October 5, 2026 Rockingham County Board of Commissioners Meeting AGENDA 1. Meeting Called to Order by Chairman Barrow 2. Invocation 3. Pledge of Allegiance 4. Request approval for the October 5, 2026 Agenda. 5. Consent Agenda Consent items as follows will be adopted with a single motion, second and vote, unless a request for removal from the Consent Agenda is heard from a Commissioner A. Dr. Charles Perkins, Superintendent, Mr. Jason Hyler, Chief Operations Officer, and Annie Ellis, CFO Requests approval to purchase one new activity bus from Carolina Thomas at a cost of $171,366. The new bus will replace a disabled activity bus being removed from the district's fleet. The purchase quote is included in the supporting documentation. Rockingham County Schools has accumulated sufficient restricted funds through activity bus usage charges to fund the replacement purchase. The district requests approval to transfer $172,000 from Fund 08 (Other Restricted Funds) to Fund 04 (Capital Outlay Fund) to facilitate the purchase. No County funds are required. B. Lieutenant Kristy Disher 1. Request approval to increase the Sheriff's Office budget $2,500.00 from the Reidsville Area Foundation donation. The donation is to help with Project LifeSaver and the funds will be used to help purchase the following equipment: transmitters, batteries, wristbands, and tracking equipment. Project LIfeSaver helps Deputies locate individuals who have wandered off due to cognitive-related conditions. 2. Request approval to increase the Sheriff's Donation budget line $100.00, and increase $100.00 Expenditures in Sheriff's General Supplies, reference to donation received from Jennifer August. Jennifer sent a check in remembrance of her Father passing away in August 2026. She is requesting it to be used as a lunch for the Criminal Investigative Division. 3. Request approval to increase the Sheriff's Office budget $6,000 from the Reidsville Area Foundation donation. The donation is to help with Project LifeSaver and the funds will be used to help purchase the following equipment: transmitters, batteries, wristbands, and tracking equipment. Project LifeSaver helps Deputies locate individuals who have wandered off due to cognitive-related conditions. C. Caleb Tilley, Engineering and Public Utilities Director 1. Request Board approval to addend the Rockingham County Water and Sewer Policy (Effective 4/30/2024). Request pursuant to North Carolina General Statute Section 143-355.4 Water System Efficiency, for any home constructed within a new development or subdivision and connected to Rockingham County public water system, the builder or developer shall install a separate irrigation meter when the home is equipped with a permanent irrigation system. 2. Request approval of up to 4,800 GPD of water capacity, from US-158 System, for Bethany's Heritage Subdivision of Witty Rd. This capacity request is for the complete development of 16 single family homes. Rules from the Rockingham County Water and Sewer Policy shall apply to this project. *BOCC Obligated Capacity: 130,000 GPD Requested Capacity: 4,800 GPD D. Trey Wright, Health Director Request approval for the appointment of Jessica Easter to the Local Child Fatality Prevention Team. E. Justin Thacker, Deputy Finance Director, 1. Request consideration to close out the project budgets for CDBG grant funds associated with the Albaad project in the amount of $1,100,000 and the Southern Finishing project in the amount of $440,000, for a combined total of $1,540,000. 2. Request consideration to close out the project budget for CDBG grant funds associated with the Purina project in the amount of $2,000,000. Purina decided not to pursue the $2 million dollar grant. 3. Request approval to appropriate the remaining fund balance of the Yanceyville Road Fire District as of June 30, 2026 to the Yanceyville Road Fire Department. The remaining fund balance as of June 30, 2026 is $18,939.30. 4. Request consideration to update the capitalization threshold from $2,500 to $10,000 for all types of County assets, including GASB 87 Leases and GASB 96 SBITAs effective July 1, 2026. Seeking approval on the memo to increase the capitalization threshold to $10,000 for all County assets purchased and updating the resolution for Leases to $10,000 and SBITAs to $10,000. Sections of the Finance policy impacted by this change in accounting estimate are 5-7, 6-1, 6-2, and 6-2.01. The budget amendment for items being impacted since July 1, 2026 is attached for your consideration. F. Todd Hurst, Tax Administrator Request the approval of all refunds from September 9, 2026 thru September 23, 2026. G. Susan Washburn, Clerk to the Board of Commissioners Request approval for the Commissioners Regular Meeting minutes for September 21, 2026. H. Clyde B. Albright, County Attorney Request consideration to approve the Resolution adopting the revised North Carolina Local Government Record Retention and Disposition Schedule from October 21, 2021. 6. Public Comment 7. Public Hearing A. Ben Curry, Community Development Manager Request approval of a road name change request for a private road from Newsome Road to Knockabout Lane. Petitioner: Carolyn T. Huskins, Tax PIN: 7958-00-06-1269 located at 130 & 220 Newsome Road, Stoneville, NC 27048 B. Adam Barr, Senior Planner Case 2026-18 TA: To consider a Text Amendment to the Unified Development Ordinance to establish specific development standards for the use of data processing facilities. 8. Presentation A. Lance Metzler, County Manager Request consideration to approve updates to the Rockingham County Ordinance Prohibiting Unreasonably Loud, Disturbing, and Unnecessary Noises. 9. New Business 10. Commissioner Comments 11. Adjourn ###
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Good evening.
Speaker 2I'd like to call to order this regularly scheduled Commissioner's Board meeting for October the 5th. We will begin with an invocation from Pastor Douglas Bray from Rock of Ages Baptist Church in Reesville, and the Pledge of Allegiance will be led by Sheriff Billy Parker.
Speaker 3If you please stand if you're able.
Speaker 4My Heavenly Father, I come to you in the name of our Lord and Savior, Jesus Christ. And I ask you, Lord, as your word instructs us, Lord, to pray for all of our leaders and those in authority. I pray for them. I pray for each and every member of the commissioner. I pray for our sheriff's department. and the sheriff, and
Speaker 4each and every law enforcement officer. We thank you for each and every branch. God and I pray that you would watch over, guide, help, lead, and direct them in a way that would be according to your word and pleasing to you. Lord, we thank you, Lord, for this county. We thank you, Lord, for our country. And we ask you, Lord, to help all of our leaders, the president, lead, guide, direct. Lord,
Speaker 4I pray, God, that you would help us. Help us, Lord, to look to you. Lord, to lean on you. Lord, we cannot lead anyone correctly if we're not wholeheartedly trusting and following you. And, Lord, I pray, Lord, that we would do that. each and every day. And Lord, we love you and thank you. In Jesus' name, amen.
Speaker 5I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation, under God, indivisible, with liberty and justice for all.
Speaker 3For being here this evening.
Speaker 2We work from a prepared agenda, which has been out for a couple of weeks. Gentlemen, you've all had a chance to look over this. Do we have any amendments, or do we have a motion to approve our agenda for this evening?
Speaker 6Mr.
Speaker 7Chair, I make a motion we approve the agenda as presented.
Speaker 2Motion by Commissioner Hall, second by Commissioner Richardson.
Speaker 3All in favor?
Speaker 8Aye.
Speaker 2We also have our consent agenda. Items on the consent agenda are typically considered to be non-controversial in nature. If you have any questions about anything on the consent agenda, please reach out to the county manager's office. Gentlemen, do we have any amendments we need to make or do we have a motion?
Speaker 1Motion.
Speaker 2Motion by Commissioner Richland. Second by Commissioner Callum. All in favor?
Speaker 3Aye. Motion carries.
Speaker 2That takes us to item six, which is our Public comment. If we can please have the rules read for public comment.
Speaker 9The public comment period shall be for the purpose of allowing members of the public to present any matter pertaining to county business or items on the Board of Commissioners agenda. Remarks shall be addressed directly to the Board of Commissioners and not to the staff, audience, or media. The chairperson shall and did open the public comment period. Any speaker who wishes to speak shall approach the podium and not speak from his or her seat. Each speaker should clearly state his or her name and physical address when he or she approaches the podium. Each citizen shall be allotted three minutes. Citizens will be allowed to yield their time
Speaker 9on a specific topic by utilizing one more attendee's time. This will allow no more than six minutes. The total amount of time allotted for the public comment period is 30 minutes. Your time will be displayed on the monitor in front of you. The clock will start with three minutes unless yielded time to six minutes. You will hear a beep at one minute to alert you to wrap up your comments. If you are to yield your time or time is yielded to you, then please let the chairman know in advance. Speakers will not be allowed to campaign for public office, promote private business ventures, or use language of a personal nature which insults or demeans any
Speaker 9person or which, when directed at a public official, is not related to his or her official duties. The board of commissioners may accept written comments and oral statements. Written statements can be delivered to the county manager's office.
Speaker 1Mr.
Speaker 3Chair. Thank you, Mr. Mesler. First, we have Mrs. Danielle Smith. Mrs.
Speaker 2Smith, I see an arrow from somebody else's name pointing to your name. Is somebody yielding time?
Speaker 10No, it's below me. Someone's going to yield for Travis.
Speaker 11Yes, ma'am.
Speaker 2Whenever you're ready, if you could give your name and address.
Speaker 1Okay.
Speaker 10My name is Danielle Smith, and I reside at 110 Hogan Drive.
Speaker 3Good evening.
Speaker 10Tonight I am handing you petitions representing approximately 3,000 citizens. For perspective, Madison has 2,100 residents, and approximately 6,000 people live within the incorporated limits of our three western towns. These petitions contain nearly 900 more names than the population of Madison and roughly half the incorporated population of the incorporated Western Rockingham County. 3,000 people is not a handful of unhappy neighbors. 3,000 people is a constituency. And they are asking how a project of this magnitude has gotten
Speaker 10this far while serious questions remain unanswered. Those aren't details you figure out later. Those are questions you answer before you permanently change a community. Last week, one of my arguments, job creation, was dismissed from this microphone as hearsay after my time expired. A remark that was unprofessional and most importantly, inaccurate. So tonight, I want to address another argument we have heard from this board, property rights. So as to not be accused of hearsay, the quoted response from this board is, how can I tell Charles Dalton that he can't develop
Speaker 10his land? Please allow me to answer.
