1954 Commercial Space Innovations and Rocket Development Bob Zimmerman reviews developments in commercial space, including talks on a launch site in the Philippines and contracts for Stoke Space's reusable rockets. He covers the private consortiums building commercial space stations to replace the International Space Station, and Japan's handover of H3 rocket operations to Mitsubishi Heavy Industries. Part One. (15)
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1I'm John Batchelor. It's holiday time, reminding me of Apollo 8 and Bob Zimmerman, the man here that we honor by sending him $ 25 to take us back to the moon. But in 1968, that hadn't been imagined yet, the huge risk of Apollo 8 to go around the moon, first time a man-made spacecraft with men in it had ever left the orbit of Earth. Bob, a very good evening to you. $ 25 gets us a ride to the moon. $ 25 more, $ 50, maybe register for Mars. But 1968, remind everybody what was necessary to do in 1968 when Apollo 8 took off. Why was it 50-50 they'd come back?
Speaker 2So the audience knows why you're asking me this question. I wrote the book on this, Genesis, the story of Apollo 8. And the reason it was a risk in 1968 is because they estimated it was a 50-50 chance of success, which they thought were good odds. So they went to the moon. I can't imagine NASA taking those kind of risks today. In fact, no mission, no company even wants to do that. You want to do better. But that was a space race with the Soviet Union. They wanted to get there first. There were political considerations, and so they took the risk, and they won. They
Speaker 2did it.
Speaker 1Here we are, almost 60 years later, and we're racing to the moon again, and you're following the story in all of its commercial aspects, because what's happened since then is Big Space, quite correctly, started acting like a contractor, hiring subcontractors. One of them is SpaceX. And we're going to begin today, now that you know that it's subscription and. And donation time for Bob Zimmerman to continue the story, we're going to begin in an unusual place, the Philippines. Why, Bob? Why the Philippines?
Speaker 2Well, according to Fernando Marques Jr., the president of the Philippines, during a press conference earlier this week, he said that his government has started discussions with SpaceX about allowing the company to establish a launch site in the Philippines.
Speaker 3They've been pushing this.
Speaker 2They signed a deal with the South Korean company rocket company, Perigee, to do a sounding rocket launch.
Speaker 3That's not even suborbital.
Speaker 2A sounding rocket launch there sometime in 27 at a location on the north tip of the Luzon Island. I've got a map on behind the black where I report all this stuff showing where this location is. Now, this might not be where SpaceX, the negotiations with SpaceX are going on.
Speaker 3SpaceX might not do this.
Speaker 2There are a lot of deal making is going to be involved with this, including arrangements with the state department but there's some sense to this and marco said he doesn't want to become another uh nasa he just wants to bring some industry to to to the philippines and spacex you know has a new space starship super heavy rocket it could use landing and launch sites and so he's offering it now we we don't know what'll happen here but at least they're exploring the idea.
Speaker 1It's kind of cool it's very cool what is stokes.
Speaker 2Space StokesBase is one of the many rocket startups that are on the verge of their first launch. It's got, what is it, a half a billion or a billion dollars in investment capital? I can't remember the number. It's got a lot of money on hand. It's building what it calls its Nova Pathfinder rocket for launch early next year.
Speaker 3It's going to do a bigger.
Speaker 2Version, Nova Block II rocket, and launch that in 29. What makes this company interesting is that the rockets are completely reusable. The upper stages come back to Earth. They're using a radical nozzle design where there's not a single nozzle. but instead a ring.
Speaker 3Of small nozzles on the outside.
Speaker 2Perimeter of a heat shield. So the upper stage can come back and use those small nozzles to control it and land. And so they plan to do their first launch. What's cool about this story is that they have now signed a multi-launch contract with For its Nova Block 2 larger version, that's not going to launch until 29. And they haven't even launched the Pathfinder version yet. This is with a satellite aggregator called SeaOps. What they do is they find launch providers, they get deals with them, and
Speaker 2then they act as a go-between with satellite makers. who might not know the ins and outs of getting a rocket launched, and they do the work for them. And so they made a deal with Stokes Space to launch out of the larger rocket. What this indicates, once again, is that the payload industry is beginning to address the fact that they want rockets.
Speaker 3And so they're willing to sign.
Speaker 2The demand is so high, they're willing to sign with rockets that haven't even launched yet and won't even launch for another three years. This just tells us the rocket industry is going to be booming very shortly.
Speaker 1Also, the business of building space stations. I've lost track, Bob. Starlab is another one, and it's subcontracting. How many are there?
Speaker 2There are right now four space station consortiums in the U.S. attempting to build space stations. Three are really solid. A fourth is just a latecomer, but I actually don't think they're that far off. They're going to do.
