Have you ever looked at a project and thought, "Everything says we're on track, but something doesn't feel right"? The budget appears fine, the team is busy, and progress reports look positive. Yet deadlines keep shifting, decisions are taking longer than expected, and the scope seems to be growing without anyone formally approving the change. In this episode of The Business Behind Your Business, Paul Sweeney sits down with project management consultant Richard Broo to discuss why projects rarely fail overnight and how business owners can identify the warning signs before small issues become costly problems. Drawing on more than 40 years of experience, including work with major organisations such as Toyota and General Electric, Richard shares practical strategies that small and medium business owners can apply to improve project outcomes. What you'll learn: The early warning signs that a project is drifting off course Why communication breakdowns create costly misunderstandings How poor scoping and inadequate planning lead to scope creep and budget blowouts The importance of monitoring costs, timelines and staff capacity How to identify risk triggers before they become major issues Why successful projects focus on delivering value, not just completing tasks Throughout the conversation, Richard explains why many businesses wait too long to seek help and how a lack of discipline around planning, reporting and accountability often leads to avoidable delays and overspending. He also shares practical ways to bring teams back into alignment, uncover the root cause of problems and get projects moving in the right direction again. Whether you're leading a major business transformation, implementing a new system, or managing day-to-day operational improvements, the lessons in this episode can help you avoid common mistakes and improve your chances of success. Richard Broo has spent more than four decades helping organizations recover projects that are over budget, behind schedule, poorly scoped, or at risk of failing. His work spans Fortune 500 companies, mid-market firms, and private-equity-backed businesses across manufacturing, packaging, automotive, medical equipment, construction materials, consumer goods, and electronics. He is often brought in when internal teams are stuck and leadership needs clear, practical solutions. As founder of True North PMP Consulting, Richard works inside client organizations to identify the root causes of project failure, restore clarity and accountability, and help teams bring complex projects back under control. www.truenorthpmpconsulting.com LinkedIn YouTube Send us Fan Mail Support the show https://thebusinessbehindyourbusiness.com/ Want to be a guest on The Business Behind Your Business - Real Advice to Help Small Business Owners Build, Lead and Thrive? Send Paul Sweeney a message on PodMatch, here: https://www.podmatch.com/hostdetailpreview/bbyb Connect with us: Facebook LinkedIn Instagram
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
SPEAKER_00Welcome to The Business Behind Your Business, the podcast where we delve into the financial strategies and insights that drive success for small and medium-sized business owners. I'm your host, Fall Tweeney, and in each episode we bring you expert guests who share practical advice, real-world experiences, and actionable tips to empower you on your business journey. Whether you're a seasoned entrepreneur or just starting out, get ready to uncover the secrets to success and gain valuable insights into the business behind your business.
SPEAKER_00Have you ever looked at a project and thought, well, look, everything says we're on track, but something just doesn't feel right. The budget looks fine, the team's busy, and the reports are telling you that things are moving forward, but deadlines keep shifting, decisions seem to take longer than they should, and uh the scope keeps growing, yet nobody has really made a decision to change it. And while you can't point to one major problem, there's a sense that something isn't quite adding up. And that reality is that most projects don't suddenly fail.
SPEAKER_00The warning signs are usually there long before the financial reports catch up. And today's guest, he's spent more than 40 years helping organizations identify those warning signs, uncover what's really causing projects to drift off course, and um and how to get them back under control before those small issues become really expensive ones. Richard Brew, welcome to The Business Behind Your Business.
SPEAKER_01Well, thank you for having me.
SPEAKER_00I'm I'm excited to have this conversation because I think a lot of times businesses, whether they're running a small project or a large project, this is an area that things can either go really well or really badly. And I've seen too many go really badly, and it sort of you know kills the momentum about whether they actually decide to go and do something different or make a change moving forward. You've spent a lot of your career being called into these kinds of projects that you know sort of went a bit off track. So when you walk into one of those situations, there's some early warning signs that you're seeing.
