A plant that can’t get more power from the grid still found room to electrify. Where did the headroom come from? This podcast episode looks at how Royal Avebe, a farmer-owned starch and plant-protein cooperative in the Netherlands, electrified part of production at its Foxhol plant without adding grid capacity. Working with Schneider Electric, the site paired a new industrial electric boiler with unified power and process control, real-time energy visibility, and dynamic load management across more than 1,000 data points - shifting load during peak demand and absorbing excess renewable energy when it’s available. This is an AI-generated podcast episode. Read the full featured article on ProFood World.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Welcome to Through the Line, the podcast exploring innovations and information across the packaging and processing landscape. From topics impacting consumer packaged goods and healthcare packaging to the latest technologies in food processing operations.
SpeakerHi, I'm Casey Flanagan, Associate Editor with Pro Food World. This AI-generated podcast episode covers how food and beverage manufacturers can electrify industrial operations while staying within grid constraints. It highlights how Dutch Cooperative Royal Avebe partnered with Schneider Electric to install electric heating and cut emissions without expanding grid capacity. It also explores how combining process control with real-time digital energy management allows processors to dynamically optimize energy use and support grid stability.
Speaker 2Imagine you have millions of dollars ready, uh just sitting there to upgrade your manufacturing facility.
Speaker 3Right, which is a great position to be in.
Speaker 2Oh, absolutely. And you have this corporate mandate to drastically reduce your carbon footprint, and you are totally ready to invest. But then you go to the local utility company to get the extra power you need for these upgrades, and they look you in the eye and say, no.
Speaker 3Yeah, just a flat out denial.
Speaker 2Exactly. They tell you you cannot have a single extra kilowatt of electricity for the next five years. The grid is completely full.
Speaker 3It's it's a terrifying scenario for a plant manager.
Speaker 2It really is. And that is the stark reality for manufacturers across Europe right now. But today's deep dive explores how Royal Avebe, which is a farmer-owned cooperative, conquered that exact scenario. They partnered with Schneider Electric to electrify their production and achieve major sustainability gains, completely without expanding their constrained grid connection.
Speaker 3Which is quite a feat, honestly.
Speaker 2It is. So for those of you listening who manage operations in the packaging and processing industry, our mission today is to extract actionable insights from this new case study on Royal Avebe Base facility in Foxhol, the Netherlands.
Speaker 3Yeah, because across Europe, uh this issue of grid congestion has become this massive physical barrier to industrial growth and you know decarbonization.
Speaker 2Right. Facilities are facing incredibly long wait times. I mean sometimes years just to get new or upgraded power connections. So, okay, let's unpack this. I want you to think about this constraint in purely physical terms.
Speaker 3Okay. Lay it out.
Speaker 2Imagine needing to drastically increase the output of a packaging line, right? But being told you cannot add a single square foot to your factory floor.
Speaker 3You're just boxed in.
Speaker 2Exactly. You are forced to optimize the exact space you already have, finding efficiencies you uh you didn't even know existed. That was the reality for Royal Avebe, except their limitation wasn't floor space, it was their energy consumption footprint.
Speaker 3Yeah, and that physical limitation is what is the defining industrial challenge of this decade.
Speaker 2Totally.
Speaker 3For processors aiming to reduce emissions, this hard cap on grid capacity presents a massive operational dilemma. Because, you know, it's one thing for a corporate board to set ambitious decarbonization goals.
Speaker 2Right. Writing it on a whiteboard is easy.
Speaker 3Exactly. But it's an entirely different challenge for a plant manager to execute those goals when the underlying energy infrastructure literally cannot support the transition.
Speaker 2It's just not there.
Speaker 3Right. The grid congestion problem effectively traps facilities in their current energy footprint. If you try to, say, replace a massive gas-powered machine with an electric one, you risk tripping the breakers for the entire facility.
Speaker 2Which shuts down production.
Speaker 3Yes, shutting down production and potentially facing catastrophic fines from the utility provider because you exceeded your contracted energy limit.
Speaker 2Which is a nightmare. And because physical grid expansion was just completely off the table for Royal Avebe, they had to look inward. I mean they couldn't build out, so they had to build smarter.
Speaker 3They had to fundamentally rethink their energy use right down at the plant level to solve this bottleneck.
Speaker 2And to do this, they formed a partnership with Schneider Electric. Now, according to the case study, the solution they developed was built on three core pillars: unified power and process control, real-time energy visibility, and dynamic load management. Right. But I have to push back on this terminology right out of the gate. Because if you are managing a packaging line right now, you know how chaotic a factory floor can be.
Speaker 3Oh, absolutely.
Speaker 2The phrase unified operational view sounds like perfect marketing fluff. I've been in these facilities. You have legacy machines from 20 years ago operating right next to brand new equipment.
