The Green Room - Energy Innovation & Renewables Industry Podcast

Can Solar Overload Your Switchboard? Current, Cable Derating & Verification - with Gil Rhodes S2E41
Can adding commercial solar or batteries actually overload an existing switchboard if the site's loads have not changed? In this Green Room conversation, Veli sits down again with Gil Rhodes for a deep technical discussion about summation of current, maximum demand, AC cable derating and what should happen after a commercial solar or battery system has been installed and commissioned. Gil explains why supplementary supplies such as solar and batteries create new current paths inside an electrical installation, why that does not automatically mean the site load has increased, and why the switchboard, maximum demand and existing infrastructure still need to be properly assessed before major upgrades are recommended. The conversation then moves into AC cable design. We look at cable configuration, spacing, tray orientation, lids, insulation temperature ratings, parallel conductors, earthing and the effect of heat on current carrying capacity and equipment life. Finally, we explore verification after commissioning. Gil discusses thermal imaging, cable temperature checks and using real site data to compare the completed installation with the original design assumptions, creating a feedback loop for future projects. What we cover: ✅ What summation of current actually means ✅ How supplementary supplies affect an existing switchboard ✅ Why the site's loads are still the key starting point ✅ Maximum demand and the four assessment methods discussed ✅ Why limitation should not automatically replace engineering assessment ✅ Domestic versus commercial and industrial applications ✅ Why switchboard builders should be involved in major alterations ✅ The impact of switchboard replacement on C&I project economics ✅ Load studies, power quality and power factor correction ✅ AC cable derating and heat dissipation ✅ Cable tray orientation, spacing and lids ✅ 90°C versus 110°C cable insulation ✅ Parallel conductors, trefoil and quadfoil configurations ✅ Earthing parallel cable runs ✅ Coordination between cables, switchboards, protection and installation methods ✅ Why cable software still requires sound engineering inputs ✅ Thermal imaging and post-commissioning verification ✅ Closing the feedback loop between design and real site performance ✅ Soil temperature and thermal resistivity for buried cables
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

