015 - Account of the Accident part 5 Mar 31-Apr 2 Epilogue

Mar 4, 202630 minAudio
ShareXLinkedInFacebookWhatsAppEmail

On the early morning of March 28, 1979, a serious incident unfolded at the Three Mile Island 2 nuclear power plant near Middletown, Pennsylvania. Triggered by mechanical failures and compounded by critical human errors, the accidents severity remained uncertain for four days, affecting plant managers, government officials, and the public alike. This event not only raised alarm bells across the nation but also ignited international scrutiny regarding nuclear safety. In response to these alarming concerns, this Commission was established to investigate the incident and its far-reaching implications. (Summary from the preface) This episode includes AI-generated content.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Speaker 1Section fifteen of the Report of the President's Commission on the Accident at Three Mile Island. This is a LibriVox recording. All LibriVox recordings are in the public domain. For more information or to volunteer, please visit LibriVox dot org. Report of the President's Commission on the Accident at Three Mile Island. Account of the Accident, Part five, Saturday, March thirty first, nineteen seventy nine. The great concern about a potential hydrogen

Speaker 1explosion inside the tm I two reactor came with the weekend. That it was a groundless fear an unfortunate error never penetrated the public consciousness afterward, partly because the NRC made no effort to inform the public. It had aired. Around nine thirty p m. Friday night, the NRC chairman asked Robert Matson to explore or the rate at which oxygen was being generated inside the TMI two reactor system and

Speaker 1the risk of a hydrogen explosion. He said he had done calculations. Matson said in his deposition he was concerned with the answers. Matson is Director of the Division of System Safety within the Office of Nuclear Reactor Regulation NRR, which is headed by Denton, and had spent part of Thursday and Friday working on how to remove a gas bubble from the reactor. Following Denton's departure for TMI, Matson

Speaker 1served variously as nrr's representative or deputy representative at the Incident Response Center. Hydrogen had been produced in the reactor as a result of a high temperature reaction that occurred between hot steam and the zirconium cladding of the fuel rods. For this hydrogen to explode or burn a less dangerous possibility, enough oxygen would have to enter the system to form an explosive mixture. There were fears this would happen as

Speaker 1the result of radiolysis. In this process, radiation breaks apart water molecules which contain hydrogen and oxygen. Two NRC teams worked throughout the weekend on the problem, and both sought help from laboratories and scientists outside the NRC. One group addressed the rate at which radiolysis would generate oxygen at TM two, the second to analyze the potential for hydrogen combustion.

Speaker 1Robert Budnitz of the NRC also asked experts about possible chemicals that might remove the hydrogen. At noon, Henry talked by telephone with Denton and expressed his concern that oxygen freed by radiolysis was building up in the react. Earlier, Henry had told Victor Stello, Junior Denton, second in command at t M I, the same thing. The NRC chairman told Denton that Governor Thornburgh should be made aware of

Speaker 1the potential danger. Denton promised to speak with Thornburgh. Shortly after one p m. Matson got some preliminary answers regarding the potential for a hydrogen explosion. An hour later, Matson got more replies. I had an estimate there was oxygen being generated from four independent sources, all with known credentials in this field, he said in his deposition. The estimate of how much oxygen varied, but all estimates said there

Speaker 1was considerable time, a matter of several days before there was a potential combustible mixture in the reactor coolant system. At a commission hearing, Matson later admitted, in response to questions from Commissioner Pigford, that the NRC could have determined from the information available at that time that no excess oxygen was being generated and that there was no real danger of explosion. But when Matson met with the NRC commissioners at three twenty seven p m on Saturday, the

Speaker 1bottom line of that conversation was there were several days required to reach the flammability limit, although there was oxygen being generated. Matson recalled in his deposition and I expressed confidence that we were not under estimating the reactor coolant system explosion potential. That is, the estimate of two to three days before reaching the flammability limit was a conservative estimate. By Saturday night, however, Matson would be told by his

Speaker 1consultants that their calculations indicated that the oxygen percentage of the bubble was on the threshold of the flammability limit. Around six forty five p m, Matson talked with Vincent Noonan, the man within the NRC most knowledgeable about what might result from an explosion inside a reactor. One NRC consultant had predicted that a hydrogen blast would produce pressures of twenty thousand pounds per square inch within the t M

Speaker 1I two reactor. B and W, designer of the reactor, however, had considered the dampening effects of water vapor on an explosion and those of an enriched hydrogen environment, and calculated a total pressure of three to four thousand pounds per square inch that was encouraging. Previous analyzes indicated the reactor coolant system of a t m I two reactor could withstand blast pressures of that magnitude. Late Saturday evening, James

