Keywords EV charging, Autel Energy, market landscape, reliability, data management, regulatory compliance, government programs, communication, charging technology, industry maturity Summary In this episode of Transition to Zero, host Jerge Schneider speaks with Dario Pagani from Autel Energy about the evolving landscape of EV charging technology. They discuss the reliability of chargers, the importance of data management for fleet optimization, and the challenges posed by regulatory compliance. The conversation also highlights the role of government programs in infrastructure development and the need for improved communication and collaboration within the industry. Looking ahead, they explore the future of charging technology and the lessons learned from past experiences in the market. Takeaways The EV charging market is stabilizing after a period of intense competition. Reliability and diagnostics are crucial for long-term investment in charging infrastructure. Data management is essential for optimizing fleet operations and reducing costs. BABA compliance for chargers increases costs but ensures local manufacturing. Government programs can provide necessary support and structure for industry growth. Effective communication among stakeholders is vital for successful project execution. 2026 is anticipated to be a pivotal year for deploying existing charging technologies. The industry is maturing, with a focus on proven solutions rather than constant innovation. Lessons learned from past failures are shaping a more confident market. Investing in the EV industry is seen as a revolutionary opportunity. sound bites "We're getting past the race to the bottom." "Reliability is key for long-term investment." "BABA compliance increases costs significantly." Chapters 00:00 Introduction to Autel Energy and EV Charging 02:48 Market Landscape and Business Models 05:46 Ensuring Charger Reliability and Maintenance 08:12 Regulatory Compliance: Buy America and Its Implications 11:17 Government's Role in Industry Development 14:02 Infrastructure Challenges and Solutions 16:34 Communication and Collaboration in Electrification 19:35 Lessons Learned and Future Considerations 22:06 The Future of Charging Technology and Deployment
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Welcome everyone to another episode of Transition to Zero, the only podcast dedicated to advanced technologies in transit. I'm your host, Jerge Schneider. I'm vice president at CalSTART where I lead the bus team. I'm joined today by Dario Pagani, the vice president of marketing and communications at Autel Energy. Dario, glad to have you here. Thank you for having me, Jared. Really excited to chat. Absolutely. So let's go ahead and level set for everybody. Tell me about it. I'll tell.
So the Outtel story actually starts uh slightly outside of EV charging. So while you may know us as an EV charging manufacturer, our roots are really not a diagnostic. That's really where the company started. And you may have seen our tools at other dealers or your mechanic. And from those roots, we developed our EV charging business. Yeah, and so, and you guys have, I believe, an entire suite of EV chargers as well, from, I believe, light duty all the way up to buses and heavy duty.
Yeah, that's correct. We address all use cases anywhere from single family residential up to industrial applications and megawatt charging. Good, so this is great. So I wanna ask and kind of dive into this, like how do you see the current industry landscape because we've seen charger manufacturers come into the market, exit the market from, how long have you guys been doing this now? We've been doing this for about four years now. I've been in the industry for about 10. So I definitely see what you're talking about.
Now, so how do you see the market right now as it's evolving? I believe we are getting past what I call the race to the bottom where we, also companies, we're trying to plant flags in the ground sometimes, perhaps not really making money while doing so. I think that we're getting past that point to companies that are operating as a business, so with profitable engagements with customers.
And it's, funny that you say that like bringing up the race to the bottom because it's such an interesting concept because everybody wants to pay less. I look, we're all consumers. I want to pay less for things, but especially if it's something around my business that I require for my operations to make money. I'll, I'll tend to pay a little bit more than the cheapest price to make sure that I'm able to continue going. So I love that you're, you're pointing out that that's somewhat leveled off. Yeah, it's definitely leveling off. think that there were some companies that entered the market without really a lot of conviction or perhaps not the right ideas from a business uh model standpoint.
So that has already been shed, I feel, organically by the industry. And now we are honed in on um some better best practices and also some more healthy business models. So let's quickly talk about the reliability part of this, because I'm sure that, especially with you guys having diagnostics tools, and I'm sure lots of data, and we'll talk about data in a second as well, what is the reliability for your chargers? And I guess, how do you ensure that that uptime is maximized as much as possible?
