0:00Speaker: Welcome back to the Solarpunk Pro podcast. Speaker: I'm James, and today I want to build on something we talked Speaker: about a episode ago where we talked about Google's parent Speaker: company, alphabet, who dropped four billion dollars to buy a Speaker: company called Intersect Power. Speaker: I said at the time that this was Speaker: the signal that renewable energy Speaker: entrepreneurship wasn't a fringe Speaker: dream anymore. Speaker: It's becoming the center of Speaker: where serious money, serious Speaker: companies, and serious careers Speaker: are going to live for the next
0:30Speaker: thirty years. Speaker: Well, I've got another data Speaker: point for you, and this one is Speaker: maybe more exciting to me than Speaker: the Google because it's not Speaker: about some tech giant making a Speaker: big bet. Speaker: It's about a utility, one of the most traditional, slow moving Speaker: incumbent institutions in America business, doing Speaker: something that they've literally never done before. Speaker: National Grid, they've just Speaker: built a marketplace, not a Speaker: marketplace for selling you Speaker: electricity, a marketplace where Speaker: hundreds of companies, startups,
1:02Speaker: aggregators, technology Speaker: providers, battery operators Speaker: that can compete to provide grid Speaker: services using the distributed Speaker: energy resources that are Speaker: already sitting in your Speaker: neighborhood. Speaker: This is rooftop solar. Speaker: This is home batteries. Speaker: These are electric vehicles, smart thermostats, commercial Speaker: Hvac systems, all of it coordinated and dispatched like Speaker: a giant invisible power plant. Speaker: And they're doing it through a Speaker: company called Piclo, which
1:32Speaker: launched its US platform in Speaker: March of 2025 and was in all Speaker: fifty states. Speaker: Six months later, let me say that again, zero to fifty states Speaker: in six months. Speaker: So let's talk about what this Speaker: actually is, how it works and Speaker: why it matters not just for the Speaker: grid, but for the entire Speaker: trajectory of the distributed Speaker: energy economy.
2:03Speaker: So here's the problem National Grid is trying to solve. Speaker: They have twenty three locations across Massachusetts where the Speaker: grid is constrained. Speaker: Substations and circuits where peak demand is pushing up Speaker: against capacity limits. Speaker: In the old world, which is also, Speaker: let's be honest, the world we've Speaker: been living in for about a Speaker: century. Speaker: The answer to that problem is expensive, and it's slow. Speaker: You upgrade the substation, you Speaker: run new transmission lines, you Speaker: pour concrete, you hang copper,
2:34Speaker: and you bill ratepayers for the Speaker: privilege. Speaker: We're talking millions of dollars per location. Speaker: Years of construction timelines. Speaker: The new answer? Speaker: It looks completely different. Speaker: Instead of building Speaker: infrastructure to these Speaker: neighborhoods, you activate the Speaker: infrastructure. Speaker: In those neighborhoods, you call on the batteries that homeowners Speaker: have already installed. Speaker: You dim the lights in commercial Speaker: buildings for two hours on a hot Speaker: August afternoon. Speaker: You pause the EV charging in a
3:05Speaker: parking garage during the five Speaker: o'clock peak. Speaker: You aggregate all of that into Speaker: what effectively functions as a Speaker: power plant. Speaker: Except this one has no smokestacks, it has no fuel Speaker: costs, and was largely already paid for by the people using it. Speaker: These are called non wires alternatives in the utility Speaker: world, and for years utilities have run small clunky one off Speaker: programs to procure them. Speaker: The problem was that these programs were opaque. Speaker: They're hard to access and heavily siloed.
3:36Speaker: If you were a company with one Speaker: megawatt of battery storage, you Speaker: couldn't participate in a Speaker: program that required a three Speaker: megawatt bid. Speaker: If you operated in Speaker: Massachusetts, you'd have to Speaker: build an entirely separate Speaker: relationship with the utility in Speaker: Connecticut. Speaker: Every utility had its own Speaker: process, its own paperwork, its Speaker: own timeline. Speaker: What Piclo did is he took all of that fragmentation and fixed it Speaker: with a single platform. Speaker: They built the equivalent of an eBay for grid flexibility, a
4:08Speaker: place where utilities post their needs and the market responds. Speaker: Here's how it actually works. Speaker: National grid goes into the Speaker: platform and says, we have a Speaker: three megawatt problem at this Speaker: substation during summer Speaker: afternoons, four to eight hours Speaker: on certain days for the next Speaker: four years. Speaker: Companies registered on the platform can see that posting Speaker: and bid to solve it. Speaker: And here's the part I love. Speaker: They don't have to solve the whole thing. Speaker: A company with one megawatt can bid their one megawatt.