Speaker 1Taylor of B and W reiterated another B and W engineer's conclusion, first relayed to the n r C Thursday night, that no excess oxygen was being generated. That information, Matson stated in his deposition, never reached him. Saturday, at two forty five p m. Henry met with reporters in Bethesda. He said then that a precautionary evacuation out to ten or twenty miles from the island might be necessary if

Speaker 1engineers attempted to force the bubble out of the reactor. NRC had concluded such an attempt might cause further damage to the core, Hendry said, or touch off an explosion of the bubble. Stan Benjamin, a reporter with the Washington Bureau of the Associated Press, followed up Hendry's press conference by interviewing two n RC officials. Edson case Denton's deputy in the Office of Nuclear Reactor Regulation and Frank Ingram,

Speaker 1a public information spokesman from them, and an NRC source he refused to name. Benjamin learned of the concern within the Incident Response Center that the bubble could become a potentially explosive mixture within a matter of days, perhaps as few as two. Benjamin checked his story with Case and Ingram, reading much of it to them word by word before releasing the article. Case and Ingram agreed it was accurate.

Speaker 1The report, first transmitted as an editor's note at eight twenty three p m, was the first notice to the public that some NRC officials feared the bubble might possibly explode spontaneously. Denton had been briefed throughout Saturday afternoon and evening by Henry and NRC officials in Bethesda on the oxygen estimates and the potential for a burn or explosion, but he learned of the ap story only a short time before he joined Governor Thornburgh and Lieutenant Governor Scranton

Speaker 1for a late evening press conference in Harrisburg. The governor assured reporters that there is no imminent catastrophic event foreseeable at the Three Mile Island facility. Denton too said there is not a combustible mixture in the containment or in the reactor vessel, and there is no near term danger at all. Denton also tried to deflate the impression voiced by several reporters that contradictions existed between himself and his

Speaker 1colleagues at NRC headquarters. No, there is no disagreement. I guess it is the way things get presented, he said. But there was disagreement, and Denton wanted it resolved. President Carter had announced earlier in the evening he would visit Three Mile Island the following day. Denton told Stello to explore the hydrogen oxygen issue further with outside experts. Stello realized the concern in Washington. He had received a telephone

Speaker 1call shortly after nine p m. From Eugene Eidenberg, a presidential aid, inquiring about the ap story. Stello told the White House that he did not share the concern felt at NRC headquarters Saturday, as the NRC wrestled with managing the accident and the envisioned danger of the hydrogen bubble, officials of the Department of Health, Education, and Welfare struggled with their own concerns. That morning, senior h W health

Speaker 1officials gathered and continued the previous day's discussion of the possibility of an evacuation. For the first time, they debated how large an area should be evacuated, but the discussions led ultimately to a recommendation to consider immediate evacuation if the NRC could not provide assurances that the reactor was cooling safely. Joseph Klifano, hw U secretary summarized the group's views in a memorandum to Jack Watson of the President's staff.

Speaker 1Later in the day, HW health officials attended an interagency meeting at the White House convened by Watson and repeated the HW recommendation to consider evacuation. Richard Cotton, a key Califano aide, raised another Califano recommendation that NRC officials consult with HW and Environmental Protection agency experts regarding the potential health effects of the efforts to control TM two's reactor.

Speaker 1Cotton persisted after the meeting, and on Sunday and Tuesday, HW officials were briefed by the NRC. These briefings, however, were always informational. There was no NRC effort to seek HW's advice Sunday, April first, nineteen seventy nine. Throughout Saturday night and the early hours of Sunday, County emergency preparedness offices were deluged with telephone calls from citizens concerned by

Speaker 1the conflicting reports about the hydrogen bubble, but the flow of useful information from the state to the local level had essentially ceased after Denton's arrival. The Governor's office focused attention on the federal effort Denton and officials from several US emergency agencies. Arren Henderson, director of the Pennsylvania Emergency Management Agency, was no longer invited to the Governor's briefings and press conferences, and he did not attend after Friday night. Thus, PIMA,

Speaker 1although it continued to receive status reports from the Bureau of Radiation Protection, was isolated from information wanted at the local level. In Dauphin County, frustration ran high. Shortly before midnight on Saturday, State Senator George Jacis called the governor in an attempt to obtain accurate information. Jacus was told the governor was too busy to talk. Then Jacus called Scranton and got the same response. At that point, Jacas

Speaker 1told a Scranton aide that unless more cooperation and information were forthcoming, Daufin County would order an evacuation at nine a m. Sunday. Scranton called the county's emergency center at two a m. And agreed to meet officials there later in the morning. The Lieutenant Governor arrived at ten a m. Preceded by Henderson, who complained of his own inability to obtain information. Scranton listened to Malloy and his colleagues. I