Yeah, absolutely. That's a great way to get started, I feel. It kind of leans into our roots in diagnostics, So, know, charger is only going to be, you know, a good choice from a long-term investment. Obviously, you have an upfront cost to any kind of charging infrastructure, and then also, you you're going to be recovering the value of that investment over time. So, you know, you may have a first gear is flawless, second gear is flawless, that we may have some issues, or you may have some minor issues due to, preventative maintenance that perhaps was skipped or not taken care of appropriately.
know, that's just where the visibility on those diagnostics and those data points is very important because obviously you're not going to go and take a look at the charger and open it up every day, every week or every month, but you're going to have to rely on some diagnostic dashboard that you're going to be leaning into when it comes to managing the chargers across sometimes multiple locations, right? Each charger from from an hotel standpoint as a regular uh preventative maintenance schedule. And then uh for anything that is obviously something that we expect to be more frequent when it comes to component failures, we rely on a network of O uh partners.
So when you think about the network of partners, they're going to lean into a stock of parts, either they warehouse or we warehouse, in order to make sure that should something happen with the charger, ah we can get that back online within a very short amount of time, sometimes even before the customer realizes there's something wrong with it. So I do wanna ask this, if you have a fleet that wants to work on your chargers themselves, do you guys allow them to do that? Because that can be risky.
Yeah, I we do have a certification program for preventative maintenance and for maintenance in general. So, you know, we don't do that ourselves. We have high-level support engineers that are supporting our partners and absolutely transit agencies, fleet operators, they could be those partners as long as they have appropriate staff. Okay, now that's good to know. From the data perspective, what data points are you guys looking at and what do you think is the most important for the fleets to be looking at?
When you look at fleet, obviously for reliability there are all sorts of, obviously a station is only going to work if everything is going correctly, right? So if there is any red flags thrown up, even if the station name may not be down, that may be operating at a limited capacity. For instance, all our stations are modular, right? So we may have multiple power modules that feed the charging stations and one of the power modules may be down, which doesn't mean that the station doesn't work, but you obviously have reduced power to that station.
So there is a uh 100 % operational versus like a 60 % operation. So I think that's from a reliability standpoint. Obviously a fleet operator is a mission critical application. So we want that uptime to be as high as possible. uh From a different side of the house when it comes to utilization uh data, uh we're constantly uh monitoring utilization, know, try to optimize also the power management of the site, which is, you know, very, very important when it comes to, you know, making sure that the costs
associated to operating that fleet are not getting, you know, higher than the expectation. Is that like the management of, guess kind of the charger management, is that an additional component, I guess like external of the charger, or is that something that's internal to your own system? So it can be internal to the hotel, you know. overall ecosystem, the hardware, the software, right? Because we do have our own cloud platform. However, we also leverage a broad array of uh third party or CPP compliant partners.
um And so when we feed the diagnostic data points to the third party partner, um then they will actually look at utilization data from their own platform uh and have their own custom dashboards and reports. they provide to the customer. So at the end of the day when it boils down to the ecosystem of hardware, software and services, like we're kind of pulling it all together, right? It is about meeting the customer where they're at.
So if they have a preference in software, obviously we are here to support that, making sure that everything is implemented correctly. And by the way, third-party software is pre-commissioned into our hardware at a factory level. It doesn't have to be done in the feed. on the last minute. ah And so that way you at least know up front what, which software is going to work with your system rather than just deploying it and going, well, this is going to take a while. Yeah, especially for a fleet application is often not a vanilla in the kind of type of integration.
You have many, you know, requirements that may need a little bit of tweaking. And that's true regardless of, you know, two different companies being interoperable or having a fully, you know, self-contained stack that we have, you know, obviously players in the field that do hardware, and services. We prefer to pull that together organically according to customer requirements. Thanks. And so kind of pivoting a little bit, but more towards kind of the hardware part of this.