Speaker 3And they don't natively talk to each other.
Speaker 2Exactly. They do not speak the same language. So how did they actually achieve this unified view? Like what does that look like in reality rather than just on a glossy brochure?
Speaker 3That is exactly the right question to ask because an operational view is totally useless if it is just a buzzword. Right. Achieving it requires a highly specific, deeply integrated digital foundation. You literally have to force these disparate systems to speak a common language. At the Foxhol site, Schneider Electric didn't just install, you know, one piece of software.
Speaker 2It wasn't a quick patch.
Speaker 3No, they deployed a fully integrated architecture designed to connect the facility's power systems, its process operations, and its energy data into one single nervous system. And they achieved this by implementing a very precise technology stack.
Speaker 2Okay, let's break that stack down for the listener because the specific tools really do matter here.
Speaker 3Absolutely. So first, they use the ecostructure Fox Pro DCS for unified process control.
Speaker 2DCS standing for distributed control system.
Speaker 3Right. A DCS acts as the central brain for the manufacturing process itself. So it handles the temperatures, the flow rates, uh the actual physical mechanics of processing the product.
Speaker 2Okay, so that's the process side.
Speaker 3Yeah, but managing the process is only half the battle. They then integrated the ecostructure electrodynamic controller.
Speaker 2And that's the power side?
Speaker 3Exactly. This is the crucial piece for our grid constraint problem, because it handles real-time load orchestration. Think of it as a traffic cop, but specifically dedicated to electrical currents, deciding where power flows second by second.
Speaker 2Okay, so you have the DCS brain managing the factory and the electrodynamic controller traffic cop managing the electricity, but how do the actual human beings on the floor interact with this? Like what are they looking at?
Speaker 3For the operators on the floor, Schneider deployed the ecostructure control HMI.
Speaker 2HMI being human machine interface.
Speaker 3Right. Imagine the glowing dashboards and operators looking at while monitoring the floor. Traditionally, an operator might have uh one screen for the manufacturing process, and then a completely different system, or sometimes no system at all, for monitoring the facility's overall power draw.
Speaker 2They're flying blind on the energy side.
Speaker 3Basically, yeah. So this HMI bridges that gap, providing the necessary visibility and intervention capabilities on a single screen. And then behind the scenes, making sure all these rules and logic are set up correctly, the engineering and system configuration was managed through EcoSructure EPAS.
Speaker 2Okay. And then there's one more piece, right? Because they had to bring all of these moving parts together with Aviva PI system integration.
Speaker 3Yes.
Speaker 2The Avebe PI system is what consolidates the data, right? Because the case study points out that it pulls in more than 1,000 data points from across the entire facility.
Speaker 3It does. And consolidating over 1,000 data points is what actually creates that true unified view you were skeptical of earlier.
Speaker 2Right. The marketing fluff becomes reality.
Speaker 3Exactly. Because these data points are not just abstract numbers on a spreadsheet. They are real-time readings of, you know, valve positions, motor speeds, temperature gauges, and the instant electrical draw from hundreds of different components. So you are no longer looking at isolated machines running blind. You are looking at the facility as a single breathing organism. But you know, this raises an important question. Which is how does all of that data actually translate into action?
Speaker 3Because having a thousand data points is completely overwhelming if you don't have a mechanism to use them.
Speaker 2Yeah. Data paralysis.
Speaker 3Right. The answer lies in the system's ability to continuously monitor and automatically adjust energy usage. By constantly analyzing those thousand-plus data points in real time, the plant ensures its operations stay strictly within its contracted grid limits while simultaneously optimizing its processing performance.
Speaker 2Okay, here's where it gets really interesting. Because this is where the digital foundation translates into real-world heavy industry. Having established that software architecture, Royal Avebe was able to make a massive physical change on the factory floor.
Speaker 3A huge change.
Speaker 2They successfully installed a new industrial electric boiler. This was a critical step because it completely eliminated fossil fuel-based heating for a portion of their production line.
Speaker 3Which is a huge sustainability win.
Speaker 2Huge. But crucially, and this is really the entire point of the case study, they achieved this heavy electrification without increasing their grid connection by a single kilowatt.
Speaker 3And this is exactly where dynamic load management proves its value. Because look, installing an industrial electric boiler is not like plugging in a toaster in your kitchen.
Speaker 2Right.
Speaker 3It's a massive, highly demanding piece of equipment that draws an incredible amount of amperage. In a traditional setup, turning that boiler on while the rest of the factory is running at full capacity would immediately exceed their contracted energy limit.
Speaker 2Bam, the breakers would trip.
Speaker 3Yeah, or the utility company would levy massive penalties.
Speaker 2So how did they avoid that? I mean, if the limit is a hard ceiling, how do you fit a massive new electrical draw under that ceiling without breaking it?
