The Kingston Line: A Century and a Half of Boom, Bust, and Rebirth on the South Shore
The transportation corridor connecting Boston with the historic South Shore represents one of the oldest and most volatile transit sectors in the United States. Today, commuters know it as the MBTA’s Kingston Line, a vital artery carrying thousands of passengers a day. But the modern tracks sit atop a tumultuous history. From its origins in 1845 as the Old Colony Railroad, through monopolistic consolidations, total abandonment in 1959, a dramatic $560 million rebirth, a massive infrastructure scandal, and a modern zoning paradox, the story of the Kingston Line is a microcosm of American transit policy.
The Golden Age of the Old Colony
By the early 1840s, Boston had rail lines radiating in almost every direction, but the southeastern quadrant of Massachusetts - the territory of the original Plymouth Colony - remained isolated. To bridge this gap, the Massachusetts Legislature chartered the Old Colony Railroad Corporation on March 16, 1844, with the goal of connecting Boston to Plymouth.
On November 10, 1845, the 36.8-mile single-track line officially opened. The ceremonial inaugural train had been hauled days earlier by locomotives aptly named the Mayflower and Miles Standish. The railroad aggressively catalyzed suburban development, turning areas like Dorchester into some of the nation’s earliest planned railroad suburbs. It quickly expanded through mergers, eventually swallowing up the Fall River Railroad and the Cape Cod Railroad.
To maximize capacity on heavily trafficked corridors, the Old Colony utilized sophisticated, albeit dangerous, operational practices. Most notable was the “flying switch,” a high-speed maneuver where the rear coaches of moving trains were uncoupled near junctions. The front of the train would speed down the mainline while the rear coaches coasted onto branch lines under the control of brakemen - a practice that minimized delays but was strictly banned following a deadly 1883 crash in Neponset.
The era of independent Old Colony operations ended on March 1, 1893, when the New York, New Haven & Hartford Railroad (the “New Haven”) leased the massive 617-mile Old Colony network for 99 years, folding it into its “Old Colony Division” and creating a near-monopoly on southern New England rail transport. Passenger service peaked between 1898 and 1914; by the 1930s, more passengers entered Boston on Old Colony lines than entered New York on the New Haven.
The “Great Interregnum” and the Death of Passenger Rail
The rise of the private automobile and the construction of modern state highways in the early 20th century began to fatally erode the railroad’s passenger base. The pivotal blow came when the New Haven Railroad filed for bankruptcy in 1935.
In a desperate bid to shed unprofitable passenger liabilities, the New Haven initiated the notorious “88 stations case” in July 1938, abruptly closing 88 stops across Massachusetts, including four on the Plymouth line. Following World War II, the railroad attempted to cut costs by deploying self-propelled Budd Rail Diesel Cars (RDCs), but deferred maintenance and soaring postwar deficits doomed the effort.
The construction of the Southeast Expressway threatened to render the Old Colony lines entirely obsolete. The state authorized a temporary $900,000 subsidy in 1958 to keep trains running during highway construction, but when that subsidy expired, the final passenger trains departed the Old Colony Division on June 30, 1959. Regional transit was immediately outsourced to highway-based bus carriers.
The physical death blow to the original inner mainline occurred on the night of July 22, 1960, when a fire destroyed the wooden drawbridge over the Neponset River. The New Haven collected the insurance payout but refused to rebuild the bridge, permanently severing the rail connection to South Station and stranding the South Shore for nearly 40 years.
A $560 Million Resurrection
As South Shore suburban growth accelerated in the 1960s and 70s, traffic congestion along the Southeast Expressway reached historic levels. The newly established MBTA purchased the Old Colony mainline right-of-way, initially using the inner portion to build the Red Line’s Braintree branch.
The true push for commuter rail restoration gained momentum in the 1980s under Governor Michael Dukakis, but the decisive funding mechanism arrived in 1991. As part of an environmental mitigation settlement with the Conservation Law Foundation over the Central Artery/Tunnel Project (the “Big Dig”), the state committed to restoring the Old Colony lines.
