On the early morning of March 28, 1979, a serious incident unfolded at the Three Mile Island 2 nuclear power plant near Middletown, Pennsylvania. Triggered by mechanical failures and compounded by critical human errors, the accidents severity remained uncertain for four days, affecting plant managers, government officials, and the public alike. This event not only raised alarm bells across the nation but also ignited international scrutiny regarding nuclear safety. In response to these alarming concerns, this Commission was established to investigate the incident and its far-reaching implications. (Summary from the preface) This episode includes AI-generated content.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Section ten of Report of the President's Commission on the Accident at Three Mile Island. This is a LibriVox recording. All LibriVox recordings are in the public domain. For more information or to volunteer, please visit LibriVox dot org. Report of the President's Commission on the Accident at Three Mile Island Supplemental Views, Part two. Supplemental View by Thomas H. Pigford.
Speaker 1I generally concur with the conclusions and recommendations of the President's Commission on the Accident at Three Mile Island. However, some of the principal results of this investigation need clarification and discussion. Among these are some that warrant immediate but necessarily limited comment. The performance of equipment and engineering systems. The Commission has properly recognized that, with the very heavy
Speaker 1emphasis upon equipment to attain reactor safety, there has been too little emphasis upon the adequacy of people to help achieve that safety. The lack of such people emphasis has been properly stressed in this report. However, that stress has now obscured the very important fact that, in spite of the very crucial errors of operators and supervisors at t M I two, the safety equipment did indeed function. In
Speaker 1spite of the open p O r V leaks in the vent gas system and other equipment failures, the overall system of equipment was sufficiently good that without the human errors, the accident at t m I two would have been only a minor accident. The reactor containment and its auxiliary equipment did indeed function to protect the public. Except for the small fraction that escaped to the environment, the radioactivity was contained, the off site radiation doses were small. We
Speaker 1have found that the actual release of radioactivity to the atmosphere will have a negligible effect on the physical health of individuals. Equipment failures were not the proximate cause of the tm I two accident. The accident was in fact a demonstration that the equipment was effective. Although there has been considerable speculation about how near tm I two came to a worse accident, our staff analyzes show that even
Speaker 1if all of the reactor fuel cladding had been oxidized to form hydrogen, or even if appreciable fuel melting or even a meltdown had occurred, the containment would still have survived and protected the public. The accident demonstrated that the defect. Hence in depth approach toward nuclear reactor safety has indeed yielded significant results. The emphasis in this report upon equipment versus people obscures the fact that the equipment itself is
Speaker 1only one product of the defense in depth or multiple barrier design approach, which also encompasses the analysis of how equipment components must perform and how systems of equipment must operate. The accident demonstrated that this system of equipment performed better than expected. Earlier assumptions and studies by aec NRC have suggested far greater core damage and greater releases of radioactivity
Speaker 1from the fuel and into the containment under such degraded cooling conditions. The accident also has demonstrated many areas wherein equipment modifications can result in further improvements in safety of existing and future reactors in this country. These are important positive results from our investigation the people related problem. The nature of the people related problems needs clarification. One such problem,
Speaker 1and a most serious one, was the errors made by operators and operators supervisors whose training was insufficient in scope and understanding. Another was the failure of many individuals to respond adequately to the earlier experience from other reactors and to other advance information that might have alerted the operators and avoided the accident. Another problem was the errors made by some NRC officials who misinterpreted the release of radioactivity
Speaker 1on March thirty and recommended evacuation, and who erroneously concluded on Marks one that the hydrogen bubble might explode. The public trauma from these mistakes resulted in severe but short lived mental stress, which was evidently the only serious health effect of the accident. Having identified the particular people problems involved, many of the necessary direct remedies are apparent. There seems
Speaker 1to be some unwillingness to recognize that many of these remedies are already being implemented. The NRC and the nuclear industry have taken and are taking steps on a broad basis to analyze and rectify these problems, as evidenced by the post TMI NRC bulletins and by the establishment of the Utilities Institute for Nuclear Power Operations i NPO and the Reinsurance program. After experiencing the shock and comprehending the
