October 19, 2026 Rockingham County Board of Commissioners Meeting AGENDA 1. Meeting Called to Order by Chairman Barrow 2. Invocation 3. Pledge of Allegiance 4. Recognition A. Rodney Cates, Emergency Services Director Request Approval for Resolution honoring EMS Training Manager Justin Stewart's thirty plus years with Rockingham County EMS. 5. Request approval for the October 19, 2026 Agenda. 6. Consent Agenda Consent items as follows will be adopted with a single motion, second and vote, unless a request for removal from the Consent Agenda is heard from a Commissioner A. Benjamin J. Curtis, Register of Deeds Request approval of the Resolution Authorizing the Rockingham County Register of Deeds to Temporarily Transfer Records to an Off-Site or Out-of-County Location for Reproduction, Repair or Preservation. B. Ben Curry, Community Development Director Request approval of the reappointment of Bernie Parnell to the Rockingham County Planning Board with his term ending October 18, 2029. C. Todd Hurst, Tax Administration Request approval of Tax Collection and Reconciliation Reports for September including refunds for September 23, 2026 thru October 6, 2026. D. Adam Barr, Senior Planner Request approval for Case 2018 TA: To consider a Text Amendment to the Unified Development Ordinance to establish specific development standards for the use of data processing facilities. E. Mandy McGhee, Finance Director 1. Requests approval to appropriate funds from the sale of property/donation proceeds to purchase two double-stack washer and dryer units for the laundry room at the Animal Shelter. The existing units are approximately 15 years old and require service multiple times per year, resulting in delays in processing laundry and maintaining daily operations. Replacing the existing equipment with two new double-stack units will improve efficiency, reduce service-related disruptions, and allow staff to maintain continuous laundry operations throughout the business day, even when one unit requires maintenance or repair. 2. Request approval to appropriate $20,790 of fund balance in the Vera Holland Community Center Special Revenue Fund to cover the VHCC floor replacement. F. Melissa Joyce, Fire Marshal Request approval of the reappointment of the Relief Fund Board for the Fire Departments (2026). Terms to expire December 31, 2026. G. Sylvia Cox, President, Rockingham Community College Request approval of the appointment to the Rockingham Community College Board of Trustees for the open term ending in 2031. H. Lance Metzler, County Manager Request approval of the amendment to the Public Comment Period Orders of Conduct. I. Stephanie Kingston, Human Resources Director Request approval to revise the Personnel Policy 5:6, Employee Benefits - Tuition Reimbursement J. Justin Thacker, Deputy Finance Director Request consideration of approval to transfer $100,000 from project RS2709 and $78,000 from project RS2710 to transfer into project code RS2711 for additional monies needed for teacher laptops. The overall scope and the amount of laptops changed from the original budget of $1.2 million. Additionally, $500,000 was added to the teacher laptop project on the September 21, 2026 meeting; however, it was known that more funds were needed and the school system was identifying where to pull the additional funds. K. Captain Kristy Disher 1. Request approval to increase the Sheriff's Office budget in the amount of $37,770.00 for the Bureau of Justice Assistance Bulletproof Vest Partnership (BVP) grant that has been awarded May 14, 2026. The BVP Grant Award is $9,517.90 for the purchase of body armor and the grant requires $9,517.90 in matching funds which will be met with the appropriation of available Federal Forfeiture Funds. An additional appropriation of $18,734.00 of Federal Forfeiture funds is being requested to cover the cost of concealable carriers, special threat plates, outer carriers, and shipping/handling costs of the vests. A total of 20 vests will be purchased. 2. Request approval due to the updated Noise Ordinance Policy that was adopted on October 5, 2026 by the County Commissioner's, to purchase 8 of the REED R8050 Dual Range Sound Level Meters. They will be distributed to the 4 Lieutenants and 4 Sergeants on Patrol. We have done our research with Nicklaus Duncan and he provided these would be the best for our situations. They are $220 per device totaling $1,760. 3. Request approval for Lieutenant Steve Perkins who retired effective October 1, 2026 from the Rockingham County Sheriff's Office with 28 years of service. He is requesting to purchase his duty weapon for $1.00 per County Policy and NCGS 17F-20. L. Caleb Tilley, Engineering and Public Utilities Director Request approval of the agreement that allows Rockingham County to serve as the required NCDOT permit holder for gas lines associated with the Renewable Natural Gas project on NCDOT right-of-way. NCDOT requires a public entity to serve as the permit holder. The gas lines remain solely owned and operated by WB Rockingham LLC, which is responsible for All construction, maintenance, permitting, and associated costs. The agreement protects the County by requiring the Developer to defend, indemnify, and hold harmless the County, its Commissioners, officers, employees, and agents from claims, damages, costs, and liabilities associated with the gas lines and encroachment. M. Rhonda Hooker, Library Director Request approval of the reappointment of Diane Parnell for the Library Board of Trustees. Her term will end October 18, 2029. N. Susan Washburn, Clerk to the Board of Commissioners Request approval of Regular Meeting Minutes for the October 5, 2026 Commissioners meeting. 