The roughly $560 million restoration project began construction in 1993, rebuilding the line with modern double-stack clearances, continuous welded rail, and fully accessible high-level platforms. However, the project featured a notable design flaw: the junction where the new Kingston spur splits from the historic Plymouth branch was not built as a full wye. This meant a single train could not efficiently serve both Kingston and Plymouth without time-consuming reversals, forcing planners to bypass Plymouth on most peak-hour commuter trains.
On September 29, 1997, regular weekday revenue service finally returned to the South Shore after a 38-year absence.
“Tracking the Truth”: The Concrete Tie Scandal
In the decade following its triumphant return, the Kingston/Plymouth line was hit by a massive infrastructure crisis. During the 1990s procurement phase, the MBTA had installed approximately 147,500 concrete ties manufactured by Denver-based Rocla Concrete Tie Technology, which had promised a 50-year lifespan.
By 2007, the concrete ties began cracking and crumbling due to a chemical process known as alkali-silica reaction (ASR). The failures caused widespread delays and severe “slow orders” across the Old Colony network.
Internal documents later revealed a disturbing lack of transparency. For 19 months, the MBTA allowed trains to run at top speed over crumbling ties, even though the agency knew all the ties needed to be replaced. As late as September 2009, an MBTA spokesman told the press that the defective ties were “isolated,” accounting for fewer than 7,000 ties. In reality, the T had been informed by Rocla in June 2008 that all of them required replacement “in the near term”.
It wasn’t until a new general manager, Richard Davey, took over in early 2010 that the MBTA publicly admitted the scope of the problem. “Ignorance is no longer bliss,” Davey stated, initiating a massive $91.5 million project to rip out all 150,000 concrete ties and replace them with traditional wooden ones. The MBTA eventually sued Rocla but recovered only about $6 million in litigation. The replacement project disrupted midday and weekend service extensively before its completion in May 2012.
The Plymouth Paradox and the Line’s Future
The operational bottleneck created by the bifurcated tracks at the southern terminus continually plagued Plymouth station. Located at Cordage Park, Plymouth recorded an average of only 21 daily boardings in 2018, as most commuters chose to drive directly to the highway-adjacent Kingston station. When the COVID-19 pandemic decimated ridership, the MBTA indefinitely closed Plymouth station on April 5, 2021, and officially rebranded the route as the Kingston Line.
Despite local outcry to restore service, the closure has created a bizarre political paradox involving the state’s 2021 MBTA Communities Act, which requires transit-connected towns to zone for dense multi-family housing. Because the train station is closed, Plymouth is classified only as an “adjacent” community, reducing its mandated zoning capacity to 2,807 units spread across its massive 105-square-mile area. If Plymouth station reopens, the town’s zoning mandate would skyrocket to 4,210 units, with a significant portion required to be densely packed within a half-mile of Cordage Park. As a result, Plymouth town officials have a strong administrative incentive to quietly support the MBTA’s continued closure of the station to avoid a localized zoning battle.
Looking ahead, the Kingston Line continues to grow, serving over 5,300 weekday boardings by 2024. However, frequency remains capped by the two-mile single-track “Dorchester bottleneck” near South Station. Transit advocacy groups like TransitMatters are pushing for future modernization, including double-tracking the bottleneck, full system electrification, and the construction of the multi-billion-dollar North-South Rail Link (NSRL) to allow Kingston trains to run directly through Boston. Until such massive capital projects are funded, the Kingston Line remains a vital, if constrained, lifeline for the South Shore - a testament to a corridor that simply refuses to die.
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.southshore.news/subscribe
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
I want you to imagine just for a second hopping on a commuter train today oh sure
SPEAKER_01you know you find your seat you pull out your phone maybe you just like stare blankly out the window as the landscape blurs by. It feels like a completely mundane daily chore, right?
SPEAKER_00Yeah, just totally routine.
SPEAKER_01Exactly. Like a totally modern, highly utilitarian experience designed just to get you from point A to point B. But what if I told you that the specific stretch of physical ground you are riding over is actually a hundred and eighty year old survivor?
