Electricity and Load Shedding

Oct 26, 202330 minAudioSeason 2, Episode 6
ShareXLinkedInFacebookWhatsAppEmail

This episode makes the point that Eskom is dying and cannot be saved in its current condition. Electricity provision, however, is not dying. We unpack the generation deficit causing load shedding and outline the likely path out of the conumdrum. So what? Load shedding will be with us for the next two years. There are no quick fixes, but it is not impossible either. For more about JP, and to read his newsletter, please visit his website.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Hello and welcome to the So What podcast, in which political economic analyst JP Landman discusses the issues uppermost in the minds of South Africans. You can find a written version of this content on JP's website, jplandman.co.za. I am Ruda Landman and I am your host. These first few recordings were done at our dining room table, but we will soon be moving

into a studio. Hello, and as always, a very warm welcome to another recording which goes with JP's latest newsletter. This one is dated the 20th of January 2023. And it's about, what else could it be about at this moment, about electricity. JP, you start with a quote from Antonio Gramsci and the quote reads, the crisis consists precisely in the fact that the old is dying and the

new cannot be born. In this interregnum, a great variety of morbid symptoms appear. Who was Antonio Gramsci and why is this relevant? Gramsci was imprisoned by the fascists in Italy in the 1930s. And he actually wrote these words from prison. He kept a journal of his writings while in prison and this quote comes from there. Why is it relevant for South Africa today? Because I think it expresses

absolutely precisely where we are with electricity. The old system of electricity provision in South Africa is busy dying. ESCOM, as we used to know it, is busy dying. The way that we provided electricity to ourselves and the nation is busy dying. And the new system is being born. A system that will be much different from and encapsulate much more than ESCOM. But the new system is not quite in place yet. The old system is also no longer working.

And we caught in between that interregnum between the old electricity system and the new system. And flowing from that, Rudha, I just want to make this one point very, very clearly. I don't think ESCOM can be saved in its current format. If we look back in five years time, ESCOM as we exist today will no longer exist. It will exist in a much diminished and different form. So ESCOM cannot be saved, in my view, but electricity provision will be saved. And that is what this piece is about. And then you make a point which I think is

one wants to say it's obvious, but I think we need to understand that we have load shedding because South Africa does not generate enough power. What is the gap and how will it be closed? The capacity gap is between 4000 megawatts and 6000 megawatts. There's no 100% consensus about the correct number. ESCOM as recently as November, they said the capacity gap was 4000 megawatts. What I do in this piece is I assume that the capacity gap is 6000 megawatts.

And then I look at how one can whittle that 6000 megawatts down. And that is simply the gap between supply and demand. Yes, that is simply the gap between what ESCOM can produce when everything goes right and when everything runs well and what is demanded by the economy and by people and by households. And so that's the capacity gap. Now it's important to note that whether you use 4000 megawatts as your number or 6000 megawatts as your number, what we're talking about are baseload megawatts.

Now what is baseload? Baseload simply means the power is available for 24 hours of the day. It's not just available when the sun shines or when the wind blows. It is there all the time. Now, if you want to compare apples with apples, 6000 megawatts of baseload will require about 18,000 megawatts of renewable capacity supported by storage and gas. That's the way to compare apples with apples. The baseload people try to argue that you can

get baseload only from coal or from coal and nuclear. And that is actually not true. Technology is developed in a different way. And you can now, there's a wind farm in Bosnian-Berg in the Northern Cape, not a wind farm, a solar farm that is now for 12 months provided electricity 24 hours per day from the sun using a salt technology. For storage. For storage. So with renewables you need storage, whatever technology and you can use gas to make up for the times

when the renewables are not working. So 6000 megawatts of capacity gap is 6000 megawatts of baseload and that translates into about 18,000 megawatts of renewable capacity that is needed. Okay, but we've been seeing renewable contracts being given. We all see wind farms everywhere. We see solar farms if you drive through the Northern Cape. Where are we in making up that gap? Right. So we've got about roughly 7,000 megawatts of renewables installed

in the country that is already being used by ISCOM and to plug this capacity gap of 18,000 megawatts renewables, you have to install 18,000 new megawatts on top of what you probably have. So the numbers look as follows. 9,000 megawatts of capacity is being built at the moment by private companies putting up power facilities for their own use and for the customers that they share in the world that they sell it to. That is private sector driven. It's