SPEAKER_00Uh, what are the things that business leaders, business owners are missing when they're running projects that are not going how they think they should?
SPEAKER_01Yeah, that's a very good question because as you said, when things aren't going well, a lot of companies get, should I say, they they get discombobulated. What's going on here? And the reason that a lot of that happens, it's communication and it's following a plan. And so when I walk into a situation, the first thing, like if you were to call me in, I want to hear your side of the story, but I also want to hear the side of the story of the people that are actually doing the work. Nine times out of ten, there's a disconnect between what you thought was going on and what they thought they should be doing.
SPEAKER_01And that's the first sign that I look for is the communication broken down between the leadership team and the worker levels to the point where neither one of them really have a good feel for expectations anymore.
SPEAKER_00Yeah. So that disconnect there or that expectation gap, is that because or is that commonly caused by a leader deciding what the project's gonna be, but not involving his team in the design or the scope of what the project's going to be?
SPEAKER_01A couple of reasons. That's one of them, where I, as a leader, could come to you and say, Paul, I want you to do this, and I'm going to assume you have it and that you're going to come to my office whenever you have a need, but it's in Paul's hands, and Paul will do it, and he'll come back to me when Paul's done. That's one of them. The second thing is, is a lot of times companies don't really scope their projects very well. What's in scope, what's out of scope. So that you get into a scope creep situation. And what I do with my clients is I I put everything down in writing.
SPEAKER_01What is in scope? What is out of scope? Look at all the assumptions and constraints and all the risks about what's in scope, and get that down on a piece of paper and have everybody sign to agree this is what we're going to do. So that's your first living document that you're going to use to keep everybody calibrated. So, you know, and then the third one is that there's really no plan. I mean, uh a lot of companies that I deal with, especially the small ones, will agree to do a project, but it's in the head of maybe the engineering manager or the program manager, but there's nothing formally done on a piece of paper about how they're going to do it, when, how, why, resources, even risks.
SPEAKER_01So those are the three main reasons that I see, you know, when we get into a situation of a project not performing, those are the things, the first few things they look for.
SPEAKER_00And all of those things you mentioned uh seem to be things that couldn't be planned for, or uh, I guess the damage can be avoided by taking time at the beginning or before you even start the project. It seems to be that a lot of business owners get excited by the prospect of launching into a project and just you know, overlook that whole process. Is that a common occurrence that you've come across?
SPEAKER_01Absolutely, with the small and the mids, mid-sized companies. To your point, they uh, you know, leadership wants to get going on a project, they'll assemble a team, they'll tell the team verbally what they want, but there's not enough effort been put in by the leadership team to scope that project first. I'm always amazed when I get called in, I say, Well, did anybody do a business case on this project? No. Did anybody do a project charter? No. Did anybody do a at least a scoping statement?
SPEAKER_01Well, this is what we want to do. This is what we told the team. Yeah, but is that on a piece of paper? Are all the assumption and constraints there? Have you really thought about the risks? Because now you you you're you're obviously in a risk situation. And and you know, I'm amazed at how many companies don't take the time to even do a business case. They just start to launch and do something.
SPEAKER_00Yeah, I I find that often when I'm called in to help a client, not so much in the project management, but in in implementation of maybe a change to reaction or for for a change in law or change in process or change in structure. I've usually been brought in probably at steps four, five, and six, not step zero or one, where if I'd gone very brought in at step zero or one, the the process would have been completely different.
SPEAKER_01Right. I mean, what you do and what I do were like medics in the army, right? Were you called then to help the wounded, get them patched up and get them moving again?
SPEAKER_00Yeah, yeah. And it's nice to say, well, hang on, if you'd have just avoided getting into that situation to start, we've all we could have got a much better situation for you, but we're not coming in at that. We're coming in at uh, you know, when the damage is starting to happen or when it's been done and the job is to fix it. So when you get to that point, okay, they haven't done like a business case study, you know, is it actually a viable product? Is it going to actually deliver what we say? Or they haven't scoped it. Do you would you stop that at that point and say, hang on, everybody down tools, let's let's assess what we're actually trying to do here?