Speaker 1think he was just totally shocked by what was transpiring at our level, how busy we were, how much work we were doing, how complicated it was, Molloy said in his deposition. Matson and several other NRC staffers met with NRC Commissioners Henry Victor Jalinski and Richard Kennedy. Their purpose was to reach a judgment based on the estimates and information available about the true potential for a hydrogen explosion inside the reactor. According to Matson's deposition, the group agreed

Speaker 1five percent oxygen was a realistic flammability limit, eleven percent oxygen was a realistic detonation limit that there could be no spontaneous combustion below nine hundred degrees fahrenheit, that the oxygen production rate was approximately one per cent per day, and that the present oxygen concentration in the bubble was five percent. After the meeting, Henry and Matson drove to TMI to meet with Denton. Stello talked with Denton's Sunday

Speaker 1morning and outlined his arguments against any danger of a hydrogen explosion inside the reactor. Pressurized water reactors the type used at TMI two normally operate with some free hydrogen in the reactor coolant. This hydrogen joins with the oxygen freed by radiolysis to form another water molecule, which prevents the build up of oxygen to a quantity that would allow an explosion to take place. Stello told Denton that

Speaker 1the process was the same now and there was no danger of an explosion. Hendry and Matson met with Denton and Stello in a hangar at Harrisburg International Airport, just minutes before President Carter's one pm arrival. Matson and Stello had not talked to each other since Friday morning. Matson outlined the conclusions reached at NRC headquarters about the bubble and the reasoning behind them. In an interview with the Commission staff, Matson described what happened, and next Stello tells me,

Speaker 1I'm crazy that he doesn't believe it, that he thinks we've made an error in the rate of calculation. Stello says, we're nuts. And poor Harold is there. He's got to meet with the President in five minutes and tell it like it is. And here he is. His two experts are not together. One comes armed to the teeth with all these national laboratories and Navy reactor people and high falutin PhDs around the country, saying this is what it is and this is his best summary, and his other,

Speaker 1the Operating Reactor's Division director, saying I don't believe it. I can't prove it yet, but I don't believe it. I think it's wrong. Upon the President's arrival, Denton briefed the Chief Executive on the status of the plant and on the uncertainty regarding its infamous bubble. The President was driven to Three Mile Island, put on protective yellow plastic shoe covers, and toured the facility with Missus Carter, Governor Thornburg, and Denton Stello, Hendry, and Mattson went to the temporary

Speaker 1NRC offices During the afternoon, Experts, including those at Westinghouse and General Electric, were canvassed by phone. By three o'clock. Were convinced we've got it, Matson said in his interview. It's not going to go boom. NRC scientists in Bethesda eventually reached the same conclusion, but later in the day, shortly before four pm, NRC Commissioners Richard Kennedy, Peter Bradford, and John ahern met. They expressed concern over the differing

Speaker 1estimates presented by the NRC staff and decided there might be a need to consider evacuation. Kennedy telephoned Henry at three Mile Island and told him the three NRC commissioners thought Governor Thornberg should advise a precautionary evacuation within two miles of the plant unless experts on site had better technical information than that available in Bethesda. Henry assured Kennedy that the free hydrogen inside the reactor would capture any

Speaker 1oxygen generated and that no problem existed. In mid afternoon, new measurements showed the large bubble in the reactor was diminishing. The gases still existed, but they were distributed throughout the system in smaller bubbles that made eliminating the predominantly hydrogen mixture easier. Why this occurred no one knows, but it was not because of any intentional manipulation by met ED or NRC engineers. By late Sunday afternoon, NRC, which was

Speaker 1responsible for the concern that the bubble might explode, knew there was no danger of a blast and that the bubble appeared to be diminishing. It was good news, but good news unshared with the public. Throughout Sunday, the NRC made no announcement that it had aired in its calculations and that no threat of an explosion existed. Governor Thornberg was not told of the NRC miscalculation either, nor did the NRC reveal that the bubble was disappearing that day,

Speaker 1partly because the NRC experts themselves were not absolutely certain. Monday, April second, nineteen seventy nine, Monday morning, Denton and Matson met the press. George Troffer, a met ED official, had already told a reporter the bubble was essentially gone. Denton acknowledged a dramatic decrease in bubble size, but cautioned that more sophisticated analyzes were needed to be sure that the

