
Total Channel Control Pilot Project
On Episode 67 of the TID Water & Power Podcast, we're sitting down with Austin Tiernan, TID Water Operations Manager, to discuss the Total Channel Control (TCC) Pilot Project.
TID’s irrigation system was built in the late-1890s and operates in much the same way as it was originally designed - flowing by gravity from La Grange Dam to and throughout our service territory. With new Rubicon technology, however, we’re working to replace manually operated side gates and drops with automated ones that will all be controlled using a cutting-edge online water ordering and scheduling software.
In this episode, Austin shares how TID's two-year pilot project is going, including details of the project's scope and feedback from growers after they completed the first of two irrigation seasons with this pilot.
Let’s get social!
Facebook: @TurlockID
Instagram: @TurlockID
Twitter: @TurlockID
LinkedIn: /company/turlockid
Find out more about TID at https://www.TID.org/podcast.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