So a lot of the discussion that we've had over the last, the last couple of years, there have always been discussions around build America, buy America and the content within the, within the chargers themselves. And I'm wondering what your take is. Cause in transit for the vehicle itself has to be at 70 % by America compliant. However, chargers have not had to fall under that compliance, but I know there are always discussions around this. What are the hurdles and what are some of the considerations you think people should take when looking at uh tinkering with applying this towards the chargers themselves?
Yeah, absolutely. So when it comes to chargers, the current, yeah. Requirements 55 % you talked about 70 % for buses. It's currently 55 for chargers. I think there are several positive factors, right that that the by America Act introduces one is that you have hands-on You know hands-on work that happens on these chargers within you know, the United States That happens from the components standpoint is all the way to the assembly of the chargers the quality control
and the closer that you bring those chargers to the customer, obviously you're going to have a more reliable supply chain when it comes to making sure that that charger is going to be delivered to the site with the least amount of points of failure on the way. So the closer the factory is to the customer, it tends to create a more reliable supply chain. From my perspective, that created an investment on our end to purchase a facility in Greece. in North Carolina with many jobs being created in the community of Greensboro.
So that's all very, very positive. I think that if we're looking at the overall challenges, obviously, I think we can all understand that the United States is not the cheapest manufacturing place in the world. So it does create a little bit of a price difference between non-Baba and Baba chargers, which obviously has to be clear to the customer as they get. as they engage into this type of program. Right. And so are there, I mean, do you know what the difference would be kind of like from a BABA compliant versus non-BABA compliant from a cost perspective?
Like, I think you have like a site or, know, I, yeah. yeah, I mean, thankfully, when it comes to the full project, the Charger is only one small part of it. The full site development could be several million dollars, tens of millions of dollars, with the Charger just being maybe 10 to 20 percent of it. However, when you just zoom in on the hardware itself, it is a sizable percentage. I would say that depending on the Charger, you're looking at anywhere between 20 and 40 percent.
increase to comply with Baba, which which makes sense. mean, look, we again on the transit side when we're at 70%, we all know, I mean, there's no, I don't think there's any hiding it, it's more expensive to be by America compliant, which you know, and that's fine. There are there are reasons both economical and, and from a regulatory and overall economic standpoint from the the industry as a whole. So it does make sense. And so kind of sticking with this regulation or really looking more at the government side of this.
What role do you see the government can play in kind of helping the industry along and are there any good examples of kind of programs that have been developed, you think? Yeah, absolutely. um the decade that I've been involved in the industry, I've seen definitely my share of programs being rolled out and some of them very successfully so, some of them a little less so. um I think that, you know, obviously the government's role is important in setting certain level of guardrails and standards.
Like, you know, we do need to have kind of a floor and a ceiling arranged where companies can actually operate in with a little more predictability without having to go. and spin up the custom business models and chasing requirements that perhaps are not realistic for the industry. So think that listening to the industry and the learn lessons is very, important. Listening to the customers in their challenges and the requirements is very, important. And then, of course, kind of making a determination of what a good program design looks like.
uh And I think that one great example, I mean, if we want to go into a specific program that I think has learned all the right lessons and is rolled out very very well uh is actually a program that that CalSTAR is currently supporting and administering is the Communities in Charge program that is focused on multi-family residential housing which you know by everybody's know determination is one of the biggest areas of improvement to where we can actually deploy meaningful infrastructure that will serve you know a an underserved
underappreciated, you know, a set of customers for sure. So I want to double click on that and I'll just go ahead and take my pats on the back. Can you tell us why that's such a good program? Yeah, absolutely. ah Many, many reasons. I mean, I think that the first thing is that obviously CallStar being involved is a great benefit because, you know, throughout the decades, right, that CallStar has taken to learn all the lessons, lead the way in some topics and some conversations and pulling together an impressive group of professionals.
I think that this is all coming together in the right program design that does uh highlight shovel ready projects instead of something that I've seen in the past where it's a first come first serve, raise your hand as quickly as you can and then you may get the money ah instead of, know what, take your time. We prefer a good project that has been thoroughly vetted, designed, permitted, and then we'll give you the money.