Speaker 1cost of this accident, the nuclear industry clearly has set into motion programs to institute many of the remedies that this Commission seeks. The problem with attitudes emphasized in the Commission's report must refer largely to pre t MI attitudes. It is reasonable to expect that other such human related problems not uncovered by this investigation may exist. That and
Speaker 1the need to instill and continue a strong emphasis upon reactor safety suggests some of the broader institutional changes recommended in this study. Scope and limits of the investigation, The limits of this investigation and the effect thereof upon the commission conclusions and recommendations need clarification. This investigation was limited to the accident at TM two and possible variation there too,
Speaker 1and to a limited extent similar transients at other places. The many other aspects of reactor safety were not investigated, although we do recommend that these be more systematically studied. The facts of the present investigation provide no basis for concluding that reactors are unsafe. They also show that, although more emphasis is needed on the analysis and planning for small break accidents, the possibility of an accident of this
Speaker 1type was known and had been analyzed and predicted prior to the t MII two accident. Therefore, any conclusions as to new fears of reactor safety do not arise from and imply large extrapolations from the facts of this investigation. This investigation has not included a study of reactor citing. Consideration of the calculated low population zone occurred only in
Speaker 1our consideration of its implication on the specification of radiation doses for evacuation decisions. Therefore, proposals made by some commissioners to reverse existing site approvals in favor of more remote sites have no justification within the facts of this study. We have recognized in this investigation that decisions as to whether or not safety improvements are to be implemented must be based in part upon a weighing of the costs
Speaker 1against the benefits. However, we did not evaluate the costs of possible safety modifications, nor did we evaluate the probabilities of some of the large hypothetical releases that have been postulated by some commissioners. Such proposals and claims as to risks therefrom have no basis within the of this investigation. We have not investigated the availability, cost, overall safety and
Speaker 1environmental effects of nuclear energy and of other energy alternatives, nor have we investigated the effect of various energy alternatives upon the nation's economy and security. We have not examined the effect of a speed up or delay of nuclear power upon the many energy problems that affect the nation. Therefore, proposals by some commissioners to impose sanctions that affret the availability of nuclear energy as an option are based upon
Speaker 1their own personal extrapolations which leap far beyond the facts of this investigation. The Commission, in its final consideration of the moratorium proposals, repudiated the issue by a vote of eight to four lack of inn put from those parts of the nuclear industry not involved directly in TMI two. Through its investigation of the Nuclear Regulatory Commission, the Commission's
Speaker 1staff has uncovered problems and practices which have suggested extrapolations to those many parts of the nuclear industry not involved directly with the TM two accident. However, little proof of the validity of these extrapolations has been established. Moreover, to my knowledge, no representatives of those other parts of the nuclear industry were interrogated or asked to present evidence on any of the relevant issues, except for one company interrogated
Speaker 1within the narrow issue of the Besnow incident. This further limits the validity of the industry wide extrapolations that are implied in many places in the report and that are implied in some of the the moratorium recommendations still endorsed by some of the Commissioners Attitudes. The framing of the Commission's overall conclusion around the question of attitudes of the Nuclear Regulatory Commission and to the extent that the institutions
Speaker 1that we investigated are typical of the nuclear industry, requires comment and interpretation. Attitudes, especially prior to t m I two, were not directly examined, nor could they be valid. Conclusions can only be drawn on actions taken i e. Problems addressed and not addressed, regulations issued and complied with, and the occurrence of events that reflect upon the adequacy of
Speaker 1those processes. Even if attitudes could be assessed, it is not clear how they could be changed by any recommended rule, reorganization, or other mandated influence. It is more constructive to assume that attitudes are symptomatic of the forces at work in the systems, and it is those forces that must be addressed. The actions already taken by the industry in setting up IMPO,
Speaker 1the Nuclear Safety Analysis Center, and the program of self insurance against the cost of replacement power. With the self policing actions thereby implied signal a genuine, if somewhat belated, recognition of the need for greater effort to prevent nuclear accidents and to cope with their consequences. These actions show a significant change in industry attitude that can only be beneficial.