SPEAKER_00Which is pretty wild to think about.
SPEAKER_01Right. I mean, we were talking about a geographical corridor that has somehow outlasted ruthless corporate monopolies. fiery bridge collapses, billion dollar highway projects, and even modern day suburban zoning wars. It really changes your perspective when you look at the ground beneath the train.
SPEAKER_00I mean, you aren't just riding on modern steel and concrete. You're riding over, well, nearly two centuries of American ambition, economic failure, and massive infrastructural compromise.
SPEAKER_01Oh, absolutely. The physical footprint of these transit lines tells the entire story of how our
SPEAKER_00modern geography was shaped. So welcome to this deep dive into the fascinating history of the old colony rail line.
SPEAKER_01Specifically, we are looking at the MBTA's Kingston Line, which connects the city of Boston down to the South Shore and, you know, historically to Plymouth. Right. Our mission today is to explore how a single 36.8 mile transit corridor originally laid down by men with pickaxes way back in 1845 has been born, killed off and resurrected.
SPEAKER_00Yeah, it's such a roller coaster.
SPEAKER_01It really is. It serves as this perfect, almost unbelievable microcosm of American transit history. Okay, let's unpack this. We have to start at the very beginning, back when laying down rails was basically the equivalent of a modern moonshot. Yeah, to understand the sheer scale of this, we really have to look at 1844. Right. That's when the Massachusetts legislature formally chartered the Old Colony
SPEAKER_00Railroad Corporation. At the time, Boston was already becoming a major hub. It had rail lines radiating out to the north, the west, and the southwest.
SPEAKER_01Okay, so it was already pretty connected.
SPEAKER_00It was, but the southeastern part of the state, the entire historical Klemeth Colony territory, was effectively an island. It was completely cut off from this revolutionary new rail network.
SPEAKER_01Wow, an island. So they decided to like aggressively bridge that gap.
SPEAKER_00Exactly. Construction starts in south Boston in June 1844.
SPEAKER_01And in what feels like lightning speed even today, by November 1845, this 36.8 mile line reaches Plymouth. which is just staggering when you think about the technology they had right and I love this detail from the sources they didn't just quietly open the line the inaugural trains weren't pulled by generic nameless engines they used locomotives specifically named after historical Plymouth figures oh yeah We are talking about massive steam engines literally named the Mayflower and the Miles Standish.
SPEAKER_00It was a brilliant piece of psychological marketing.
SPEAKER_01Really? How so? Well, they were tapping into the deep historical pride of the region from day one.
SPEAKER_00They wanted the local population to view the railroad not as some, you know, invading corporate force, but as an extension of their own civic identity.
SPEAKER_01Oh, I see. Which brings up a thought I had while reading through all this research. If you look at this mid 19th century rail boom, it feels exactly like the modern tech boom we've seen with the Internet or smartphones.
SPEAKER_00Oh, that's a great comparison.
SPEAKER_01Right. It wasn't just about laying down steel tracks. They were basically building the physical Internet of the 1800s to connect these totally isolated geographic hubs.
SPEAKER_00Yeah.
SPEAKER_01But, you know, if you build a tech platform today, you need users. Did these 19th century railroad barons just build the tracks and pray people showed up? Or did they have to actively manufacture the demand to make the rep profitable?
SPEAKER_00They absolutely manufacture the demand. And that tech platform analogy is incredibly apt.
SPEAKER_01Okay. Just like a social media app needs engagement, a railroad needs daily riders. They couldn't afford to wait decades for towns to grow organically around their stations. Right. They needed cash flow immediately.
SPEAKER_00Exactly. So under the leadership of their early presidents, the old colony railroad took on the role of city planners. They actively catalyzed suburban development. For instance, they helped establish Beechmont in Dorchester.
SPEAKER_01Wait, so they essentially played SimCity in real life.
SPEAKER_00Pretty much.
