The Driverless Digest Podcast

The Driverless Digest Podcast artwork

Charging the Fleets of the Future with Neha Palmer

Sep 2, 202537 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Listen to this episode on Apple Podcasts, YouTube, Spotify, and Substack. In today’s episode, I’m speaking with Neha Palmer, CEO and Co-founder of Terawatt, one of the leading providers of charging infrastructure for AV/EV fleets. Neha talks about her journey in the energy industry, highlighting her background leading global energy strategy at Google. She explains Terawatt’s focus on providing AV/EV charging solutions and the motivation behind her founding the company. We discuss the unique process and intricacies of building and launching charging sites suitable for AV/EV fleets of varying sizes, and the technical/logistical requirements of these sites. We also touch on how Terawatt uses their data to work with fleet owners to ensure they get the best utilization for their vehicles while maintaining access to charging sites with excellent uptimes. We also discuss their biggest challenges with customers, charging requirements for fleets and other services offered at their charging sites. Chapters (00:00) Introduction to Neha Palmer (01:33) Neha’s background at Google (02:31) Introduction to Terawatt, and how they help AV/EV fleets (04:55) The challenges of providing AV/EV fleet charging solutions (05:53) The impetus behind behind Neha founding Terawatt (06:57) The benefits of renewable energy for fleets (08:48) What industries does Terawatt focus on? and their footprint (10:10) How Terawatt got their first AV customer (11:31) What it takes to build and launch a charging site (12:35) How many sites does Terawatt have currently (14:03) The optimal locations for building charging sites (17:05) Hardware/power requirements for charging sites and how they evolve (19:40) How fast do vehicles charge at Terawatt’s charging sites (21:22) How Terawatt works with partners to design operating domains, and the data involved (23:28) How time of use works for AV/EV fleet charging (26:16) The EV to AV transitions, and how it has affected Terawatt’s business (28:20) Quantitative charging requirements for fleets (30:10) Biggest challenges experienced with new customers (32:00) What other services does Terawatt offer at their charging sites (33:30) Fully autonomous charging (35:30) Conclusion and Final Thoughts Notes/Links: * Link to Neha’s previous webinar appearance on Ride AI - Ride AI x Terawatt Webinar 7/1/25 - Harry Thanks for being a subscriber to The Driverless Digest! If you enjoyed this episode, feel free to share it with someone who might like it too. And if this email was forwarded to you, why not subscribe and stick around :) This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit www.thedriverlessdigest.com

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_01We provide turnkey charging solutions for fleets. We have real estate. We own real estate. That's located in suitable locations for fleets to be charging. There are EV fleets. We have a lot of good connections with utilities to bring the power to those sites. We provide all of the on-site infrastructure. So we bring the chargers, solar or batteries on the site. We'll bring that as well. Any backup generation that's required. And then the cherry on top and the most important thing really to customers is our high uptime operations.

SPEAKER_00Neha, how are you doing today?

SPEAKER_01I'm great. Thanks so much for having me.

SPEAKER_00I'm excited to chat with you today. And I have to say, would it be fair to say you are a charging expert or an energy expert? Or how do you like to describe yourself? Ithinkit'salloftheabovebecauseweneedtobeexpertinallofthosethings

SPEAKER_01to deliver our final product to customers.

SPEAKER_00Yeah, andIliketojokethatIfeellikealotoffolksintheAVindustrytodayhave done some stint at some point at Waymo or, you know, their original self-driving project. But I guess you were at the parent company, Google. And before we dive into Terawatt and what they're doing today, can you talk a little bit about your background there? Were you working on, you know, energy for all of the data centers and all the ads business that Google does? Or what was your sort of role and responsibilities there?

SPEAKER_01Yeah, I was focused on helping turn up the global suite of data centers. So really working closely with real estate professionals at the company to find those pieces of property that had a large amount of power where we could go and put a very large data center. As you know, Google is one of the largest builders in the world. And so really starting to understand that nexus between real estate and powerand also working with utilities across the world who would bring that power to our sites. So spent a lot of time really thinking about what is the best location and

location

SPEAKER_01strategy based on power, and then figuring out how to do it in 10, more than 10, you know, many, many different jurisdictions.

SPEAKER_00Very cool. Well, I see a lot of synergies to obviously what you built at Terawatt today and the team and the company is doing. So for those who may not be familiar with the brand, can you tell us about Terawatt, you know, where the company's based, the footprint, and obviously, of course, what you're doing to it?

SPEAKER_01Yeah, so we're headquartered here in San Francisco. We founded the company in 2021. We provide turnkey charging solutions for fleets. And I call it a full stack turnkey solution, which means we have real estate. We own real estate that's located in suitable locations for fleets to be charging their EV fleets. We have, you know, a lot of good connections with utilities to bring the power to those sites. We provide all of the on-site infrastructure. So we bring the chargers, solar or batteries on the site.