Speaker 1It becomes clear as the theme of attitudes is developed in the Commission report that what is of concern is an apparent phase failure of the system to incorporate an effective mechanism, to assimilate lessons from plant experience, and to incorporate the appropriate up to date technology, particularly as it applies to control room design, and to develop sufficiently trained and competent people to manage this technology. This is a
Speaker 1more manageable and appropriate focus for the overall conclusion of this Commission. I believe that such technology is being or will be used by the industry, and that changes and improvements in design and operating procedure will be effected not merely to satisfy critics nor to demonstrate attitudinal penitence, but on the basis of sound judgment resting on sound data
Speaker 1commission judgments on overall safety. In its overview, the Commision acknowledges that it has not examined how safe is safe enough, or the broader question of nuclear versus other forms of energy, recognizing the complexity of the issue and the limitations of staff. However, the Commission soon leaps this hurdle and speaks of the risks that are inherently associated with nuclear power, and it
Speaker 1holds that equipment can and should be improved to add further safety. Even the conclusion that accidents as serious as TMI should not be allowed to occur in the future may imply that an assessment of risk and safety has been made. This conclusion is more understandable if interpreted in terms of what was really serious about this accident. The only serious health effect was the mental stress resulting from
Speaker 1the confusion and public misunderstanding concerning the March thirty release and the March thirty one hydrogen bubble. The financial loss to the utility and ultimately to the ratepayer, is also serious. Every technology imposes finite degrees of risk upon society, both in its routine operation and in the occurrence of accidents over a long enough time period, even low probability accidents
Speaker 1may occur. The essential question is the trade off between the risks and the benefits. The Commission neither received any evidence nor reached any conclusions that the risks of nuclear power outweigh its benefits. The NRC promotional philosophy. The NRC's assignment is indeed difficult, but not because of dichotomy of safety on the one hand and the industry's convenience on
Speaker 1the other. The problem is more complex. There is in each issue the element of how much cost, how many person years of expert analysis, and how much delay is justifiable to achieve an increment of safety. Seldom are these issues black and white. Since the designers and engineers must recognize that absolute absence of risk in any project is unattainable,
Speaker 1and that social costs accrue to both inaction and overreaction, efforts to balance costs and benefits should not be considered evidence per se of a promotional philosophy. It should be expected that industry will logically resist unwarranted changes proposed in the name of safety. Hydrogen from small break locus finding A ten may be misinterpreted as to sons suggesting that
Speaker 1because of the experience at TMI, the generation of large amounts of hydrogen gas is an inevitable consequence of small brake locus. This misinterpretation leads to the erroneous conclusion that NRC over emphasis on large brake locos at the expense of small brakes is what left the TMI operators unprepared for the hydrogen produced during the accident. Since significant amounts of hydrogen are not predicted in the typical analyzes of
Speaker 1large brakes, such inference is without basis. Large brake analysis or any brake analysis, will predict the generation of large amounts of hydrogen whenever the cooling water added to the reactor core from the emergency systems is reduced to the extent that was done at TMI two. The two step licensing process finding G six implies that in the two
Speaker 1step licensing process construction permit and operating license safety may be compromised due to the large financial commitment prior to the operating license stage, with the implication that insufficient information is known at the construction permit stage for an in depth safety review. A review of actual license applications will reveal that major safety features are sufficiently described at the
Speaker 1construction permit stage. The issuance of an operating license several years later facilitates consideration of appropriate technological developments and feedback from operating plants, which may be factored into the design toward the end of the construction period. Safety review in licensing is not a discrete two step process. There is and should be continuing dialogue between the NRC staff and the applicant during this interim period. Single failure criterion finding
Speaker 1G eight A that applicants are not required to analyze what happens when two systems or components fail independently of each other conveys some misunderstanding of the single failure criterion. The requirement is that the applicant must show that applicable off site radiation exposure limits will not be exceeded in the event of an accident initiated by a any credible component failure,