about a hundred projects countrywide, consists of wind and solar and batteries in many cases and the number is 9,000. Then we have about 3,000 megawatts that have been procured through the official procurement processes run by the government, run by the Department of Mineral Energy. If I say government, it's also, it includes procurement processes being run by local governments, but that's minuscule. You can for all practical purposes ignore that. There's a lot of talking and noise about what municipalities are doing, but so far it's

a very, very small number. So 9,000 private, 3,000 public. That gives you 12,000 megawatts of new capacity that's in one shape or form in the process of being created at the moment. And you think by the end of 2024, most of that will be online? Yes, absolutely. Certainly the private processes, no question about that. I see there is a statement from the presidency suggesting that a lot of it will come online during 2023. That may

be I'm working on 2024 as the outside date. So we've got 12,000 and then there's another 2,000 that is being made available through ISCOM repurposing the land on which it's current coal fired power stations are standing. And what they've done is they've already leased out 6,000 hectares to private entrepreneurs to come and build renewable facilities on ISCOM land. There's no purchase agreement with ISCOM. They can sell it to whoever they

want to and they have to pay ISCOM rent. But the upside of those sites is that they are already linked to the grid. Correct. Transmission is no problem because the coal fired power stations transmit the power. So that's another 2,000. So you've got 9,000 private, 3,000 through official procurement, the so-called bitwindows. You've got 2,000 from ISCOM that gives you 14,000. And then there is another 1,000 megawatts

that will take the total to 15,000 of power that will be bought from existing independent power producers who have extra capacity. So you have a capacity for say 110 megawatts, but you're only selling 100 megawatts to ISCOM. So there's an extra 10 megawatts lying around. The idea is to buy 1,000 megawatts from existing independent power producers as well as the sub-African power pool. So we import power from other countries in sub-Saharan Africa

which also belongs to power pool. Now the presidency or the National Energy Committee on electricity is of the opinion that 2,000 megawatts can be procured in this manner. I've cut that number in half and only using the number of 1,000. And that brings us then to a total of 15,000 megawatts that are currently in the process of being procured and which I think will be connected to the grid by the end of 2024 at the latest. And this full number of 15,000 are projects connected to the grid or who have grid capacity available

to them. There's a problem with the grid as we can discuss later, but this 15,000 is covered by the grid. Okay, so we're left with 3,000 renewables or a bit less if it's baseload. Yes. And you... Where will that come from? You risk putting Madhupi and Kusili into the picture. Yes, Madhupi not Kusili. We shouldn't treat the two of them the same. Madhupi and Kusili, both of them have six units each. At Madhupi,

three of those units are in full operation and two of them have been running at the EAF, an energy availability factor of higher than 85%. In fact, one of them has run for 12 hours at 92%. So the three units at Madhupi are doing quite well. The place is being run by an old ESCOM veteran, Mr. Zivelli Wittboi. He's been there for more than 20 years and they're doing well. Two of the units at Madhupi are not at full capacity yet because they must be modified to deal with carbon emissions. Madhupi or ESCOM applied for an emission exemption

from minimum emission standards. They didn't get the exemption, so they have to fix the plant to reduce emissions. And that's why two of the six units are not in full production yet. And then the sixth unit, as you know, was damaged in 2021 in an explosion. Two employees were dismissed because of that explosion, no longer works for ESCOM. And that unit should be in operation, giving us about 800 megawatts by September 2024. So as you put it at the

beginning of your question, we've got 1000 megawatts of base load that we need. We can get 800 megawatts of that from Madhupi, bringing an extra unit online. Plus the other two units that are currently being fixed for emission standards will probably give us another 200. But again, let's leave that out of the equation. Kusili actually is not doing that well at all. Of the six units, four were in operation by June last year, June 2020 too. And then

there was an explosion that took one of them out of action. Don't know what the cause of the explosion is. Then a month later in October, an accident took place. We took out two more units. So one unit is running. I think it is safe based on discussions I've had with people on the inside to say that Kusili will not make a contribution to power supply in the country in 2023 and probably also not for the biggest part of 2024. So I ignore

