Three Mile Island Accident Commission Report

Three Mile Island Accident Commission Report artwork

006 - Commission Findings part 3

Mar 4, 202627 minAudio
ShareXLinkedInFacebookWhatsAppEmail

On the early morning of March 28, 1979, a serious incident unfolded at the Three Mile Island 2 nuclear power plant near Middletown, Pennsylvania. Triggered by mechanical failures and compounded by critical human errors, the accidents severity remained uncertain for four days, affecting plant managers, government officials, and the public alike. This event not only raised alarm bells across the nation but also ignited international scrutiny regarding nuclear safety. In response to these alarming concerns, this Commission was established to investigate the incident and its far-reaching implications. (Summary from the preface) This episode includes AI-generated content.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Speaker 1Section six of Report of the President's Commission on the Accident at Three Mile Island. This is a LibriVox recording. All LibriVox recordings are in the public domain. For more information or to volunteer, please visit LibriVox dot org. Report of the President's Commission on the Accident at Three Mile Island, Section six Commission Findings, Part three f Training of operating personnel. One. Training of meted operators and supervisors was inadequate and contributed

Speaker 1significantly to the seriousness of the accident. The training program gave insufficient emphasis to principles of reactor safety. Two. The TMI training program conformed to the NRC standard for training. Moreover, TMI operator license candidates had higher scores than the national average on NRC licensing examinations and operating tests. Nevertheless, the training of the operator's per proved to be inadequate for responding to the accident. Three. NRC standards allowed a shallow

Speaker 1level of operator training a The operator licensing branch. Activities were principally restricted to preparing and giving initial licensing examinations and occasional visits to vendors for an informal spot check of start up certification tests. The branch was heavily involved in the initial startup of the B and W Cold licensing program in the early nineteen seventies. A paper review of B and w's course for new plant operator training was performed without comment in nineteen seventy six. B NRC

Speaker 1prescribed only minimal requirements for operator training. There were no minimal educational requirements for operators. There was no requirement for checks to be made on the psychological fitness of candidates or whether they had criminal records. C an could fail parts of either the NRC licensing examination or the Utility Requalification examination, including sections on emergency procedures and equipment, and still passed the overall examination by getting a passing average

Speaker 1score and qualify to operate the reactor d. The NRC had no criteria for the qualifications of those individuals who carry out the operator training program. It also did not conduct regular in depth reviews of the training programs. Four met ED had primary responsibility for the training of operators. The quality of the training program at TMI was low A.

Speaker 1The training program was quantitatively and qualitatively understaffed, as well as conceptually weak. Emphasis was not given to fundamental understanding of the reactor, and little time was devoted to instruction in the biological hazards of radiation. The content was left to the instructors, who had no greater formal educational qualifications than those of their students. B TM two's station manager, unit superintendent, and Supervisor of Operations were not involved in

Speaker 1operator training c Within our sea approval, the unit superintendent and the station manager at TMI were only required to acquire the experience and training necessary to be examined for a senior reactor operator license, but were not required to hold such a license. D. Although auxiliary operators performed tasks that could affect reactor power level or involve the handling of radioactive material, there was no formally defined training program

Speaker 1for them. E met ED did not request waivers from employees with naval reactor experience to allow examination of their Navy records. Five TM contracted with B and W to carry out a portion of the TMI operator training. B ANDW performed only those functions specifically required under the agreement A. There was little interaction in B and W between those who conducted training and those responsible for nuclear plant design.

Speaker 1Course content and conduct of courses were made up by the B and W Training Department entirely on its own. There were no formal syllabi or training manuals. B The simulator at B ANDW was a key tool in the training of operators. Simulator training did not include preparation of the operators for multiple failure accidents. Indeed, the B and W simulator was not prior to March twenty eighth programmed to reproduce the conditions that confronted the operators during the accident.