Speaker 1and in which B either all external or all internal power supplied to the plant is lost, and C there is, in addition, failure of that single active component whose failure would be most worsen the results of the accident. Although confusingly called a single failure criterion, it is clear that this criterion requires the assumption of at least three failures. It is further required that if failure of one component
Speaker 1causes failure of other components, the entire series of failures must be regarded as one failure. The single failure criterion is applied on a system by system basis, which implies single failure tolerance in each of the systems. Safety related items finding G five B concerning NRC's handling of safety related items needs clarification in several respects. First, the well
Speaker 1established practice of the NRC is to require that any component, system, or feature needed for the pre mitigation of a serious accident must meet documented requirements of quality, redundancy, testability, environmental qualifications, et cetera, and must be categorized as safety related. Although other components, systems, or features are classed as non safety related,
Speaker 1they must meet requirements appropriate to their operational function. NRC practice is to subject all safety related items to review. Additionally, non safety related items are reviewed by NRC to reassess their possible reclassification. Second, in analyzing postulated accidents, one is not permitted to assume that an active non safety related item will be capable of performing its function. As a result,
Speaker 1either an active item must meet safety relations requirements of quality, etc. Or no credit can be taken for its functioning in an accident. In the TMI two accident, it appears that the NRC's preoccupation with the safety related item list was not the fault, but rather the safety analyzes did not take into account the actual lack of training, the inadequate operating procedures and practices, and their potential capability for producing
Speaker 1an accident if the PARV stuck open. Finally, the NRC is in some degree responsible for the level of safety consciousness in the industry. In this sense, NRC's emphasis on safety related categories has probably been less influential than its reluctance to give credit for safety innovations and its requirement that the industry comply with many technically unreasonable rules. These
Speaker 1practices encourage the industry merely to comply with NRC rules with regard to finding G eight C. It is not the reliance on artificial categories of safety related items which has caused NRC to miss important safety problems. Rather, it was the failure to recognize that some items not part of the safety system may challenge that system at an undesirable frequency. Moreover, the capability of the operators to defeat
Speaker 1the safety system was not given sufficient attention. These important issues are apart from safety system classification and the single failure criterion. Plant instrumentation finding G five F does not provide a balanced account of all the consideration identified by the Atomic Industrial Forum AIF in its nineteen seventy eight response to an NRC proposal to institute a new guide
Speaker 1requiring a wider range of response for inplant instrumentation, nor does it recognize the seeming lack of technical basis for the NRC request. The relevance to the TMI two accident of the AIF response is not clear, since the range of the inplant instrumentation at TMI two was adequate for diagnosis and plant control during the accident. Instead, the problem
Speaker 1during the TM two accident was that only part of the range of the inplant instrumentation was displayed to the operators, and the manner of display was in some ways inadequate. Additionally, the operator's misinterpre some instrument readings. However, a greater range of instrument response might have aided the later assessment of the core damage that occurred. Backfitting Finding G eight h
Speaker 1that there is no systematic backfitting review on a plant by plant basis of operating plants and plants under construction appears to take too little account of the NRC's Systematic Evaluation Program SEP, initiated more than three years ago. Under this program, operating plants have been categorized by NRC, issues have been identified by NRC, and information about older plants
Speaker 1has been supplied to NRC by the utilities. In a number of cases, physical modifications of operating plants have been made in order to comply with updated NRC requirements. In some areas, such as that of the upgrading of emergency plans cited in the Commission's report, progress does appear to have been somewhat slow. Independent testing by I and E
Speaker 1in finding G nine A and Recommendation A two D, the recommended improvement of NRC's inspection and auditing of licensee compliance with regulations and the need for major and unannounced on site inspections of particular power plants is logical. It calls for NRC to do more of what it already does, and to do it better. In fact, NRC has for over a year stationed full time inspectors at some operating