Kusili and I assume that there are no megawatts coming from there, only from Madhupi. And then the role of all the homeowners, like ourselves, many people are putting solar panels on the roof and in many cases by lunchtime the batteries are full. Yes. Now, of course, not all panel owners have got batteries. One must allow for that too. Some people just use panels and that's all. But it is a big potential source. Industry

players reckon that the 3,600 megawatts of renewable panels on homes and offices all over the country and it's growing at the rate of 1,000 megawatts per year. Now, if you take that 3,600 and you apply the formula, it will give you a base load of over 1,000 megawatts. That's more than what Kusili is producing. It's quite a substantial amount of power. And what happens, as you correctly point out, is people satisfy their power needs, at least

partially from these solar panels. But then there's always a bit of a surplus. So you run your dishwasher or you use your hairdryer or you make coffee and the panels provide you with power. And then after you've made your coffee or after the dishwasher is run, well the panels are still working. The sun is still shining in most parts of South Africa and that power goes to waste. So what would be a logical thing to do, and Vietnam has done this, Germany has done this, many countries have done it, is you use that power by allowing

people to feed the power back into the local municipal grid or if they're connected to ISCOM to feed it back into the ISCOM grid. That is the basic idea. Why do we not do it? For two reasons. The one is what is the price at which you feed it in? So the so-called feed in tariff. And that must be, tariff must be finalized. ISCOM has developed a tariff. They call it a residential tariff. That's for homeowners. They call it home flex, but NASA has to approve of that. My understanding is that NASA did approve it last week when

they announced their infamous tariff increases for the next two years. So that's an important thing to clear. And then of course you have to, the meter in your house will have to change and the connection of the grid will have to change. Remember our grid has been built as a one way street, one way traffic, power coming into the house. If you now change it to bring power into the house, but at the same time also send power out sometimes, you change from one way traffic to two way traffic and that requires technical changes. So although

the concept is easy to understand and although the concept is quite clear, you needed appropriate price and you need technical changes. But then you can, you can move along this road. I'm really delighted to see that the presidency and their statement have made it quite clear that this is a major area of work now for government. They want to finalize the feed in tariff and get the show on the road. And that will add another few hundred megawatts

of base load to the national supply. But what about the municipalities? Not everyone buys directly from ESCO. Absolutely right. The municipalities are very keen to hold on to the source of income. So they also are not prepared to let go. In fact, Salga, the association of local governments have brought a court case against the government for the court to declare that only municipalities are allowed to distribute power in a certain municipal area. Now we're going to see where the court case goes. One can understand where they come

from. And again, you know, the old system is dying. The new one is being born, but precisely what must be the rules of the new one. And you don't, you don't design these things by way of artificial intelligence. And then it's there. It's a process of moving through the obstacles. And I think what municipalities want and what they can get as part of that process. And deeply political. And it's very deeply political. You know, we are all on the page of let's use renewables, let's change the energy system, let's become part of the

global move to a greener economy and so on and so forth. A lot of people in South Africa don't accept that. And they are fearful of the changes. They are fearful that the poor will be left behind and so on. All those problems can be overcome. It is possible to overcome them all. Countries have done it. We will also do it, but it's a process of working through the issues. I think that's important. Any short term possibilities? Look, there are only two short term possibilities that I can see. The one is that you use diesel,

which is very, very expensive and it's not a sustainable option. But if Treasury can find the money, ISCOM doesn't have the money. Let's be clear about that. ISCOM doesn't have the money and it looks as if NERSA has not allowed ISCOM to increase tariffs to allow for diesel purchases. That is what the NERSA decision looks like. So if you want diesel, you want to buy diesel more than what is allowed for in the ISCOM budget, you'll have to get the money from somewhere else. But that diesel is one option if Treasury gives you the money.

The other option is that we go back to the car power ship option. I call it the dreaded car power ship option in the written piece. Why dreaded? Because it involves 20 year contracts. It involves very little permanent infrastructure and it brings with it undesirable environmental impacts. So you can argue that none of these things, 20 year contract and so on, none is as important as reducing load shedding. And that's a choice the society must make. So

you can do those two things, gas at a huge price or diesel at a huge price. I think the better way to approach this is simply to say publicly and openly, we will have load shedding for another two years. There is no ways around that. There's no quick fix. There's no quick solution. This idea that you can do things and next week load shedding will be over is really, really nonsense. Even if you use gas and even if you buy diesel, it will still

take time and it will be prohibitively expensive. So no, I don't think there are shorter solutions. But as you say, there are people who argue that ISCOM's power stations must just pull themselves together. Yes, absolutely. And then it will be over by tomorrow. Yes, absolutely. And particularly the politicians are doing that. They say ISCOM doesn't have a money problem. It has a management problem, quote unquote. I think that's total nonsense. Other

people say there's no capacity shortage. They reject the capacity gap argument. What they're saying is that ISCOM has got about 44, 45,000 megawatts of installed capacity and it's only delivering about 23, 24,000. So clearly there's a lot of capacity there not being used. I think the problem with that argument is that it ignores the energy availability factor. The ISCOM plant is old. The average age, if you exclude Madhubi and Kusili, is more than