SPEAKER_01Yes. Uh I tell them now you need to slow down and go faster. You need to go back and do the steps that you failed to do when you started your whole project in order to get this thing back on track. So I take them back. Let's talk about your scope. What are you trying to accomplish? Why? What's the value there? Who's going to get that value? What are the assumptions and risks that you have about what you want to do? Very important that that gets cleared up front and gets down on a piece of paper. And then I look at, well, okay, so now you're down this far in the process.
SPEAKER_01What are all the steps you missed along the way that we have to go back and now redo? And in some cases, the company can be so far down the track to recover, you know, you have to say you're going to have to give up some scope, or you're going to have to, you're going to have to increase your resources or your time. And if you want it all, there's no way you're going to get in this time frame because you're too far down the road and you didn't do your due diligence up front.
SPEAKER_00Yeah, and I think that's that's often hard at that point. Do you get a lot of resistance to that advice when when you're telling somebody? Because I think, you know, we get very passionate about the ideas that we have and the projects that we put in place. And we said I think sometimes when somebody comes in and says, hey, you you're not quite doing this correctly, rather rather than saying, hey, you're doing everything wrong. Um, but if you're not quite doing it correctly, we still get that sort of um, I guess, uh, a little bit of a offensive about hearing that, because we have a very strong ownership with our with our ideas and our projects.
SPEAKER_00Do you find a lot of resistance?
SPEAKER_01Uh yes. I mean, nobody likes to be told they have to stop the train for a while in order to figure out what the train should be doing. It's painful for a leader and it's also painful for the team. But as I try to impress upon my clients, what's at risk here? You can continue to go down the path, you continue to expend more resources, time, and money, and you're not going to get the end result you're looking for because you didn't do certain critical steps up front. So let's get those done.
SPEAKER_01We can get those done quickly to get the train moving faster again. But it makes no sense to keep that train going down the track because all you're doing is burning fuel for no reason.
SPEAKER_00Yeah. I I just following on from that, I guess one of the areas I see where somebody's unwilling to give up on a on a path that they've chosen is I've already sunk a bunch of money into this, I've a lot of time into this. I don't want to abandon it. Um, how do you over help them overcome? Like you were talking very clearly at the beginning about where communication has broken down. How do you communicate, you know, why they need to move on from that to getting into a more efficient process?
SPEAKER_01Well, I think the first thing that I like to tell clients is when you're in the situation, and once we figure out the root cause of things, before you even take that next step, you need to bring the whole team back together again and make sure we're all calibrated. It's no good if I'm as a CEO and I come to you as say my COO or my engineering manager and say, okay, yeah, these things are wrong. You know, Paul, just go right ahead and move this way. That you know, there's more people than you involved. So what I tell them was is, yeah, we're going to slow down and maybe have to stop for a day or two before they before we speed up again.
SPEAKER_01But we have to get everybody around the table. And when I when I say everybody, manufacturing, quality, logistics, finance, commercial, uh, customer service. Uh, we need to calibrate on what's going on here because we may not be in a crisis situation yet, but we're heading towards one. So it behooves us to get together for half a day or however long it takes to recalibrate. So everybody leaves with the same set of understanding rules and instructions.
SPEAKER_01Again, a lot of managers don't like to hear that, but you know, it's better to mend the wound than to just put a bandage over the wound. And what we're trying to do is mend the wound so we can move on.
SPEAKER_00Yeah, I love like that analogy. So often I see people trying to put a band-aid on a deep cut, and the band-aid, yeah, it does the job that it can do, but it's not stopping the flow of blood coming from from the deep wound. Do you talk about having to stop and just um you know assess where we're at and and fix the problem before we move on? I'm sort of reminded a bit about, I guess, the Japanese car manufacturing process, which I think you'd be familiar with as well, is when something goes wrong in one part of the process, the whole factory stops.
