0:00Speaker: Welcome back to the SolarpunkPro podcast. Speaker: As I have shared on this channel Speaker: many times, I have had the joy Speaker: and luck of being able to work Speaker: in the electrify everything and Speaker: power it with renewable energy Speaker: industry for just about two Speaker: decades. Speaker: Along the way, I've had the Speaker: privilege of wearing many, many Speaker: hats, sometimes at the same Speaker: time. Speaker: One of our projects, I was able Speaker: to go from sales and design to Speaker: project management. Speaker: The lens in which I viewed maybe Speaker: the hardest project I've ever Speaker: worked on, changed dramatically Speaker: as I stepped from one hat into
0:30Speaker: the next. Speaker: This project was a solar carport over a surface parking lot. Speaker: I built it on a Helioscope. Speaker: It's the design software we use to model solar production, and Speaker: the numbers look great. Speaker: I was able to draw out these beautiful rectangles that made Speaker: sense with the known span of our trusted carport manufacturer. Speaker: Had a good angle, good sun Speaker: exposure, straight forward Speaker: structure. Speaker: We did this initial site visit Speaker: and nothing jumped out from the Speaker: electrical. Speaker: Jesus, is this project going to be a clean one? Speaker: It's construction.
1:00Speaker: It is never going to be clean and straightforward. Speaker: By the time we finish this project, we had hit underground Speaker: utility conflicts, not actual hit underground utilities. Speaker: We had geotechnical surprises Speaker: that tripled our foundation Speaker: depth requirements. Speaker: A downtown Boston parking stand off that I may never get Speaker: entirely over a global pandemic, and construction crews working Speaker: directly outside major law enforcement headquarters during Speaker: some of the most intense public demonstrations this country had Speaker: seen in decades.
1:31Speaker: But we finished on time. Speaker: We finished on budget, and I Speaker: learned more about what this job Speaker: actually requires on that single Speaker: project than I had in years of Speaker: routine installs. Speaker: This is what solar work actually Speaker: looks like when the puzzle gets Speaker: complicated. Speaker: And if you are thinking about building a career in this Speaker: industry, I want you to understand both what goes wrong Speaker: and what it takes to get it right and why you will never, Speaker: ever, ever, ever get bored working in this industry.
2:07Speaker: The project was a solar carport Speaker: for a large municipal law Speaker: enforcement complex in a major Speaker: northeastern city. Speaker: We were brought in through a general contractor who was doing Speaker: a package of significant energy efficiency upgrades across a Speaker: number of municipal buildings. Speaker: Our piece was the parking lot carport. Speaker: The design phase. Speaker: It went smoothly. Speaker: The site visit went smoothly, and then we did. Speaker: Underground utility locate the site. Speaker: It had drawings of where the electrical was. Speaker: So this was just a triple check that those locations were right.
2:38Speaker: It's a corner. Speaker: Honestly, we could have cut. Speaker: The drawings were not that old, Speaker: but it's relatively inexpensive Speaker: compared to how much it costs if Speaker: and when you actually hit Speaker: something. Speaker: Well well well. Speaker: We found the main electrical Speaker: service line running directly Speaker: through the footprint of the Speaker: carport. Speaker: Specifically, it came right Speaker: where approximately half of our Speaker: structural posts were going to Speaker: go. Speaker: This is the moment in a project where you have two choices. Speaker: You can panic or you can problem solve.
3:09Speaker: We. Problem solved. Speaker: The redesign extended one of the carport tables, making it longer Speaker: to bridge over the utility corridor, which then pushed the Speaker: structure out over the entrance to the parking lot. Speaker: New clearance calculations. Speaker: New structural loads. Speaker: New drawings. Speaker: Back to the city for approval. Speaker: We confirmed the height clearance was going to work for Speaker: vehicles entering the lot. Speaker: We had a workable solution. Speaker: New design locked in. Speaker: Time to move on. Speaker: This is the first thing I want you to understand about real Speaker: solar project work. Speaker: The design you start with it is almost never the design you
3:42Speaker: finish with the ability to redesign quickly, communicate Speaker: changes clearly, and keep all the stakeholders aligned while Speaker: you do it. Speaker: That. Speaker: That's the job. Speaker: With the electrical conflict Speaker: resolved and the redesign Speaker: approved, we moved to Speaker: geotechnical investigation. Speaker: These are drilling tests. Speaker: They drill borings to understand Speaker: what the soil conditions were, Speaker: so that we could spec the right Speaker: foundation depth for the carport Speaker: posts. Speaker: Standard carport piling depth is around eight feet. Speaker: That is what we budgeted.