Speaker 3A demo mission.
Speaker 2I've got a list on behind the black of the four stations. You can go into my story and look it up. But Starlab signed Paragon to build the light support system on the Starlab station. Starlab is going to be launched as a single large module inside Starship.
Speaker 3So it's going to be very big.
Speaker 2It's going to have a lot more square cube footage than actually ISS. but a single module. And so they've hired Paragon to build a life support system. Paragon is a Tucson company that was building the life support system for Northrop Grumman on NASA's now canceled Lunar Gateway space station. Northrop Grumman had the contract to build the habitable module, but it hired Paragon to build the life support systems. Well, now Paragon doesn't have that job to do anymore, though
Speaker 2they did a lot of work and got some money. They're now going to do it for Starlab. And this just strengthens Starlab's position because they've now signed contracts with a variety of subcontracts to build the station's primary structure, its interior, its attitude control, its life support systems, and even make a deal for station communications with the satellite company SES.
Speaker 3So they're in a good position.
Speaker 2And NASA is going to announce the winner of its major contracts in April. I expect it to actually distribute the money to all three of these companies. The other two is VAST and Axiom, the three leaders. They have their own financing, so NASA will give some to have some ability to use the stations, but they're going to be all independent private.
Speaker 1There's a drawing of Starlab's projected space station. Are we looking at the entry port that the spacecraft will come up and connect to? Is that what the theory is?
Speaker 2Yeah, they chose the docking port on the end, but for all I know, they'll have docking.
Speaker 3Ports on both ends, John. There'll be no reason not to have a port on both sides. But yes, it's going to be large. Remember, it's going to be launched in Starship.
Speaker 2So it's going to be quite big module, much bigger than actually than any modules that are launched routinely.
Speaker 1Yeah, very cool looking, too. Sort of a race car space station. OK, JAXA, which is the official and it has a trouble with boosters over the years, has handed control of its H-3 rocket at Mitsubishi.
Speaker 3Why?
Speaker 2All right, so JAXA is the space agency for Japan, government agency.
Speaker 3They don't build rockets.
Speaker 2They own and control the rockets they ask other companies to build in Japan. Mitsubishi built the H-3 rocket for JAXA. They've had a mixed series of results. It's a rather new rocket. It's only been around for about two, three years. Well, JAXA is going to hand over control of the H-3 rocket to its builder, Mitsubishi. Basically, let Mitsubishi own its own rocket, market its own rocket, and make contracts with its own rocket and manage it rather than have the
Speaker 2government agency do it. Mitsubishi has already signed one deal with somebody to launch its rocket. And so this is a good deal for Jackson Space Agency. We'll transition from a government model where the agency controls it to the capitalism model where they buy the product from a private enterprise. So if Jackson launches, it can buy it from Mitsubishi, but let Mitsubishi run and market its own rocket. And that's what they're going to do. And that's a very good sign, John.
Speaker 1Space ports. Bob and I have been working on a theory that there's no entry requirements to say you want to be a space port. And I'm thinking I could turn my backwoods into a spaceport. Bob, what have you got for a spaceport?
Speaker 3I'm not interested in getting into this business.
Speaker 2I have enough to do just reporting on what's going on in space. I have a long article on Behind the Black that there were a number of stories this past weekend about various spaceports.
Speaker 3In both Canada and Europe.
Speaker 2And so I put it all in one piece because they all.
Speaker 3Are good signs.
Speaker 2First, in Europe, the South Korean rocket startup Innospace and the commercial company, consortium, that wants to build a spaceport on Santa Maria Island.
Speaker 3In the Azores. This is part of Portugal, but it's about 900 miles up.
Speaker 2West of the mainland of Europe.
Speaker 3It's in the Atlantic. They want to build a spaceport there.
Speaker 2Well, the two have now applied to the Portuguese government for a launch license because Innospace wants to launch there in the second quarter of 27. So this is moving towards an actual launch site in Europe. Secondly, the German-based aerospace company OHB signed a deal with an Irish spaceport startup, SUAS, to research the possibility of putting a spaceport on Ireland's west coast. Now, SUAS has been around for a while,
Speaker 2but they haven't gotten any progress.
Speaker 3OHB is the biggest.
Speaker 2Investor in the German rocket startup company, Rocket Factory Augsburg, which has been trying to launch from the Saxaport spaceport on the Shetland Islands in the UK. They've been blocked or delayed, hampered by red tape there. And so what I think OHB is doing is looking for alternatives in Europe.
Speaker 3That gets away from the United Kingdom. And that's their deal.
Speaker 2And finally, the third deal in Canada, the Spaceport Startup Maritime Launch Services. They've been trying to get their spaceport in Nova Scotia going now for a decade, and.