SPEAKER_00And then they don't keep processing or or restart until they've fixed the issue, uh, because that has implications further down the line. So I'm not sure it might be okay, maybe the the hinges aren't working on the doors uh or not fitting correctly, but so they stop that and fix it so that the whole the whole factory stops till they fix that problem and move forward, which seems like you know, a lot of us would be look, hey, that's a lot of lost time because we're stopping the whole factory, the whole process just to fix one problem. But the efficiency down the line is much better.
SPEAKER_00Um yeah.
SPEAKER_01And with that, what you just described, because I've I've worked with Toyota and over the course of my career in automotive, the beauty of that system is they get everybody involved. It's not just the man or woman on the line with the hinges, but what happened, what happened prior down the line before it got to there? Was there something that happened down that line that forced that? So, and that's that's what I try to impress upon my customers. If you want to get out of your problem very quickly, you need to take a holistic approach. You know, it's like going to the doctor, you know, I have I have shortness of breath, I have heaviness in my chest.
SPEAKER_01He's gonna ask you a lot of questions. He's gonna take a holistic look at what's going on in your body. It's no different when you have a problem in your business. You need to take the holistic approach to make sure that you actually get to root cause, implement the right root cause corrective action, and then make sure that that action doesn't exacerbate the problem, but eliminates the problem.
SPEAKER_00Yeah. I I think fixing the fixing the process, fixing the identifying the problem is is the key. And we mentioned that a lot of business owners, they just can't pinpoint what that problem is. What are some of the strongest warning signs that you uh that we should be looking for to find out if a project's not not working? And I think, you know, we'll go right back to the beginning where there's that we actually haven't decided whether it's a viable project to start with.
SPEAKER_01Well, let's assume that there is a project plan and there was a business case and there were some several other documents to support this, and everybody agreed to those. You know, the first thing I look at is the schedule. Where where the first thing you should look at, I think, is as a program manager, product manager, engineering manager, or the COO and hire is look at your project schedule. You're gonna see slippage slippage happens, can happen daily. The moment you see slippage, you know, two one or two days in a row, you know you got a problem.
SPEAKER_01You know there's a problem there. That should be your first sign. You just shouldn't assume that, well, you know, rich will rich will get that time back down the road. You can't assume that. You have to figure out, okay, I've got now 40, 24, 48 hours of slippage, what's going on there? That's the first thing I look at. The second thing, uh, and I see this a lot of small demids, is the the the the financial aspects of it. I come from General Electric, and everything was done with cost accounting. Every little component that we handled in making raw materials had a cost account to it.
SPEAKER_01And every day the cost accountants would post to that account. So I I I I tell my customers, how are you do you have cost accounts and every component going into it, what's going on? And you say your costs are are moving in the wrong direction. Well, why? Is it all components? Is it certain components? Um, but you need to do a very meticulous job of making sure that you have recorded your costs properly so that you can find out where in the system, in the raw materials that you're using, is that issue occurring.
SPEAKER_01Amazing how a lot of small to medium-sized companies don't do that and don't involve their project manager or product manager in the finance part of things, but you need money to do it. You have this program or product manager trying to develop something for you, they need to be intimately involved in how the money is flowing. And again, a lot of companies don't follow the money tight enough, and that's when they start to get into their financial issues.
SPEAKER_01The other one is the resources. You can only uh a human being can only do so much. And if you and I are project or product product project or product managers and we're assigned to four products or projects, we can't do any one of them any justice. You know, they you got a little bit of our time. So, you know, if I see resources overextended, like hey, Paul's e Paul's head of you know AI development for these four projects and they're not moving.