SPEAKER_01We'll bring that as well. Any backup generation that's required. And then the cherry on top and the most important thing really to customers is our high uptime operations. When we decided to build this company, we really focused on this kind of turnkey nature. Most fleet managers are used to buying diesel and running their vehicles. They'renotexpertinrealestateandpoweranddifferenttechnologythat's required for the EV chargers. So we provide all that turnkey to fleets. And because time is money for them and they have to have high uptime,

we're also investing a lot into making sure that our sites provide that for our

SPEAKER_01customers as well.

SPEAKER_00Yeah, Ithinkthat'sagoodpointwiththesortofoldgaspoweredfleetmodelthat obviously, I mean, there'sstillabunchoutthereandthatIthinkthereprobablyarealotof experts in that. I mean, is there any real downtime, you know, when it comes to, you know, I mean, you just fill up with gas. I mean, do you ever run out of gas and go to gas stations everywhere? I mean, there's all the normal, you know, cars get into accidents that every fleet has to deal with. But as far as like the power that is powering these vehicles, I mean, gas seems kind of simple, right?

SPEAKER_01Yeah, it's ubiquitous as well. Right. And there's gas stations all over. And so it's not hard if you are caught in a pinch to find one. That's not the case with charging. And it's certainly not the case with fast charging for fleets. So we are providing something that I think of it, you know, as a once in a century transition. Right. You had railroads for long haul freight. Then you had your national highway network. And now you have, you know, charging infrastructure that's laying on top of all of that. So we're still just getting that rollout started.

SPEAKER_00Yeah, definitely. And I think two pieces that you mentioned to me that, you know, kind of from a non-expert in the charging side seems very challenging would bethe real estate. I mean, there is an industry of real estate professionals out there, right? So that is a business in itself right there. And then, of course, the providing the charging and sort of the fleet servicing model. I mean, I guess would those kind of be the two main, you know, I guess, challenging pieces of the business? I think the whole stack is challenging, frankly, but we brought to bear some expertise there.

SPEAKER_01I think, yeah, the real estate piece, understanding how that market works, how to find the right properties. For AV in particular, my share, we're looking in downtown dense areas that have been downtown for many decades. So knowing how to source those types of properties and the right type of property to buy for these use cases, and then layering on top of that, these sites also have to have quick and easy access to power. which may not be the case in the built-out downtown area. It may be on a circuit that's completely impacted in full. So those two things tied together really are kind of the core of our

expertise. And then once you have those two elements, it's actually going and building that site.

SPEAKER_01You have to work with the city to get all the appropriate permits, get the construction team together to deliver that. And then once it's live, the high uptime operations.

SPEAKER_00Got it. What was the impetus for you starting the company and sort of wanting to build out to this network of chargers with Terawatt? Yeah, so when I was at Google, you know, I saw the impact of corporate buying.

SPEAKER_01You know, wehadGoogleandalotofothertechcompaniesthatstartedbuyingalotof renewable energy. And that really pushed, I think, a lot of cost reduction in that industry, but also caused it to scale pretty significantly, the renewables industry. And so I started thinking to myself, where else could you see that impact of corporate buying? And right away, it triangulated on fleets because, you know, transportation is between one third and one fourth of global emissions. And then you also have, you know, all this new technology that's coming to bear with EVs. AndsoIthoughtaboutitbeingareallygreatopportunityandthenkindof

thinking about this challenge that fleets would have when they wanted to start,

SPEAKER_01you know, having many, many vehicles that were electric in their fleet and figuring out how to chargethem in a high, you know, high reliability way. I realized there was an opening for something that actually could leverage the skills that I'd built at Google. So that's when we did the link.

SPEAKER_00I actually, I feel like not a lot of people talk about the sort of benefits of renewables with fleets. And I think for me, it's obvious, you know, like a full-time rideshare driver will do a thousand miles a week. So of course it makes sense to go EV and, you know, you're doing four to 5,000 miles a month. And, you know, so the costs and the buyback period and the charging, everything, it's like kind of a slam dunk, no brainer. compared to gas but i i guess talk a little bit about that fact like how do fleets you know or do some of your customers care that you know obviously all of this you knowevandavtransitioniscomingfromyouknowrenewablesorcouldhavethe

potential to come from electricity you know that's cleaner than you know other

SPEAKER_00forms of energy

SPEAKER_01Yeah, absolutely. I think that there's a nice confluence of the facts of the technology. It is easier to build, for example, autonomous vehicle technology on top of an EV platform. It's also more cost effective, as you noted. So if you're doing a lot of miles, especially if you're doing those miles sitting in traffic, as many rideshare vehicles do, that's even more cost effective than... I mean, it'd be weird to build an AV company on a gas-powered car these days. Yeah, exactly. But even just general rideshare, right? They're doing a lot of miles and they're sitting in traffic.