Speaker 3They haven't had much luck.
Speaker 2Well, what they've done now is they're copying what NASA and the American Space Force does in the United States. They have leased a dedicated launch pad location to the German rocket company, ESAW. ESA is going to control this pad, build its own facilities, and launch its own rocket there. And this is what the U.S. has done very successfully. The companies don't want to work with facilities that someone else controls. They want to build their own and run their own space bar, their own launch pad. And so
Speaker 2it works in the U.S., and so that's what Maritime is now doing here at Nova Scotia. And I think this is going to finally get them a launch, maybe next year from ESA, because ESA has already launched successfully, John.
Speaker 1The Exploration Company, proposed crew capsule. Who are they building it for?
Speaker 3All right.
Speaker 2They're building an unmanned cargo capsule called Nix. They want to get the business to ferry cargo to ISS and to the other space stations I mentioned. Well, they've also now revealed their first design concepts for their crew version of nix i have this picture up of this concept and i put it next to a dragon crew capsule because they look remarkably alike so i guess you know flatter you know copying is the best sort of flattery and that's what's going on here they're copying spacex quite aggressively This company is really working hard, this French company,
Speaker 2to grab the business of crew and cargo ferrying to.
Speaker 3The various space stations.
Speaker 2And I think they're working aggressively and successfully to get that business. Sadly, there aren't any American companies doing the same thing. If SpaceX gets out of that business, this French company, the exploration company, is going to grab it all.
Speaker 3And that's kind of a shame.
Speaker 1And dirigibles, one more time. What's it for this time, Bob? Over the years, there have been several projects about dirigibles.
Speaker 2Yeah, not much has gone, but this one's actually got a deal. This company is called Sky. That's not how it's spelled, but you see it on Behind the Black if you look at the article. They've developed large dirigibles that can fly in the high stratosphere, and they've signed a deal with a Japanese communications company called SoftBank to deploy a fleet of these over Japan to to provide cell service to phones, to provide communications, texting, the whole thing for internet access, et cetera. Basically, it's equivalent to Starlink or LEO that are satellite constellations, but instead it's
Speaker 2these dirigibles.
Speaker 3They've got a deal.
Speaker 2They're flying there. They're going to do their fleet. And so this is another alternative to the satellite constellations.
Speaker 1India, Gaganya, again, delays. What's gone wrong with that?
Speaker 2Well, we don't know if it's delayed because the head of ISRO says, no, there are no delays. But he doesn't specify a launch date. In this case, I don't think the delays are a big deal, John. It's a delay from maybe December 26 to February 27, the last few stages. This would be the first unmanned test mission of the Gaganya capsule. They eventually want to do manned missions, but they're going to do three unmanned missions first. It probably means that the manned mission won't.
Speaker 3Happen in 28. It's a government project, John.
Speaker 2So, of course, it takes forever and gets delayed.
Speaker 1Capitalism in space means debt. Canada's Telesat, is that a private company? Yes.
Speaker 2Well, it's a private company with lots of government money. Telesat is an attempt by Canada to build its own Starlink. Carney government really wants to use Telesat's constellation instead of Starlink.
Speaker 3Well, Telesat has a problem.
Speaker 2It has actually negotiated with the holders of its various loans to delay payments for five weeks until next year. They have some issue, cash flow issues, and they've asked their lenders to wait. That doesn't look good for the constellation, John.
Speaker 1Bob Zimmerman, $ 25 gets you a ride to the moon, 50 bucks, maybe register on the Mars trip if you're young enough. This is Behind the Black, and when we come back, we're going exploring, especially if there's trouble in Mercury orbit. Maybe not. I'm John Batchelor.
1968 APOLLO 8 CONTENTS JOHN BATCHELOR SHOW 11-25-26 Analyzing North Korean Regime Survival Strategies David Maxwell argues that North Korea operates like a criminal cult bent on dominating the Korean Peninsula. The Kim...
1940 Global Spaceport Initiatives and Planetary Exploration Bob Zimmerman looks at new spaceport projects in Europe and Canada, next-generation high-altitude dirigible communication networks and crew capsule designs. He...
1923 TEHRAN Unconventional Warfare and the Iranian Threat Cliff May argues that Iran avoids direct conventional naval warfare and relies instead on asymmetric tactics, proxy networks and terrorism against American...
1900 BAKU Ukrainian Drone Attacks Impacting Russian Refineries Michael Bernstam analyzes Ukrainian drone strikes on Russian energy infrastructure and explains the difference between oil refineries and distribution hubs....
1960 Hotel Mars: Engineering Failures That Ended the Soviet Moon Bid Anatoly Zak explains the severe engineering problems the program faced, such as synchronizing 30 first-stage engines and building reliable fuel cells....