SPEAKER_01Yeah, you know, you got Paul stretched so thin, he can only do so much, you know. After 12 hours, this man is burned out. So I'm I I like to make sure that these companies understand don't stretch your resources beyond their productivity capabilities, because that that will also get you into trouble. And the last one is, and I said this a little before, is you need to plan for risk up front. And and and mo most companies do plan for risk, but I'm not interested in the risk.
SPEAKER_01I'm more interested in the trigger. Like the trigger on a gun. Something's gonna make that risk become an issue. So you need to figure out what the risk is. Yes, you need to figure out what the response to that risk could be, but what will trigger that risk? Because you're ultimately looking for the finger near the trigger so that if you see the finger coming near the trigger, you know how you have a response ready to go if that trigger gets fully pulled. And someone has to own that risk response. It can't cannot always be you, Paul, as the president or the engineering manager.
SPEAKER_01Someone on the team needs to own each individual risk and be prepared to address that risk if that trigger gets pulled.
SPEAKER_00So three very key points there, Richard, um, that you mentioned. Uh, I think the costing side, I think a lot of times when I speak to a business owner, they they're unaware of how much it costs them to produce a product or a service. And yeah, that's dangerous, really, because you keep you could just keep producing stuff that you're never gonna make a profit on. Or if you in in the project sense, you might have a uh an allowance or funding available for a particular project, but if you're not monitoring your costs, you're gonna run either run out of money very quickly or or not understand the true cost of what you produced.
SPEAKER_01Yeah, and and there's an interesting statistic. On average, when most projects go over budget, they go over by a minimum of 20%. That's a lot of money that's being wasted. And what I find extremely interesting is small to mid-sized companies, they don't really integrate the financial part of their operation into the product or project parts. And that's important because if you and I are a product or a project manager and we've been entrusted to deliver something for the company and the client, we need to know where the money's flowing, how it's flowing.
SPEAKER_01We need to know if there's a component coming in from a vendor where you know the costs, the the costs are escalating. You know, because that's our job to figure out how to stop that cost from escalating. But if we're not part of that process and you're my boss in your company and you say, hey, Rich, you know, this component's gone up 15%, what's going on? I'll say, Paul, I have known I I you you're coming to my office and you're telling me this. No one has told me this before. So it's very important that companies involve the financial operations to help product and project management stay on budget.
SPEAKER_00Yeah. So price price rises is one of those things that you can't always predict. And but you do need to be aware of what the impact is. I know that recently we've had a couple of our suppliers where the the price of what we're paying has gone up 33%. And in some cases, we actually had you know a thousand percent increase in one of our costs. Um you've got to be monitor that. But yeah, I want to ask you about um, you talked about capacity planning. Okay, you talked about the the the project manager with four projects. And capacity planning is one of those things that a lot of people don't think, uh, think about, you know, even if you're not looking at big-term projects, uh we we use capacity planning in our accounting practice here to work out well, what are our staff actually realistically going to be able to do in a week?
SPEAKER_00Uh, and are we making, you know, can we tell the client what that we can get to the work this week, or is it are we looking at three weeks before we can start their work? But I think one of the things that we've we've moved away from here, particularly in the last decade or two, is this whole idea of accounting for what we're doing, uh, accountability. And, you know, in the professional services area, uh, the big one was people have stopped using timesheets to record their actions because timesheets used to be used for billing and we've moved away from that. But we actually use timesheets to track how much time we're actually expending on a particular type of work and tracking back, well, hang on, we're thinking it's gonna take us six hours to do this, it's actually taking us eight.
SPEAKER_00We either need to change our process or change our pricing. Um, if we can't change the process, we have to change the pricing because there's no point us doing the work if we're not gonna make a profit. But without that accountability or that tracking, yeah, you're not gonna know what the true cost is. So you could be doing work at a loss. And I think that whole idea of capacity planning is something that you know today we've got an aversion to being accountable for how we spend our time. Is that something that you're you're finding when you go into businesses?