SPEAKER_01When they're sitting in traffic in an EV, they're not burning fuel. So I think that's all exciting. So you don't have the combustion at the vehicle level. It's also tied to economics and technology, which are better than the incumbent that's available. And then, yeah, you can have, you know, all of this powered by renewable energy and that kind of completes what that, you know, the full stack of, you know, fueling that's happening there, which is super exciting. I think for many, it's, I won't call it the icing, you know, on the cake, but it's, again, this nice trifecta of effects that, you know, the economics, the technology and the cleanness of it all.

SPEAKER_00Yeah, well, I think it's always cool when the economics sort of match the, you know, sort of potential benefit to society or, you know, kind of, you're not, you know, forcing people to use renewables or EVs and in a way that, you know, maybe doesn't make sense for the business. But this is such a clear use case for so many different fleets and industries. So can you talk about what are the industries, you know, that Terawatt works with today, some of your customers, or maybe, you know, what's the footprint of the company too? And, you know, what industries do you focus on?

SPEAKER_01Yeah, so we kind of focus on two verticals. The first vertical is heavy-duty kind of trucking. So think about a semi-truck that's been electrified, but even, you know, delivery vans, that type of a vehicle that's involved more in moving freight around. Andsowehavesitesthatarelocatedinandaroundportsthatareinkindofthe transition from the road to the rail, the intermodals, and then in the warehousing districts where there's so much demand for transportation. that transition between freight to last mile delivery, et cetera. So we have sites that serve that segment.

And then we obviously have our sites that also serve the light duty world.

SPEAKER_01And that really is focused on rideshare at this point. So regular and autonomous vehicle rideshare, and those tend to be located more in urban areas. And so we have a site right near LAX. I think that's the one that everyone knows about. And that is a site that is purpose-built to deliver capacity for rideshare drivers.

SPEAKER_00Yeah. So on the rideshare side of the business, which I think we'll focus on today, obviously this would be sort of the, are you doing a lot of work with, I guess, human fleets these days in addition to autonomous?

SPEAKER_01Yeah, I think we cover both, right? Autonomous is certainly growing leaps and bounds. And it's been interesting to watch. I say that we grew up with that industry. When I started the company, put out my LinkedIn note, hey, I'm starting this company. This is what we do. And within a few hours, Iactuallygotamessagefromanoldcolleaguewhowasatoneoftheautonomous vehicle companies saying, I think we need your help. And that was our first EV customer. So we've grown up alongside that industry as well. But definitely, there's obviously many, many rideshare vehicles that are EVs as well.

right well and i think it's it's funny right because av it seems like the industry is growing and you know so big and there's so much momentum i think waymo is doing 250 000 trips per week or that's at least what they've announced and i always like to remind people that uber does 30 million trips per day around the globe so it's stillyouknowthethehumansyouknowmightbearoundforalittlewhileandi

SPEAKER_00think it kind of makes sense to you know we see a lot of companies now It might be tough to build a huge business just servicing AV fleets, but if you can kind of do that combo, you set a lot of the kind of building blocks with human fleets of AVs today, and then as it transitions more to AV, I mean, a lot of the technology, I'm guessing, is similar, right?

SPEAKER_01Yeah, I think there may be some things that you think about more carefully when it comes to technology for AVs, data download, and you might want to configure your site slightly different, but generally speaking, this is equipment that is fungible across both.

SPEAKER_00All right, well, I think I'm going to ask you about that. But before we get into that, let's talk about what it takes to build and launch a charging site. Where do we start?

SPEAKER_01First, we have to have a site. And so we do a site search and understand really what the site location criteria are. So if I focus on rideshare, we're looking to be near where those rides are happening. So generally in an urban area. And so we look for just available real estate. Again, these are downtown areas that have been built out over a long time. And there's not a lot of flat lots available, which is the most ideal type of location for us to be building. Anddoyoutypicallyworkwithacustomeronthisorareyoukindofgoingoutin

SPEAKER_00advance and getting these lots? How does that process look? And I guess what's the timeline look like too?

SPEAKER_01Yeah, it's a mix. You know, I think we have gotten pretty good at understanding what makes a good site froma location perspective, having worked with a wide number of fleets at this point. And so the timeline, you know, can be very varied. It depends on the market and how impacted that real estate market is. It depends on how that market is built out. Sometimes you have more sprawl, sometimes you have more dense and sprawl is generally easier to find. But, you know, it really depends on the specific geography we're looking in.

SPEAKER_00Got it. About how many sites do you have across the country right now?

SPEAKER_01We have, gosh, it keeps increasing. So I would say in our portfolio, we have about 40 sites. And I would say about a third of those are in active development or live.

SPEAKER_00Got it. Okay. And usually those might have 20 to 30. LikeIthinkI'vedrivenbytheWaymofacilitybyLAXandIthinkIcounted30 Waymos, you know, or so charging. Is it usually 20 to 30 or what's the sort of good number?

SPEAKER_01It really depends. You know, it depends on the type of facility. It depends on the location. We can certainly go larger. The biggest constraint is always going to be power. So that is really what drives a site from getting too large. When you get past a certain point, You move from the kind of smaller, lower voltage lines to the bigger voltage line. And that is a step change in cost and timelines and things like that. So we are balancing all of these criteria as we put sites together.