Speaker 1It was unable to simulate the increasing pressurizer level at the same time that reactor coolant pressure was dropping. Commission findings d the Nuclear Regulatory Commission One. The purpose of the Energy Reorganization Act of nineteen seventy four was to divorce the newly created NRC from promotion of nuclear power. According to one of the present NRC commissioners, I still think it the NRC is fundamentally geared to trying to

Speaker 1nurture a growing industry. We find that the NRC is so preoccupied with the licensing of plants that it has not given primary consideration to overall safety issues. Two NRC labels safety problems that apply to a number of plants as generic. Once a problem is labeled generic, the licensing of an individual plant can be completed without resolving the problem. NRC has a history of leaving generic safety problems unresolved

Speaker 1for periods of many years. For example, the problem of n anticipated transience without scram In nineteen seventy six, during the tm I two Operating License o L review, the Advisory Committee on Reactor Safeguards recommended, as they did in at least one other o L review, that prior to commercial operation, further evaluations be done of various possible accidents, including low probability accidents. NRC staff designated this as a

Speaker 1generic issue. Tm I two received its o L two years later without the resolution of the issue three. Although NRC accumulates an enormous amount of information on the operating experience of plants, there was no systematic method of evaluating these experiences and looking for danger signals of possible generic safety problems. In nineteen seventy eight, the General Accounting Office criticized NRC for this failure, but no corrective action had

Speaker 1been taken as of the t MI I two accident. Four. The NRC commissioners have largely isolated themselves from the licensing process. Although the Commissioners have adopted unnecessarily stringent exparte rules to preserve their adjudicative impartiality, they have also delegated most of their adjudicative duties to the Atomic Safety and Licensing Appeal Board and actually adjudicate approximately twenty five percent of all licensing decisions. That figure is misleadingly high, in part because

Speaker 1a number of the decisions do not represent significant adjudicatory events and include decisions on exports. The commissioners have also isolated themselves from the overall management of the NRC. One of the present NRC commissioners, testifying before Congress, said, there has I think been too little commission involvement in the setting of safety policy in this agency, and too little commissioned guidance on safety matters to the staff and to the Board. Five the major offices within the NRC operate independently,

Speaker 1with little evidence of exchange of information or experience. For example, the fact that operators could be confused due to reliance on pressurizer level had been raised at various levels within the NRC organization, yet the matter fell between the cracks and never worked its way out. Of the system prior to the t MI two accident. Six. Licensing of a nuclear plant is a two step process. First, the company must obtain a construction Permit CP, and several years later,

Speaker 1must obtain an operating license OL. The CP stage does not require complete design plans, and therefore the full safety review does not occur until the OL stage. By then, hundreds of millions of dollars have been spent or committed in the construction process. Therefore, the ultimate safety review may be influenced by economic considerations that can lead to a reluctance to order major changes at the o L stage. Seven.

Speaker 1The Advisory Committee on Reactor Safeguards ACRS reviews all applications for licenses and poses whatever questions it deems appropriate. The ac RS is the only body independent of the NRC staff which regularly reviews safety questions. However, it has established no firm guidelines or procedures and generally has only monthly meetings of limited duration. ACRS members are part time and have a very small staff. Thus, they must rely heavily

Speaker 1on the NRC staff for follow up of their concerns. ACRS members tend to concentrate on their own particular areas of expertise, thereby resulting in a fragmented licensing review. Eight. There are serious inadequacies in the n RC licensing a. Applicants for licenses are only required to analyze single failure accidents. They are not required to analyze what happens when two systems or components fail independently of each other. The accident

Speaker 1at TMI two was a multiple failure accident. B NRC's design safety review places primary emphasis on those items labeled safety related. This designation is crucial since items not labeled safety related need not be reviewed in the licensing process and are not required to meet NRC design criteria, need not be testable, do not require redundancy, and are ordinarily not subject to NRC inspection. There are no precise criteria

Speaker 1as to what components and systems are to be labeled safety related. The utility makes the initial determination subject to NRC approval. For example, at TMI two, the POARV was not a safe safety related item because it had a block valve behind it. On the other hand, the block valve was not safety related because it had a PrV in front of it. C NRC's reliance upon artificial categories of safety related items has caused it to miss important