Speaker 3Okay.
Speaker 10And every surrounding homeowner would expect this board to protect their rights, too, because property rights exist on both sides of the property line. A massive rezoning is not a property right. It is a request, and the current owner and potential developer's property right is to develop it as it is currently zoned. Except here now, we're not protecting a golf course. We're talking about irreplaceable farmland. Once you pave it, subdivide it, and cover it, you cannot put it back. Some mistakes can be corrected, but this one's going to get paved over. And that brings me to October 19th. This vote will become part of your legacy.
Speaker 10Years from now, people may not remember every meeting you attended or every routine item you approved. But they will remember who voted for a decision that permanently changed their community. If 1,100 homes are built here despite this level of opposition, you might as well add to the plan a Mount Rushmore at the entrance with the faces of everyone who voted for it. That isn't a threat, it's accountability, and it's also your legacy. 3,000 citizens have asked for the studies and research supporting this rezoning through calls, emails, letters, face-to-face conversations, and public record requests.
Speaker 3They are still waiting.
Speaker 10So please don't mistake politeness for acceptance. People can be respectful and angry. Quiet does not mean supportive. The same faces may keep appearing at these meetings, but thousands of people stand firmly behind them. Tonight, those people have put their names on the record. You can't say you didn't know and you can't say you didn't hear us. And on the 19th, the record will show what this board did with those 3,000 voices. Please do the responsible thing and protect rural Western Rockingham County.
Speaker 3Thank you.
Speaker 2I have Travis Heffinger and also Austin Tucker. You don't both have to come up if somebody just wants to let me know.
Speaker 3Who's yielding to who.
Speaker 12Austin's going to yield his time to me.
Speaker 3Okay. Mr. Heffinger, if you'd please come up and state your name and address.
Speaker 12Do you guys get that map?
Speaker 3Yes, sir.
Speaker 1Okay.
Speaker 3Is that from you? Yes, sir.
Speaker 12My name's Travis Heffinger, and I reside at 150 Langerth Road in Madison. The map that you guys have shows the Voluntary Agriculture District and its properties surrounding the proposed development. The map tells you something that looking at the Dalton property by itself does not. This development is not being proposed in the middle of an established suburban area. It is being proposed in the middle of an established agricultural landscape. I want to read you the words of Rockham County's own Voluntary Farmland Preservation Ordinance. It's section 420503, and it
Speaker 12says the purpose. That ordinance is to promote agricultural values and the general welfare of the county and to increase protection from non-farm development and other negative impacts on properly managed farms. Our county's own VAD encourages the preservation and protection of farmland from non-farm development. No one is claiming that being beside a VAD property does not legally prohibit development, but here
Speaker 12is the question. If all these VAD properties surround this track carry no meaningful weight when the county decides whether to put approximately 1,100 houses in the middle of them, then what exactly does this farmland preservation policy protect? Now let's talk about money because there is another assumption that needs to be challenged. That converting farmland to residential development is automatically financially better for the county?
Speaker 3North Carolina's cost of community.
Speaker 12Services study showed why this assumption is wrong. These studies do not simply ask how much tax revenue land generates. They asked the more important question. After you collect that revenue, how much does it cost the government to serve that land use? The North Carolina Department of Agriculture currently reports cost of community services studies from 20 North Carolina counties. In every single one of those 20 counties, agricultural land
Speaker 12generated more local tax revenue than it consumed in public services. Across these studies, Agriculture land required approximately 53 cents in public services for every dollar revenue it generated.
Speaker 3That's not a deficit.
Speaker 12It's a net fiscal contribution. And one North Carolina cost of community services study made the difference especially clear. For every dollar of revenue generated by residential land, the county spent $ 1. 18 providing services. For agriculture and forestry land, question.
Speaker 11Mark, 35 cents.
Speaker 12Residential land uses in that study produced a deficit of approximately 17.75 million. Agriculture and forestry land produced a surplus of approximately 2.23 million, a 17.75 million residential deficit compared to a 2.23 million agriculture and forestry surplus. Those are not Rockham County's numbers, but 20 North Carolina counties have now been studied, and agriculture land was a net provider
Speaker 12of local tax dollars in all 20. When somebody says, think about the tax revenue from 1,100 houses, my response is, now think about the bill that comes with them. Schools, fire, EMS, law enforcement, roads, stormwater, infrastructure, recreation, and thousands of additional vehicle trips. Farmland generates revenue too. As data shows, that can generate the revenue while requiring very little in public services. So farmland is not just something nice to look at.
Speaker 12Farm can be a physical asset to the county government, and this brings me to consistency. If you take a look at the map, this is your surrounding land use. This is your existing agricultural character. This is the context in which this rezoning has to be considered. The 2040 land use plan anticipates growth along Highway 220, but it does not mean that we need to put up housing developments all over the county because a developer proposes this. Growth policy does not erase farmland preservation policy. Infrastructure policy
Speaker 12does not erase compatibility. This is not consistency. So I believe there are two questions the board needs to answer. How is placing approximately 1,100 houses in the middle of an agricultural landscape consistent with an ordinance whose stated purpose is to increase protection from non-farm development and its negative impact on farms? And second, how is converting working agricultural land into intensive residential development automatically physically responsible when North Carolina's own cost of community service studies consistently show agriculture
Speaker 12and land producing a physical surplus? Those questions deserve real answers, not simply we need housing, not simply there's water and sewer, and not simply growth is coming. Infrastructure tells you where developments can happen. Planning determines where it should happen. Rockham County has already told us in its own ordinance that agricultural growth is worth protecting. This map shows you the agricultural landscape that exists here today. The physical studies show you that farmland is not a financial burden. Now comes
Speaker 12the part where these policies should be tested because a farmland preservation policy that carries no weight when farmland actually faces development pressure isn't preservation. A policy only means something when it affects a decision.
Speaker 3Thank you very much, Mr. Hepburn. Thank you. We have Charles Stewart. Mr.
Speaker 2Stewart, I see the same address on here twice. Is somebody yielding time?
Speaker 3I'm going to yield my time to my wife, Sarah. Yes, sir. Ms. Sarah Stewart, if you'd come up, please. And if you could just state your name and address.
Speaker 14My name is Stewart.
Speaker 15My address is 251 Cedar Drive. I have lived and farmed in Rockingham County with my family for five generations. We own farms in the Huntsville-Ellisburg community, the Deep Springs community, and we lease others in the county. I have four children who are educated, college-educated, master's degrees, who all chose to come back to Rockingham County and work in various capacities. Can't say kids go to college, leave the county, and don't come back. Mine came back. They're producers. I'm here to address the rezoning policy just like everybody else. Nobody
Speaker 15here is opposed to growth. We want our county to thrive. I want it to thrive for my grandchildren. But growth has to make sense. It has to match the reality of our land and our infrastructure. Adding thousands of new residents into narrow lane roads like Ellisboro Road is a disaster waiting to happen. Not just for the commuters, but for the agriculture heartbeat of our community. High density housing and a residential agriculture zone violates the county's UDO's intent to preserve our rural heritage agriculture and protect agriculture operations
Speaker 15from incompatible neighboring uses. Farming's not a hobby. It's a working, breathing industry in Rockingham County. Farm equipment doesn't move like standard passenger cars. Tractors, hay mowers, balers, grain carts, combine harvesters, they're wide, they're heavy, and they're slow. They require the operators to use both sides of the road sometimes, two-lane roads navigating bridges curves and the shoulders we want to request that the Board of Commissioners require the developer of
Speaker 15this proposed development to fund a traffic impact analysis that specifically accounts for agriculture equipment transit on Ellisboro Road not just passenger vehicles that agriculture transit okay Ellisboro Road and the intersecting roads that come on to Ellisboro Road okay I previously submitted three documents. One of those is Farm Bureau traffic safety data. One is the 2023 DOT traffic crash statistics, and the third one is the 2024 Rockingham
Speaker 15County traffic data. For 2023, Rockingham County had 185 farm-related accidents. That was farm tractors or farm equipment. Sixty injuries, two fatalities. In 2024, there were 202 accidents. There were 61 injuries and four fatalities. So in those two years, the fatalities doubled, okay? So with Farm Bureau's traffic safety information, their findings with their studies, 82% of farm equipment crashes involve non-farm vehicles.
Speaker 15And the fatalities are five times more likely in accidents involving farm vehicles, okay? Not just the injuries, not just the deaths. You're taking out that farmer's office, his place of work. His tractor's destroyed, he can't work. His combine's destroyed, he can't work. His baler's destroyed, he can't work. Gotta get through the insurance process to get another one. Okay, you essentially cannot put a city-sized subdivision into a rural
Speaker 15community without first, fix the roads, fix the bridges. Fix the public safety. Approving this project before completing a comprehensive traffic and safety analysis just puts the corporate developers' profits ahead of the physical safety of our citizens and our heritage and my farmers.
Speaker 5Thank you for your time.
Speaker 3Next, we have Chris Angel.
Speaker 16Good evening.
Speaker 3Good evening. My name is Chris Angel.
Speaker 17My address is 267 Ellisboro Road. As a shop owner in Madison, I'm for growth, but not at the expense of our community or our way of life. Grading this rezoning request will have a negative, irreversible ripple effect across our entire county, not just our community. Therefore, I respectfully request that you delay voting until you have comprehensively reviewed all potential impacts this project will bring. I strongly urge
Speaker 17you to uphold high ethical standards, align your vote with the clear feedback of your constituents, and ultimately deny this request for rezoning.