This also oh goes to mitigate the risk of projects. Some projects actually never happening. We've seen that. the past that has plagued some of the other programs. Lots of people raising their hands, getting an approval, and then those projects never happen because the due diligence was not done and those projects are just not actionable. Yeah, it's a lot of aspirational projects. I think the FTA actually did a really good job of this as well when they were uh assessing low no applications and looking for to your point shovel ready programs, like making sure
that you have all the players in place, making sure that you have everything set up ahead of time because of that exact thing. It's a lot of work and energy to have something go into like the planning phase and never make it out of that planning phase. because then it took money from other people. took money from infrastructure, from the American people to not actually, you know, get this pushed across, across the finish line. So I think that's a really, really good point. What, what do you see like in terms of, um, from the infrastructure side, we look at other countries and we see large scale deployments happening and we just haven't gotten it here
yet. And I'm sure it's coming, but what do you think is kind of holding us back? as an industry, as kind of a nation from really those large full-scale deployments. Yeah, I think we have had a little bit of... think we got a little bit startled from the early stages oh of the process where perhaps some companies that we thought were going to be key uh for driving this type of deployments, perhaps they exit the market or they failed at delivering on their promises.
And that does tend to erode the confidence of oh both customers and entities that are supposed to spend the money in driving this this motion. uh That resulted in uh contained pilot programs where people were evaluating two or three different OEMs and then they were evaluating buses and chargers and how they work together. Then there was the utility side of things and the permitting for the actual site.
Overall, this stretched out over years of pilots and I we are finally exiting that stage of lab work, if you will, and getting more into looking at where the marbles have settled, the players that have emerged as being reliable. uh And proof is in the pudding that we're seeing some sites that rolled out that were fantastic, and we have to give props to those early movers and visionaries that have driven those early standards.
And now I think we can... look at it with more confidence. And let's not forget that even when you look at international space there are some obviously that know trial and there's there was trial and error there. I think that you know people were bolder at single threading to maybe one OEM, one OEM partners and one perhaps or two charging operators. So they quickly standardized and said okay this is the way I think we have been a little more cautious you know in the United States about
making sure that was truly the right way to do it. Yeah. And you brought up something that, that I'm always interested in because one of my favorite topics is communication and making sure that people are speaking to each other and making sure that everyone understands what's going on in, I know in the early days and I say early days, you know, all of like 10 years ago, let's just say, really we could just say about three years ago, but having uh a fleet will have a trans agency that may be having a discussion with their vehicle manufacturer.
Then they have a separate discussion with the charger manufacturer. Then they have a separate discussion with the utility and so on and so forth. Have you seen that those kind of that siloing effect has started to reduce over time to where instead of getting every instead of having those individual conversations and trying to put all the pieces together that you have everyone coming together in one room and saying this is what needs to happen. Everyone tell us what you need. Yeah, absolutely. And I think that that's been a common thread when it comes to uh the electrification space.
ah Even if you look at commercial real estate, you look at other other areas, it's never somebody's full 100 % job, right, to take care of a project like this, it always falls into like a shared hat or multiple hats being worn by different people. And, and, you know, obviously, when you have also, perhaps a lack of confidence that certain products are going to get delivered. In time, um people have been delaying those decisions as much as they can.
It's like, well, let me see if I can get those buses. I'm not sure I'm ever going to get those buses. So not going to spend the money on charging infrastructure quite yet. And that keeps pushing, kicking the rock down the street basically until then everything is like, you know, it's a hurry up and wait type of scenario. So you brought it up that sometimes you have these people that it like there's it's not one person's job to make this happen. One thing I actually found was really interesting. I was talking with a trans agency a little while back and they had installed a microgrid and they were getting more battery electric buses and they were doing all these things.
