Skip to content
PodSubs
ShowsPeopleGuestsJobsNewsEvents
More
BlogPodCred
Menu
ShowsPeopleGuestsJobsNewsEventsBlogPodCredNetworksSign in
Join nowSign in
  • Shows
  • People
  • Jobs
  • News
  • More
    • Guests
    • Events
    • Blog
    • PodCred
    • Networks
    Join nowSign in

The Copper Connection Podcast — Plumbing & Building Services Engineering

The Copper Connection Podcast — Plumbing & Building Services Engineering artwork

The Pressure Test That Never Lies — Commissioning Hot Water Systems, 9289 Phase 3 Unit 310 (Part 1)

Aug 9, 202622 minAudioSeason 2, Episode 84
ShareXLinkedInFacebookWhatsAppEmail

An unvented cylinder can be fitted perfectly, look fine, and still fail three weeks later if it was never actually pressure tested. In this episode of The Copper Connection Podcast, Chris Bailey opens Unit 310 of the 9289 apprenticeship (ST0303), Phase 3, Learning Outcome 2, moving commissioning and handover thinking from cold water systems across to hot water systems. This is Part 1 of a two-part hot water systems masterclass, covering the difference between open-vented and unvented systems, the full nine-step commissioning procedure, and steps two to four in detail: the visual inspection, filling and venting, and the soundness test. Chris breaks down where the 1.5-times test pressure figure in the Water Supply (Water Fittings) Regulations 1999 comes from, and how BS EN 806 can push that figure even higher - working through the bar-pressure calculations examiners expect for hot water safety and plumbing exam preparation. You will learn to: Understand the difference between open-vented and unvented hot water systems Explain the full nine-step commissioning procedure for hot water systems and components Identify the ten checks carried out during the visual inspection stage Apply the correct filling and venting sequence for open-vented and unvented systems Calculate the statutory soundness test pressure under the Water Fittings Regulations Compare that figure with the BS EN 806 commissioning test pressure calculation Explain the WRAS G12.2 and R12.2 requirements for testing rigid pipework Identify the Test A and Test B procedures for plastic pipework under BS EN 806 Part 2 Grab your Unit 310 notes and work the bar-pressure calculation yourself before Part 2 lands with steps five through nine. soundness testing, hot water systems, unit 310 phase 3, 9289 apprenticeship, ST0303 Hosted on Acast. See acast.com/privacy for more information.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. T-Level DSP & BSE Revision: Command Verbs Decoded – What Is the Examiner Really Asking? | Papers 1 & 2

    Nov 22, 202624 minAudio

    Are you revising for your T Level Design, Surveying and Planning for Construction (DSP) examinations but still struggling to turn your knowledge into marks? You might know the answer, understand the subject and have...

    Credit the people on this episode

  2. T Level BSE Paper 2 Revision: Building Services Science and Measurement

    Nov 22, 202611 minAudio

    Welcome to Episode 4 of The Copper Connection Podcast's T Level November Resit Revision Series! Are you preparing for your WJEC/Eduqas T Level Building Services Engineering for Construction Core Paper 2 examination? In...

    Credit the people on this episode

  3. Hot Water Design Temperatures Explained | Level 3 Plumbing Unit 332

    Nov 15, 202622 minAudio

    Why does a hot water system need to store water at a high temperature but deliver it at a much lower temperature to the person using it? In this epsiode of The Copper Connection Podcast, Chris Bailey explores the design...

    Credit the people on this episode

  4. T Level Paper 1 Revision: Pearson DSP & WJEC Eduqas Building Services Engineering

    Nov 15, 20269 minAudio

    Welcome to Episode 3 of The Copper Connection Podcast's T Level November Resit Revision Series! This episode is designed for students studying two different T Level qualifications: 🏗️ Pearson T Level Design, Surveying...

    Credit the people on this episode

  5. Construction Project Management and Sustainability | T Level DSP & BSE Paper 2

    Nov 8, 202611 minAudio

    Preparing for your Pearson T Level Design, Surveying and Planning for Construction and WJEC Building Services Engineering Paper 2 exam? In Episode 2 of The Copper Connection Podcast's November Resit Revision Series, we...

    Credit the people on this episode