Speaker 3Thank you for your time. Thank you, Mr. Andrews. Thank you.
Speaker 5I'm Heather Talley.
Speaker 6I live at 1408 Ellisboro Road. Before you consider further increasing residential density in western Rockingham County, I'm asking you to answer one important question.
Speaker 11Where is the.
Speaker 6Evidence that our existing public safety and health care infrastructure can safely support it? Right now, the county's own data raises serious questions. The county's community health assessment reports our primary care provider ratio is 40% below the North Carolina rate. In my own experience as a nurse and a hospice nurse, home health care is already extremely difficult to staff here. And the hospice in this county cannot possibly grow fast enough to keep up with the rapid increase in population. We are clearly not in a position of excess health
Speaker 6care capacity. We also need to talk about emergency response. Based on the county reports, EMS was able to meet the goal response time less than half of the time. How often were ambulances already committed when another emergency occurred, or how often were those ambulances wasting precious time transporting all the way across the county instead of transporting to the facilities nearest to their homes? And what happens to those numbers when hundreds, potentially thousands, of households are added in a concentrated area? The new Western EMS base was
Speaker 6planned before the proposed rezoning of Dalton Farm. That alone should make one question whether emergency infrastructure should come before additional density rather than afterward. And then there's fire protection. The county's own website states that fire protection in our county is primarily performed by volunteer firefighters. Adding 1,000 homes in Huntsville Township creates a catastrophic mismatch between modern cluster housing risk and rural volunteer fire department response limits. The county fire marshal's office states that manpower response is always
Speaker 6at a premium in the fire service. Those are not my words, they are the county's. Higher density development can mean more structure fires, medical calls, traffic accidents, and critically more simultaneous incidents. Before approving substantial additional residential density, please consider the cumulative impact to all aspects of public safety, healthcare capacities specific to western Rockingham County, including emergency call volume, staffing, apparatus requirements, law enforcement, EMS demand, and primary care provider capacity.
Speaker 6What will be the taxpayer cost of providing all additional infrastructure and personnel required to serve that growth? Approving houses does not automatically create paramedics, it does not create firefighters, it does not create ambulance and fire trucks, and it does not create doctors. A zoning decision may change density on a map, it does not increase emergency services capacity. I respectfully request that you measure the capacity first, understand the cost, and then make the land use decisions. Thank you for your time. Thank you, Mrs.
Speaker 3Powell.
Speaker 18Chelsea Knight Smith, 1754 Ellisboro Road, Madison. Today I want to address a question that keeps coming up for me, and that's what does capacity actually mean? Does it simply mean we have gallons of water and allotted allotment on paper and Or does capacity mean having the infrastructure to support that growth, the roads to carry it, the pipes and pumps to serve it, and the land and easements to build it? Because capacity on paper is not the same thing as capacity on the ground. County engineering has
Speaker 18told me that there is not yet a finalized sewer route for Dalton Farm. One conceptual route discussed with me would follow the natural drainage towards Hogan's Creek, then potentially use Williams and Landreth roads to reach sewer infrastructure near 220. That route is hypothetical, the problems and questions it raises is not. County standards require 25 foot permanent sewer easement and a 30 foot permanent water easement, with 50 foot construction easements ordinarily required for both. Williams and Landreth are
Speaker 18only about 20 feet paved, and NCDOT identifies 60 foot right away of Williams Road. Even if we assume the same on Landreth, that space already contains drainage, driveways, and existing utilities. So where does the sewer go? Where does construction occur? And whose property will be needed if it cannot remain within the existing right-of-way? That isn't some far-fetched concern. Just this March, the county authorized acquiring private easements, even through eminent domain if necessary, for the U.S. 220 water
Speaker 18main replacement project. And utilities aren't the only question. NCDOT already recommends widening Sardis Church Road between Ellisburg and 220. With thousands of additional daily vehicle trips being proposed, what improvements will be necessary on Ellisburg Road? What will be necessary at the intersection of Ellisburg and Sardis Church? And what additional right-of-way or private property will those improvements require? And most importantly, when will the public actually see the information necessary to answer any of this? The applicant requested
Speaker 18additional time and received another month. Will the public receive that same opportunity to review the information? Or will traffic studies, infrastructure information and answers to these questions be presented on the night of the hearing? And residents be expected to hear them, understand them, verify them, determine how they'll affect their property and community and respond in three minutes? That's not meaningful public review. Before you rezone roughly 500 acres, show us the route, show us the right of way, identify the easements, identify the road improvements, and then give
Speaker 18the public a meaningful opportunity to review those answers before you make your decision. Because if this information is important enough for this board to rely on when deciding this rezoning is reasonable and in the public interest, then it's important enough for the public to see before the night of the vote.
Speaker 1Thank you.
Speaker 3Tommy Middleton.
Speaker 2If you would rather keep your seat, we can get you up.
Speaker 3I can get to this thing.
Speaker 19I got Parkinson's disease, and I'm sorry.
Speaker 3No, take your time.
Speaker 19Okay, here we go. When I get excited, I lock up.
Speaker 3I can't walk. I'm sorry. Take your time. We're not in a rush.
Speaker 19What I've got now on my mind is, if I can get to the podium, I want to speak loudly and clearly. This Parkinson's sometimes makes me speak slow or fast. I have to go with what the good Lord gives me to say and do.
Speaker 3Okay.
Speaker 19My name is Thomas Lemons Middleton. I live at 1882 Gidding Grove Church Road, Stokesdale, NC. That is in Rockingham County, even though it's served by a Guilford County post office. I've lived in Rockingham County all my life. My dad has lived in Rockingham County all his life. My grandparents have lived in Rockingham County all their life. And I'm Lemons by my mama's maiden name. And they are Rockingham County residents. My grandpa Lemons is named after Lemons Road.
Speaker 19He has lived in Rockingham County all his life. His dad has lived in Rockingham County all his life. So we're sound Rockingham County people, and we love Rockingham County. I love Rockingham County. I love every bit of Rockingham County. And I'm here not to criticize, and I hope I don't hurt anyone's feelings. If I get out of line, somebody please tell me, because sometimes I get carried away within myself. So here's what I got in mind today. I want to talk about three things. We the people, the Dalton estate, and the casino. They may or may not be in that order, but I might bounce back
Speaker 19into from one to the other at times. I'm going to start with we the people. And the preamble says, we the people of the United States in order to form a more perfect union, establish justice, and ensure domestic tranquility. Now, I'm not an authority on the Constitution. You guys are probably better than I am. But what it means is what it says, in order to form a more perfect union. Now, what does that mean to you? It means that we're not satisfied with the last one, so we've got to form another one. And it's by We the People. All right, We the People is my total strategy for the night. I'm a little bit different, but I'm going to bring
Speaker 19some of the other things in that they said. All right, when you say We the People, that means We the People rule. All right, I'll go on with a little further than that and say that the very reason that We the People was written there is because we had tax action without representation, you know, You know all this story. I'm just trying to refresh your minds on what I'm trying to get at. Okay, here we go with we the people. All right, in order to form a more perfectly established justice. Now, justice is a critical thing in
Speaker 19my mind, and establish domestic tranquility. That means, you know what it means. We need to get along with each other, board members and we the people.
Speaker 1Or members.
Speaker 3All right, yeah.
Speaker 19Now, we the people means not a nation ruled by the, means a nation that is ruled by the people, not a king or dictator, nor the president, Supreme Court, our members of Congress, state legislation, nor our county commissioners. You don't own us. We are your boss. That's what I'm taking. Now, that's an opinion. That's what I read, and I've read a lot about it.
Speaker 3We're your boss.
Speaker 19We can hire you or fire you through the domestic, through the democratic right to vote. Okay, now I'm going to bounce on to the Dalton property. Now, you're asking a Dalton property to be taxed for something that that they are not going to benefit from. They may benefit some, but it's mostly for the benefit of the developer. So I think the developer should pay the price and not the very people who don't want it. It's got to pay the price to put it there.
Speaker 3That's not right.
Speaker 19I mean, I don't know.
Speaker 3I don't know what to say.
Speaker 19I don't know what to say about that.
Speaker 2Let me hold you one second. I'm going to take a prerogative here.
Speaker 3Roy, will you put three more minutes on the timer for me? Go ahead, Mr. Middleton. Okay.
Speaker 19According to what I've just heard tonight, petitions and all, it says what percent of Rockingham don't want it.
Speaker 3I don't know what the percent is.
Speaker 19But I will say that if the people don't want it, then we the people are your boss. You need to listen to we the people because we the people do have power in a democratic vote. And then I'm going to bounce over to the casino deal. Now, the casino deal went against the we the people. Eight hundred people come down here. Said they didn't like it, but we the people was not right, but you the government was. So that's what I'm trying to get at.
Speaker 3It's we the people. We're your boss.
Speaker 19We can hire you or fire you through a Democratic vote, and that's what happened. So when the casino come up, I think all of you awoken a sleeping giant, and that's we the people. We the people got upset, and I got upset very much. All right, here it is. I'm your boss, and you're telling me what to do. It's we the people, not you the government. That's what Ronald Reagan's saying from way years ago. I love Ronald Reagan. He was a good president. So I didn't aim to insult nobody. I'm just telling you that we're the people
Speaker 19that's the boss. We can hire a fire any time we want to. If we get together, ensure domestic tranquility. Now, that means you've got to work with us, too. I mean, we've got to work together on this thing. It's not you, the government, nor we, the people. It's we, the people, put together, if you understand what I'm trying to say. We've all got to be a Christian attitude about this thing, and love each other like the Bible commends us to. And it's hard to do sometimes when you have things on your mind. But then that's all I've got to say.
Speaker 3Thank you very much, Ms. Moore. Thank you.
Speaker 2We should go.
Speaker 20We did good.
Speaker 3I'm not putting on 10% of these.