4:13Speaker: That's what the design assumed. Speaker: What the geotechnical report Speaker: came back with was eighteen Speaker: feet. Speaker: Here's the thing about Boston Speaker: that maybe most people don't Speaker: know. Speaker: I knew it conceptually, and Speaker: maybe I should have guessed this Speaker: was going to be an issue, Speaker: because significant portions of Speaker: the city of Boston are built on Speaker: fill loose debris, rubble, and Speaker: landfill that was used over Speaker: centuries to expand the original Speaker: landmass into the harbor and Speaker: surrounding marshland. Speaker: The back Bay neighborhood is Speaker: literally filled in large parts
4:44Speaker: of downtown. Speaker: Same story. Speaker: The ground under a parking lot Speaker: in Boston can be very different Speaker: animal than the ground under a Speaker: parking lot in Ohio, Eighteen Speaker: foot pilings instead of pilings Speaker: means a completely different Speaker: drilling rig. Speaker: It means significantly more concrete and steel. Speaker: It means more time on site. Speaker: It means a line item in the budget that wasn't there before. Speaker: It also means you cannot fabricate your structural Speaker: columns in advance, because you do not know the exact finished Speaker: depth until you have drilled each hole and confirmed what you
5:15Speaker: are dealing with. Speaker: So we're fabricating columns on Speaker: site in real time in a tight Speaker: urban environment as each boring Speaker: was completed. Speaker: Which brings us to the parking lot. Speaker: To install an eighteen foot deep foundation system with a large Speaker: drilling rig in a downtown parking lot, you need the Speaker: parking lot to be empty. Speaker: This is not a negotiable construction requirement. Speaker: A multi-ton drill rig. Speaker: It needs clearance, staging space, and the ability to move Speaker: around the site safely.
5:46Speaker: The problem was that this was Speaker: the parking lot for a major law Speaker: enforcement complex in downtown Speaker: Boston in the summer when Speaker: parking in downtown Boston on a Speaker: good day is already a contact Speaker: sport. Speaker: We coordinated with the facilities team well in advance. Speaker: Notices went out. Speaker: A nearby college was gracious enough to rent us a portion of Speaker: their parking lot about a block and a half away. Speaker: Not ideal for the people working Speaker: at the complex, but it's Speaker: workable. Speaker: It's a block and a half. Speaker: We had a plan, and then the day came to clear the lot, and a Speaker: meaningful number of vehicles simply did not move.
6:19Speaker: We assumed the police would follow the rules. Speaker: Well, we were wrong about that too. Speaker: We ended up having to install Speaker: construction fencing to Speaker: physically prevent vehicles from Speaker: re-entering the work zone and Speaker: expense that was in the original Speaker: budget, but was to keep the Speaker: public out. Speaker: It had not occurred to any of us that we would need to fence out Speaker: the people whose job it is to enforce parking regulations. Speaker: The gigantic drilling rig. Speaker: It had to navigate a tight urban Speaker: footprint, working around parked
6:49Speaker: vehicles on adjacent streets, Speaker: utility access points, and the Speaker: general chaos of a busy downtown Speaker: location. Speaker: The column fabrication was Speaker: happening on site in real time, Speaker: as I mentioned, the general Speaker: contractor. Speaker: They were also coordinating Speaker: multiple simultaneous scopes of Speaker: work under the broader municipal Speaker: project. Speaker: The logistics puzzle was dense. Speaker: And then there was the context. Speaker: It was the summer of 2020. Speaker: George Floyd had been killed in May. Speaker: The demonstrations that followed Speaker: were happening in cities across Speaker: the country, and Boston was no
7:20Speaker: exception. Speaker: There were significant public protests occurring in the Speaker: immediate vicinity of our job site outside the very building Speaker: we were working on. Speaker: And I want to be honest about what that was like, because I Speaker: think it matters for anyone considering this kind of work. Speaker: Our crew, they showed up every Speaker: day and they did the job, but Speaker: the environment, it was charged Speaker: in a way that's hard to Speaker: describe. Speaker: if you weren't there. Speaker: Your running construction equipment. Speaker: You're managing a complicated install, coordinating with a Speaker: building that is simultaneously the center of significant public
7:53Speaker: attention and tension. Speaker: The human reality of what was Speaker: happening in the country was Speaker: present on that job site every Speaker: single day. Speaker: You figure out how to hold both things the work and the world Speaker: it's happening in. Speaker: That's part of the job, too. Speaker: The project. Speaker: It was completed on time. Speaker: It was completed on budget. Speaker: The carport. Speaker: It is generating clean Speaker: electricity over a parking lot Speaker: in the middle of a major Speaker: American city. Speaker: And it has been doing so ever since.
