profitable. I know how to make a luxury market, I'm sorry, luxury project marketable and profitable. And the area can carry it. And the area can carry it. If you look at a one mile radius, you hit 20 million dollar homes. You hit one million dollar homes within a thousand foot radius. I mean, literally the parcel next door to us is routinely in a million. It's not uncommon to

get an over $1 million sales price in there. So I'm very encouraged. I would have loved to experiment and to take what we do as trust home builders into a more middle market product. And it didn't work out that way. Part of why there's a housing shortage are all these regulations. Honestly, we literally saw it happen. Some of those regulations were just things that the regulators wanted. They're not even in the books. They're not even technically a regulation. But a regulator told me that they wanted it. And because I don't

want to die on that hill, the fire is like, no, we don't need a 100 foot cul -de -sac. Traffic didn't want it. They didn't care. It was a sewer truck that might need to get up there in 10 years. And he might have to back into one of the driveways to get out of there one time in 10 years. Maybe never. Or back out of the cul -de -sac and back onto Horizon Ridge. But no, the entire cul -de -sac, till the end of time, is going to be bigger now because of that one regulator. Is that a standardized code? No. There's not a single cul

-de -sac that big in Las Vegas, in the metro area. This is going to be 13 feet bigger. It's pretty wild. But because of that, we lost... I mean, like I said, it's hard to bellyache when everything worked out, but it's still, you know, still kind of... Frustrating, but it's okay. Everything worked out. It's gonna be a great product. I'm very excited about it. I know the whole team's excited about it. The map, I haven't noticed the final action. My next step is to design the product that goes there. I didn't spend a ton of time. I drew about probably 10

different houses over the course of the last seven months for that neighborhood thinking, okay, if we end up with this, let me just get excited about it. So I'm pretty close. I'll probably find one of those, three of those 10. that will work in there. And it'll be really exciting. The product is going to be great. It's going to have a 2027 delivery. So ideally, maybe the market comps are even better by then. So I probably will end up being very happy with the way everything played out, I would imagine. So we'll put the

best product that we can on there and do the best we can do to make it a successful project. So overall, very excited about it. Still 23 townhomes. That's not in my wheelhouse. I mean I can do it, but I would have been a little nervous Do I what do do amenities start to matter more at that point do people want pools eight? Kind of yard spaces are they probably not looking for zero, but maybe they don't want you know a Massive yard or so and then HOA There's just a lot there

was a lot of things, but I wanted to do it just to get out of our comfort zone It pushed me right back to my comfort zone, which is okay Wow It's going to be a great project. It's interesting to watch it in real time unfold where you think you have one and then you have the meeting and then everything has to change and then you get it redrafted and you think you have it and then you go to the meeting. So it's just interesting every time the municipalities get involved, we were pivoting to fit into the criteria or the

expectations that they've set forth. Yes, exactly. and it's part of what makes it exciting though. I mean honestly and it's part of why the little parcels like this are still left for companies like ours because they're not easy to develop. Infill projects are not easy at all. Not to say that larger big master plans don't have their own set of their own basket of issues but it's not easy and then you don't get the capital behind them that the big projects get. They're not sexy to wall street. You can't lump it up as a syndicated

investment as easily as you could say let's say a hundred whole subdivision in some of them you know that's easy to erase those funds and it's easy to pull the fire so this would be a challenge I mean this is what our business is it's a challenge to to get them you know to get city to see your your way just get the buyers to see your vision to get the company on board to get capital behind you all these things are challenging, but it's why there's not 101 companies in town that do what we do. So I'm grateful that it's challenging

and we're ready for these challenges. We've had these challenges forever, so this is nothing new for us. But it'll be interesting. We definitely earned our grid on this one. We've never pulled something out of existing zoning and done it to this extent before. So we're about, I would say we're about 30 % through. the next 30 % would be all the land development, the physical work, and then the last 40 % of the houses. So that's the funny anecdote to think that as a developer,

when you see homes come out of the ground, the developer is already about 65 % there. And it's right. It's true. The buyer coming in is the last 1 % of the equation. So when they're coming in and saying, this house isn't going to be done. nothing's been done. The place board's still missing lights. There were no utilities here about six months ago. You would have been camping. So I think a lot's been done. We're third quarter. Yeah, we're third quarter of 2025 today. And you just said this will be a turnover in 2027.

So before you get there, stuff. We've talked about that numerous times. example to really point out how far in advance decisions are made prior to the home actually standing. Yes and what was set in stone long before a market shifted or long before and you know we had any data on what that year would even look like. I don't even know where rates of interest rates are going to be in 2017. I have no idea. Your guess is as good as mine. A year ago I would have thought we were in the low sixes. High five. Yeah. Didn't

happen. Either way We're bullish on Las Vegas. 60 ,000 people a year move here. 22 ,000 households are created every year, and about 13 ,000 homes are built, including multifamily. So we'll be OK as developers. It's just challenging. Yeah, it's not always kittens and rainbows. There's a lot of challenge and a lot of obstacles that we face to just kind of pull back the curtain.

be plain about that. This is not what we expected, and obviously we have come to a place where we're excited about it and we know it's going to be great, but the pivot has happened again and again and again throughout Israel, so fair to share it. Thank you for being transparent, for sharing it. And let us know how you guys... about this forum. I'll be anxious to hear your feedback or to see what you guys think. Does this work as well for you or or how could we improve on it? We work with so many great people. So many

behind the scenes like he was just talking about the engineer. We've got so many people that we can invite in to discuss other opportunity topics with. So hoping this becomes a forum we can do that in. I love it. Thanks again for joining us on another episode of Trust the Process podcast and we will see you next time. Thanks. Bye bye. Thanks for tuning into the Trust the Process podcast. Make sure to follow us on Spotify to stay in the loop with the latest insights, project updates, and everything in between. See you next

time.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. More Than Rates: How Builders and Lenders Create Affordable Pathways to Ownership EP 45

    Sep 23, 20261 hr 2 minAudio

    Trust the Process Podcast | Episode 45 You see the finished homes. We show you the steps it took to get there. Today, one of the steps nobody puts on a highlight reel. The financing. Krista and Michael sit down with...

    Credit the people on this episode

  2. When the Market Changes: How Builders Have to Change With It | Episode 44

    Aug 30, 202633 minAudio

    The 2026 housing market is showing more activity, but that doesn’t necessarily mean it’s getting easier. In this episode of Trust the Process, Krista and Michael take a mid-year look at the Las Vegas housing market -...

    Credit the people on this episode

  3. The Evolution of Mesa Verde EP 43

    Jun 23, 202639 minAudio

    Every community has a starting point, and often, it begins with a conversation. In this episode of Trust the Process, Michael and Krista take listeners behind the scenes of Mesa Verde Enclave, a proposed four-home...

    Credit the people on this episode

  4. Underspec'ing a Build: The Costs You Don't See Coming EP42

    Apr 29, 202631 minAudio

    S2 Episode 42: Trust the Process Podcast Building a home involves hundreds of decisions, and not all cost-saving choices carry the same impact. In this episode of Trust the Process Podcast, we explore the concept of...

    Credit the people on this episode

  5. How Do Small Teams Mange Big Builds? EP41

    Mar 30, 202628 minAudio

    Episode 41: In this episode of Trust the Process Podcast, we pull back the curtain on how our business actually runs day to day. From the outside, it can look like a large operation with endless resources - but in...

    Credit the people on this episode