SPEAKER_01More or less. Again, uh, I was raised in a Fortune 500, which everything everything you did here to be recorded to the Nats, you know what. The small the mids, they you know, they really if I walk into an engineering department and I'm and I'm working on say uh a budget overrun and trying to figure that out with them, it's very difficult to extract that financial data uh from from the operations because again, they don't the accountability that you talked about, you know, that's what you ultimately need to stay on budget.
SPEAKER_01And also uh on a schedule, you know, uh you see slippage. Why? Where? When did this occur? How often does it occur? I've seen a lot of, shall I say, um, the word I'm looking for is just good faith that we'll get that back, we'll make up that time. Well, how? You know, you just can't, I just can't come to your office as my boss and say, look, Paul, I've lost three days on the job. I know it's going through your mind when you well, Richard, what are you going to do to get those three days back?
SPEAKER_01Because time is money. That is not as prevalent as what I grew up in. It's one of the reasons why I do what I do now because I want to help small to mid companies to get that type of discipline. Because everything else that they do, I mean, think about it. You audit your engineering department, you audit your quality, you audit your finances. Some people even audit their commercial operations and their logistics operations. What do they support? They support product and project management.
SPEAKER_01Well, you say, I don't understand. Well, look, they're in place to help produce a product or service for your company and your client. They're they require money to do that. Okay. But you have to have the discipline to audit them as well to make sure they are just as efficient as your other operations. And that's one of the things that I, you know, when I I'll do an audit when I first come into a company that that asks for my help to try to figure out where those bottlenecks and those pinch points are.
SPEAKER_01And then you can get down into the questions. I use what's called the five Y. I keep on asking why until I get down to this really is the root cause, or could be the real root cause. And then we can talk about root cause corrective actions. But you have to do that if you want to be successful, be on track, be on time, meet customer expectations. I don't know of any other way. You know, I mean, product and project management, just like accounting, is a discipline.
SPEAKER_01You have to follow the discipline.
SPEAKER_00Do you do you find that that discipline that sort of gets pushed to one side when we have an abundance of funding allocated to a project? So it's not always the case in small business because small businesses are often tight on resource. But a lot of time I see where there's a there's a large funding pool allocated to, or what appears to be a large funding pool pool allocated to a project, that the sense of um, I guess, um, being accountable for cost, monitoring cost, sort of doesn't it feels like it's not necessary because we've got plenty of leeway here.
SPEAKER_00Is that is that a dangerous trap that you know when we've got too much funding for a project?
SPEAKER_01I I believe there is. I mean, there's your there's your budget that you have dedicated to your project. And then you can put buffers in the budget, which I don't like to see people do. And then management could put on their reserve on top of your reserve, uh, with the attitude is, well, you know, the project should take a million dollars, but you know, we've got an extra$115,000 in the budget, which is fluff. And that I just pull my hair out when I hear that say, Well, you're just putting buffers in there because you really haven't done enough due diligence and plenty to know what your real costs are.
SPEAKER_01So you're saying, well, let me throw this extra in there just in case. And by the way, if just in case doesn't happen, well, I'm$115,000 ahead of the game. You're overlooking, you're overlooking the whole discipline. You're not doing your due diligence to say it should cost a million dollars, and here's why, and here's the breakdown of that million dollars. I'm not against doing, you know, management reserves, but when it's but but when it is absolutely positively required. Just don't throw buffers in there to say, well, you know, the wind's blowing this way, so I'll just do it.
SPEAKER_01That that's too dangerous because you get very comfortable. You know, Paul's not going to get angry if I spend another 80,000 because he already gave me this extra reserve. I don't think you're going to get angry, but you're not going to be pleased with me as your project manager if I do spend it.