7. New Business 8. Public Hearing A. Emily Luther, Parker Poe Request approval of the Resolution of the Board of Commissioners of the County of Rockingham, North Carolina, Approving the Issuance of Bonds by the Public Finance Authority for the Benefit of Piedmont Affordable Senior Housing Foundation Holdco I LLC. B. Adam Barr, Senior Planner 1. Case 2026-16: Zoning Map Amendment (Rezoning) - A request to rezone a (+/-) 17.1 acres parcel of land from Light Industrial (LI) to Residential Agricultural (RA) - Conventional Rezoning. Applicant: David Simpson, Jr. - Tax PIN: 8902-04-93-0169 located at 310 Elm Grove Church Road - Reidsville Township. 2. Case 2026-14: Zoning Map Amendment (Rezoning) - A request to rezone a (+/-) 504.15 acres parcel of land from Residential Agricultural (RA) to Residential Mixed - Conditional District (RM-CD) - Conventional Rezoning. Applicant: Dalton Investment Group, LLC - Tax PIN: 8902-04-93-0169 located at 1329 Ellisboro Road - Huntsville Township. 9. Commissioner Comments 10. Adjourn ###
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1I'd like to call to order this regularly scheduled meeting for the Board of Commissioners for October the 19th. We will begin with an invocation by Pastor Heath Lloyd, followed by a pledge of allegiance, which will be introduced by Commissioner Richland.
Speaker 2If you're able, please stand. Let us pray.
Speaker 3Father, thank you for this day that you have given to us. It is a day to rejoice and be glad. And Father, what a beautiful day you've created. And Father, we thank you that you have given to us the health, the strength, the wherewithal to get up and to get out. Lord, we know that every blessing, every good and blessing that we enjoy comes from you. And Father, we thank you. Father, we thank you that we reside in Rockingham County. And indeed, Lord,
Speaker 3it is a good place. And Father, we pray your blessings upon our county, upon its citizens. Father, we pray for your guidance and your direction here tonight. Lord, I pray that you will guide these commissioners as they take up these serious matters. Lord, I pray that you will give them wisdom, Father, to do what is right. Father, that your will.
Speaker 2Be done.
Speaker 3In Rockingham County as it is in heaven. Father, we thank you again for your love, for your mercy, for your grace, for your faithfulness. Father, we thank you tonight most of all that you so love the world that you gave us your only begotten son.
Speaker 4And Father, it's in Jesus' name that we pray.
Speaker 2Amen. Amen.
Speaker 5I'm pleased to introduce a distinguished citizen of Stoneville, Mr. Asher Evans, if you'll come forward, he's 12 years old, homeschooled, and he's also one of our 4-H Explorers. So, Asher, if you would start us, and the rest of us will render the appropriate courtesy, and let Asher lead us.
Speaker 6I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation, under God, indivisible, with liberty and justice for all.
Speaker 1That takes us to item four on our agenda, which is a recognition by Mr.
Speaker 2Rodney Cates.
Speaker 7Mr.
Speaker 2Cates, if you could please come forward.
Speaker 8So we get to begin tonight with a recognition for Justin Stewart. Justin's a 30 plus year employee with Rockingham County EMS. Justin, if you would just start making your way on up. Justin announced his retirement a while back and we really didn't see it coming, but Justin had an opportunity that seldom falls into our hands, anyone's hands, but a great opportunity fell into his hands and He has certainly served graciously with the county for 30 years, so the opportunity certainly was good for him, and we're
Speaker 8certainly proud of you for that. So Justin, tonight this is a resolution honoring your dedicated public service, whereas Justin Stewart, a resident of Eden, has given generously of his time and energy in public service to the citizens of Rockingham County. And whereas Justin Stewart began working with Rockingham County EMS on August 3rd, 1992, as a part-time EMT. Justin earned his paramedic credential on September the 1st of 1994 and became a full-time employee with Rockingham County EMS on February the 4th of 1995. Whereas, due to his knowledge and
Speaker 8dedication to duty, Justin was promoted to the rank of lieutenant on March 22nd, 2003, assistant training officer on July 3rd, 2011, EMS training officer on October 31st, 2016, And through a restructuring of EMS administration, Justin was promoted to the rank of training manager on July the 1st of 2025. Whereas throughout his career, Justin has served on numerous committees and councils and has provided valuable insight to county departments and
Speaker 8other EMS agencies nationwide. Whereas the board honors Justin Stewart on this occasion of his retirement from Rockingham County Emergency Medical Services and for his dedicated service to the community. Now therefore it be resolved by the Rockingham County Board of Commissioners that Justin Stewart is hereby honored for over 30 years of dedicated service to the citizens of Rockingham County. Justin, congratulations.