SPEAKER_00Well, and I think you also mentioned something that is probably common knowledge for those in the rideshare industry like myself. But most rides, I would say an overwhelming majority of rides, happen in the downtown dense areas. And with human drivers, they actually can't afford to live. I call it the higher socioeconomic areas where rent is expensive, where in Los Angeles, West Hollywood, the beach, downtown, South Bay, and most drivers can't afford to live there. So they kind of drive in from far away but you guys need to build charging lots i guess what's kind of the optimal distance you know is it right there in west hollywood where people

are chargingtheircarsorisitmaybeyouknow51020minutesawayhowdoyouthink about the sort of density and you know kind of specifically like i don't know if youhavespecificexamplesofsanfranciscooflayouknowhowyoupicksomeof

SPEAKER_00these locations Yeah, maybe I'll pick San Francisco because I'm from here and I'm sitting here now.

SPEAKER_01But, you know, San Francisco is a lot of AV companies and SF too. Yeah, and also we're the epicenter of it all here for AV. Yeah, I think, you know, usually think about taking a ride in San Francisco. I also live here. You know, you're going to want to be close to where the riders are. If you're out, say, you know, the airport or, you know, South City, that would take 10 minutes for a vehicle to get there, to charge, and then come back. That's a couple of rides they might have been able to complete. And so you're thinking about, and I think about this as a system now, the utilization of vehicles is what is driving the profitability.

And so any kind of deadhead mile time is, you know, going to cost them and their utilization.

SPEAKER_01And so it makes sense for it to be as close as possible. Got it. Other things I think about, because I ride... You know, Waymos and AVs all the time, I think about how long I have to wait for a vehicle. So if they're all kind of clustered around the charging site and it's 10 minutes from my home, it might take me longer to get a vehicle. And so just from a customer experience and my experience is driving my perception here, I'd want that site to be really close to my home, which is closer downtown.

SPEAKER_00So generally, it sounds like the best location is kind of where the highest density of rides are. There isn't a benefit to say, you know, going like five, 10 minutes away, you save a little on the real estate, but then all of your cars have to travel an extra five or 10 minutes.

SPEAKER_01Yeah, I think that's right.

SPEAKER_00Got it. I mean, I think the other thing we've seen with, you know, with Uber drivers is a lot of times they like to place their, you know, their big service and support centers by high density locations. Like you mentioned the airport, for example. So, you know, down by the airport, Uber had a big support center, has a big support center for drivers there because they kind of know that, you totheairportandyouknowchargeorsorrynotchargeigotchargingonmyyou know you you might do a ride over there and so you can stop if you need anything so it'snotit'slikekindofoutofthewaybuteventuallyyou'regoingtokindof

make your way over there have you thought about placing any locations there inkind

SPEAKER_00of that respect

SPEAKER_01Yeah, absolutely. I think airports are also a big origination point for lots of ride shares, you noted. So, you know, the site that we have in LA is literally a five minute ride from LAX. And so I think that's been pretty helpful.

SPEAKER_00It's also by SoFi Stadium. And I know there's a bunch of concerts.

SPEAKER_01Yes, exactly. So when you mentioned, you know, that was a site we picked without having any customer at that point. But we realized that, you know, the location was really perfect for lots of big venues that would be driving a lot of ride share.

SPEAKER_00Got it. Yeah. So I guess I like that strategy, especially if you're maybe doing some of these locations on your own, you know, maybe something that's not as, you know, obviously the real estate, you know, over in Inglewood there is not cheap, but it's less expensive than, you know, maybe the core of LA. So you can kind of go for some of those opportunities there. Interesting. So you also touched on the power. I guess it was interesting that at a certain threshold, I guess the cabling, and we don't need to get into all the specifics if you don't want, but it sounds like, what is the number? Is it like 20, 30,

SPEAKER_00and complicated?

SPEAKER_01So this is where things get really fun. So the technology is constantly evolving. And so the type of power and the type of charger required for vehicles is evolving over time. And what we're seeing is that they're requiring its individual charger. So a single stall is starting to require more and more power over time. Because the vehicles are getting more efficient and able to take that higher power and charge faster. So I would say it's a bit of a moving target. There's probably a minimum density that makes sense for us from a cost effectiveness of building.

SPEAKER_01I would say 30 feels like where we are right now. Again, it could change over time. When you go to the utility right now where the chargers are and they're kind of sizingandit capacity, the 30 stalls make sense. If you all of a sudden bump that up to where we think the technology is moving, you would start to bump up against what most utilities provide, what they call the distribution system, kind of more local cabling available for power. And so once you go past, you know, 10 megawatts, and I know we're starting to get into power nerdery here,

SPEAKER_01but it starts to be a much bigger project. And so, again, balancing kind of what is needed by the vehicle, what the technology requirements are, and it's going to change over time. And so when we think about building our sites, we future-proof them, knowing that that technology will change over time. And so if you look at one of our sites, it looks like a parking lot with chargers, which is what it is, but there's a lot happening under the ground there. And so we have thought about that kind of trajectory of technology curve that will require us to have the sites actually be more power dense and more power

intense

SPEAKER_01over time.