40 years. Now, if you will know from your fridge in your kitchen or the lawn mower in your garden, you use a 40 year old piece of equipment, it doesn't give you the same performance as a new fridge or a new lawn mower. Just as simple as that. Added is the fact that a lot of the ISCOM plant has not been maintained for a long time. We know that. How do we know it? Because an industry association, VGB, based in Germany, to which ISCOM also belongs, track and monitor the energy availability factor, the EAF, of power stations worldwide.

The reality is that ISCOM was absolutely on par in its energy availability factor, its efficiencies with the world average, the global average, until about 2011. Since 2011, now that is now 11, 12 years ago. Since 2011, ISCOM's energy availability factor has simply fallen away from the global average. So there's clear empirical evidence that there's a strong problem with the efficiency of the ISCOM installed capacity. So to talk about we've got 24,000,

we must just use it properly, is really, it is simply wrong. It is simply wrong. And the figures that you quote, the global average is 75% or more, EAF. ISCOM is 53. That's a very important point. The ISCOM fleet is running at below 54%, 53.9 to be precise. This year, last year, they ran also at those levels. There is an energy analyst, Mr. Clive Mallinson, who's done extensive work on the energy availability factor of the ISCOM fleet.

And it's been coming down for a long time. And he is predicting that this will go down below 50. So nevermind the 53.9 that we're doing currently, it may drop even lower. And that has been the trend. So yeah, absolutely. We are way below what ISCOM used to be. You know, we must forget at the beginning of the 2000s, ISCOM was voted the best utility in the world. It was really a superbly run and producing organization. But that is 11, 12

years ago. No, that's 20 years ago. That's 20 years ago. I'm sorry. It's 20 years ago. And things change. Things change. And machines get older and older and older. And machines get older and they get older quicker if you don't look after them. And that is precisely what happened here. So now I'm afraid the efficiency argument doesn't hold up. But then the next problematic area is the grid transmission. Yes. What came out clearly in December is something which people have been warning us

about. And that is that there isn't enough transmission capacity, transmission lines to carry power up and down. Now, again, our grid, our national grid was developed to move power or electricity in one direction, one way traffic from the power stations in the eastern side of the country, Mipumalanga, to the rest of the country. What is happening now with renewables and power plants going up all over the show is you need a grid that can do electricity in two directions. Secondly, you need a grid that can cope with the intermittency

of wind and sun. If the sun is shining, there's power. Cloud moves in before the sun, there's no power. That's a bit taxing on a grid. And you've got to adapt the grid for that. And a lot of the new of the renewable power stations are in completely different places now. Northern Cape, Eastern Cape. Yes. There's no, there are very few transmission lines. Well, they're not enough transmission. Let's put it that way. And this became very clear in December when the government announced the results of bit window, bit window six.

The bit window was 4,200 megawatts big. There were 56 bits that came in. So people are interested. People are definitely interested. What the bits tell us is that people want to invest. For all the stories about people not wanting to invest in South Africa, blah, blah, blah. People with real money and real checkbooks have actually written the checks to participate in the bit and they've submitted bits, very competitive bits. But only of that 4,200, only about 850 or 860 in the end could be allocated because only those bits had access

to the transmission grid. So you have 56 bitters, only six bitters had access. So you lost 50 bitters, so to speak. You wanted to get 4,200 from the bit round, but you only got about 850. There may be another 150 coming, calling it, call it a thousand, but the gap is quite big. So the round was a big disappointment. And I think what the round tells us is that the upgrade of the transmission grid is now really important.