SPEAKER_00Nah, no, and I think the other thing there, the danger I see is that um when it's other people's money, it's a lot easier to spend it. So when you think you've got other people's money, um, you're you're a lot less um careful about how you spend your time or your money or your resources. You just think, oh, oh, okay, I don't need to think how I can save some money or be more efficient here because I've got the funding. It doesn't matter, I'm not paying for it, it's not coming out of my pocket. So I see that quite a bit, particularly at at uh that sort of manager level in in small medium businesses that where they they feel, I guess, almost entitled to spend somebody else's money without without the care.
SPEAKER_01I agree. You know one of the first things, I mean, when I was at General Electric, uh Jack Welsh used to say you have company money assigned to you for your group or what you're trying to accomplish here. You need to think of that as your own personal money, the money that you have to run your own household. I he would expect us to run it very efficiently. And that's where I learned that discipline of cost control and schedule control and scope control. And that and that that's a lesson that I carry forward to my clients, which is success is based on process discipline.
SPEAKER_01The moment you I mean, you could have the greatest idea in the world, the greatest people to do it for you, all the resources in the world. But if you don't have the process and the plan to help all of that come together, it's not going to happen. And so every project should have, in my opinion, a project uh business case, and then a charter, and then some type of plan, whether it's agile project management or traditional project management or hybrid thereof.
SPEAKER_01There needs to be a roadmap. The roadmap is there for a couple reasons. One, it keeps us all calibrated. We all understand where we are on the road. Two, it's a living document so that when we go to performance reviews, project reviews, stage gate reviews, this is a document that we can use to make sure that we are on track. And if we're not, then you know, if we do the how are we going to get back on track, whether it's money or it's time or it's scope creed. And number three, it it helps people on a daily basis understand the roles and responsibilities.
SPEAKER_01What do they have to do? Why do they have to do it? What's the importance of that? What value are they creating? Because ultimately, product and project managers do they deliver a product? Absolutely. But that's not what they really deliver. They deliver value, something of value for the company and the clients of that company. And that value is what drives their competitive differentiation and their profitable growth. And that's very important within that discipline that people understand that.
SPEAKER_01It's not about the product or it's a lot about the value that you're being asked to create and deliver.
SPEAKER_00I think, Richard, um, I was gonna get try and summarize what what you uh what we've been talking about, but I think you just summarized it really well. We're talking about the warning signs of a failed project. And I think really it's very clear from what you said, there's no business case, there's no plan, there's no scope, there's no accountability and and no reporting. All of those are pretty major signs that you know if they're not if those things aren't present in your project planning, um they're your early signs that the project is not going to be successful, or it might it might succeed in delivering, but it might come at a huge cost.
SPEAKER_00Pretty big warning signs, and I think we ignore those um significantly. Um look, I think the challenge is uh, and and and I'm we we sort of talked about this, is uh being prepared to accept that um yes, it might be your idea, but you do need to get some feedback, independent feedback, and and help with the project. Because I would say that most small medium business owners or or uh managers don't have the experience necessarily as project managers. And I think that's where one of the issues lies is that they try to do something that they don't have the skill for.
SPEAKER_00This would be, I guess, the ideal time to bring in, bring in yourself. Your company, True North PMP Consulting, does this with small medium business owners. I think that's the ideal time to recognize that okay, we're about to embark on this project. We don't have the skills in-house. Let's get some guidance, let's bring in Richard to to help us. And I think that that would that alone increases the the chance of your success. Getting somebody with the right skills and expertise to help guide you in that process before you start would be an incredible way to make sure you your project's a success.
SPEAKER_00Is there anything you I've missed in that, Richard?
SPEAKER_01Yeah, I I see a lot of that. Most of the times when I do get called in, it's it's when the management of the company understands they have a problem and knowing and staff to resolve that problem. They've tried all the resources they have. And what I find very interesting when I, you know, as I get to meet and work with the leadership team, is why does it take so long for you to realize you have a problem? I mean, obviously there were warning signals that came to your office weeks ago, but here we are several weeks down the pike, and you're finally laying down your weapon and saying, Yeah, I need some help.