And I was like, how are you managing all of that? They were like the one of the best things we did was we appointed. I think it was actually their O and provider. that they appointed as the project manager for the entire thing. They're like, that way we just have one point of contact. They're like, it costs us a little bit more to do this, but it made it so much easier and so much more successful to have somebody that was dedicated to just making sure this project worked. So hopefully we'll see more of that. 100 % and I think that what was lacking also, you five to ten years ago was a rich array of developer companies, turnkey type of partners that you could engage and you could rely
upon because, you know, they have gathered that knowledge through, you know, hundreds of sites that they have built now. So you do have those entities now in the market that perhaps that was not, again, we were all learning the same lessons, you know, ten years ago. So talking about learning lessons, one thing I would love to know is what do you think a fleet should be asking that they usually wait until it's too late and ends up either costing them time or money when you're when you're engaging them?
Finalizing a site design in general perhaps is not a question but is a decision needs to be done early on, right, because that's going to influence, you know, the construction process and that's by far the one that's going take the longest. Too often we deal with temporary sites. ah Again, we have that kind of like fear of committing. Yeah. Well, and it's, it's funny. I, we were doing, uh, this is a few years back, as Cal start, were assisting a transit agency on their other battery electric bus deployment and they just, they charged right
ahead with getting it was not your chargers. So they charged right ahead though, and worked with the utility, got them installed. The vehicles were delayed by, I'm going to say like eight, nine months and they were paying for the upgrade service the whole time. Oh my gosh, you want to see somebody mad that tell somebody that they installed their infrastructure too soon. They're paying for it and can't get the buses. I hate that. that hesitancy, obviously it's not because we want to be afraid of that kind of outcome.
It's because we have seen that happen. uh It's learned lessons from perhaps your peers from a different transit agency that you've seen that happens. Like, well, that's not going to be me. But the cool thing is that from those challenges also have emerged solutions that are quite creative. There are some skidded solutions for instance that are out there right now that are allowing you to move from a temporary site to a permanent site without having to uh
replace that infrastructure. those skids can be moved around, be recommissioned as needed without having to go out and replace them. Or you could just basically buy part of the infrastructure on skids. And that includes, by the way, the battery storage because that is also available in skids nowadays. ah So that gives you little more breathing room before finalizing the site design.
However, obviously at some point you're going to have to do it and you know that the clock starts there and we all know how long that takes. Yeah, and so to that point on kind of the utility side and the power being available at sites, how do you recommend that fleets kind of work towards understanding when the power will be ready and how do you as the charger provider work with them to plan on that? Because we know that some sites, I mean, it may not be energized for five years.
I mean, you've got cost escalations, I'm sure they get kicked in, like how can they address that? Yeah, and think the whole microgrid story is really where... um That's one of the aspects of this industry that has gone much more mature. Obviously you can use that to bridge the gap between the utility service, know, between where you are now and where you're going to be perhaps like three years from now from a utility service standpoint. And if after that you can actually use that to load balance in the sense that, you you kind of shave those peaks a little bit and make sure that you have a reliable, you know,
cost of actually charging your fleet. Yeah, so where do you see the charging industry and the battery electric industry going as a whole in the US? We'll kind of focus on that since that is our area of interest. I've seen that to be uh much more in sync as of late. I think that 2026 in general will be a very interesting year for seeing some of those sites come alive.
There are going to be some interesting concepts coming to market. For instance, obviously, we all know about the initial trial and errors with integrated charger and battery type of plays. Unfortunately, that was not a great start for that kind of concept. We lost a couple of industry players due to that. uh And so I'm confident that we have learned the lessons and we have a much more mature, uh know, realistic view of the world when it comes to battery and charger.
We have very, very mature battery and storage players in the space. We have much more mature charging players in the space. You know, some that have endured through the last decade and some that have actually, that were created a little bit later, like not a cocktail, but by leveraging the experience and the learned lessons from an array of industry professionals that come together to work on these projects.
So you brought up an interesting point that I wanna ask you about, and I don't want to mischaracterize this as a negative, but from what it sounded like you were saying, we're looking more like an acceleration of current technology deployments as opposed to just uh rapid innovation. Because at some point, you can't do both at the same time. Because the market has to actually mature for the new technologies to be adopted. So do you think this is kind of, or at least in 2026, kind of our year of deployment of current technologies?