Speaker 1safety issues and has led the nuclear industry to merely comply with NRC regulations and to equate that compliance with operational safety. Thus, over emphasis by the NRC process on specific categories of items labeled safety related appears to interfere with the development throughout the nuclear industry of a comprehensive safety consciousness that is a dynamic, day to day process for operating safely d There is no identifiable office within

Speaker 1NRC responsible for systems engineering examination of overall plant design and performance, including interactions between major systems. E. There is no office within NRC that specifically examines the interface between machines and human beings. There seems to be a persistent assumption that plant safety is assured by engineered equipment, and a concomitant neglect of the human beings who could defeat it if they do not have adequate training, operating procedures,

Speaker 1information about plant conditions, and manageable monitors and controls. For example, despite recognition within NRC and various industrial groups that outdated technology in the control room could seriously handicap operators during an accident, NRC continues to license new plants with similarly deficient control rooms. As noted before, problems with the control room contributed to the confusion during the TMI accident. See also finding A eight f. The requirement of additional instrumentation

Speaker 1to aid in accident diet diagnosis and control was considered by NRC as early as nineteen seventy five, but its implementation was delayed by industry opposition, as expressed by the Atomic Industrial Forum AIF. AIF opposition was based on, among other things, the belief that the instrumentation required would cover Class nine accidents and therefore would extend beyond design basis requirements. The lack of instrumentation to display in the control room

Speaker 1the full range of temperatures from the core thermocouples contributed to the confusion involved in the attempt to rapidly depressurize the primary system. On March twenty eighth g It is common to issue operating licenses to plants when there are still open safety items. When a plant is licensed with many open items, the Division of Operating Reactors, which has the technical expertise to supervise operating plants, may refuse to accept jurisdiction from the Division of Project management. In effect,

Speaker 1the plant then ends up in a regulatory limbo, receiving insufficient attention from either division. T MI two was in this limbo at the time of the accident, thirteen months after its OL had been issued. H When NRC issues new guidelines concerning safety, there is usually no systematic review on a plant by plant basis of operating plants and plants under construction for possible backfitting. For example, Chairman Henry

Speaker 1explained to a congressional committee that stricter requirements for on and off side emergency plans had not been imposed on any already operating plants because of the need to balance costs against safety. The committee, however, found no significant cost burden in requiring utilities to upgrade and implement emergency plans. Similarly, NRC determined not to backfit the nineteen seven five Standard Review Plan SRP to those plants such as TMI two

Speaker 1that received construction permits prior to September one, nineteen seventy five. According to Roger Matson, director of the Division of Systems Safety, if individual SRP requirements had been reviewed for possible backfitting, the SRP requirement of diverse containment isolation actuation would probably have been backfitted to plants such as TMI two instead. TM two containment was isolated only when the pressure in the building exceeded four pounds per square inch. Thus, containment

Speaker 1isolation did not occur until several hours after the start of the accident. However, this delay had little effect on the actual small releases of radioactive material during the accident. I. Although decisions of significant public health impact are considered in the licensing process, n RC has no specific mechanism for interactions with public health agencies in the licensing process, other than the US Environmental Protection Agency EPA, which does review

Speaker 1environmental impact statements filed by applicants For CPS and OLS nine, the Office of Inspection and Enforcement I and E is charged with a determining whether these licenses are complying with NRC regulations, rules and licensing conditions. Some serious deficiencies in this office are a A nineteen seventy eight General Accounting Office report found that IONY inspectors did a little independent testing of construction work, relied heavily on the utility's self evaluation,

Speaker 1spent little time observing ongoing construction work, and did not communicate routinely with people who did the actual construction work. Similar problems exist in I and E inspections of operating plants. For example, the principal Iony inspector for t MI two completed an inspection shortly before the accident by examining utility records and interviewing plant personnel, but without physically examining any equipment. B. A nineteen seventy eight survey of I and E commissioned

Speaker 1by the NRC determined that the majority of inspectors felt their procedures were unclear and lacking in sufficient technical guidance. C. Of crucial significance to I and d's system of inspection and enforcement are the Licensee Event Reports LER, in which utilities report and evaluate important incidents. However, both licensees and vendors often have a strong financial disincentive to evaluate and report safety problems that may result in more stringent regulations.