Speaker 1I'm doing okay.
Speaker 21I do not know.
Speaker 11All right, pull me out.
Speaker 1Tighten me up right now.
Speaker 19Okay, now I'm good.
Speaker 1I'm good. Good.
Speaker 3Next we have Mr. Doug Isley.
Speaker 22Gentlemen, Doug Isley, 1790 Flat Rock Road, Reidsville, North Carolina. Chairman and commissioners, thank you for the opportunity to speak tonight. I understand that Rockingham County is going to grow, and I also understand the discussion that has been taking place regarding property owner rights. Property rights are very important. But with a project of this size, I believe we also have to consider the rights and the interests of people who already live in surrounding communities and the long-term responsibility the county.
Speaker 3Will have as a whole.
Speaker 22The proposed Dalton Farm development involves roughly 500 acres and has potential for approximately 1,100 homes. This is a significant part of Rockingham County. I think we have to look beyond just this. If a project of this magnitude is allowed, and once these investors are done, they're going to be moving on to their next projects. Rockingham County folks will still be here. The families who live along these roads will.
Speaker 3Still be here. Our schools will still be here.
Speaker 22Our fire departments, EMS, law enforcement, and county services will still be responsible for serving whatever development was approved. The traffic created by the potential 1,100 additional homes will not disappear when the last house is sold. These are long-term consequences that deserves consideration and deep thought. The concerns of the people who live here should not simply be viewed as opposition to growth. Folks are asking reasonable questions about roads, traffic, schools,
Speaker 22emergency services, water and sewer needs, stormwater, and the loss of agricultural land. I had the opportunity to speak with the Commissioner of Agriculture this evening, Mr. Troxler, and Steve put it pretty clearly, and I asked him, could I say this? He said, I certainly support the position that you folks have taken, and we do not need to cover up 500 acres of farmland with houses, and there are plenty of places to build houses that won't disrupt agriculture.
Speaker 22I think that is worth considering, gentlemen. This does not have to be a choice between property rights and no growth. The question should be whether this particular location can responsibly support development of this magnitude. Once these 500 acres are developed, we can't simply put the farmland back. The face of this community, along with Ellisboro Road, Mineral Springs, and other roads, are forever changed. And for the families who live and work and farm and raise generations here, this is more than acreage on a map.
Speaker 3It's a home.
Speaker 22If hundreds or potentially more than thousands of homes are built, the county must deal with the infrastructure and service demands that come with it. So I respectfully ask you, gentlemen, to look beyond the immediate decision that you're going to have to make coming up. Think about what the area will look like in 10, 20, 30 years, even though you may not be here and I may not be here. It's something that we've got to consider for the future youth and folks of this county. Growth can be good for Rockingham County, but good growth should be planned growth,
Speaker 22responsible growth, and growth that leaves the next generation with something better, not problems that they were never given a chance to prevent.
Speaker 3Thank you, Jim. Tiffany Hamilton.
Speaker 11Good evening.
Speaker 8My name is Tiffany Alexander Hamilton. I live at 163 Sitting Rock Drive, Madison, North Carolina, off of Gold Hill Road. In other words, I have to turn down 220 Russian Roulette off of Gold Hill because it's very dangerous there. I'm not sure you guys know about it. After listening to I came to talk about something different tonight, but after hearing all this, I'm going to tell you how it ties into what I wanted to talk about tonight, and this is the Rockingham County Ordinance Prohibiting Unreasonably Loud, Disturbing,
Speaker 8and Unnecessary Noises. We have had quite a time, so I wanted to start by saying, Buenas noches. Gracias por permitirme hablar con ustedes esta noche. Espero que puedan resolver este problema con. I said that in Spanish because I get to hear Spanish at least once a month.
Speaker 5And it is so loud.
Speaker 8It has been called a rodeo, but it is really, truly. Well, let me stick to my script. So I live three to four football fields away from what is now Plaza Rancho Viejo. I lived in the residential agricultural neighborhood for over 15 years. Tractors plow the field behind my house and I never hear them unless I'm at the edge of my property near the field. I love hearing tractors. And it's never bothered me, never been too noisy.
Speaker 3It's agricultural.
Speaker 6Sorry, I'm so nervous.
Speaker 8It's such a big deal. So I've also lived in my house when the former horse farm had auctions from time to time. You could hear the auctioneer if you were in the front yard. It was annoying, but it only lasted a couple of hours. I'm sure it was worse for my neighbors. Nothing prepared me for what happened on June 20th, August 1st, and September 12th. I was in my living room talking to friends. Then we could hear music so loud inside my house that's three to four foot fields away from this rodeo that I went
Speaker 8to my other's room and said, you need to turn your music down. And it was coming from three to four football fields away. So I've been reading over the proposal for a cleaner version of the noise ordinance, and there's a lot of things that I really do like about it. There's a presentation on it tonight. But the only thing that I notice is that there's a fee of like $ 250, and when the place is charging $ 40 admission, $ 20 for parking, and they just have thousands of dollars of cash rolling in, cash money, I don't think a
Speaker 8$ 250 fine is going to stop anything. I've heard from neighbors from Sourwood, Angel Road, down Griffin Road, and they have the same complaint.
Speaker 3It's too loud.
Speaker 8We have asked them politely, can you turn down the music? And they laughed in our faces. And I speak Spanish fluently, so I know what was being said. And they did not care. And they told us they did not care. And there was nothing we could do about it. So I appreciate that we are looking at the noise ordinance. And I pray that I do not have to continue to listen to this.
Speaker 3You think that's disruptive?
Speaker 8I can still hear myself talk. When I'm at my front yard, I can't even hear myself talk.
Speaker 23I appreciate your illustration.
Speaker 2That brings us to the end of our public comment. That will take us to item seven, which is a public hearing by Mr.
Speaker 3Ben Curry. about what we were just discussing, I believe. So, Mr. Curry, if you'd please come up, sir.
Speaker 20Not quite yet.
Speaker 3Oh, we're not there yet. Okay, I'm sorry. Please continue.
Speaker 20Thank you, Chairman and Commissioners. I'm going to turn this over to Nicholas Duncan, our planner. He's going to present this item to you.
Speaker 14Evening, Commissioners. We have a petition for a road name change request.
Speaker 3It's Ms. Carolyn T. Huskins.
Speaker 14She's requesting that the road name be changed on a private road from Newsome Road to Knockabout Lane. And North Carolina General Statute, North Carolina General Statute 153A-239.1 states, a county shall not name or rename a road or adopt an ordinance to establish a procedure to assign or reassign street numbers on a road until it has held a public hearing on the matter, which is why we're here tonight. You have to have up to 75% of all signatures. She owns the entire road, so she was the only
Speaker 14signature required, and I'm respectfully requesting that you grant her a petition to rename the road from Newsome Road to Knockabout Lane.
Speaker 3Thank you very much, Mr. Duncan. Is the applicant here? Does she wish to speak? She's not. I don't believe so.
Speaker 14I told her not to come because it was going.
Speaker 3To be a... Okay, I understand.
Speaker 2Well, then, with that, we will open our public hearing. on the road name change for Knockabout Lane. We have no one signed up to speak for this item. Is there anyone here who wishes to speak on the name change to Knockabout Lane? With that, I will close the public hearing. Gentlemen, do we have any discussion? If not,
Speaker 2I will accept a motion.
Speaker 14Motion.
Speaker 3Motion to approve by Commissioner Richardson.
Speaker 4Second.
Speaker 3Second by Commissioner Hall. All in favor? Aye. Motion carries. Congratulations on Knockabout Lane.
Speaker 21Thank you.
Speaker 3So, Mr.
Speaker 2Barr, are you going to address the music we were just listening to? That is actually right after me. There are going to be little.
Speaker 13Bits of dovetails, I think, between what I'm presenting and that as well. So, tonight we are actually going to be presenting a text amendment to the UDO regarding data centers. This is something that, as I'm sure you know... Data centers is something that has been around for some time, but the size and scope of them and the negative externalities associated with them has kind of drastically changed within the past few years. And really across the country, but
Speaker 13also particularly in the state, many local governments have been looking to address these as a particular use and going about it in many different ways. This is something that, as staff, we thought that we would be able to spend several months working on this. This has been something that's been not only just a part of our planning staff, but Lance Metzler's office and Lee Cochran with Economic Development
Speaker 13has helped tremendously with some of our research and things along with this. So our main kind of philosophy is that we wanted to get particular regulations in place and on the books so that we have clear processes and clear regulations for when this use does potentially have an application come through. So currently our UDO does not have
Speaker 13any of those in place and so this is going to kind of create that clear process for us and just as a kind of particular note. This isn't going to be something that is intended to completely prohibit or necessarily encourage them at all, but really it's just kind of intended for making sure that we do have regulations in place for this fairly novel use that does have
Speaker 13very particular aspects about it.
Speaker 3So I'm going to go through the language of this and.
Speaker 13First off here, we will see this is exactly how we're treating it, what district that we want to put it in, and then here we've got the purpose and intent of the ordinance and then its applicability.
Speaker 3Basically, the short notes to this is that.
Speaker 13We are only going to be permitting this in the highway industrial district and we are actually just going to be requiring this through a conditional use rezoning process. So just kind of generally how that looks is that it does go first before planning board and then this board for final approval. And it is something that they will include specific site plans and potentially be up for additional consideration for conditions between both you and the planning board as they go through that. That purpose and intent section is really just kind of some guiding principles to help
Speaker 13with interpretation of the language. You know, like what are we doing here with this language? So when we are down the road interpreting some of the specific regulations, we kind of know, okay, this is kind of the direction that we should be thinking about. And then with that applicability section. Oh, thank you so much.
Speaker 2I was going to let you finish what you were saying, but yeah.
Speaker 3Thank you.
Speaker 13I'll go back very quickly just to have those up for everybody's use.