4:38Speaker: The platform helps National Grid combine that with another Speaker: provider's megawatt and another, and then stitched together a Speaker: portfolio that meets the need. Speaker: This is portfolio bidding, and it's a massive deal because it Speaker: opens the door to smaller players who previously couldn't Speaker: get a foot in. Speaker: And then, because utilities Speaker: don't just take your word for it Speaker: that your battery will show up Speaker: when needed. Speaker: There's a testing process before Speaker: anyone gets paid for real grid Speaker: events. Speaker: There are dispatch tests, practice runs.
5:11Speaker: National grid effectively auditions you before putting you Speaker: in the show. Speaker: The math behind this program is specific and worth knowing. Speaker: National grid is procuring roughly twenty five megawatts of Speaker: flexibility across those twenty three Massachusetts locations. Speaker: They've budgeted between thirty thousand and one million dollars Speaker: per location, depending on need. Speaker: The program runs from twenty Speaker: twenty six through twenty twenty Speaker: nine. Speaker: And critically, providers can
5:41Speaker: stack this revenue on top of Speaker: participation in other programs, Speaker: connected solutions, wholesale Speaker: energy markets, retail Speaker: incentives. Speaker: This isn't one bite of the apple. Speaker: It's an orchard. Speaker: Let me zoom out because what's happening in Massachusetts is Speaker: not an isolated experiment. Speaker: It's the pilot for something much, much larger. Speaker: Piclo launched in March twenty Speaker: twenty five, and by September, Speaker: they had registered one gigawatt Speaker: of distributed energy resources
6:11Speaker: across all fifty states one Speaker: hundred plus aggregators, four Speaker: hundred plus programs, three Speaker: hundred and fifty utility Speaker: buyers. Speaker: These are not projections. Speaker: These are actual numbers from six months of operation. Speaker: And they're not alone. Speaker: The virtual power plant market, the VPP market, which is the Speaker: broader category, this all belongs to hit 37 and Half Speaker: gigawatts of enrolled capacity in North America in 2025, Speaker: growing at over 25% annually.
6:42Speaker: Wood Mackenzie, which is about Speaker: as authoritative as source as Speaker: exists on this stuff, tracks Speaker: over two dozen established Speaker: companies operating in this Speaker: space and sees no sign of growth Speaker: curve flattening. Speaker: The company is making this Speaker: ecosystem function span a Speaker: remarkable range. Speaker: You've got companies like Leap, Speaker: which partnered with National Speaker: Grid directly to help their own Speaker: Massachusetts office buildings Speaker: participate in the ConnectedSolutions program. Speaker: Essentially, National Speaker: Grid using VPP technology to make their own facilities into
7:17Speaker: grid assets. You've got Speaker: Voltus, which operates across all nine North American wholesale Speaker: markets and represents the largest portfolio of VPP Speaker: programs of any operator in the country. You've got Speaker: Virtual Peaker, a Louisville, Kentucky, company building the Speaker: cloud software that lets utilities manage all these distributed devices Speaker: smart thermostats, water heaters, batteries, EV Speaker: chargers as a unified, controllable resource. You've got Speaker: Enel X, the demand response giant with nearly five gigawatts under
7:49Speaker: management in North America alone, which has been running Speaker: VPP in Massachusetts and the broader region for Speaker: years. And then Speaker: there's Sonnen, the German battery Speaker: company, with a program called Speaker: Sonnen Connect, specifically for Speaker: homeowners in National Grid Speaker: and Eversource Service territories Speaker: in Massachusetts. They Speaker: are Speaker: paying battery owners six hundred Speaker: to nine hundred dollars per Speaker: year, guaranteed just to Speaker: let Sonnen manage their batteries participation Speaker: in these grid programs. Speaker: That's right. Speaker: People are Speaker: getting paid to have home batteries, help balance the grid and
8:23Speaker: provide them backup power when the grid goes down. What I Speaker: want you to understand is that the structure of what's being built Speaker: here? The Piclo Speaker: platform is the marketplace infrastructure, the digital layer Speaker: that connects buyers and sellers. The aggregators Speaker: like Voltus, Leap and Enel X are the participants who Speaker: pull together these distributed resources and bid into Speaker: that marketplace. The hardware Speaker: companies Tesla, Sonnen, carrier, Speaker: Resideo they make the Speaker: physical devices that actually respond
8:54Speaker: to dispatch signals. The Speaker: utilities, Speaker: like National Grid sit at the top there, right in the Speaker: checks, and they're setting the need. And underneath Speaker: all of it, the Massachusetts legislature and the State Speaker: Public Utilities Commission created the legal and regulatory framework Speaker: that makes it all possible. This is Speaker: not a simple system. It is Speaker: not being run by a handful of incumbents. It is Speaker: a layered, competitive, technology driven ecosystem that did not Speaker: meaningfully exist five years ago and is now scaling to every state
9:28Speaker: in the country. Speaker: Here's why this matters for the mission of this podcast. Speaker: I talk a lot about distributed Speaker: energy economy as an act of Speaker: economic rebellion. Speaker: Not because I think that's clever framing, but because it's Speaker: literally what is happening. Speaker: Every kilowatt hour that gets delivered through a battery in Speaker: someone's basement or a smart thermostat in a commercial Speaker: building is a kilowatt hour.