SPEAKER_00Yeah. So I guess you have to think about the trends with EVs that, I mean, I guess the two most obvious ones, like you mentioned, are the batteries are getting bigger and the cars are charging faster. Does that sound right?

SPEAKER_01Exactly. And I think those are the two main drivers. And then that drives us to have higher power chargers, which requires more power from the entire site.

SPEAKER_00Yeah. And so how fast, you know, at your sites are you charging these cars? So I've got, you know, I had a Tesla and then now I have a Rivian and I think I, so I have a Tesla wall charger at home. So I believe that would be a level two charger. I call it the washing machine outlet, right? I think it's 220. Does that sound about right? Okay. So far, so good. And I, you know, I believe the last time I was charging, I'm getting up to 40 miles per hour, right? So it seems pretty fast, you know, at home, right? Overnight, eight hours, you know, you can kind of get over 300 miles of range and that's more than, you know, I would need on those vehicles.

SPEAKER_00So how fast do you guys charge your vehicles? Because I imagine, you know, the faster, the better, right? To get the cars back on the road for a fleet. Yeah.

SPEAKER_01Yeah, absolutely. Faster the better. And I think there's two drivers to that. There's what type of vehicle it is and what type of chargers we have. The chargers we install can generally charge a vehicle in less than half an hour. They're called DC fast chargers. So they're much faster than what you have in your garage at home. And again, I think there is a lot of technology that's being built out to allow that to maybe even come down even further. And so, you know, I think half an hour is the holy grail. But we see that, you know, oftentimes they're not coming in totally empty.

SPEAKER_01You might put your garage in your car with, you know, 5% charge. Most of these come in, I think, you know, optimally between 20 and 80%.

SPEAKER_00Got it. So do most vehicles come in at 20 and then you charge them up to 80 or what's the sort of. It really depends on what the fleet, the fleet kind of makes those decisions. I think what we talk about is a charge curve and the most fast charging can happen

SPEAKER_01between 20 and 80 percent on most vehicles. And so if you go beyond 80, it starts to really slow down. You don't get as much paying for your buck, et cetera. So I guess it sounds like you work pretty closely with your customers to sort of

SPEAKER_00figure out, you know, with their business model and, you know, kind of where they have vehicles. I mean, there's a lot of factors that go into it basically, right? Like maybe I think about like, hey, you know, I have a car that I can get down to 10%, but that's going to make me, you know, an extra $200 on a certain trip. I might do that. And then, you know, I'm going to cost myself a little on the charging side. How do you work with your partners to sort of design, I don't know, do you call it like an operating domain or how does that work?

SPEAKER_01Yeah. I think we're just getting started there, butweareabletosharethethingsthatwe'velearnedfromnowoverayearof operational data to provide them insights into how they might think about running their fleets most efficiently. Sowearedefinitelyontheupwardtrajectoryofstartingtohavethesegreat insights that we share that they can then use in any way that they need to. So those are things that we think about, you know, as we build our business out, that can be really helpful specifically for the rideshare domain. Because as you noted,

there's a tradeoff between time and money in that industry that's a little bit

SPEAKER_01different than, you know, how you and I would think about our EVs, our garages, right?

SPEAKER_00Yeah. Well, are there any one or two insights that you've kind of learned from that, you know, year of experience that you could share that, you know, are maybe a bit surprising?

SPEAKER_01I think a couple of things. I think definitely that charge curve. I mean, that's a commonly known thing in the EV world is that you have this charge curve. And so optimizing between those two points is important. I think we've learned that actually, if you think about the site as a whole, It's very rare that you're going to have every vehicle pulling the maximum amount of power that they can. So with that, can you maybe oversize the site a little bit and have more chargers? So if you added them all up, it might be taking more power than you actually have coming from the grid.

SPEAKER_01Got it. But as you're able to kind of manage some of that, you realize it's very rare that you would actually get to that maximum. So then you start to provide more flexibility for maybe more stalls on a site. And so those are the kind of insights that we've pulled out is that it's going to be really hard if you think about even How would 30 vehicles pull in at exactly the same time and beat the top of the charge curve? Sotheseareinsightsthatwe'reusingtonowoptimizethesitesovertimeand really maybe drive down some of the cost to build and also just the speed to build because if we're able to rationalize having less power,

SPEAKER_01that can sometimes mean a quicker connection to the utility.

SPEAKER_00What about when you charge these vehicles? Because I know, for example, here in LA, you know, I think they have time of use, right? So if you charge at certain times, your EVs, right, basically when people aren't, you know, they'll give you a little better bang for your buck. How do you take that into consideration in your different areas of operation? So what we see with a lot of rideshare fleets is they're very high utilization.