SPEAKER_01I mean, why did it get that far? And you get a whole myriad of answers. Well, we thought we could do it ourselves. Um, you know, we've been we we we we've seen this before, and we thought we could we've always done it this way, but now it's not working. And, you know, I mean, they're all probably valid reasons, and I believe everybody has a good heart in what they're trying to do. But what amazes me is it takes so long for the leadership to realize they do have a problem. And when they do, that's when they make the call.
SPEAKER_01But they could have avoided where they were if they had just acted sooner.
SPEAKER_00Okay, projects can go wrong, but let's get a uh our setup on the right framework, the right foundation right from the beginning. Get the right help right from the beginning. Richard, you mentioned call, call you. How how do we get in touch with you if we want you to help us with our project management?
SPEAKER_01I can be reached on LinkedIn, uh Richard Brew B R O O. Uh, I can also be reached through my company website www.tru, t-e north, n-o-r-t-h, pea is and perry, Amazon Mary, P is and Perry Consulting.com. And if I could be of assistance to someone in your audience, it would be my privilege.
SPEAKER_00Fantastic. Uh, we'll put those links to how you can contact Richard in the show notes as always. And I'll also be sharing some links to there's some absolutely fantastic articles that I've read of Richard's helping with this project management or understanding a bit more about project management because maybe it's a new concept for you. But I'll encourage you to check those articles out and I'll put the links to them in the show notes as well as on the businessbehindyourbusiness.com website where you can find uh not only uh links to everything we've talked about today, but also our past episodes um and resources for you to help uh you know grow your business, but also make sure that when you are doing work, projects, product improvement, that you do it in the right way for the best results without the wastage and slippage.
SPEAKER_00Uh Richard, I've had uh a lot of fun. I've been smiling as you've been answering because it's just sort of uh uh um talking uh because it just rings so true of many of the experiences I've seen working with small and medium business owners and that that frustration, um, but also the clear strategy and process that you have. Um, and also the look, we we we only really touched on it in in passing, right? The wealth of experience that you have to share from you know working with Toyota and uh General Electric. Um, some amazing experience, but that that skill, making that available to small business owners, that is uh uh fantastic that you're doing that because I think you know, small business owners, they are, I guess, the lifeblood of our community.
SPEAKER_00They need all the help they can get because running a business can be hard, but it doesn't have to be that way. Richard, thank you for joining us on the business behind your business. Oh, thank you for having me. It's been a pleasure. That's a wrap for this episode of The Business Behind Your Business. We hope you found today's discussion insightful and valuable for your business journey. Before we go, don't forget to subscribe to our podcast on your favourite platform. Share it with fellow business owners who could benefit and send in your burning questions because we love hearing from you. Missed any of our previous episodes or looking for additional resources to help grow your business?
SPEAKER_00Head over to our website at the businessbehindyourbusiness.com. There you'll find our full archive of past episodes along with show notes, transcripts, and links to valuable resources mentioned in each episode. Your journey to business success continues at thebusinessbehindyourbusiness.com. Until next time, stay inspired, stay informed, and keep building the business of your dreams.
Are you building the business you really want, or simply reacting to whatever opportunity comes along next? It's easy to get caught up in the day-to-day decisions of running a business. You take on more clients, hire...
What does it really take to turn a frustrating everyday problem into a product people want to buy? In this episode of The Business Behind Your Business, Paul Sweeney speaks with Chundee founder Karmyn Roberts about the...
Many business owners believe that more customers, more sales and higher revenue will eventually lead to stronger profits. But what if the business is growing, the team is busier than ever, and there is still little cash...
Technology keeps businesses running, but it can also create risks that are easy to overlook. As AI becomes part of everyday work, protecting your business is no longer simply an IT issue. It comes down to how your...
A challenging personal experience can sometimes reveal a much bigger opportunity. In this episode of The Business Behind Your Business, Paul Sweeney speaks with Elysia Krstevski, founder of MEKE Baby, about turning a...