SPEAKER_01They bought the land, built the suburb, and then sold the new residents the train tickets required to commute out of it.
SPEAKER_00It's the ultimate closed-loop business model. They were literally inventing the concept of the commuter suburb.
SPEAKER_01That blows my mind.
SPEAKER_00And they didn't stop there. On the tourism and leisure side, the corporation actually funded the construction of the massive Samoset Hotel right in Plymouth.
SPEAKER_01Oh, wow. Imagine a modern airline building a massive luxury resort just to guarantee people
SPEAKER_00have a reason to buy plane tickets.
SPEAKER_01That's brilliant, honestly.
SPEAKER_00It was. They were creating a premium destination so the wealthy Bostonians would have a reason to ride the rails on the weekends.
SPEAKER_01And that highly integrated model just exploded. Through incredibly aggressive mergers and acquisitions, the system grew to roughly 617 miles of track.
SPEAKER_00A massive footprint.
SPEAKER_01Yeah. Then in 1893, they made a massive bet. They leased their entire network for 99 years to the New York, New Haven and Hartford Railroad. This created a colossal consolidated transportation monopoly in southern New England. And you can see the sheer wealth of that era reflected in the architecture they left behind. I mean Plymouth actually had three different train stations at its peak.
SPEAKER_00Three of them.
SPEAKER_01Yeah. The grandest was the Park Avenue station originally built in 1846. The sources described this massive portal on the north end of the building. It was designed so large that horse drawn coaches could drive directly inside the building.
SPEAKER_00Think about the luxury of that.
SPEAKER_01I know, right? A passenger could step out of their carriage and board a train without ever once
SPEAKER_00being exposed to a drop of rain or a flurry of snow. It was the absolute pinnacle of Gilded Age travel.
SPEAKER_01It sounds incredible.
SPEAKER_00It was. Passenger ridership on the division peaked right around the turn of the century between 1898 and 1914. But there is a fundamental rule of infrastructure and economics that always catches up with these giants.
SPEAKER_01Uh-oh.
SPEAKER_00Yeah, an overextended, highly consolidated monopoly is incredibly vulnerable the moment a new disruptive technology enters the chat.
SPEAKER_01Which means we're talking about Henry Ford, the Model T, and the rise of the automobile, the ultimate disruptor.
SPEAKER_00Exactly. They had the ultimate monopoly, with passengers riding in absolute luxury.
SPEAKER_01But that massive expensive infrastructure became a financial albatross. The second people could just drive themselves.
SPEAKER_00It really did.
SPEAKER_01And this wasn't a sudden death for the railroad. It was a multi-decade decline, a real death by a thousand cuts.
SPEAKER_00Yeah, it was slow and painful. The rise of private cars and state funded highways just started eating into the
SPEAKER_01railroad's profits year after year. By 1935, the New Haven Railroad was completely bankrupt.
SPEAKER_00If we connect this to the bigger picture, You have to look at how a massive corporate entity responds to a financial crisis of that scale.
SPEAKER_01Okay, how did they respond?
SPEAKER_00The railroad strategy was essentially battlefield triage. They decided to amputate their own limbs to save the core of the business. Ouch. Yeah. They desperately tried to shed any passenger liabilities that weren't turning a massive profit. This culminated in the notorious 1938-88 stations case.
SPEAKER_01Where they essentially took an axe to the schedule.
SPEAKER_00Entirely. They abruptly closed dozens of suburban stops across the entire state in one fell swoop. On the Plymouth Line alone, stops like North Hanson, Burridge, and Halifax were just wiped off the map. If you lived there, your commute was simply gone overnight.
SPEAKER_01They even went so far as to physically rip up the steel. I read they removed the second mainline track south of Braintree in 1940 just to cut down on routine maintenance costs.
SPEAKER_00That's right.
SPEAKER_01They reduced this massive bustling corridor to a single track operation. But the sources do point out they tried to innovate their way out of the whole race.
SPEAKER_00They did try, yes.