SPEAKER_01So they're running kind of around the clock, right? And so when you do that, you don't have as much of an impact of these time of use rates. Certainly you have to take it into consideration, but generally speaking, you know, they're running at a pretty high capacity factor and there's generally ratesthat can... you know, be used to help, you know, address that, you know, it's like very flat load. It's very similar to data centers, actually. So it makes it easier to plan on the grid, but also makes that rate lower, that average rate lower over time.

SPEAKER_00Got it. Because they're, I mean, I think that's sort of the whole name of the game. And I guess this has also been Uber's big pitch to AV partners like Waymo is that, hey, come onto our platform and we will keep you heavily utilized. You know, you'll be busy all times of the day and night. And I think I just got a push notification from Waymo this morning, you know, 25% off, you know, late night rides, right? Because in certain markets, right, it's like the cars are probably sitting there, you know, empty at times, right? And I think, you know, we've had fleet owners on in the past, I'm thinking about Will from Will Coleman, who's at Alto and they partnered with Uber.

SPEAKER_00And he told me that, you know, one of the big impacts they saw from immediately partnering with Uber is that now they're kind of nighttime, you know, the off peak utilization has gone up. Right. So I guess like with the AV fleets today, I mean, I imagine they have some, you know, downtime at night so they could charge more. Are you saying that like they kind of need to charge at all times throughout the day? We have seen utilization from the rideshare area come at all times of day and night

SPEAKER_01and pretty high utilization of those chargers. So you look at like a, you know, a public facing EV charger, they'reprobablygoingtogetmostoftheirbusinessinthemorningandthe evening, right? This is fairly kind of flattened throughout the day. Andsothatkindofhelpsaddresssomeofthosetimeofusetypethingsthatcan crop up in different read structures and The crazy thing is it's like not one size fits all. Every utility has its own rate structure. So what you see in downtown L.A. is actually different than, you know, what you see in Inglewood is different than what you might see on the Far East.

SPEAKER_01And so it really is a little bit personalized. But I would say that the nature of most rideshare, that there's this constant churn of vehicles coming into charge, does help kind of mitigate some of those spiky rates where there might be really high rates. at peak hours and really low during non-peak hours. But certainly everyone knows that people sleep. So the vehicles might be able to operate without people, but they don't make any money without people. So there is a diurnal effect.

SPEAKER_00So the, you know, the past, I'd say, three, four, five, six, seven years, we've seen this big push into EV across, you know, electric vehicles, across a number of, you know, on the OEM side, on, you know, regulations, you know, everywhere you look, I think there's been this big EV push. Everyone, I kind of joke, everyone in California, you know, has a Tesla now. But now, you know, over the past year or two, we've seen this big AV push. So talk a little bit about this EV to AV transition and how that has affected your business, because I imagine that, you know, you're kind of building out charging for EVs.

SPEAKER_00Now, whataresomeofthekindofuniquechallengeswhenyoustartthinkingabout building out for autonomous vehicle fleets that are also EV? Yeah, I mean, I think a lot of them have been native EV from day one, right?

SPEAKER_01A lot of their testing, you know, I remember the autonomous vehicle project at Google was, I think the first testing was on hybrids, but very quickly went to EVs. As I mentioned, there's some technology alignment with being able to control the vehicle. better with AV technology if it's an EV powertrain. So I think there's great synergies there. I would say building out for AV has been super interesting. I think that the location matters even more. So that downtown area, I think, is very, very important, oftentimes because they are starting out with maybe a more limited area that

they

SPEAKER_01can operate in. So we have to be close to or fitting within that range. You have to be right in the center of the action whenever they're going to launch. Exactly. So that's been a consideration for us, I think. The other pieces, I think, are really just about the scale. You know, I think it's really interesting where if you own, say, you're a rideshare fleet owner, right? You can start to kind of feather in some EVs over time. But, you know, you might start with five, 10. There is a fleet that we work with that started out with five vehicles and then

he

SPEAKER_01had 20 and now he has 40. But it's definitely taken the last three years to get to those 40 vehicles. With the AV fleets, you know, EV native from day one. And there are a lot of vehicles in the markets where they're operating. And so I think that the need for our types of services where you have this fast chargingvehicle with lots of chargers located in one place, is becoming more acute with the AV build-out that we see here across the U.S.

SPEAKER_00Yeah. So, I mean, for example, I know it was reported that Waymo launched in Austin with 100 vehicles, 100 AVs. So it seems like, you know, like you say, you can't just go in there with 5, 10, 20. How many charging stalls might I need if I have 100 vehicle fleet? Because that seems to be like the number that I see a lot of AV companies are launching. And they're not launching with 5 or 10. You know, it's like they usually launch with a pretty decent number.

