This episode explores how AI’s biggest constraint may no longer be chips or model quality, but electricity. Using Microsoft’s cancelled UK data centre deal and the wider scramble for grid access as a starting point, the discussion compares different ways to power large-scale computing: waiting for the grid, using on-site gas generation, or building around solar and batteries. From there, the episode turns to a more unconventional idea: placing data centres on the coast in sunny regions, where seawater can handle cooling and spare solar power can be used to make fresh water. Mombasa becomes the central case study, with its strong solar potential, subsea cable landing points, and urgent water shortage. The episode argues that a self-powered coastal data centre could both support AI infrastructure and help supply clean water, while also acknowledging environmental, financial, and political challenges.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Welcome to the Hi Tech podcast, spelt HY, and I'm Rob Highgate. Let's talk tech. I'm the founder and CTO of eWater Services. Most of my working life has gone on electronics, embedded systems and startups, and these days on water infrastructure that runs on sunshine, which is quite relevant this week. Because at the weekend, Microsoft walked away from what the British government had called the country's largest AI data center.
Not because of the chips. Not because of the money. Because there's no electricity. Or not until the 2030s anyway. And I think that's the real story of AI for the next five years. The scarce thing isn't the model. And it isn't really the chip. It's the power. So today, I want to follow that thread. And it ends somewhere you probably won't expect. A beach in Mombasa, making drinking water. So, the story. The Tenegraph
broke it on Sunday, and Microsoft confirmed it on Monday. The site is in Loughton, in Essex, and it's being built by NScale, a British company backed by Nvidia. Microsoft had planned to lease the whole thing, 50 megawatts, with around 23 ,000 Nvidia GB300 chips inside. NScale had put up a £2 .5 billion commitment, and it was due to be running in 2027. And then, according to UK media reports, the grid people said, more
or less, lovely, you can have your power in the 2030s. The local network isn't really the hold -up. It's the National Transmission Network, the big high -voltage wires that needs the work. So you've got a building, a customer, and the chips on order. And the one thing you can't buy is the electricity. NScale says it's still committed to the site and is exploring alternative power sources. Hold on to that phrase, because I think it's actually the whole episode. And Loughton
isn't on its own. According to TechRadar, there's more than 300 data centers in Britain still waiting to connect to the grid. That's not a queue, that's a car park. What people miss is the timing. You can put up the building in about two years. You can get the chips if you're patient and rich enough, but a big grid connection in a lot of places now takes longer than the computers inside will stay current. The slowest part of the AI industry isn't the software, it's copper and
transformers and planning permission. And the numbers are big. 50 megawatts all day and all night is 1 .2 gigawatt hours every single day. That's a lot to ask of a grid that was designed in the last century for a completely different shape of demand. Now here's what makes it interesting. Same company, same week. On Monday, Bloomberg reported that NScale is in talks to sell Anthropic
about $45 billion of computing power. Not in Essex, in West Virginia, at a campus called Monarch, for a second building of around 460 megawatts. That's nine Loutens, give or take. And where does Monarch get its power? According to data center dynamics from natural gas generators on site, they're not waiting in anybody's queue, they're bringing their own. So one company in one week shows you both futures. Wait for the
grid or make your own power and get on with it. And frankly, the money is going to the second one. James Titcom, who covers technology for the Telegraph and broke the Microsoft story, commented on X on Sunday. Exclusive! Microsoft cancels UK data centre deal with NScale. Comes just as NScale hopes to pull off a $35 billion IPO. I won't comment on anyone's share price. But that second sentence is the one for the finance
director. So if your finance team is sat on a... No. Let me come at it from the other side. A grid date used to be a facilities problem. Somebody with a hard hat on the desk worried about it. Now it's sitting right in the middle of a company's valuation. And it's not only a problem for data center builders. If your organization is quietly becoming dependent on AI, your provider's power supply is now your supplier risk. There's a fair
pushback to all this. And it came from Elon Musk, who runs SpaceX and Tesla. He commented on X on Tuesday. Lack of electricity is an oversimplification. Everything is hard about bringing massive compute online at extremely high speed. If there was twice as much time, this would be relatively easy. But there is not. And to be honest, he's got a point. It's cooling and land and chips and people and permits all at once. But I'd turn
it round. If the problem is speed, which power can you build fastest? A new nuclear station takes the best part of a decade, and the small modular reactors are, I'd say, a 2030s thing at the earliest. Gas is quick to put in, but I'm told the order books for the big turbines are years long and the fuel bill never stops. Then there's solar with batteries. You can put up a big solar farm in about a year. and the Sun, as far as I know, has never once sent an