SPEAKER_01There was a brief, desperate revival period from 1951 to 1954. They brought in these new vehicles called bud rail diesel cars, or RDCs, From what I understand, instead of a massive, heavy steam locomotive pulling a string of passenger cars, these bud cars were self-propelled, like a really heavy bus on rail. Yeah, they were a very smart technological fix for a system bleeding money. Because they were self-propelled, you didn't need a massive crew to operate a locomotive.
SPEAKER_00Right, that makes sense. They were highly cost-effective, designed specifically to lower the operational overhead of running a passenger line.
SPEAKER_01Wait, hold on. If they just invested in these cheaper Bud Diesel cars and successfully cut their overhead, why didn't that stop the bleeding? It sounds like they solved their own problem. Was the railroad just hopelessly mismanaged by that point or were there outside factors they couldn't control?
SPEAKER_00Management certainly had its blind spots, but the structural economic forces were entirely insurmountable.
SPEAKER_01Okay.
SPEAKER_00The final blow to passenger rail wasn't internal inefficiency. It was the government.
SPEAKER_01Of course.
SPEAKER_00Yeah. The state and federal governments were pouring unprecedented, massive public subsidies into highway construction. For the old colony line, the death knell was the construction of the Southeast Expressway.
SPEAKER_01Wow.
SPEAKER_00The state was literally building a massive, publicly funded, free-to-use competitor right next to the railroad's tracks.
SPEAKER_01And you just cannot compete with free.
SPEAKER_00No, you really can't. The Commonwealth of Massachusetts did authorize a temporary $900,000 public subsidy in 1958 just to keep the trains running while the highway was being finished.
SPEAKER_01But it was purely a stopgap.
SPEAKER_00Yeah. Temporary Band-Aid.
SPEAKER_01Right. The moment that public money ran out, the axe finally fell. The very last passenger train ran on June 30, 1959. And the human impact of this is wild.
SPEAKER_00Oh, it was devastating for the riders.
SPEAKER_01Termuters were just abandoned. The sources mention a Kingston resident named Helen Foster. She was a commercial artist who relied on that train every single day to commute to her studio on Park Street in Boston. One day, her commuter ticket book is perfectly valid. The very next morning, she and thousands of others are forced to buy cars and get onto the newly paved highways.
SPEAKER_00It represents a profound, permanent shift in the American landscape. We moved from a rail-centric society to an auto-centric one.
SPEAKER_01Yeah, completely.
SPEAKER_00And for the old colony line, it seemed like the definitive end. Even nature and disasters seem determined to physically erase the line.
SPEAKER_01Wait, what do you mean? Well, in 1960, a massive fire completely destroyed the wooden Nipponset River drawbridge.
SPEAKER_00Physically severing the steel connection to Boston.
SPEAKER_01Oh, my God.
SPEAKER_00Yeah. And the New Haven Railroad just collected the insurance money and refused to rebuild it.
SPEAKER_01Just walked away. Exactly.
SPEAKER_00But the corridor itself, that actual 1845 physical footprint carved into the earth, stubbornly refused to die. It was kept on life support by a single, highly unglamorous, savior localized freight trains delivering materials to industrial parks.
SPEAKER_01Right. Just freight. Which sets the stage for the dormant years and eventually the wildest resurrection
SPEAKER_00story in transit history.
SPEAKER_01Yeah. So during the 1960s suburban growth exploded. Everyone had moved out of the city and suddenly that brand new state of the art Southeast Expressway was choked with historic mind numbing levels of traffic.
SPEAKER_00Classic induced demand.
SPEAKER_01Exactly. Planners quickly realized they'd made a colossal mistake in completely abandoning the rail corridor. So the newly formed MBTA swooped in and bought the inner main line right away in 1965.
SPEAKER_00But they didn't bring the commuter trains back right away, did they? No, they didn't. They used that inner segment through Dorchester to build the Red Line Subway's Braintree branch.
SPEAKER_01And this is a crucial detail for anyone riding the rails today. They built the Red Line right over the old, old colony trunk.
SPEAKER_00Hmm. Because space was tight, that left only a single track available for any future commuter rail.