SPEAKER_01Yeah. I mean, I think it really depends on what they're doing, if they're training or if they're actually like delivering rides. And so, you know, when they're training, it's probably less sensitive. But, you know, I there probably is a rule of thumb that they have. I would think that for 100 vehicles that you're running around the clock, you would want at least five chargers.

SPEAKER_00OK, it's not not a ton.

SPEAKER_01Not a ton, but remember, like these suites can get big pretty quickly. So thinking through what the potential build out could be. And remember, we kind of started where, what do you do to build one of these sites? So the first piece was the real estate. The second piece is going and getting the power information. So do we have power at this site? I see an awesome flat lot that I want to buy in the right location. It's within my price range. And is there any power about, you know, The majority of the time, the answer is no. So that's kind of the second piece of it.

SPEAKER_01You layer on all the time to get permits, construct it once you actually kind of check those first two boxes. And you are kind of in the 18-month to two-year range from when you started to when you finished building the site. And so if you think about, okay, I want to be, it might be 100 vehicles now, but I want to be 500. Yeah, that's true. In the next short period of time, you'realreadykindofattimeforfindingthatchargingsiteandhavingit underway to be built.

SPEAKER_00Yeah. I mean, I kind of imagine that, you know, based off every, it probably isn't too hard of a sale in the sense, like, I can't imagine a lot of people are going out and like, oh, this seems like a good idea. I should do this on my own, right? Like, I think it doesn't take a genius to realize there's a lot that is going on here. And obviously partnering with someone who really knows what they're doing probably has big advantages. I guess, what's the sort of biggest, you know, sort of challenge or obstacle that you have, you know, when customers are coming to you? Is there, you know, what are the challenges they're facing, you know, when they come to you?

SPEAKER_01So I think the number one thing is what I just said is the timeline. So we're seeing this accelerate too, right? With the kind of acceptance or wide acceptance of AV technology for rideshare especially, we're starting to proliferate into more and more markets. And that regulatory period of trying to figure out like, okay, are we going to be able to operate here is compressing over time. As the technology gets better over time, Their time to train, their time to learn a new market is also compressing. And so they'll come to us sometimes and different customers will say,

SPEAKER_01oh, can you have something ready in weeks? That's like very hard. Months? No, it's really at least a year process, if not longer. Got it. I think the timeframes that they're coming to us in can sometimes be a challenge. And then sometimes, you know, it is the location. Like these are prime pieces of real estate in downtown locations that they're wanting to operate out of. And there's just not a huge number of these properties for sale. And so I'd say that's kind of another challenge. And then, you know, something that's going to get better over time, frankly,

is the zoning.

SPEAKER_01There's no zoning for EV charging in many locations. They've never come across this. And so if you tell the city, hey, I want to build this here, they're like,

SPEAKER_02hmm,

SPEAKER_01there's nothing in my code. Sometimes that takes time to get them to put something in their code so that we can go apply for the permit to go build it. And so I think there's a lot of different elements that are driving this timeline. We always try to figure out how to compress it. We have standardized designs that we can give our construction companies thatwork with us, et cetera. But at the end of the day, there are just some things that are going to be headwinds in terms of the timeline.

SPEAKER_00Yeah. Whataresomeoftheotherservicesthatyoumightbeabletoofferatyour charging sites, either directly or indirectly? Because I think from everything you're telling me, a lot of the common lost items, those types of issues and cleaning and servicing, I have to imagine that a company, an AV player wouldn't want a bunch of different sites for all of that. Might as well do it kind of all in one, right? Yeah. Or what have you seen out in the market? What's the best practices?

SPEAKER_01Yeah, I mean, we really hand these sites over to our customers. Andsothey'rekindofoperatingastheyneedtowithintheconstraintsofthe permitting of that location. But I do think one of the things that I don't think people realize, it's like, oh, this is an EV charging site. It's a site where operations are happening, right? Vehicles are coming in and out. And so we spend a lot of time on access, right? These are vehicles that are coming in and out without anybody in them. And so our gates have to work perfectly. The systems that open the gates have to work perfectly. So we spend a lot of time in just general site services as well.

SPEAKER_01It's not just about the charging. Obviously, that is the nexus of why a vehicle would come to that location. But certainly, there are a lot of other things that have to happen to make that site run efficiently. And so when I think of services we provide, it's making sure that facility is running seamlessly outside of just the charging. Ingress, egress. We do obviously have some humans at the site. We provide a lounge for those humans to, you know, operate out of. And so making sure those facilities are up and running in the right way.

All of that are kind of additional aspects of what we provide the customer.

SPEAKER_00Yeah. What do you think about this notion of fully autonomous, you know, sites or charging? I know there's a lot of, you know, demonstrations or companies now that are doing the cool, you know, videos where, you know, the car comes in, it goes over a pad and then, you know, sort of mounts and, you know, wirelessly charges or some kind of, do you, do you kind of buy into all of that? Are you thinking about that type of stuff too?