9:59Speaker: That doesn't have to come from a centralized fossil fuel plant. Speaker: Every dollar that National Grid Speaker: pays to a VPP aggregator instead Speaker: of to a substation contractor is Speaker: a dollar that flows into new Speaker: distributed competitive market Speaker: rather than into the incumbent Speaker: infrastructure. Speaker: And the reason this is accelerating right now. Speaker: The reason utilities are Speaker: suddenly willing to do something Speaker: as radical as building an open Speaker: marketplace is that the
10:30Speaker: economics have become Speaker: undeniable. Speaker: The Department of Energy looked at this, and they found that a Speaker: 400 MW VPP costs about forty three dollars per kilowatt year. Speaker: A gas power plant doing the same job costs ninety nine dollars. Speaker: The grid doesn't run on an Speaker: ideology when distributed energy Speaker: resources are more than twice as Speaker: cost effective as building new Speaker: gas capacity. Speaker: The rational actor builds the VPP every time.
11:00Speaker: During the June 2025 heat wave in New England. Speaker: And I want you to picture this the grid was under serious Speaker: stress, and Sunrun, the residential solar company, Speaker: dispatched 340 MW from virtual power plants across New York, Speaker: Massachusetts, Rhode Island, California and Puerto Rico in a Speaker: single evening, three hundred and forty megawatts from Speaker: people's rooftops and batteries. Speaker: That's a power plant, a power
11:31Speaker: plant that was distributed Speaker: across hundreds of thousands of Speaker: homes that didn't burn a single Speaker: BTU of gas that paid its owners Speaker: for participating. Speaker: This is the energy transition happening in real time, not a Speaker: rendering, a climate report, a real dispatch event on a hot Speaker: Tuesday in June. Speaker: So here's where I want to land with you today. Speaker: We are watching the infrastructure of distributed Speaker: energy being built right now, not in some future decade, not
12:01Speaker: pending favorable legislation. Speaker: There is a request for proposals Speaker: sitting on the Piclo platform Speaker: with a February 13th deadline, Speaker: where National Grid is asking Speaker: companies to bid to solve grid Speaker: constraints at 20+ locations Speaker: across Massachusetts. Speaker: That's a real procurement. Speaker: That's real money. Speaker: And friends, that is real opportunity and the ecosystem Speaker: required to respond to that procurement, the software Speaker: platforms, the aggregators, the hardware companies, the Speaker: consultants, the program managers, the grid engineers
12:34Speaker: they are hiring the people who will run it. Speaker: If any part of today's episode got your attention, if you heard Speaker: the words marketplace and distributed and non wires Speaker: alternative and thought, I want to be part of that. Speaker: I want to talk to you. Speaker: I do a free thirty minute industry analysis call where I Speaker: map out the specific companies, the programs and opportunities Speaker: in your region. Speaker: Because here's the thing. Speaker: The National Grid program started in Massachusetts. Speaker: Piccolo is in fifty states.
13:05Speaker: The map is everywhere. Speaker: Remember, friends, we're here for a good time. Speaker: Not a long time. Speaker: So let's go get you plugged in.