Speaker 3The mechanics of dynamic load management allow the facility to play a highly sophisticated game of electrical Tetris.
Speaker 2Electrical Tetris. I like that.
Speaker 3It really is. The system dynamically shifts loads during periods of high demand. So instead of drawing a constant, heavy amount of power that would exceed their grid limits, the ecostructure system orchestrates the energy use moment by moment, millisecond by millisecond.
Speaker 2Okay, so if the Avebe Pi system notices that the overall facility is approaching its maximum grid limit, the electrodynamic controller steps in.
Speaker 3Exactly. It steps in and say it might automatically and temporarily power down a non-critical mixing vat for 30 seconds. Or it might slightly reduce the power to a secondary cooling system just long enough for the electric boiler to kick on, get up to temperature, and do its job. The system constantly borrows and returns power across the facility's thousand data points, so that the total power limit is never breached, and the core processing output is never compromised.
Speaker 2To put that into perspective for you, it is like transforming the entire processing facility into a highly intelligent sponge.
Speaker 3A sponge.
Speaker 2Yeah. It absorbs power rapidly when it's available, and it smartly rings it out, you know, pausing certain non-critical operations intelligently when the overall capacity is stressed. And it manages to do all of this without disrupting the core product going down the line. It's really a brilliant way to handle industrial energy consumption.
Speaker 3This is a great way to visualize it. But if we want to take that intelligent sponge analogy a step further, imagine a sponge that has millions of tiny nerve endings.
Speaker 2Okay, nerve endings.
Speaker 3Those nerve endings are the thousand-plus data points we discussed. They tell the sponge exactly which pores to squeeze and which to open, based on the real-time pressure of the grid. And furthermore, the system is designed to absorb excess renewable energy when it becomes available on the broader grid.
Speaker 2Wait, let's pause there. Absorbing excess renewable energy from the outside grid. Like, how does that work?
Speaker 3Well, the broader electrical grid is increasingly powered by wind and solar, right? Right. But wind and solar are intermittent. Sometimes the wind is blowing furiously, generating way more power than the region actually needs. When that happens, energy prices drop, and the grid actually needs places to dump that excess power just to remain stable. Exactly. Because Avebe has this deeply integrated digital system, they can see those signals. This capability completely transforms the facility.
Speaker 3They are no longer just a passive consumer mindlessly draining power from the grid, regardless of the conditions. They become an active energy prosumer.
Speaker 2A prosumer, a hybrid of a producer and a consumer?
Speaker 3Exactly. By actively shifting their internal usage to absorb excess renewables when they're abundant, and then throttling back their overall draw when the regional grid is stressed, they are not just managing their own factory, they are actively supporting broader grid stability for the entire region.
Speaker 2So they become a shock absorber for the local utility infrastructure.
SpeakerYes.
Speaker 2That's incredible. It is entirely strategic. I mean, it changes the relationship between the manufacturer and the utility provider from a one-way street into a dynamic partnership. And it obviously produces highly measurable outcomes on the bottom line.
Speaker 3Absolutely.
Speaker 2The success of this implementation at the Foxhol site doesn't just solve a local problem. It provides a clear blueprint for the entire processing industry. Let's look at those long-term results, because Royal Avebe achieved a comprehensive list of benefits that go far beyond simply turning on a new boiler.
Speaker 3Right. It's not just about one machine.
Speaker 2First, they significantly reduce their carbon emissions. And this is not just a vague, you know, environmental win. It keeps them precisely on track for their specific corporate target of a 30% reduction in emissions by the year 2030.
Speaker 3Which is a metric that is highly scrutinized by stakeholders today. You can't just miss those targets. Right. Furthermore, they achieved improved energy efficiency through that continuous optimization we discussed. Because when you were tracking a thousand data points to manage your power limits, you inevitably discover inefficiencies in your day-to-day operations.
Speaker 2Oh, sure. You see things you wouldn't have noticed otherwise.
Speaker 3Exactly. You find motors that are running when they shouldn't be, or heating processes that are drawing more power than necessary. The system basically cleans up those wasteful habits automatically.
Speaker 2They also gained greater operational flexibility in response to fluctuating grid conditions. If you are managing a plant, you know the absolute dread of a utility company warning you about peak demand charges or potential rolling brownouts.
Speaker 3It's the worst.
Speaker 2A Veby system gives them the agility to navigate those fluctuations without forcing a full, chaotic shutdown of the line, which leads directly to their fourth major benefit. They established enhanced resilience.
Speaker 3Yeah, and we are operating in what is becoming an increasingly constrained and volatile energy market. Energy prices spike, grid stability wavers, supply chains get interrupted. Having a facility that can dynamically adapt its energy profile gives you a massive competitive advantage.