Speaker 1At least in part because it is uncertain which entity will ultimately bear the cost of increased safety, I and D makes little effort to systematically review the LER, has no formal review mechanism for them, and hence must rely on individuals to remember events and to identify generic concerns. D IOND inspectors at various times have had difficulties having safety issues that they have raised seriously considered within the office.

Speaker 1For example, in nineteen seventy eight, one I and D inspector raised the issue of operator termination of HPI during the September nineteen seventy seven incident at Davis Bess. For some five months, none of his efforts produced any action. He then took advantage of the open door policy of NRC and went directly to two of the commissioners. The commissioners considered his complaints serious enough to merit further exploration. Unfortunately, this meeting with the commissioners did not take place until

Speaker 1one week before the t MI TiO accident. E. Early this year, the General Accounting Office concluded that NRC had not made effective use of its authority to assess monetary penalties for significant violations. The report cited cases where I and E consolidated continuing violations into one violation, took too long to impose penalties, and sometimes reduced the penalties to avoid financial hardship for the licensee. F In its investigative

Speaker 1report on the t MI two accident, New reg six hundred, I and D came to the unequivocal conclusion that if operators had followed their procedures for loss of coolant accidents, there would have been no accident. However, for more than two hours on March twenty eighth, the operators at TMI did not recognize that they had a loss of coolant accident and did not consider the LOCA procedure relevant. In any event, the t MI two procedures were inconsistent and misleading in this regard. Ten, there is an apse throughout

Speaker 1the NRC of any overall system to measure and improve the quality of safety regulations. There are inadequate management and internal quality assurance systems, an inadequate research program, and the absence of any systematic effort to obtain and use the public health related research of such federal agencies as HW and EPA. Eleven, The information and direction issued by NRC to licensees based on operating experience was at times fragmented

Speaker 1and misleading. For example, a an NRC publication describing the September nineteen seventy seven Davis Bess incident made no mention of the fact that operators interrupted HPI. The incident appeared under the heading of valve malfunction not operator error B. In the weeks following the accident, NRC apparently was confused as to what emergency precenteis plant operators should follow. Thus, within a short span of time, NRC issued and then

Speaker 1either modified or contradicted its post TMI emergency instructions. One immediately after the TMI accident, NRC directed operators not to override automatic engineered safety features under any circumstances, and to operate high pressure injection without regard for reactor vessel pressure temperature limits. NRC modified this directive within a short time two. On April fifth, NRC required all licensees operating B and

Speaker 1W designed reactors to revise their procedures so that in the event of HPI initiation with reactor coolant pumps RCP operating at least two RCPs would remain operating. On July twenty sixth NRC took the opposite position and directed licensees to shut down its pumps when HPI initiated I in E. In its August nineteen seventy nine report on the TMI accident stated that the failure of the t MII operators to shut down the RCPs sooner than they did was

Speaker 1a potential item of non compliance. Twelve. With its present organization, staff, and attitudes, the NRC is unable to fulfill its responsibility for providing an acceptable level of safety for nuclear power plants. Commission findings h the public's right to public information. One. The quality of information provided to the public in the event of a nuclear plant accident has a significant bearing

Speaker 1on the capacity of people to respond to the accident, on their mental health, and on their willingness to accept guidance from responsible public officials. Two. Before the accident, met Ed had consistently asserted the overall safety of the plant, although the company had made information concerting difficulties at TM two public and weekly press releases, this information was not pursued and often not understood by the local news media in the area, and the local news media generally failed

Speaker 1to publish or broadcast investigative stories on the safety of the plant. Three. Neither MEDED nor the NRC had specific plans for providing accident information to the public and the news media. Four. During the accident, official sources of information were often confused or ignorant of the facts. News media coverage often reflected this confusion in ignorance. Five met ed's handling of information during the first three days of the