Speaker 3This is the first slide.
Speaker 13This is our language here for where we're putting it in the ordinance and what district, and this was that purpose and intent applicability section. So that applicability section is mostly just there to say, you know, any data processing facility, any new one, this is what that's going to apply to, and then anything else within the UDO outside of these regulations and state.
Speaker 3And federal law are going to apply as well.
Speaker 13Here we have our definitions and we've got a couple added. Some of them are about the cooling systems and I'll kind of touch on that a little bit later, but mostly the definition for data processing itself. Our intention here with that definition is to kind of be fairly broad with it and to kind of include anything that's processing any type of data, whether that's like crypto mining or anything like that. So we're kind of catching most of the different purposes that we think of with like a data center in this. But we also wanted to include
Speaker 13some particular exceptions to this as well. Mostly because, I mean, a building like this, many office buildings will have like a server in it. So we don't want to include something like a small office that happens to have a server in it essentially. Here we have just some of our requirements and, you know, materials that are needed to be submitted along with that application for rezoning. A lot of this you'll kind of see correspond to various different sections that we touch on later on. Here we have
Speaker 13a section for a requirement referred to as a neighborhood meeting. This is something a lot of different ordinances may require this on like a rezoning process or maybe a special use permit or things of that nature generally across the board.
Speaker 3We typically do not do that.
Speaker 13We often will recommend maybe an applicant, especially if it's something that could potentially be controversial, to go ahead and do a neighborhood meeting or at least touch base with their neighbors beforehand. But it's not a requirement by any means for any use. But we are going to be adding, just because of the size and scale and the controversy, associated with data centers, I think it's an appropriate thing to add for this particular use. Some of our main highlights of the requirements here. They're going to be conducting this meeting. This is something purely on the applicant. Staff
Speaker 13would not be involved. they would try to notify neighboring property owners and have an informational meeting and kind of a Q & A session. And then we kind of outline kind of the specifics of how that should look, like when time frame-wise that should be before the meeting and how to go about notification for neighboring property owners. They're then required to take a summary of kind of what was generally discussed in that meeting and submit that along with the application.
Speaker 3Here we have kind of our.
Speaker 13main specific standards for things like lot size and setback requirements. Our minimum lot size was, we're proposing 25 acres. We figured with most of these facilities are going to be something that's probably intending to be rather large. A lot of that was gone into thinking that they're going to need that space essentially to meet things like reasonable setback requirements and landscape bufferings and to make sure we don't
Speaker 13have noise impacts and things like that. And that's kind of some of our logic there with the setback requirements as well. We're proposing 200 feet from a property line, 500 feet from any property that's specifically zoned residentially, and then that height is pretty much our standard kind of across the board for most like industrial and commercial type districts.
Speaker 3And we do have a little.
Speaker 13Bit at the end that kind of touches on setbacks in a different way that we'll touch on as well.
Speaker 3So just keep that in mind.
Speaker 13Here we have our landscaping standards. And for the most part, this is going to be similar to a lot of the standards that we have already in place. So with a use like this in industrial, we would already be requiring a 15-foot parcel perimeter buffer. And we have different ways that you can achieve that. It can be with... specific planted trees. It could be with a berm, things like that. So there's plenty of different options that they can choose from kind of already in our ordinance for landscaping.
Speaker 13So that's already kind of standard across the board for industrial uses that they would have that 15-foot buffer all the way around the perimeter of the parcel. We're also proposing for this particular use that if they have storage of outside equipment, so say something like cooling systems or generators, that there would be an additional 15 foot buffering around those particular items as well.
Speaker 3Um, and so in a.
Speaker 13Lot of our research, a lot of places we're doing large, just one, but larger buffers. Um, so a lot of our thought process here was, um, you know, double kind of screen the things that we want screened the most.
Speaker 3And then if kind of on.
Speaker 13A site by site analysis through that conditional rezoning process, landscape buffering is usually a pretty great thing to potentially increase.
Speaker 3On a site-specific.
Speaker 13Scope through that conditional rezoning process and placing.
Speaker 3Specific conditions on.
Speaker 13Next up we have noise, which is probably kind of the biggest concern that you hear about in regards to something like data processing facilities. We did include a very specific decibel count that's going to be measured at the property line.
Speaker 3That decibel is 60 decibels.
Speaker 13We've also included, and it's kind of a metric that's based off of that 60 for tonal frequencies. So like one of the large concerns with data processing facilities is that it's not just the potential noise itself, but that it's operating at a super low frequency. Um, that's almost imperceptible, but can still potentially have effects if you're in a certain area around the facility. Um, so along with that, and it's kind of part of the application and process,
Speaker 13we are requiring two noise studies. Uh, the first would be at the beginning submitted along with the application. And this is kind of like an ambient noise study to kind of get a test of what is the current noise levels on the property and then maybe, um, have them do some additional analysis of what are you generally expecting, um, for after the proposal is finished, what kind of expectations would you have for increases? We will also be having, after it gets approved, before the issuance of a CO,
Speaker 13which is kind of the very last step in the kind of construction process and inspection process that we have, is kind of the last thing before, okay, it's built, we've checked everything out from a building inspections level.
Speaker 3And now you're ready to occupy it.
Speaker 13Before that is issued, we would require an additional noise study because at that point they would have most of the equipment actually out there and could test it and get a real feel for what potential impacts would be. And then we include some language there for potential enforcement after it's completely been established as a use. Essentially if we get complaints that allows us as staff and code enforcement to take those complaints, go out and verify it and then potentially require more noise studies to kind of go from there.
Speaker 3In regards to our enforcement process. Next up we have generators.
Speaker 13Our main kind of concern with generators is mostly kind of focused on ambitions. A lot of them are using mostly diesel generators. So we kind of have three highlights of requirements, and that's one, we're kind of requiring them to have some of the highest EPA standards that we have to kind of point to and gesture towards for emission standards for the generators themselves. We're also requiring that they can't be the main source of power. You have to actually get full electricity, and there wouldn't be any
Speaker 13kind of temporary time period where they're like a full year or something like that. where they're operating just on diesel backup generators, mostly because of concerns for emissions. So this would be limited to emergency and then maintenance. They do have to run periodically. That would be their limitation there. And so kind of as part of that, we do outline some broad specifics of when they can do maintenance, mostly during normal business hour days where people hopefully aren't
Speaker 13at home. We did want to leave that a little bit open so they could potentially still have that conversation specifically with neighbors and make good determinations of, okay, we're going to do it 10 o'clock on Tuesday because these neighbors over here have told us that's the best time for them. That's something that we wanted to encourage through that process. Their maintenance schedule is going to be submitted along with the application as well for review. Next up, we have vibration. Vibration is going to be very similar
Speaker 13how we treat noise. So we do have a hard limit of two inches per second measured at the property lawn and kind of similarly study submitted at time of application and then kind of that same process for enforcement that allows us to have require additional studies where we receive complaints and be able to verify it. Lighting for the most part is going to be very similar to kind of already how we have lighting in the ordinance as is. Our main concern there is they'll be submitting
Speaker 13a lighting plan along with the application, but also just to really just kind of make sure that all the lighting is going to be cut off fixtures and not like open lighting to hopefully encourage decreases in light pollution and, you know, potential shielding from neighboring properties and right-of-ways. Electrical usage and capacity is kind of like a really big component of kind of like what people have concerns about
Speaker 13with these so it's an odd thing to attempt to regulate at our scale for the most part because so much of it is kind of more of a conversation between the applicant or developer and.
Speaker 3Their electrical service provider like Duke.
Speaker 13Energy for example so a lot of our focus here is really just to kind of get basic information for us and the boards and making our decisions and for the general public as well So the main things is just include some basic information about like what is their electrical expected usage going to be generally across the board during peak hours, things of that nature. And then to get some verification from their electrical service provider that they would generally be able to have capacity. For larger scale projects,
Speaker 13a lot of electrical service providers often include large load studies. These are more expansive studies for particular projects that were going to have much larger impact on the grid. Really just requiring.
Speaker 3Do you need this? Where are you at in that process?
Speaker 13A lot of that gets funny on how much they can share at that point, but just some confirmation of if it was required and where they are in that process. This is the water usage part of it. Parts of this is very similar. But here's where we get into the cooling systems aspect. So there are three main types of cooling systems that data processing facilities use. The first is air cooled and kind of the main detriment of
Speaker 13those as it relates to a land use perspective. is air-cooled will likely generate quite a bit of noise. Open-loop cooling systems is very water-intensive specifically. That was another thing that we wanted to stay away from.
Speaker 3One of the things that we're doing.
Speaker 13Here is specifically requiring what's called a closed loop system. Typically these can also be referred to as like direct to chip cooling systems. These often are using like a solution specifically like water and like propylene glycol in a system that really doesn't, once it started, doesn't really need any kind of additional water content added to it.
Speaker 3That's kind of our main requirement here.
Speaker 13A lot of it is just going to be those potential impacts for water usage, aquifers, and things like that as well. And then a lot of the rest of it is kind of going to be similar to how we look at the electrical capacity aspect of it, getting some preliminary documentation saying that they're a water provider. And oftentimes that's going to be us, but it could also be other people like Dan River, for instance, potentially.
Speaker 3Okay.
Speaker 13Just verification from them that they would have capacity. Talking to Caleb, the head of our public utilities, this is something he often does very early on in a process with something like a subdivision, for instance. Just a quick kind of check on the front end that, hey, we would likely have capacity available kind of thing.
Speaker 3And then this last kind of component is hopefully just kind of.
Speaker 13Additional just-in-case kind of language, especially if we're requiring that.
Speaker 3Closed-loop aspect of it. But if their water usage does get.
Speaker 13Relatively high, and we do have 10,000 gallons per day as the particular limit, it's mostly.