Speaker 1equations that are used to calculate bubble size properly include all effects. As to the bubble's potential for explosion, Denton told reporters the oxygen generation rate that I was assuming yesterday when I was reporting on the potential detonation inside the vessel is it now appears to have been too conservative. Throughout the press conference, Denton continued to refer to the NEC's estimates as too conservative. He never stated outright that

Speaker 1the NEC had aired in its conclusion that the bubble was near the dangerous point. According to Matson, the tone of the press conference, its vagueness, and its imprecision, was decided upon at a meeting of NRC officials Monday morning. We wanted to go slow on saying it was good news. We wanted to say it is good news, do not panic. We think we have got it under control. Things look better. But we did not want to firmly and finally conclude

Speaker 1that there was no problem. We had to save some wiggle room in ord to preserve credibility. That was our judgment epilogue. The accident at three Mile Island did not end with the breaking up of the bubble, nor did the threat to the health and safety of the workers and the community suddenly disappear. A small bubble remained, gases still existed within TM two's cooling water, and the reactor itself was badly damaged. Periodic releases of low level radiation continued,

Speaker 1and some feared a major release of radioactive iodine one thirty one might yet occur. Schools remained closed. The governor's recommendation that pregnant women and preschool children stay more than five miles from the plant continued. Saturday, March thirty first, the Department of Health, Education, and Welfare had arranged for the rapid manufacture of nearly a quarter million bottles of patassium iodide. That same day, the Pennsylvania Bureau of Radiation Protection,

Speaker 1which had originally accepted h EW's offer to obtain the drug, transferred responsibility for handling the radioactive iodine blocker to the state's Department of Health. Gordon MacLeod, who headed the state department, put the drug shipments in a warehouse as they began arriving Sunday. During the weekend, Thomas Jeruski, director of the Bureau of Radiation Protection, requested that his people at Three Mile Island be issued potassium iodide. Jeruski wanted b RP

Speaker 1personnel to have the thyroid blocking agent available should a release of radioactive iodine occur. MacLeod refused. He argued that if the public learned that any of the drug had been issued, a demand for its public distribution would result. MacLeod had the backing of the Governor Office and Harold Denton in his decision not to issue the potassium iodide. The decision did not find agreement in Washington, However. On Monday,

Speaker 1Jack Watson asked h. E. W to prepare recommendations for the drug's distribution and use. These were developed by a group headed by Donald Frederickson, director of the National Institutes of Health. The recommendation included administering potassium iodide immediately to all workers on the island, providing the drug to all people who would have less than thirty minutes warning of a radioactive iodine release, roughly those within ten miles of

Speaker 1the plant, and that local authorities assess these recommendations in light of their first hand knowledge of the situation. Governor Thornberg received the recommendations in a White House letter on Tuesday, although some Pennsylvania officials had learned of the Monday. McLeod strong opposed distributing the drug to the public. Among his reasons, radioiodine levels were far below what was indicated for protective action, and the likelihood of a high level release from t

Speaker 1m I two was diminishing. Distributing the drug would increase public anxiety and people might take it without being told to do so, and the possibility of adverse side effects presented a potential public health problem in itself. Mc cloud chose not to accept the federal recommendations. The potassium iodide remained in a warehouse under armed guard throughout the emergency. In Midsummer, the FDA moved the drug to Little Rock, Arkansas,

Speaker 1for storage. Tuesday, April third, General Public Utilities met ed's parent company established its t m I two Recovery Organization to oversee and direct the long process of cleaning up t m I two. Robert Arnold, a vice president of another subsidiary, the g p U Service Corporation, was named to head the recovery operation. Wednesday, April fourth, Schools outside

Speaker 1the five mile area surrounding t m I reopened. All curfews were lifted, but schools within the five miles of the island remained closed, and the Governor's advisory remained in effect for pregnant women and preschool children. Some sense of normalcy was gradually returning to the three mile island area. Governor Thornburgh asked Denton repeatedly if the advisory could be lifted, allowing pregnant women and preschool children to return home, but

Speaker 1the n r C wanted some specific event as a symbol to announce the crisis had ended. At first, the n r C looked to reaching cold shutdown, the point at which the temperature of t m I two's reactor coupled fell below the boiling point of water. When it became obvious that cold shutdown was still days away, agreement was reached between Pennsylvania's Bureau of Radiation Protection and the NRC on ending the advisory. On Saturday, April seventh, Kevin Molloy,

Speaker 1at the request of the Governor's office, read a press release announcing the closing of the evacuation shelter at the Hershey Park Arena, not until two days later, however, did Governor Thornburg officially withdraw the advisory. The accident at Three Mile Island did not end with cold shutdown, nor will it end for some time. More than a million gallons of radioactive water remain inside the containment building or stored in auxiliary building tanks. The containment building also holds radioactive