SPEAKER_01It created what transit planners still call the Dorchester bottleneck.
SPEAKER_00It's a severe physical constraint. Because there's only one track, you can't have trains going north and south at the same time.
SPEAKER_01Right. One train literally has to pull over and wait for the other to clear the segment. It dictates the maximum frequency of trains on the entire south shore to this very day. So if you live on the South Shore right now and wonder why your train schedule only offers a train every hour or two instead of every 15 minutes, a concrete decision made in 1965 is the exact reason why.
SPEAKER_00It really is. But the catalyst that finally brought passenger trains back to Plymouth in the
SPEAKER_011990s wasn't some grand vision by transit planners. It was environmental litigation.
SPEAKER_00This is where transit history meets legal history. In 1991, the state reached a massive legal settlement with the Conservation Law Foundation. At the time, Massachusetts was planning the Central Artery Tunnel Project, what we all know as the Big Dig.
SPEAKER_01Oh, the Big Digs.
SPEAKER_00Yeah, it was the most expensive highway project in U.S. history. To legally mitigate the massive environmental impact and the projected increase in auto emissions from the Big Dig, the state was forced by the courts to fund major public transit projects. So to build a giant highway, they had to rebuild the train line they let die 30 years prior. Exactly. The irony is palpable.
SPEAKER_01That is wild. The state drops $560 million to restore the old colony lines. They clear the old track beds, build new double-track tunnels, and construct entirely new stations.
SPEAKER_00Right.
SPEAKER_01But the 1990s planning phase was a chaotic mess of local politics. They couldn't secure the land they wanted for the Kingston Terminal, so they shoved the new station and the massive layover yard into a former sand and gravel quarry behind a shopping mall.
SPEAKER_00Yeah, a huge compromise.
SPEAKER_01And in Plymouth, instead of running the train back into the historic walkable downtown where it used to go in the 1800s, local neighborhood opposition pushed the station out to an isolated old industrial site called Cordage Park. But the actual track layout they built to connect these two stations is what completely blows my mind.
SPEAKER_00Ah, you're referring to the lack of a full wide junction?
SPEAKER_01Yes. Let's try to visualize this for you. Imagine pulling into your long driveway at night.
SPEAKER_00Okay.
SPEAKER_01But when you want to leave the next morning, you can't just put your car in reverse and back out into the street. Instead, you have to drive across your neighbor's front lawn, reverse back into the main road, shift into drive, and then finally go.
SPEAKER_00That sounds like a nightmare.
SPEAKER_01It is. That is essentially what these massive multi ton commuter trains had to do because the track junction was missing a crucial connecting piece. They spent half a billion dollars but designed a layout that requires a massive locomotive to do a slow motion three point turn just to serve both Kingston and Plymouth. It was a crippling infrastructure compromise made to save money on land acquisition
SPEAKER_00and track construction.
SPEAKER_01Unbelievable.
SPEAKER_00And because of that specific design flaw, a single train couldn't serve both Kingston and Plymouth efficiently on the same run. The logistics were a nightmare.
SPEAKER_01I can imagine.
SPEAKER_00A train would go down to Kingston, physically reverse direction out of the station, slowly switch tracks at the junction, and then proceed down the branch to Plymouth. It nearly doubled the travel time for passengers on that second leg of the trip.
SPEAKER_01Which means that during rush hour, when commuters are desperate to get to work or get home, the MBTA just ran trains that bypassed Plymouth entirely to save time.
SPEAKER_00Exactly the outcome you'd expect. It fundamentally doomed the Plymouth station's ridership from day one.
SPEAKER_01Wow.
SPEAKER_00So when the grand reopening finally happened in September 1997, bringing the iconic purple trains back to the south shore after 38 years, it was celebrated as a historic milestone. Right.
SPEAKER_01Right.
SPEAKER_00But for the town of Plymouth, it was deeply bittersweet. The physical infrastructure guaranteed terrible, infrequent service.