8:24Speaker: But I want you to understand Speaker: what on time and on budget Speaker: actually required on this Speaker: particular job. Speaker: It took a full redesign after the utility locate with new Speaker: structural calculations and revised municipal approvals in Speaker: eighteen foot foundation system instead of an eight foot one Speaker: fabricated on site in real time as conditions were confirmed. Speaker: A downtown Boston parking logistics operation involving a Speaker: college campus, construction, fencing and a level of Speaker: negotiation with stakeholders that would have felt at home in Speaker: a labor dispute. Speaker: A crew working professionally and safely in one of the most
8:58Speaker: socially and politically charged environments of the decade. Speaker: None of that appeared on the original project scope. Speaker: All of it had to be solved. Speaker: The tool that made the project look oh so simple. Speaker: Helioscope was right about the solar production. Speaker: It had nothing to say about what Speaker: was buried underground, what the Speaker: soil was made of, where the Speaker: parking attendants were going to Speaker: leave their cars, or what was Speaker: happening in the streets Speaker: outside. Speaker: That gap between what the model shows and what the site requires
9:29Speaker: is where experience lives. Speaker: It's where judgment lives. Speaker: And it's the part of this work Speaker: that no software will ever Speaker: replace. Speaker: I tell you this story not to Speaker: impress you with the Speaker: complications. Speaker: Every experienced solar Speaker: professional has their own war Speaker: stories and versions of this Speaker: story. Speaker: But to give you an accurate Speaker: picture of what this work Speaker: actually demands, it demands Speaker: technical knowledge. Speaker: It demands understanding soil conditions and foundations, Speaker: engineering and electrical systems, and structural loads.
10:01Speaker: The master class, the Solar punk Pro master class. Speaker: It gives you the foundational literacy to understand why these Speaker: problems exist and what the solution categories look like. Speaker: It demands project management, Speaker: the ability to hold multiple Speaker: moving pieces, communicate Speaker: clearly when plans change, keep Speaker: stakeholders from panicking, and Speaker: find creative solutions inside Speaker: real constraints. Speaker: If you've managed anything Speaker: complex in your current career, Speaker: that skill, it transfers Speaker: directly. Speaker: It demands judgment.
10:31Speaker: Knowing when to escalate. Speaker: When to problem solve quietly, Speaker: when to push back on a scope Speaker: change, and when to went to Speaker: absorb it. Speaker: That comes with experience. Speaker: But it starts with understand the landscape well enough to Speaker: recognize what kind of problem you're actually looking at. Speaker: And occasionally it demands the ability to work well in Speaker: difficult human circumstances. Speaker: The world. Speaker: It does not pause for construction schedules. Speaker: This project is not the hardest thing I've done in two decades Speaker: of solo work, but it is a great representation of what the job
11:03Speaker: looks like when it asks something of you beyond what the Speaker: design software predicted. Speaker: If you like this episode, stay tuned for future episodes where Speaker: I tackle other war stories. Speaker: Next up, it is about a one megawatt commercial install Speaker: where the real complexity. Speaker: It wasn't on the roof at all. Speaker: It was in three months of Speaker: interconnection negotiations Speaker: with a municipal utility that Speaker: had never done anything like Speaker: this before. Speaker: A multinational client whose Speaker: European headquarters had made
11:34Speaker: renewable energy non-negotiable, Speaker: and a lease structure that Speaker: needed new language written from Speaker: scratch. Speaker: That one. Speaker: That one's a different kind of puzzle. Speaker: And if today's episode gave you a real sense of what this work Speaker: looks like, the kind of thinking it requires, the variety of Speaker: problems it throws at you, and why people who have built Speaker: careers solving complex problems in other industries are Speaker: generally well suited for it. Speaker: While the Solarpunk Pro Masterclass is your next step, Speaker: it is built to give you the technical foundation to
12:06Speaker: understand the landscape and the industry context, to position Speaker: yourself credibly within it without having to go back to Speaker: school without starting over. Speaker: The link for that class is in the show notes. Speaker: Or if you would rather talk Speaker: about your specific situation Speaker: first, go ahead and book a free Speaker: 30-minute industry analysis call Speaker: with me and we'll map it Speaker: together. Speaker: I'm James Manzer. Speaker: This has been the Solarpunkpro Speaker: podcast and I will see you next Speaker: week.