Speaker 1gases and the badly damaged and highly radioactive reactor core. Radioactive elements contaminate the walls, floors, and equipment of several buildings. Ahead lies a decontamination effort unprecedented in the history of the nation's nuclear power industry, a clean up whose total cost is estimated at eighty to two hundred million dollars and which will take several years to complete. The initial

Speaker 1clean up began in April, using a system called epicor I met ed began decontaminating pre accident water stored in the TMI one auxiliary building, which contains low levels of radioactivity less than one microcure per milileter. Efforts to decontaminate the TM two diesel generation building began in April, and work on the auxiliary and fuel handling buildings got underway

Speaker 1in May. This involves mostly dry and wet vacuuming, mopping, and wiping of radioactive areas to remove the contamination, a task that requires special clothing and respirators to protect the workers. The accident and its subsequent clean up already have produced a variety of solid, slightly radioactive wastes, such as clothing rags, ion exchange resins, swipes, and contaminated air filters. To date,

Speaker 1twelve truckloads of these wastes have been hauled to Richland, Washington and buried at a commercial disposal site. But more difficult aspects of decontamination, both technically and politically, lie ahead. Met Ed has asked the NRC for permission to release the krypton eighty five in the air of the containment building into the atmosphere in controlled bursts. These releases would come over a two month period to ensure that off

Speaker 1site radiation does not exceed the NRC's limits for routine operation of a nuclear power plant. Much of the contaminated water left from the accident, some six hundred thousand gallons pooled in the containment building and about ninety thousand gallons in the reactor coolant system, contains high levels of radioactivity in excess of one hundred microcures per milli liter. Met ED had stored three hundred eighty thousand gallons of water

Speaker 1containing intermediate levels of radioactivity one to one hundred microcures per millileter in several tm I two auxiliary building tanks. Over the summer, the utility installed a system called epicor two to treat this water. NRC approved its use provided that the resins used to remove radioactive materials from the water were solidified before shipment from the island to a disposal site. Met ED began decontaminating the intermediate water in

Speaker 1mid October. Until the radioactive gases are removed from the containment building, no human entry into the sealed structure can be made. Meanwhile, detailed plans for entry and assessing conditions inside the building are being developed. Because no one knows the exact condition of the reactor vessel or its core, no detailed plans have been made for handling and removing its damaged core. Thus, the accident at three Mile Island

Speaker 1in a very real sense continues and will continue until the year's long clean up of t m I two is completed. Workers will receive additional radiation doses until the decontamination process is completed. Five workers in late August, for example, received doses in excess of the NRC's quarterly limits for exposure to the skin or the extremities, and there still remains some risk to the general public that released radiation

Speaker 1could escape from the island. End of section fifteen recording by Maria Casper. End of the Report of the President's Commission on the accident at Three Mile Island.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Castaways of Disappointment Island - Herbert Escott Inman

    Nov 21, 20267 hr 2 minAudio

    Castaways of Disappointment Island - Herbert Escott Inman. This episode includes AI-generated content.

    Credit the people on this episode

  2. Report of the Inquiry into the Role and Oversight of Private Security Contractors in Afghanistan - United States Senate Committee on...

    Nov 14, 20265 hr 54 minAudio

    Report of the Inquiry into the Role and Oversight of Private Security Contractors in Afghanistan - United States Senate Committee on Armed Services. This episode includes AI-generated content.

    Credit the people on this episode

  3. Appeal to the Religion, Justice, and Humanity of the British Empire for West Indies Slaves-William Wilberforce

    Oct 31, 20262 hr 17 minAudio

    "Appeal to the Religion, Justice, and Humanity of the British Empire for West Indies Slaves" by William Wilberforce is a powerful call to conscience, urging the British Empire to recognize the moral imperative of...

    Credit the people on this episode

  4. Four-Fifty Miles to Freedom-Maurice Andrew Brackenreed Johnston, Kenneth Darlaston Yearsley

    Oct 25, 20266 hr 51 minAudio

    "Four-Fifty Miles to Freedom" by Maurice Andrew Brackenreed Johnston and Kenneth Darlaston Yearsley invites listeners to explore themes of resilience and the quest for liberation. This compelling narrative delves into...

    Credit the people on this episode

  5. Safeguarding children pediatric medical countermeasure research-Presidential Commission for the Study of Bioethical Iss

    Oct 24, 20265 hr 41 minAudio

    "Safeguarding Children: Pediatric Medical Countermeasure Research" by the Presidential Commission for the Study of Bioethical Issues delves into the critical intersection of pediatric health and ethical considerations...

    Credit the people on this episode