Speaker 1nuclear power plants. At some plants, unannounced on site inspections appear to be so frequent as to be commonplace. The implication that NRC's I and D inspectors should do a substantial amount of independent testing of construction work and should place little reliance on work done by the utility is clearly impractical because of the enormous resources that would be required. Careful auditing of industries testing is the only practicable and
Speaker 1effective approach emergency procedures. In addition to the fact that some of the existing t MI iiO procedures were unworkable, as indicated in the Commission's report, the procedures did not provide a step by step pathway for identifying the problem implied by the information available in the control room, given the philosophy that the operators had to adhere closely to written procedures. The unavailability of diagnostic procedures and training in
Speaker 1their use was a significant factor among the causes of the TMI two accident. The major problems with NRC's approach to reactor safety. The Commission report has identified many mistakes by NRC personnel in their handling of the TMI two accident and deficiencies in NRC's regulatory practices. However, this criticism does not reach some essential elements of the problem. I
Speaker 1believe that the following are some of the more important problems at NRC. Lack of quantified safety goals and objective. When a safety concern is postulated, there is no yardstick to judge the adequacy of mitigating measures. Inability to set priorities and to allocate resources in proporse portion to the estimated risk to the public. In my view, a disproportionate effort is being required for some issues that have only
Speaker 1a marginal impact upon risk to the public. Lack of experienced staff. An undesirably large proportion of NRC staff and management have little or no practical experience in designing or operating the equipment that they regulate. Arbitrary requirements. Too many of the NRC requirements are mandated without valid technical backup and value impact analysis, a stifling adversary approach. The existing
Speaker 1process inhibits the interchange of technical information between the NRC and industry. It discourages innovative engineering solutions. Ineffective evaluation of operations. NRC has no effective system for evaluating data from operating plants. Data should be analyzed systematically to identify trends and patterns. Lack of a comprehensive system approach to the whole plant.
Speaker 1A large percentage of the NRC staff are specialists focusing upon narrow topics. There are relatively few systems engineers within NRC who can integrate individual safety features into an overall concept and who can place issues into perspective. An overwhelming emphasis on conservative models and assumptions. Realistic analyzes are needed to identify the margins of safety and to aid competent decisions.
Speaker 1The staff report nights, schedule and deadline for the Commissioner's Report has allowed little opportunity for careful review of the staff reports upon which our findings are to be based. Some staff reports are not yet completed. There are several parts of some key staff reports with which I cannot agree, particularly the Staff Report on the NRC the Staff Report
Speaker 1on the Nuclear Regulatory Commission. The Staff Report on the Nuclear Regulatory Commission is a companion document published by the Commission. Some deficiencies in this report are already reflected in earlier comments on Findings and conclusions concerning the NRC. Having reviewed that report. In search for understanding for many of the findings and conclusions adopted by this commission, I noted several deficiencies varying from tech error to unbalance in the investigation.
Speaker 1Two examples are given below. Performance characteristics of large light water reactors. The staff report contains generalities by an NRC staff member who seriously questioned the state of knowledge of the performance characteristics of the larger light water reactors in this country, an opinion apparently also echoed by some other individuals within an RC. The cited statement was adopted by
Speaker 1the authors of this staff report. However, the staff report reflects no attempt by the staff to obtain evidence from the nuclear industry on this issue, even though the various companies in the nuclear industry are the parties impugned by the cited statements. Statements were recently obtained from Saul Levine, director of NRC's Office of Nuclear Regulatory Research, and from two different companies that design light water reactors and that
Speaker 1are not connected with the t MII two accident. It should not be construed, from reference to economy of scale that the regulators were being asked to accept reduced safety margins. Rather, the growth was largely achieved by adding more fuel assemblies of the same or similar volumetric and linear power density, and by adding more heat transfer loops having the same mechanical and hydraulic characteristics as in the plants previously licensed.