I believe so. think that for a long time we were trying to wait for customer requirements. As companies, we always add certain concepts ready from a product development standpoint. Like B2X being one of the most notable aspects of this industry that we have had ready for a long time, but we have not really seen customer demand for it. ah And the biggest application to date ah is on the residential side.
we're basically still very limited. ah However, I do believe that 2026 uh is going to be the year where we actually start being a little more in sync. I don't think we need to develop anything new for a little while longer. I think we can actually finally leverage the things that we have worked on for the past several years and never could quite bring to market because there was just no demand for it. Yeah, that's a, it's a really good point. It's I haven't really thought about until we were talking about this, but that is in any market.
The more you innovate that that's great. As long as you have a product pool that people are willing to buy. If you just innovate and innovate, no one's going to buy because they're just waiting on the next thing because you don't have a mature product. But it sounds like now from what you're saying, there are mature products out there that are reliable and can be put into place. that the, that while we have innovation, It may not be this whole system change that that you may have seen maybe 10 years ago where everyone's trying to move in different directions.
I mean going from like level two to level three looking at overhead and you know and inductive charging just all of those innovations happening at the same time. It's hard to pick which ones which ones the right one for you. absolutely. And I think that there is maturity in the technology, but there's also maturity in the ecosystem when you have, again, the hardware, software, and services, right? uh Sometimes in the same company, sometimes in three different companies, sometimes even more than that. But we have a much more mature set of uh players in the space that are able to work together well without...
uh having some of the same mistakes that we saw years ago when you had players that were only looking for a quick uh buck basically. And companies that perhaps were doing something else completely that were like, well, we have this grant, we're going to just spin up a quick white label charger and hope for the best. Oh, doesn't that that hurts that it's again also working in technology. I fully understand and appreciate how frustrating that is when somebody is not dedicated to a technology.
They come in. Like you said, they make a buck and then they leave and it hurts everybody. That is, oh, it's so frustrating. But I have one more question that I want to ask. And this is about you, Dario. So you've been in this industry except for about 10 years now. Correct. would love to know if like now 10 years later, if you could jump back to yourself 10 years before, what would you say to yourself as, hey, the industry is going to look like what?
So as I entered the industry 10 years ago, um I approached with a lot of curiosity. I was coming from a whole different, I was coming from software, from actually learning management systems and software security and things of that nature. um And I approached it as a... as an industry that would give me the ability or the opportunity if you will to see my work reflected in meaningful projects in the world. And if I were to go back and tell myself something, be like, yes, you're making the right decisions.
And by the way, you know, double down on this because it's going to be one of the biggest areas of revolution that we have known in the last hundred years. I love that. I love that. love the optimism and Dario. I appreciate the time and all the work that you all are doing at Autel. So thank you so much. I really appreciate it. Thank you, Jerry, it was a pleasure. Absolutely.
Episode 60: Rethinking Transit Adoption, Open-Loop Payments, and Equity with Dr. Susie Pike Episode Overview In this episode of Transition to Zero, host Jared Schnader is joined by Dr. Susie Pike, Director of the UC...
Transition to Zero Podcast: Show Notes Episode Title Unpacking Bus Customization: Costs, Risks, and the Road to Fleet Standardization with Phil Plotch & Grace Truslow Episode Description & SEO Summary Why do U.S....
This episode of Transition to Zero explores how transit agencies can use digital learning, digital twins, and modern LMS tools to prepare their workforce for zero emission fleets and other evolving propulsion systems....
Transforming Transit Operations: Anthony's Military Background, Fort Bliss Partnerships, and the Future of Clean Mobility Explore how Anthony's military background informs a disciplined, mission-driven approach to...
Episode Overview The procurement of a zero-emission bus (ZEB) is not the final destination - it is merely the starting line. As transit agencies across the country deploy advanced transit fleets, the ultimate metric of...