invoice. What's really changed is the batteries. Solar always had one big problem. It's cheap, but it stops when the Sun goes down and the computers don't. The energy think tank Ember put the cost of a complete battery system connected to the grid at around $125 per kilowatt hour for big projects outside China and the US. And it worked out that if you store half your daytime solar and use it at night, the electricity costs about
$76 a megawatt hour. Their point was that solar isn't just cheap daytime power anymore. You can have it when you want it. It's like the water tank on a roof. Fill it while it's flowing, draw on it when you need it. And I'll be honest, I don't need a think tank to tell me this one. I live off -grid. Both of my homes one here in portugal and one in croatia run on solar panels and lithium batteries with no grid connection
at all it's not an experiment anymore it's just it's just how the house runs. But let's be careful because the house isn't a data center a fifty megawatt site needs that one point two gigawatt hours every day rainy season included and the says as much itself. For steady power every hour of the year, you overbuild the solar and add more batteries. My back of an envelope for a site that size, somewhere sunny, is a few hundred
megawatts of panels and several hundred megawatt hours of batteries. That's square kilometers of land. Here's the bit that surprised me though. At Ember's prices, those batteries come to getting on for a hundred million dollars. Sounds enormous! until you remember Loughton was a £2 .5 billion project. Next to the chips, the battery is small change. The economics aren't really the problem. The land and the sunshine are. Which is why I
think the giant single campus starts to look a bit old -fashioned. Picture lots of mid -sized sites instead, maybe 10 to 50 megawatts each, each with its own solar and batteries, all linked by fibre. The software sends the work wherever there's sun or a full battery at that moment. Most of what AI does day -to -day, answering questions, running agents, reading documents, doesn't care where it runs. Training the biggest models still needs tens of thousands of chips
in one room, but the everyday work can follow the sun. Now, if you've been on X this week, you'll know a lot of very clever people have a different answer. They're looking up. There's been loads of talk about data centers in space, where the sun more or less never sets, and Google says it'll launch two prototype satellites for its SunCatcher project by early 2027. Elon Musk commented on X on Sunday, The only things that
will scale to incredible size, K2 and beyond, economically, are super intelligence, robots, solar power, and mass to space. K2 is the Kardashev scale, from a Soviet astronomer in the 1960s. A Type 2 civilization uses all the energy of its star. Not a modest ambition. And I agree with him on the solar. Where I'd push back is the order of things. Fixing a dusty panel in
Mombasa needs someone with a squeegee. Fixing one in orbit needs a rocket. There's an awful lot of sunshine on the ground going spare first. So where does it go? You want three things. Strong sun, the sea, so you can cool the computers without drinking anyone's water, and subsea fiber cables, so the data gets in and out fast. Because heat is the catch with sunny places. A lot of data centers cool with fresh water, and in a hot,
dry country, that means competing with people for it. That's the one that bothers me most. So go to the coast. There's a working example here in Portugal at scenes. A company called Start Campus took over an old coal power station and the clever bit is it kept the plant's, what's the word, the intake, the seawater intake that used to cool the power station. Its first data center came online at the end of 2024. It pulls
in Atlantic water, sends it back slightly warmer and Start Campus says it uses no fresh water for cooling. It's aiming for 1 .2 gigawatts by 2030, right by the subsea cable landings. And the little irony? EnScale and Microsoft are both involved at signs as well. Now Africa, and a cautionary tale first. In 2024, Microsoft and G42, the Abu Dhabi AI company, announced a billion
dollar geothermal data center in Kenya. In May this year, President Ruto suspended it. His point, as reported, was that it would need about a gigawatt, and Kenya's entire installed capacity is about three. One project, a third of the country's electricity. And I think that was the right instinct, because it tells you the rule. In a lot of East Africa, a data center that plugs into the grid competes with homes and hospitals. One that brings
its own sun and batteries isn't competing with anybody, it's adding to the pile. So there's an old rule I'd happily throw out. It says a data center sits near its customers, plugs into the national grid, and off -grid is what you do when you can't. I think that's backwards now. Self -powered is the plan, and the grid connection is a nice extra, if it ever turns up. Which brings me to Mombasa. I've been building up to this, so bear with me. Mombasa has the sea and sun
all year round. It's where Kenya's subsea cables come ashore, seven of them, or thereabouts, carrying more than 95 % of the country's international internet traffic. And it has, hang on, I've jumped ahead of myself, the water. Mombasa has a serious water problem. In June, Kenya's water cabinet secretary told a Senate committee that the four coast counties, Mombasa included, need about 512 ,000 cubic meters of water a day and get
about 185 ,000, just over a third. Mombasa doesn't even have its own freshwater source. Help is coming. The Moche dam in Kwale is about 90 % built and due to start filling around now, adding 186 ,000 cubic meters a day. Genuinely good news. But on the government's own figures, if I've done my sums right, the coast is still short by something like 140 ,000 cubic meters a day.