SPEAKER_01And that infrastructure flaw, combined with some incredibly short sighted cost cutting measures during construction, set a literal ticking time bomb in the track bed that would detonate in the 21st century.
SPEAKER_00Oh, the concrete ties.
SPEAKER_01Yes. Here's where it gets really interesting. Let's talk about those concrete ties.
SPEAKER_00Right, so during the rebuild in the early 1990s, the MBTA deviated from using traditional wooden railroad ties.
SPEAKER_01Okay.
SPEAKER_00To save money and supposedly lower long-term maintenance costs, they purchased roughly 147,000 concrete ties from a manufacturer called Rokla. These ties were promised to have a 50-year lifespan.
SPEAKER_01But by 2007, barely a decade later, they were literally crumbling to dust beneath the weight of the trains.
SPEAKER_00Yeah, it was a disaster.
SPEAKER_01It was caused by a chemical process called an alkali silica reaction. If I understand the research correctly, it's almost like baking a cake with way too much baking powder.
SPEAKER_00That's a good way to put it. Moisture from the environment seeped into the microscopic pores of the concrete. It reacted with the silica inside, creating a gel that expanded like freezing ice.
SPEAKER_01It literally blew the concrete ties apart from the inside out.
SPEAKER_00Wow. Trains had to slow down to a crawl just to avoid derailing. The MBTA had to launch a massive $91.5 million project to rip out 150,000 defective concrete ties and replace them all with traditional wood. Yeah, it took years of agonizing weekend closures and shuttle buses to fix.
SPEAKER_01It was a massive, costly disruption that eroded public trust in the line.
SPEAKER_00Absolutely. And just as the corridor finally recovered from the concrete crisis, we hit the year 2020. Right. The COVID-19 pandemic decimated transit ridership across the entire globe as remote
SPEAKER_01work became the norm. But for the Plymouth station, the pandemic was just the final nail in an already sealed coffin. Remember that terrible slow motion three point turn track layout we talked about? Yeah, the one that bypassed Plymouth.
SPEAKER_00Because of that routing, Plymouth Station was already practically empty. The sources note that back in 2018, long before anyone had heard of COVID, the Plymouth Station at Cordage Park recorded an average of only 21 daily passenger boardings.
SPEAKER_01Think about that. A multi-million dollar train station serving 21 people a day. Everyone else in town was just driving a few miles over to the Kingston station because it had direct faster service.
SPEAKER_00It makes complete sense from a commuter perspective.
SPEAKER_01Right. So facing massive budget deficits, the MBTA closed to the Plymouth station indefinitely in April 2021. The entire route was officially rebranded. It is now simply the Kingston line.
SPEAKER_00The trains simply stopped going to Plymouth. The branch went dormant again.
SPEAKER_01Yeah. But here's the fascinating twist that transit planners in the 1990s could never have foreseen.
SPEAKER_00A twist involving modern real estate law and suburban housing politics.
SPEAKER_01Yeah. So in 2021, the Massachusetts state legislature passed the MBTA Communities Act. it's a major piece of legislation designed to address the severe regional housing crisis right and we are just reporting on the sources here not taking a stance on the politics of this but the law mandates that towns with transit stations must change their local zoning laws to allow for more dense multifamily housing But here's the catch. The level of housing density a town is legally forced to zone for depends entirely on the type of transit service the time currently has.
And this is where the physical reality of the tracks meets local governance. Because the Plymouth train station is currently closed and not receiving active
SPEAKER_00service, the town is classified by the state only as an adjacent community rather than a full commuter rail community. Let's break down the math on why that distinction is so critical for them. Under the adjacent classification, Plymouth only has to zone for 2807 multifamily units.
SPEAKER_01Furthermore, because Plymouth is geographically massive, it's over 105 square miles, they can spread that required density out over a huge area, minimizing the impact on any single neighborhood. Right. But if the MBTA were to reopen that train station tomorrow, Plymouth instantly gets bumped to the stricter commuter rail category. Suddenly, their legal mandate jumps from 2,807 units to 4,210 units. And even more critically, a huge chunk of that new housing legally has to be clustered within a half-mile radius of the historic
cordage area right
SPEAKER_01where the station is. This raises an important question about the complex systemic incentives we create
SPEAKER_00with our infrastructure.