Speaker 3They're going to be providing more information.
Speaker 13What is their exact water usage going to be, and how do you all plan to potentially mitigate some of your water usage if it is getting to these higher levels? Mostly, again, just kind of have information for the boards to help make a decision, and then information for the public as well. Here we have a section on discontinuation of use. This is actually going to be something very similar to kind of like what we already have for uses such as cell towers or solar farms.
Speaker 3For the most part.
Speaker 13So they're going to be submitting along with their application a decommissioning and a site restoration plan. This is particularly kind of geared more towards like outside storage of equipment and things like that. to make sure that if the use is discontinued for a certain amount of time, then it does potentially get restored. And so we are also requiring a financial guarantee be submitted.
Speaker 3Before permits are issued.
Speaker 13And there's some language in there on how that's particularly calculated and everything like that. But this is essentially money put up for the ability to if the you know the property owner or the developer is not able to restore the site to its original condition then that financial guarantee will ensure.
Speaker 3That we would be able to go about and do that later on.
Speaker 13Traffic and access you know in our research Throughout this, this actually really isn't a use that's super intensive in regards to traffic per se. The amount of people coming to it on a day-to-day basis is actually fairly low in comparison to other industrial type uses. So our main kind of points here is just to make sure that it's coming off a public road, make sure that we can potentially do temporary measures during the construction phase especially.
Speaker 3Then here we have that high impact use classification.
Speaker 13That's going to be tying in a little bit to the setback requirements a little bit. Essentially, we have those initial setback requirements that we talked about before. Essentially, our thought process here is that at a certain scale, we could look to potentially increase.
Speaker 3Some of these standards.
Speaker 13The particular trigger points for this would be over 100,000 square foot and gross floor area, over 100 megawatts, and if a substation is needed. And then here we have, um, the kind of specifics on what that triggers. We, we've been putting it into the, so this actually isn't part of the, the text amendment. This is already in our ordinance just kind of for reference. Um, we'd be classifying it as a class three. So the setbacks from property lines would actually remain the same.
Speaker 3Um, but the, the.
Speaker 13Increase would be, um, Increased setbacks from, it's referred to here as protected facilities. So this would be anything that's like a home, a church, a daycare, anything of that nature. So once it reaches a certain size and scale, we're looking to potentially increase those setback requirements there. But that's, I think, everything. So I'd be happy to answer any questions that you all may have at this time.
Speaker 3Gentlemen, do we have any questions for Mr. Barr at this time? Commissioner Richardson. We will be open to public hearing in just a minute. Yes, ma'am, if you just hold on one second.
Speaker 21You mentioned that the county manager's office had helped with the research. Could you tell me the background that helped you help in this UDA?
Speaker 9So when we looked at it, and I worked with Lee Cockramar, Director of Economic Development, and We obviously didn't take this lightly due to the nature of data centers in the nation and the state. So we did contact a lot of counties that do have data centers, those who have been in the business for a long time. A couple of localities out of Wyoming, South Carolina, York County, closer to home, Loudoun, Virginia, then even closer, Chatham County, Pitt County, Town of Hildebrand, Mayden, and Lee County. And
Speaker 9we kind of looked at all of theirs. and we tried to pull as much as we could the best management practices of what we saw, what they were doing, and compulated this proposal.
Speaker 3Thank you, Commissioner Richardson. Do we have any more questions at this time, gentlemen?
Speaker 5Yes.
Speaker 3Commissioner Collin.
Speaker 11If something like this was brought in and it did exceed the statutes here and were fined, how would the fines be levied? I mean, you know, if it's a big operation and still has a lot of money, then would the fines be effective?
Speaker 3You're talking about fines in regards to, like, code enforcement? Right, right. Code enforcement to it, yes.
Speaker 13I will defer that question real quick to my director, mostly because he served many years in code enforcement and probably knows that off the top of his head.
Speaker 20Yeah, so once the citation process concludes, it would be taken to our legal, to Clyde, and they would take him to court.
Speaker 23Okay.
Speaker 3To come up with a remedy. Okay, thank you. Thank you, Mr. Chair. Commissioner Callum, any other questions at this time, gentlemen?
Speaker 13And I will just throw up one thing that I just realized was missed from my presentation. This was a handy-dandy little chart to kind of help wrap your mind around the decibel levels, if that was something that you were thinking about.
Speaker 3This was prepared by our planner, Nicholas Dunkin.
Speaker 13And on the right-hand side is hopefully things that you really shouldn't have to consider. Those are the more extreme noise levels. So 60 was kind of like in that middle of the range that we thought.
Speaker 3Would be appropriate. Thank you for that information, Mr.
Speaker 18Barr.
Speaker 2And thank you to all the, Mr. Curry and all the staff for all the hard work on this. So with that, I will open the public hearing on Case 2026-18. And I have signed up to speak, Mr. Michael Jordan.
Speaker 3Good evening. My name is R.
Speaker 24Michael Jordan. I live at 439 Cascade Avenue, Eden, North Carolina. First of all, I think there's a lot of good things in this document. There were a few problems I had with it. One is that the studies being done are paid for by the corporations, which are great, but the people doing them are hired by the corporations, which I don't trust. Because I will say I hate data centers. I think they're an attack on the Fourth Amendment, but that's just me. The other thing that bothered me was
Speaker 24the fact that you have a usage of water, a usage of electricity, and Um, it does. Yes, there are regulations that say they have to be able to still have a fire hydrant work and there has to have no Brown outs and so forth. But with the increase, we know Duke power loves to raise their bills, much less giving them a reason to, is there, is these corporations going to absorb that different? So our bills aren't going up cause we're not using them. Um, And the
Speaker 24last concern I had was security for being able to go in and inspect to see that they were actually doing the things they promised to do, which has been addressed. So thank you all, and thank you all for letting me listen.
Speaker 3And talk. Thank you, Mr.
Speaker 1Jordan.
Speaker 2Is there anyone else here who wishes to speak on this matter? Come on up, ma'am, if you'd give us your name and address, please. If you wouldn't mind just pulling that microphone down a little.
Speaker 5Shirley.
Speaker 23My name is Cheryl Garrity. I live at 209 Longview Road. in Madison or outside Madison. I didn't realize, I didn't come prepared to speak because I didn't realize this was going to be discussed. I think that we need, as a whole population of the county, a total copy of everything that that gentleman presented tonight. I think we need it either available online or hard copies so that we
Speaker 23can look at it carefully. I don't know when it's going to be voted on or how it works. But it looks like they've put a lot of hard work into it. And I appreciate that. But it's going to impact all of us. And we need to know all the details. And we went through them tonight. But I'm sorry, that was really, really fast. And I surely didn't absorb
Speaker 23much of anything. in the presentation. I guess that's what I have to say. We need that information available to everyone.
Speaker 3Thank you, ma'am. It's a public record, so we'd be happy to get you a copy of that. That's not a... Mr.
Speaker 9Chair, it's actually online. She'll go to our meetings under the agenda. It's in the packet.
Speaker 3Yes, ma'am.
Speaker 6Okay.
Speaker 23Tell me again how we get it online.
Speaker 3Adam, can you... Okay.
Speaker 11Okay.
Speaker 3I just know that there are several counties around our area.
Speaker 23Who are having issues, and it's important that we understand.
Speaker 19Thank you.
Speaker 4Mr.
Speaker 9Chair, I also failed to mention that we did take the commentary from Stokes County, and we also included that when we decided to create this amendment.
Speaker 3Thank you very much, Mr. Messler. Come on up, sir. Yes, sir. If you could just give your name and Address, please.
Speaker 25Gib Horton, 440 Neal Road, Madison. Thorough investigation and study, but I saw nothing about nuclear reactors, many nuclear reactors that these data centers.
Speaker 3Are talking about implementing.
Speaker 25I'd like to see something in that report that would address that as well.
Speaker 3Thank you very much for your comment. Yes, ma'am, come on up. If you could give your name and address, please.
Speaker 26I'm BJ Ryerson, 586 Carlton Road, Stokesdale. I didn't realize you guys were going to go over this either, so I wasn't quite prepared. But if you could fan out maybe, as I understood it, the federal government was indicating that these data centers were supposed to supply their own electrical power and possibly their own water. So if you could just fan out whatever discussions you had on that, I would appreciate it. And I really wish you would propose voting or postpone voting on it from tonight just so we would have a chance to look at it as a community.
Speaker 1Thank you.
Speaker 19Yes, ma'am.
Speaker 2Just as a reminder, our agendas are published usually about two weeks in advance. So if anybody needs to look up anything, they're usually up there a couple of weeks at a time. Was there anybody else who wanted to speak on this issue? Seeing none, I will close the public hearing.
Speaker 3Mr.
Speaker 2Boer, is there anything you could add to provide any more insight to any of those comments?
Speaker 13I know on nuclear in particular, that was the one that stood out to me, most of that is going to be regulated mostly through the federal government for the most part. They've got really extensive processes that they have to go through that's mostly kind of outside of local control for the most part in regards to nuclear.
Speaker 3I'm trying to think. Were there particular other ones that you had in mind?
Speaker 2There was a question about the providers for the water and energy. I'm not sure if the question was are they supposed to generate their own electricity in water or if that meant they were supposed to purchase their own.
Speaker 3I wasn't really clear.
Speaker 13At least I know that there has been talks and maybe even bills proposed at like state and even potentially federal levels for several of those things. But like, at least in our understanding so far, none of that has gone through so far. So a lot of the, the impetus for this right now is to make sure that we do have regulations in place right now.
Speaker 3We're wanting to come through and apply in that meantime. If the, federal regulations change, obviously we would reevaluate. Exactly.
Speaker 13And at least currently, we're kind of limited in regards to how at the local level we can regulate a lot of those different aspects as it relates to utilities.
Speaker 19Yes, sir.