So here's my idea, and it's a Rob Highgate idea, not a project anybody has signed. A data center on the coast at Mombasa, cooled with seawater like signs, with a big solar field and battery bank so it never takes power off the city. Because you overbuild the solar for the bad days, most days there's spare power around midday once the batteries are full. You use that surplus to run a reverse osmosis plant, making fresh water from the sea. Reverse osmosis means pushing seawater
at high pressure through a membrane that lets the salt... No, the other way around. It lets the water through and holds the salt back. A modern plant uses roughly 3 -4 kWh per cubic meter, and industry figures put power at 30 -50 % of the cost of the water. So cheap midday power is exactly what it wants. And the scale works! A plant making 100 ,000 cubic meters a day needs about 15 megawatts on average. That's a mid -sized
data center. You don't even have to run it at night. Make the water at midday and store it, because a water tank is a far cheaper battery than a lithium one. And this is where e -water comes in. And I'll keep it short because this isn't an advert. Most water projects don't fail at the plant. They fail in the last mile. The water doesn't reach people, or nobody pays so nobody maintains it. That last mile is what we actually do. Solar -powered community taps, prepaid
tags that work a bit like an Oyster card, mobile money like M -Pesa so people can pay from a phone, and fault detection that sends field teams out. About ten years of it in Kenya, Tanzania and the Gambia. Almost half a million people, more than 1 .5 billion billion litres. And it works both ways. The water gives the data centre real local support, which data centres badly need, and the data centre gives the water cheap power and a seawater intake. Now let me argue against
myself, because there are real problems. The brine first. Making fresh water sends back a salty concentrate, and the cooling water goes back warm. Get either one wrong, and you harm the reef and the fish. That needs proper diffusers and a proper environmental assessment, not a pipe off the end of a jetty. Then the money. Somebody has to sign a long contract for AI computing in Mombasa, and right now, the big customers
are signing in West Virginia. Running the water plant only at midday means building it three or four times bigger. And water is political. Who owns the plant? Who sets the price? So, I don't know if this happens in five years. I genuinely don't. But power is the bottleneck. The fastest cheap power is solar with batteries. The best coolant is the sea. And the place where sun, sea, and cables meet is desperate for water.
That's not a bad set of coincidences. It won't happen by itself, though. So here's where I land. A solar -powered, seawater -cooled data center in Mombasa making clean water for the city with its spare midday power should be a high priority for Kenya. Not a pilot that sits in a drawer. A priority. Think about what Kenya gets out of it. AI computing on Kenyan soil, right where the cables come ashore, without taking a single
megawatt off the national grid. And clean water. every day for a coast that badly needs it. It gets around the problem that stocked the Olcaria project too, because this one brings its own power. It needs three sorts of people around one table. The Kenyan government, national and county, because water and power are public business. A data center builder who'd rather build where the sun is than queue for a grid connection. And a donor or a development bank to back the
waterside. And e -water would manage the last mile, the taps, the payments, the maintenance, the part that makes sure the water actually reaches people, and keeps reaching them. So if that's you, or you know who it is, get in touch through the show. I mean it. AI's power problem could end up paying for a city's water. Let's make it happen. That's it for this one. You've been listening to the high -tech podcast, spelt HY.
and I'm Rob Highgate. Keep exploring, keep building, and keep making technology useful wherever the power comes from. Until next time, let's keep talking tech. Peace and love.
This episode uses the launch of Grand Theft Auto 6 as a springboard to argue that video games are becoming more than entertainment: they are a proving ground for graphics hardware, AI, simulation, robotics, and remote...
This episode explores why people react differently to art once they learn it was made with AI. Using examples from music, images, and recent industry moves at Deezer, SoundCloud, Spotify, and Bandcamp, the discussion...
This episode argues that AI will not simply create a new jobs crisis, but will expose a long-standing economy built on scarcity, pointless work and badly measured unemployment. Drawing on examples from Microsoft and...
This episode looks at how rapid advances in satellite communications, positioning, onboard cameras and autonomy are reshaping sailing, especially for boats far from help. Drawing on years of offshore voyaging and the...
This episode looks at what “made in Kenya” really means for electronics and hardware. Using examples from Nairobi and Seoul, it explains the difference between kit assembly, circuit board assembly, and chip...