SPEAKER_01Right. You have a $560 million piece of state-funded transit infrastructure currently sitting dormant. but keeping it closed is now actually serving as an effective municipal strategy.
SPEAKER_00It's wild. It's a fascinating loophole. The town is simply plain by the rules as written by the state optimizing their zoning obligations based on the physical reality of a closed station.
SPEAKER_01Yeah. have a strong administrative incentive to support the ongoing closure because keeping it inactive allows the town to maintain much tighter local zoning control
SPEAKER_00and avoid a highly localized housing density mandate.
SPEAKER_01It's an incredible, almost absurd paradox. A closed rusting train station is currently more legally valuable to the town's broader zoning strategy than an active functioning one.
SPEAKER_00It really is.
SPEAKER_01So the line sits exactly as it is today. As of late 2025, it runs about 13 weekday trips, all terminating at that former gravel quarry in Kingston. Meanwhile, the actual tracks leading into Plymouth just gather rust and weeds.
SPEAKER_00Yeah. But transit advocates argue the story of the old colony line shouldn't end with a
SPEAKER_01zoning loophole. So what does this all mean? Where do we actually go from here?
SPEAKER_00Well, groups like Transit Matters have looked at this history and proposed a radical rethinking of the entire corridor.
SPEAKER_01Okay, what are they proposing? They suggest abandoning the isolated, car-dependent park-and-ride model at Kingston entirely.
SPEAKER_00They're proposal advocates for a regional rail model.
SPEAKER_01Oh, interesting.
SPEAKER_00Yeah, this would involve extending the line just one mile further south, taking it right back into the historic walkable Plymouth Center. Which is incredibly poetic because that would reconnect the dense heart of the town
SPEAKER_01directly to Boston, which is exactly the way the original Old Colony Railroad did it when they first laid the tracks in 1845. A full circle vision.
SPEAKER_00It is. A regional rail model would provide frequent, all-day, bi-directional service. It would transform the train from a strict 9 to 5 commuter tool for office workers into a genuine regional connector that people could use for errands, socializing, and reverse commuting. It's a bold vision for the future built directly on the foundations of the past.
SPEAKER_01And it leaves us with a lingering thought for you to chew on today.
SPEAKER_00Yeah.
SPEAKER_01The next time you are sitting on a train staring out the window, consider how the specific physical placement of steel rails laid down by laborers with pickaxes over 180 years ago still actively dictates modern multimillion dollar real estate development, suburban sprawl and incredibly complex housing laws in 2026.
SPEAKER_00It's so true. We like to think that we confidently shape our infrastructure to suit our modern needs.
SPEAKER_01But as that mundane commuter train rumbles over the tracks, remember this, ultimately, our infrastructure shapes us.
Contains AI Generated Content Every Thanksgiving morning at 9:00 a.m., viewers tuning into WCVB Channel 5 across eastern Massachusetts watch costumed colonists, military units, and hand-built historical floats roll past...
Contains AI generated contentFirst Glance * The $185,000 Controversy: On August 12, 2026, Plymouth County Commissioners voted 2-1 to hire former Brockton CFO Troy Clarkson under a guaranteed three-year Memorandum of...
Contains AI Generated Content To paddle down the North River today is to slip into a landscape of quiet, almost meditative peace. Known locally as a central corridor of Massachusetts’ scenic “Irish Riviera,” the river...
CONTAINS AI GENERATED CONTENTIf you have driven through the intersection of Grove Street and Route 53 in Norwell recently, you might have noticed a small, black camera mounted on a pole, topped by a sleek solar panel....
Contains AI Generated Content Off the rocky coast of Cohasset and Scituate, Massachusetts, stands a monument of granite and romance, rising directly from the treacherous waves of the Atlantic Ocean. It is Minot’s Ledge...