This sounds as if it could be expensive. It will be expensive. The ESCOM transmission division, which is due to be set up as a separate company, but reporting as part of ESCOM, they published a transmission development plan every year. And the last one was published in October last year for the next 10 years. And essentially what they are saying is that they, at the cost of about 72 billion Rand, they can add 16 and a half thousand megawatts

of transmission capacity. And they've got a number of projects, 23 in one case and 13 in another case. So it's more than 30 projects all over the country, which if they implement the projects, they can upgrade by the 16,500 megawatts I referred to. That will cost 72 billion Rand. So where will the money come from? At this stage, the idea is that the money must come from the green climate funds that South Africa got in the deal that it signed at COP27. Now I wrote about that in December last year. If you look at the detail

of that plan, 131 billion Rand is set aside in the plan to upgrade the South African transmission grid. And the president in fact has already said it, some press conference, that the first cash from that COP agreement or climate funds agreement will go towards upgrading the grid. So I don't think that it is a constraint now. It is a problem now. I don't think it's a permanent constraint. You can throw money at the problem, create the extra capacity

and connect all the new producers and the money is available via the climate green funds. Do you think government is on top of this? Yes, they're on top of the issues, but they're behind in time. What I mean by that is the Ramaphosa government has made a number of important changes in electricity policy over the last four years. But the reality on the ground has developed faster and quicker than what the government has reacted. So yes, they

are on top of it in terms of understanding the issues and what needs to be done. There is also division in government. We know that Greddy Mantashe wants to pull in one direction, but they hasn't stopped policy development so far. But load shedding is happening faster and quicker than what government policy is evolving. And I think that is the basic constraint. Government is not getting ahead of the problem. They are just always a few steps behind. And that's, I suppose that's in the nature of governments, but it is a problem for electricity

provision. So what should happen this week to start getting us out of what you call the mess at one point? Well, first of all, the 9,000 megawatts of private power must be allowed and helped to become real. Don't put obstacles there. Don't prevent their progress. Ditto for the 3,000 megawatts of publicly procured power through the bit windows. Those bits have now been allocated. Everybody knows what the prices are, who is in, who is out. Allow those projects to go ahead. So basically dealing with the

administrative issues around procuring power. That's number one. Number two, I think a feed in tariff from home and this must be put down and municipalities must be guided to change their approach and accept what needs to be done to make that happen. I think that is number two. If we're going to stop adding any of the capacity that I've referred to, any of that 18,000 megawatts capacity, then load sharing will persist beyond

two years. If we can get the 18,000 megawatts of capacity, we can deal with load sharing. And then lastly, of course, we must get a clear effort to finance the upgrading of the transmission grid. That money from the green climate change funds, green money must be used to upgrade the transmission. So it's quite clear what needs to be done. Just sit down and do it and make it happen. That is really where we are. From your lips to, I won't say God's ears, from your lips to the relevant people in government's

ears. Thank you very much and thank you for all the work that went into this. No, thank you. Go well. Thank you for listening to the So What podcast. If you enjoy this content, please don't forget to leave a review and a rating and please consider subscribing so you don't miss any future episodes. Also tell your friends. Remember, you can find a written version of all JP's content at jplandman.co.za.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Local Government Elections - The Second Round

    Nov 12, 202615 minAudio

    In this episode JP looks at the results of the 2026 local government elections and discusses possible coalition configurations. For more about JP, and to read his newsletter, please visit his website.

    Credit the people on this episode

  2. US China South Africa Quo Vadis 2

    Sep 29, 202616 minAudio

    In this episode, JP returns to the fraught relationship between SA and the US. He does not expect the rhetoric to let up, and points to increased trade and investment in spite of that. "The dogs bark, but the caravan...

    Credit the people on this episode

  3. On Satellites, South Africa and Starlink

    Jul 27, 202621 minAudio

    In this episode JP looks at the players in the low-earth-orbit satellite industry; who is operating in South Africa, where Starlink fits in, and what the possibilities are for the future. For more about JP, and to read...

    Credit the people on this episode

  4. The Achilles Heel of South Africa: Local Government

    Jun 22, 202626 minAudio

    In this episode JP discusses what is being done to change our municipal system in order to safeguard funds for maintenance and capital investment, as well as instituting a framework for running coalitions. For more...

    Credit the people on this episode

  5. US, China, South Africa: Quo Vadis?

    Mar 23, 202619 minAudio

    In this episode we look at the big picture, especially the shifting trade relations between SA, China and the US. For more about JP, and to read his newsletter, please visit his website.

    Credit the people on this episode