Speaker 1Saul Levine said quote, As far as I know, there have been no size dependent factors found in the operation of large reactors to affect the safety of the plant's. Adversely, end, there appears no supportable suggestion that SAVE was compromised as a result of the extrapolation of technology. The unqualified acceptance of the cited testimony in the staff report is an indicator of insufficient balance in this part of the investigation.
Speaker 1Reliance on books and magazines. The staff report relies to a considerable extent upon excerpts from a book authored by E. Rolfe, without establishing the author's qualifications. MSS rolf did not testify in this investigation. The undue reliance upon this secondary source without first establishing a primary source for its support, and without establishing its reliability is a further example of insufficient
Speaker 1balance in this part of the investigation. In my view, the rolf book does not express a comprehensive accurate and balanced knowledge of the NRC and of the nuclear industry. Concluding statement, The rather extensive criticism of NRC in the Commission report and as implied in this supplementary statement, should not obscure the central issue that primary responsibility for nuclear
Speaker 1safety lies with the utility, shared to a large extent with the equipment suppliers and the architect engineers. This also reflects my view of the responsibilities for the t MI TiO accident. However, these criticisms of both the industry and the NRC should not obscure the fact that in four hundred eighty reactor years of commercial nuclear power operation in the United States, there has still been no identifiable effect
Speaker 1upon the physical health of the public, and that this record has been achieved by the industry and NRC, the parties that have been criticized, and under the system that has been criticized. It must be emphasized that nothing learned from this investigation suggests that the nuclear power option should be curtailed or abandoned as a result of the t M I two accident. Thomas H. Pigford, October twenty five,
Speaker 1nineteen seventy nine. Supplemental view by Anne D. Trunk. The following is a minority view on two issues raised in the report Item one. This item represents the feelings of the undersigned and a majority of her circle of citizens who lived through the t m I accident. The report concluded that the errors and sensationalism reported by the news
Speaker 1media merely reflected the confusion and ignorance of the facts by the official sources of information. It further concluded that the press did a creditable quote more reassuring than alarming, unquote job of news coverage. In fact, these conclusions are not generally supported by the staff reports. There were reliable news sources available, too much emphasis was placed on the what if rather than the what is. As a result,
Speaker 1the public was pulled into a state of terror of psychological stress more so than any other normal source of news. The evening national news reports by the major networks proved to be the most depressing, the most terrifying. Confusion cannot explain away the mismanagement of a news event of this magnitude. It is requested that the news media undertake a self evaluation on an individual basis and review their role in
Speaker 1this accident, which was not limited to equipment damage but also included psychological damage Item two. The Undersigned could not support a motion for an undefined time frame moratorium on all new construction permits because it was not shown how this could result in a safer plant at t m I, nor attain higher standards of safety and performance by the industry. A defined period say two years, to act on this
Speaker 1report's recommendations, along with a separate probationary operating period say five years, for the licensee at t m I, could accomplish both the above objectives, and is therefore recommended and d TRUNK October twenty five, nineteen seventy nine, end of Section ten. Recording by Linda Johnson
Report of the Inquiry into the Role and Oversight of Private Security Contractors in Afghanistan - United States Senate Committee on Armed Services. This episode includes AI-generated content.
"Appeal to the Religion, Justice, and Humanity of the British Empire for West Indies Slaves" by William Wilberforce is a powerful call to conscience, urging the British Empire to recognize the moral imperative of...
"Four-Fifty Miles to Freedom" by Maurice Andrew Brackenreed Johnston and Kenneth Darlaston Yearsley invites listeners to explore themes of resilience and the quest for liberation. This compelling narrative delves into...
"Safeguarding Children: Pediatric Medical Countermeasure Research" by the Presidential Commission for the Study of Bioethical Issues delves into the critical intersection of pediatric health and ethical considerations...