Speaker 2Gentlemen, do we have any further questions for Mr.
Speaker 3Barr? Commissioner Richardson.
Speaker 21I don't have a question, but in regard to nuclear power, that follows a very set schedule. directed by, at the federal level, the Nuclear Power Commission. And sequentially, if there is a nuclear station required or proposed in an area, it'll be publicized to the public, and site consideration will include the public. And then there are about two or
Speaker 21three more stages of that. and this is entirely separate from the data center, but since you were interested in that, that will be very publicly made available to you. I know of no nuclear power stations advocated or proposed for this county at this time.
Speaker 3Commissioner Richardson, I believe the Blues Creek.
Speaker 21That's in Stokes County.
Speaker 11Yes, sir.
Speaker 21And that one is, I attended that hearing, public information hearing. I attended that. That's several years down the road, and it's at this preliminary level of site consideration before it gets into the other details of what's involved. I will tell you for your own public information, and you can talk to Duke Power. which is the agency most of
Speaker 21us get our power from around here. They're the only agency I know that is proposing to use nuclear generation for power. They're the only one that's doing it now, and they're the only ones that has a proposal in mind for future generation using that methodology.
Speaker 3Thank you, Commissioner Richardson. Mr.
Speaker 2Moore, I believe some of the commissioners had some concerns about some of the language that we have.
Speaker 3Commissioner Berger, if you go ahead.
Speaker 5Well, I think in the proposed ordinance, there's a couple of things. One, under D, number two, I believe the word mail needs to be added. Then in number three.
Speaker 3After first class? Yes, sir.
Speaker 5Then in number three... the proposed mitigation efforts. Um, I'm not real clear based on the way it's drafted.
Speaker 3This was under what section, sir?
Speaker 5Uh, the same section. It's just number three. Um, talking about the neighborhood meeting and then proposed mitigation efforts of, uh, so I'll go through a couple of things and then, so we've got that. Um, As far as the landscaping plans at the time of an application, I know I talked to Commissioner Hall earlier and addressed my concerns as far as the timing of submitting the landscaping plans at
Speaker 5the time of application as opposed to after an application pending approval. I believe G number.
Speaker 25Let me.
Speaker 3Make sure I got my pages right.
Speaker 5Yeah, G number four... I don't see a definition for verified noise complaint.
Speaker 19And I.
Speaker 5Know I talked to the manager as far as K, as far as the electrical usage inconvenience. There seems to be two different types of, well, two different sources of electricity, one being a source that is shared with others, and then similar to what we saw in Madison, a direct source from the utility to the end user that is
Speaker 5a completely different unit or a completely different source that's not drawing from the same lines as other users. So didn't know if y'all may have had any examples or explored whether the requirements there would only apply if they're drawing from a shared source.
Speaker 13Specifically on this, our main thing is just getting information as opposed to really putting hard and fast regulations specifically on.
Speaker 3How they would go about it.
Speaker 13If they were doing private installation or something like that for their own substation, that would just be hopeful information that they can include because they would definitely have you know, conceptions of that and that early application process with electricity being such a vital component of their operation.
Speaker 5I guess the question there is a detailed electrical demand analysis if it's a... I'm not sure what we're getting at if their source is dedicated from the utility provider and what kind of details we might require at that point.
Speaker 3And so.
Speaker 5My thought would be to have a separation between those that have a dedicated source to where they've just got to provide some evidence that they'd have a dedicated source, and then those that have a shared source to require the detailed analysis.
Speaker 1And I believe that.
Speaker 5I believe those are the.
Speaker 1Only things.
Speaker 5I've had the word mail. Some clarification of what we're talking about in three. That's under D.
Speaker 1And then the.
Speaker 5Landscaping would basically after approval, they'd still have to provide that to you.
Speaker 3There was one other thing.
Speaker 13And just to clarify on the landscaping, I think it's pretty common, at the very least, for initial concept plans, kind of at that stage of the approval process, that you would just kind of show, hey, we're doing our 15-foot buffer here and here kind of thing, and then you get into more granular level of detail usually, but later on in the process after approval, such as at TRC, for example.
Speaker 5I did skip over one.
Speaker 20So F4?
Speaker 3You have sunk my battleship.
Speaker 13That's right.
Speaker 5It talks about as far as the landscaping being replaced. It says within six months. I believe we may need to require some or add some language there as the initial application. Because it It says to replace the material, which certainly it needs to be replaced, comparable species and screening capacity, but then the word size. So if they're
Speaker 510 or 15 years down the road, requiring them to replace it with something that's of similar size at that point in time could be an issue. So my thought would be to add that as the initial application.
Speaker 3Mm-hmm. About size at the initial planting?
Speaker 8Yes.
Speaker 1That's fine.
Speaker 5Yeah, I mean, those are the things. And what I would say is if they could bring that back at the next meeting and then everything looks good, we could have it under consent and adopt it at the next meeting under consent with... as far as having a drafted document.
Speaker 3And I just want to clarify on that with Clyde real quick.
Speaker 13Is that something that we would be able to approve now and then put just those language changes on consent?
Speaker 3Would that be an appropriate process?
Speaker 2I'm going to ask that we table it until we get the language for everybody to see, and then we can vote on it then. So, gentlemen, I'm requesting that we table the vote until we get.
Speaker 3The updated document. Language, would anybody be willing to make that motion?
Speaker 6Motion.
Speaker 3Motion by Commissioner Callum.
Speaker 11Second.
Speaker 3Second by Commissioner Berger. All in favor?
Speaker 5Aye.
Speaker 3Thank you, Mr.
Speaker 13Barr.
Speaker 2Now, we've got to be ready to talk about the noise ordinance now, right?
Speaker 3I believe so. Mr. Messler.
Speaker 8Yes, sir.
Speaker 3That demonstration just really got me focused on that.
Speaker 1Good.
Speaker 9The decimal chart, but I guess you've already seen that. Thank you, Nick, for stealing the thunder. The proposed noise ordinance is derived from Section 4.8 to public nuisance from animals in Section 1836 of the Public Peace and Order. I'm just going to go through it section by section and summarize it. Section 1, just the title of Rockingham County Ordinance Prohibiting Unreasonable Loud, Disturbing Unnecessary Noises. Section 2 is the purpose of the ordinance, which is how it is to secure and promote the public health, comfort, convenience, safety, welfare,
Speaker 9and prosperity of the citizens. Section 3 gives the commissioners the authority to enact the ordinance. Section 4, jurisdiction will be in the unincorporated areas of the county. Section 5, the sheriff or his designee will be responsible to administer and enforce the ordinance. Section 6 for the For most of the part of Section 6 is the same as we're currently having our code of ordinances currently. It does include but not limited to Sunday through Thursday from 11 p.m. to 7 a.m. and 11 p.m. to 7 a.m. Friday
Speaker 9and Saturday. All the noise violations are the same as the previous public peace and order section with the exception of additional subsection 15, which includes animals from Section 4.8 of the old ordinance. Section 7 illustrates the exemptions that are exempt from the provisions of the proposed ordinance, and that's a variety of different things, including farm equipment and just your basic lawn mowing at certain times. Section 8, in the past, enforcement was up to the discretion of the sheriff or designee, and that had caused some issues,
Speaker 9I guess, for the enforcement and for the citizens that had called, at least my office, to voice their concerns. This section adds actual measurements with enforceable violations by including decimal levels. We would have to, after speaking with the sheriff's office, we'd have to purchase eight decimal devices to make the violation less subjective and discretionary, and those aren't very expensive. They're in the mid $ 200 to $ 300. Decibel
Speaker 9levels are very reasonable and will be read at the property line where the sound is generated. The young lady earlier talked about penalties. Well, I do agree with the penalties are relatively low with initial written warning. Then Citation 1 is $ 250, but it increases every time they go back out there. If it's Citation 2, it's $ 500. If it's Citation 3, it's $ 750. Citation 4, within 30 days, it's $ 2, 000. And then after Citation 4, the equipment may
Speaker 9be seized by the sheriff's office. Section 10 is a conflict with other laws. If this ordinance conflicts with another ordinance or law, if there's a conflict with this ordinance, the more restrictive or that imposing, the higher standards will govern. Severability, if any of this ordinance is found invalid by a court and the decision of the court will not affect the validity of the remaining sections of this ordinance. Section 12, amendment. This ordinance can be amended by the commissioners at any time. And Section 13, replacement of existing ordinance. This will replace the Norris ordinance adopted in 2017. And lastly, Section 14
Speaker 9is the effective date we'll take effect upon the adoption. We have met with the county attorney, the sheriff's office, Captain Hopper, Lieutenant Disher, and we all were in concurrence with the direction of this ordinance modification in light of recent instances that the young lady had mentioned earlier on the western side of the county.
Speaker 3Mr. Chair? Thank you, Mr.
Speaker 6Messler.
Speaker 2So for this presentation, a public hearing is not required. So gentlemen, do we have any questions or comments about what Mr.
Speaker 3Messler presented?
Speaker 1Yes.
Speaker 3Commissioner Burke.
Speaker 5As far as other ordinances on the books, we started getting phone calls back in the summer about the noise and the issues with this event that I believe there was some sort of permit issued. We had off-duty officers working security. or at least they had submitted the application for off-duty officers to be there and work security. Correct me if I'm wrong, was a payment made for the
Speaker 5off-duty folks to be there?
Speaker 3Typically they do, yes.
Speaker 10Okay.
Speaker 5Are there things on the books before this is voted on to address the issues?
Speaker 3Yes, there have been.
Speaker 9I know that on several times they had gone out there and it eventually came back to occur once the noise was, it calmed down for a few and then it came back on later on.
Speaker 5And since we got Sheriff Parker here, then he may be able to tell us what's on the books now before we get into this, or maybe Clyde could, as far as ordinances that we have, that could be enforced or maybe that could be looked at in addition to what we're talking about here.