Speaker 1accident resulted in loss of its credibility as an information source with state and local officials, as well as with the news media. Part of the problem was that the utility was slow to confirm pessimistic news about the accident. In accordance with an informal agreement worked out between Governor Thornberg and the White House, the release of information was centralized beginning on the third day of the accident. Under the agreement, Harold Denton of the NEC would issue all

Speaker 1statements from the site on plant status, the Governor's office would be the sole source of comment on protective action and evacuation, and the White House would coordinate comment on the federal emergency relief effort. This agreement limited the number of sources available to the news media, and while it brought some order out of the chaos in public information, it raised two problems. First, information on off site radiation releases was not centralized in any source so that it would be readily available to the news media and the public.

Speaker 1And second, the plan provided no specific public information role for the utility seven During the first days of the accident, B and W made a conscious decision and not to comment on the accident, even when company officials believed that misinformation was being made available to the public by others. Eight. The reporters who covered the accident had widely divergent skills and backgrounds. Many had no scientific background. Because too few

Speaker 1technical briefers were supplied by NRC and the utility, and because many reporters were unfamiliar with the technology and the limits of scientific knowledge, they had difficulty understanding fully the information that was given to them. In turn, the news media had difficulty presenting this information to the public in a form that would be understandable. A. This difficulty was particularly acute in the reporting of information on radiation releases B.

Speaker 1They also experienced difficulty interpreting language expressing the probability of such events as a meltdown or a hydrogen explosion. This was made even more difficult when the sources of information were themselves uncertain about the probabilities. Nine. The impression exists that in news coverage of the accident, the news media presented a more alarming than reassuring view of events without attempting to assess how alarming. The accident may in fact have been. An analysis of the sources quoted in the

Speaker 1news media reveals, overall a larger proportion of reassuring than alarming statements in the coverage concerning the status of the accident. In choosing quotations from both official and unofficial sources, the news media did not present only alarming views, but rather views on both sides of issues related to the accident. Ten A qualitative survey of forty two newspapers from around the country showed that the vast majority covered the accident in much the same way as the major suppliers of news,

Speaker 1such as the wire services, the broadcast networks, The New York Times, and the Washington Post. A few newspapers, however, did present a more frightening and misleading impression of the accident. This impression was created through headlines and graphics and in the selection of material to print. End of Section six.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Castaways of Disappointment Island - Herbert Escott Inman

    Nov 21, 20267 hr 2 minAudio

    Castaways of Disappointment Island - Herbert Escott Inman. This episode includes AI-generated content.

    Credit the people on this episode

  2. Report of the Inquiry into the Role and Oversight of Private Security Contractors in Afghanistan - United States Senate Committee on...

    Nov 14, 20265 hr 54 minAudio

    Report of the Inquiry into the Role and Oversight of Private Security Contractors in Afghanistan - United States Senate Committee on Armed Services. This episode includes AI-generated content.

    Credit the people on this episode

  3. Appeal to the Religion, Justice, and Humanity of the British Empire for West Indies Slaves-William Wilberforce

    Oct 31, 20262 hr 17 minAudio

    "Appeal to the Religion, Justice, and Humanity of the British Empire for West Indies Slaves" by William Wilberforce is a powerful call to conscience, urging the British Empire to recognize the moral imperative of...

    Credit the people on this episode

  4. Four-Fifty Miles to Freedom-Maurice Andrew Brackenreed Johnston, Kenneth Darlaston Yearsley

    Oct 25, 20266 hr 51 minAudio

    "Four-Fifty Miles to Freedom" by Maurice Andrew Brackenreed Johnston and Kenneth Darlaston Yearsley invites listeners to explore themes of resilience and the quest for liberation. This compelling narrative delves into...

    Credit the people on this episode

  5. Safeguarding children pediatric medical countermeasure research-Presidential Commission for the Study of Bioethical Iss

    Oct 24, 20265 hr 41 minAudio

    "Safeguarding Children: Pediatric Medical Countermeasure Research" by the Presidential Commission for the Study of Bioethical Issues delves into the critical intersection of pediatric health and ethical considerations...