Skip to content
PodSubs
ShowsPeopleGuestsJobsNewsEvents
More
BlogPodCred
Menu
ShowsPeopleGuestsJobsNewsEventsBlogPodCredNetworksSign in
Join nowSign in
  • Shows
  • People
  • Jobs
  • News
  • More
    • Guests
    • Events
    • Blog
    • PodCred
    • Networks
    Join nowSign in

The GMP Insider

The GMP Insider artwork

Change Control Management: What Gets Companies in Trouble

Nov 9, 202615 minAudio
ShareXLinkedInFacebookWhatsAppEmail

The most dangerous change in a GMP plant is not the big capital project everyone debates for a year - it is the small one nobody logged, because someone called it like for like. Marcus and Priya walk through change control management: what the system is actually for, the invisible changes that escape it, where impact and risk assessment do the real work, the timing failures inspectors cite, honest rules for emergency and temporary changes, and how to keep control without freezing the plant. • What change control actually is: 21 CFR 211.100, EU GMP, and ICH Q10 - and why the validated, registered state is the thing being protected• The invisible changes: like-for-like claims, temporary changes that never leave, software and spreadsheet changes, supplier notifications, and "editorial" edits• Assessment, where the real work is: cross-functional impact, the regulatory filing question, and risk assessment under ICH Q9• Timing failures: implementation before approval, training after the effective date, and the open tail of never-closed changes• Emergency and temporary changes: a faster door into the same system, expiry dates, owners, and end states• ICH Q12: established conditions and post-approval change management protocols - less theatre, more precision• What good looks like: a change log leaders test against floor reality, post-implementation effectiveness review, and change metrics in front of leadership New episodes every Monday and Wednesday - follow The GMP Insider so you never miss one. Connect with Tushar Arora on LinkedIn: https://www.linkedin.com/in/tushar-a-926382161Watch on YouTube: https://www.youtube.com/@TheGMPInsider Produced with AI assistance.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. 21 CFR Part 11 and Computerized Systems (CSV) in the Annex 22 Era

    Nov 23, 202614 minAudio

    An electronic signature is the easy part of Part 11 - it's everything behind it that gets companies in trouble. Marcus and Priya cover what Part 11 and Annex 11 actually demand: validation for intended use, audit trails...

    Credit the people on this episode

  2. Cleaning Validation: Worst-Case Approach, PDE and MACO Limits

    Nov 18, 202615 minAudio

    Cleaning validation fails in places nobody looked: the product nobody chose, the limit nobody calculated, the swab nobody recovered. Marcus and Priya work through the modern approach - worst-case product selection...

    Credit the people on this episode

  3. Environmental Monitoring: Alert vs Action Limits & Trending

    Nov 16, 202614 minAudio

    An environmental monitoring programme can collect data for a year and still know nothing - thousands of results, beautifully filed, never trended, never questioned. Marcus and Priya lay out EM done properly: alert...

    Credit the people on this episode

  4. ICH Q9(R1) Quality Risk Management: What's Actually New

    Nov 11, 202613 minAudio

    Most quality risk assessments fail in the first ten minutes, when someone picks a score out of the air and the room nods. Marcus and Priya break down what the ICH Q9(R1) revision actually changed: formality that follows...

    Credit the people on this episode

  5. Contamination Control Strategy (CCS) Under EU GMP Annex 1

    Nov 4, 202615 minAudio

    Most contamination control strategies fail on page one - not because anything in them is wrong, but because everything in them is copied from somewhere else. Marcus and Priya break down the CCS under EU GMP Annex 1:...

    Credit the people on this episode