Speaker 2You're not just waiting for the lights to go out.
Speaker 3Right. You are no longer at the complete mercy of the utility's absolute worst-case scenario.
Speaker 2And finally, they secured their readiness for the future. By installing this digital architecture now, they are perfectly positioned for the future integration of even more advanced monitoring tools and you know on-site renewable energy sources.
Speaker 3Yeah, think about it. If they decide to cover their roof in solar panels five years from now, the brain of the facility, the DCS, the HMI, the Avebe Pi system is already in place to seamlessly integrate that new power source.
Speaker 2It's future-proofing.
Speaker 3Exactly. And to understand the human perspective behind all these technical metrics, we can look at the insight provided by Joyce DeVries Peterson, the Director of Communication and Public Affairs at Avebe.
Speaker 2What did she say about it?
Speaker 3She stated that further electrifying their production processes is an important step in making their operations more sustainable. Specifically, she noted, together with Schneider Electric, we are demonstrating that it is possible to make concrete progress toward future-proof and more energy-efficient production within the limits of what our existing grid connection allows.
Speaker 2So what does this all mean? If you are a packaging and processing professional listening to this, you are probably wondering how you can apply this to your own operations.
SpeakerRight.
Speaker 2You know the exact dread of trying to hit an ambitious environmental, social, and governance target when your facilities infrastructure is just completely maxed out. What Avebe did proves that you do not necessarily need a brand new building and you do not need to wait five years for the utility company to lay new high voltage cables to your site.
Speaker 3You just need a smarter brain for the building you already have.
Speaker 2Exactly. If we connect this to the bigger picture, well, Royal Avebi has created a highly scalable model for food and beverage manufacturers everywhere.
Speaker 3They really have. Because the traditional mindset was that infrastructure expansion had to precede operational evolution.
Speaker 2Right, build the pipes first.
Speaker 3Exactly. But that is no longer true. Processors do not have to wait years for grid expansion to take the next step in their decarbonization journey. Smarter energy strategies, combining targeted electrification with advanced digital energy management software, can unlock sustainability and competitiveness today, even within strict existing physical limits.
Speaker 2You are basically replacing physical copper wires with intelligent software algorithms.
Speaker 3That's a perfect way to put it.
Speaker 2So to summarize our deep dive today, Royal Avebe successfully conquered severe physical grid constraints by looking inward. They were locked in a box by the local utility grid, unable to pull more power to meet their sustainability goals. But by utilizing real-time data integration, advanced control systems like the Eco Structure Suite, and dynamic load management alongside Schneider Electric, they turned a critical energy bottleneck into a showcase for modern electrified processing.
Speaker 3They proved that a facility can decouple its sustainability goals from its physical grid limitations.
Speaker 2Yeah, they played electrical Tetris, managing over a thousand data points in real time to install a massive industrial electric boiler without tripping the breakers. It's incredible. And I want to leave you with a final thought to consider regarding this case study as you look at your own factory floors. Okay. If a single processing facility in the Netherlands can use software to become a dynamic prosumer, absorbing excess renewables and intelligently shifting loads without expanding its grid footprint, consider the implications for the future of manufacturing.
Speaker 2It's massive. What happens to the global energy market when thousands of processing and packaging plants stop being passive consumers, draining the grid, and instead act as an interconnected network of virtual power plants, stabilizing it?
Speaker 3That changes everything.
Speaker 2It really does. Thank you for joining us for this deep dive into the Royal Avabay Case Study.
Speaker 3Thank you for listening.
Speaker 1Thank you for listening to Through the Line Packaging and Processing. You can listen to more episodes on all streaming platforms. Be sure to visit us at packworld.com, profoodworld.com, and healthcarepackaging.com for more packaging and processing news. This podcast was edited by Bri Guntz.
What happens to a pharma packaging line when the industry runs out of 10-digit drug codes? Listen in to hear why the FDA’s move to a 12-digit National Drug Code by 2033 can’t be extended, and how the denser 2D barcodes...
Why are food manufacturers still investing in lot-level traceability when the FDA has pushed back its deadline by 30 months? This episode looks at how retail mandates from companies like Walmart are setting the real...
Why does the U.S. recycling system always seem to be playing catch-up with packaging design? Senior editor Anne Marie Mohan sits down with Cody Marshall, chief programs officer at The Recycling Partnership, about the...
Could a QR code one day replace the paper leaflet in the box? In this week’s End of the Line, PMMI Media Group editors Matt Reynolds, Derrick Teal, Anne Marie Mohan, and Casey Flanagan sit down for a weekly roundup....
How do you ensure a medication arrives at the proper temperature and uncompromised when its trip takes place by air rather than by delivery vehicle? BayCare Health System, a not-for-profit academic healthcare system in...