SPEAKER_01Yeah, maybe I sat steeped in the technology soup for a long time, but I absolutely believe that technology is there. We call it the concept of a dark site, butcouldyouhaveacompletelytouchlesssitewherenobodyhastotouchthe vehicle? Absolutely. I think that technology is not that complex, frankly, ifyouthinkaboutlikea robotic charging arm or something like that, obviously it has to work seamlessly. And that really ties again to the high uptime. So we're definitely super excited about different technology that can be integrated into our stack and allow for all of that.

SoI'msuperoptimisticthatthiscanbekindofsomethingsupersimpleand

SPEAKER_01mechanized without too much additional technology that has to be built. Which of the sort of automated charging form factors are you kind of most bullish on?

SPEAKER_00If you kind of had to pick one that you think will come to sort of real commercialization first, you know, the robot arm or the car drives over the pad. What do you think?

SPEAKER_01Yeah. I mean, Ithinktherobotarmcanbeveryinterestingbecauseitworkswithtoday's technology pretty easily, right?

SPEAKER_00Yeah.

SPEAKER_01It really is replicating the human the most and the most, you know. a complete way but i've seen other technologies i think the wireless technologyis still a little bit tough especially as the technology moves to higher power you starttolosepoweryouhavelossesandheatthatyouknowcanbedifficultto control i think someone will figure out that technology but i think it will be a while there's i've seen other technologies where there's a way you can drive over and it clicks in i mean i think there's all kinds of things that But I think for right now, just given that it requires no other tech changes besides the robot arm,

SPEAKER_01that's something that's pretty exciting to me.

SPEAKER_00Definitely. Well, I think it was really cool. I think it's a great note to end on. And I think it was really cool to learn about Terawatt, the company, and everything that goes into building a charging site. I don't know if we convinced anyone to go out there and do it on their own, but I think that if they need someone that can work on this, I think they know who to call. Any other final notes you want to leave our listeners with? No, I just think it's such an interesting moment, especially in AV rideshare.

SPEAKER_01And there is definitely, every day there's some interesting news that comes out globally, you know, different partnerships, different technologies, different AV technology companies coming out. And I think one thing that's really interesting kindofstartingtocomeouttomeandagainimayberelyonmydatacenter experiencealotbutyouknowithinkofdatacentersasenablingaiandthat really is you see the boom going on there for av to really take off and i mentioned you know you need a lot of chargers to get these fleets up and running you're going to really need a lot of charging and i think that's starting to be recognized

as maybe one of the bottlenecks of deploying and going to market new geographiesand

SPEAKER_01so we're just super excited to be providing that layer and that expertise to this industry. I think it's going to become increasingly, hopefully not as intense as data centers are right now, but, you know, a bit of a scrum to get that capacity to be able to launch in new cities. So we're excited about that.

SPEAKER_00Well, and I imagine, you know, the smart AV companies, you know, like you said, a lot, I'm sure some are coming and say, oh, we need this in weeks or months. And that's probably just not feasible. But You know, that kind of one year timeline, obviously there's some testing and, you know, things that need to happen. So it seems like, you know, the savvy ones probably are doing a little bit more work ahead of time to sort of lay the foundation and groundwork for a lot of this. Yeah, exactly. All right, Neha, appreciate it. Thank you.

SPEAKER_01Thank you.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. What Went Wrong with AVs in D.C.? (Greg Rogers)

    Nov 23, 202643 minAudio

    Listen to this episode on Apple Podcasts, YouTube, Spotify, and Substack. Transcripts are also available by clicking on the “transcripts” button in the top right corner of this post on the app/web version. You can also...

    Credit the people on this episode

  2. Bringing Robotaxis to Europe with Bolt CEO Markus Villig

    Nov 16, 202631 minAudio

    Listen to this episode on Apple Podcasts, YouTube, Spotify, and Substack. Transcripts are also available by clicking on the “transcripts” button in the top right corner of this post on the app/web version. You can also...

    Credit the people on this episode

  3. The Data Transfer Bottleneck Facing AV Fleets with Virewirx CEO Jason Fiber

    Nov 9, 202632 minAudio

    Listen to this episode on Apple Podcasts, YouTube, Spotify, and Substack. Transcripts are also available by clicking on the “transcripts” button in the top right corner of this post on the app/web version. You can also...

    Credit the people on this episode

  4. Making Autonomous Drone Delivery Work with Zipline CEO Keller Cliffton

    Nov 2, 202641 minAudio

    This week’s edition is brought to you by Terawatt - purpose-built charging for autonomous vehicle fleets. Listen to this episode on Apple Podcasts, YouTube, Spotify, and Substack. Transcripts are also available by...

    Credit the people on this episode

  5. From Long Haul to Last Mile: Autonomous Vehicles Take on New Form Factors

    Nov 2, 202629 minAudio

    Listen to this episode on Apple Podcasts, YouTube, Spotify, and Substack. Transcripts are also available by clicking on the “transcripts” button in the top right corner of this post on the app/web version. You can also...

    Credit the people on this episode