Speaker 16Well, the test has been whether it's a reasonable or an unreasonable noise based on the time of day and location. Sure. And this particular incident that the a lady talked about, it just got out of hand. And the ordinance, as it's written currently, doesn't have any provision for measuring the sound, the decibel level, that I can take to court and tell the judge, hey, they're not supposed to be.
Speaker 21At this level.
Speaker 16They were 120, which is the sound of a chainsaw.
Speaker 5Is there anything beyond the noise ordinance? I know in speaking with one lady over the summer, There was some sort of permit, but this may have even, or the event that took place may or may not have even gotten beyond the permit that was granted. Yes, sir, but
Speaker 5as far as other potential violations, and what I'm getting at is whether or not there's Other ways to tackle the issue beyond the noise ordinance, if they had some sort of permit, do we have any information about in the past whether they complied with the permit?
Speaker 9The only issue with that, and it is a state issue, and I think they're trying to address it to the state, they've got farm exemption, which means basically they can do any function that anybody can do with a farming facility. I mean, it takes it kind of out of the hands of, unless they break something like a noise ordinance like this.
Speaker 3Mr.
Speaker 2Messler and Commissioner Berger, if I could interrupt for a second.
Speaker 3Mr.
Speaker 2Curry, could I have you come up and just speak on the bona fide farm status that he was just referencing?
Speaker 20Yeah, that's the only permit we issued with them was a bona fide farm exemption. They brought the necessary paperwork in for that.
Speaker 3And that's, as Mr. Messler alluded to, that's from the state of North Carolina. That's from the state of North Carolina. That's not something we have control over.
Speaker 20No county involvement, other than we get them to fill, when they present us with that paperwork from the state, we give them a permit that shows they are a bona fide farm.
Speaker 11Thank you very much.
Speaker 5But does the bona fide farm permit allow them to have the events that they were having, or did we issue some sort of permit or anything?
Speaker 20We have a special event permit, but when they have a bona fide farm exemption, they're exempt.
Speaker 1Yes, sir.
Speaker 3Yes. Horse, some kind of horse activities.
Speaker 1All right.
Speaker 5And so there was no other permit that was issued.
Speaker 1Okay.
Speaker 3He was just bringing clarification from the state of North Carolina. The public comment period has ended. I'm sorry about that. Mr. Messler, did you have anything else to add on that?
Speaker 9No, it's pretty clear again that they are discussing the state. They've found that plenty of individuals across the state of North Carolina have taken advantage of having this exemption, and they are looking into it now.
Speaker 21Unfair advantage.
Speaker 3Thank you, Mr. Messler. Commissioner Richardson. Thank you, Mr.
Speaker 21Chair. I don't usually share other information, but I think I probably received a half a dozen.
Speaker 3Ms.
Speaker 21Hamilton, you'll be interested in that. But the complaints that I got also had to do with traffic and underage drinking.
Speaker 3And you know, the.
Speaker 21Sheriff would have to observe that before he could take action. So there are other things alluded to besides just noise. But hopefully the presence of the sheriff and enforcing the noise would allow him the opportunity to observe other inappropriate activities.
Speaker 3I'll speak on Commissioner Richardson's behalf and say allegedly.
Speaker 9Yeah, allegedly.
Speaker 3Yeah. Gentlemen, do we have any further discussion? Yes. Commissioner Cowell.
Speaker 11According to what I heard from the crowd, how many horses or bulls does it constitute.
Speaker 3To have a rodeo?
Speaker 11Amen. Is it just one or is it multiple ones? I mean, that would be something to look into if they're having a rodeo and they claim they're having a rodeo.
Speaker 3What constitutes a rodeo? If you go out there and they got one horse.
Speaker 11it's half dead laying around or they got done something, then does that honestly?
Speaker 9I think we're steering a little bit away from the noise ordinance itself. The noise ordinance, if we have this enacted, then we can address all the issues that comes with it. Because what I understand was it was claimed to be a rodeo and it turned into be more of a larger gathering with a lot of festivities and music.
Speaker 11Well, I'm saying if there's a permit pulled through the state or whatever claiming it's a rodeo, and it's not actually a rodeo, that may be another alternative for us to shut it down.
Speaker 9That would be a state enforcement.
Speaker 2That's a question for the state of North Carolina, yes, sir.
Speaker 3With that, gentlemen, do we have a motion?
Speaker 1So moved.
Speaker 3Motion by Commissioner Berger. Second. Second by Commissioner Hall. All in favor?
Speaker 6Aye.
Speaker 3Any opposed? The motion carries. Updated noise ordinance.
Speaker 2That brings us to item 9, which is new business.
Speaker 3Mr. Metzler, do we have any new business this evening? Yes, sir.
Speaker 2That takes us to item 10, Commissioner Comment.
Speaker 3I will begin with Commissioner Callum.
Speaker 11Yes, I would like to thank the Rockingham County Sheriff's Department, the Reedsville PD, and the Highway Patrol for an incident that happened in Reedsville over the weekend where an SBI agent was shot. I believe he's doing very well in recovering. Our prayers and thoughts are with him and his family. And I would like to thank everybody involved that participated in that incident and took care of the citizens in the surrounding area. I'd also like to thank everybody who showed up tonight to voice their opinions, to come out
Speaker 1Yes, the airplane that took place this weekend, former Commissioner Don Powell and a number of other volunteers were instrumental in putting together the Youth Day, Youth Outdoor Day. And I understand they had, I believe, the most participants they've ever had.
Speaker 5And so that was a great success. I believe a lot of people enjoyed that.
Speaker 3So thank you.
Speaker 1Thank you, Commissioner Burke.
Speaker 2Commissioner Richardson Thank You mr.
Speaker 21Chair Certainly good to see this many folks out and appreciate your comments and attendance as a whole and Encourage you to continue doing so the more astute among you might have noticed that my pink attire Some would call it poofy, but I call it in appreciation recognition of October as Breast Cancer Awareness Month. So if you know survivors or choose to support financially the American Cancer Society,
Speaker 21this is the month to do it. I'd also like to recognize tonight.
Speaker 3Mrs.
Speaker 21Anna Rhodes.
Speaker 3Mrs.
Speaker 21Anna Rhodes from our own Rockingham County. She gets a congratulations for having won the GlaxoSmithKline NC Child Health Individual Recognition Award for her work with children and with families, particularly in regards to child care seats and carried seats. She's considered to have made an outstanding contribution to children's health through her individual efforts. And there will be a
Speaker 21monetary grant $ 4, 000 to be given to the State Public Association for a scholarship in the name of Anna. So if you see Anna out there, Anna Rhodes is doing good work for our community, and she's to be commended.
Speaker 3That's all I have, sir. Thank you, Commissioner Richardson. Commissioner Hawke.
Speaker 7Thank you, Mr.
Speaker 6Chair.
Speaker 7I want to appreciate Sheriff Billy Parker being here tonight and your staff. Thank you guys for all you do, and as was mentioned, the incidents this weekend, but you guys face stuff every day. Thank you all for your service. And thank you folks for attending tonight. We appreciate your input.
Speaker 14That's all, Mr.
Speaker 7Chair.
Speaker 3Thank you, Commissioner Hall.
Speaker 2I would like to continue my plea for help. We are in desperate need of foster families here in the county. We have over 160 children in our care and we need more foster families. So if you or anyone you know, anybody that you go to church with or any social societies, we need help. If you are interested in helping us, please reach out to the county. We'd be happy to train you up and get you ready to help out a child in need.
Speaker 3I'd like to.
Speaker 2Address and I also ask everyone to continue to pray for the SBI agent. He's a local gentleman, and he was injured over the weekend in that shooting. So, again, thank you to him and to the Sheriff's Office for putting themselves in a dangerous situation.
Speaker 3I'd like to thank Mr.
Speaker 2Middleton for his comments earlier in regards to the Declaration of Independence. I understand that, you know, Back during the Revolution, we thought England was too far away to make decisions for us. Perhaps Ellisboro feels like Windworth is too far away for them to make decisions for them. But, you know, I would say that looking at our map and looking at where all of our municipalities are, perhaps it's time for a new municipality in that southwest corner. We certainly seem to be well organized here for people in that area. So local rule is always appreciated in the United States.
Speaker 2With that being said, our next meeting will be on October the 19th at 6.30 p.m. Gentlemen, do we have a motion to adjourn? Motion by Commissioner Hall, second by Commissioner Kellum.
November 23, 2026 Rockingham County Commissioners Special Called Meeting AGENDA 1. Meeting Called to Order 2. Lance Metzler, County Manager Request consideration of the Resolution for Approval of the Bonding of County...
November 18, 2026 Reidsville Planning Board Meeting AGENDA 1. CALL PLANNING BOARD MEETING TO ORDER 2. ROLL CALL 3. ADOPTION OF THE AGENDA FOR NOVEMBER 18, 2026 4. APPROVAL OF MINUTES - JULY 15, 2026. 5. ITEMS FOR...
November 17, 2026 Eden City Council Meeting AGENDA 1. Meeting called to order by: Neville Hall, Mayor 2. Invocation: Pastor Samuel Moriarty, Kings Highway Christian Church 3. Pledge of Allegiance: Liam Sutton, Central...
November 17, 2026 Rockingham County Board of Elections Meeting AGENDA 1. Welcome / Call to Order 2. Pledge of Allegiance 3. Invocation - Pastor Rick Gore Victory By Grace Church, Eden 4. Approval of Agenda 5. Consent...
November 16, 2026 Rockingham County Board of Commissioners Meeting AGENDA 1. Call to Order 2. Invocation 3. Pledge of Allegiance 4. Request approval for the November 16, 2026 Agenda. 5. Recognition A. Daniel Crews, PIO...