Speaker 9Well, I definitely didn't pitch this size of a crowd, but thank you for all being here tonight. But I just want to thank Jesus for the opportunity of working here in such a wonderful county and such support from our county commissioners and also our county administration. It's been definitely a blessing to be able to go out there and to see people, even from the point where I delivered them as a baby, to even see them later in life and being able to make an.
Speaker 2Impact in the community.
Speaker 10And I look forward to working at Rockingham Community College and actually building and workforce developing and putting more people on the streets and to maybe this is the end of my MS career, but it's just the beginning of working for Rockham Community College.
Speaker 2Thank you.
Speaker 11You're fine.
Speaker 5You're fine.
Speaker 2There we go.
Speaker 12All right, one, two, three.
Speaker 13Hold tight for me.
Speaker 4One, two, three.
Speaker 14One more.
Speaker 12One, two, three.
Speaker 15Perfect.
Speaker 2That's fine.
Speaker 11Good job, buddy.
Speaker 16We'll see you around the corner.
Speaker 2Too many papers, give me just a minute.
Speaker 12Here.
Speaker 1I'm going to take a point of privilege and introduce our next speaker who will be speaking for breast cancer awareness. Tanya, if you'd like to come on up. I apologize, I've lost my paper that had all of your credentials on there, so I'm gonna let you just introduce yourself.
Speaker 17Introduce myself, my name is Tanya Gatewood. I have been a resident of Rockingham County since 1998. My husband and I, he was a resident of Rockingham County, we moved here. I am currently, thankfully and blessed, an employee of Rockingham County Schools and Human Resources. Just thankful and grateful to certainly be a part of an amazing county. And I'll give you a list of reasons why.
Speaker 18I feel that way.
Speaker 17And I hope to get through this without a lot of tears.
Speaker 2Take your time.
Speaker 17But it's grateful tears. There is not a sad tear that I will shed. It's one that is of gratefulness, of thankfulness, and of blessings to my Lord and Savior, Jesus Christ, first of all. For getting me through a journey that, one, I would not wish on anyone, and second, one that I would never have thought I would have to endure. My diagnosis came January 30th of this year. Of course, January was a little bit of testing, biopsies, all of the things that were a bit overwhelming, and
Speaker 17the confirmed diagnosis of stage 2B triple negative breast cancer on January 30th, 2026. I began with surgery the next week to have a port placed, and I began with chemotherapy February the 16th, which was one of 16 treatments.
Speaker 18It was grueling.
Speaker 2It was.
Speaker 18Days that I thought, oh God, am I going to make it through this?
Speaker 17And other days I was so very thankful that I was not experiencing such the side effects that so many have experienced.
Speaker 18Experienced.
Speaker 17As a resident of Rockingham County and as a cancer survivor, I want to thank you for the health facilities that we have available in this area. My first cancer treatment was at Wesley Long in Greensboro with Cone Health Cancer Center. And for treatments 2 through 16, I was able to do that at Annie Penn Hospital with the cancer center there. I cannot begin to tell you of the exceptional care that I received.
Speaker 18It was like going into a family every day.
Speaker 17I saw them every week for the first 12 weeks, once a week for chemo. And then I would see them three days after that, three days in a row for immunotherapy shots. So when I'm telling you they became like my family, they were like my family. So I thank you for allowing that exceptional care to be part of our county. There are so many cancer patients that do not have this and they have to travel, you know, 30, 45 minutes, an hour, some an hour and a half just to get the care.
Speaker 18And I'm telling you, for me, we live in Eden.
Speaker 17So for me, it was a 20 minute drive there and 20 minutes back home. And man, I was exhausted. I can't imagine what others have to do. So for myself as a citizen, thank you for allowing that care to become part of this county. I finished chemo, did my last treatment, and rang the bell July 20th. Ever so thankful and grateful. And not only was I able to ring that bell to say that, you know what,
Speaker 17chemo is finally over. But two weeks after that, it was like, okay, it's time for the breast MRI again. Let's see how good the chemo did. That's a scary thing. It's very scary. And my faith truly was in God. And I was like, you know what, Lord? I accept whatever you have in store. And praise God, they called me and the results. And let me tell you again, my MRI did not have to go to Greensboro to have this done. I was able to go to Annie
Speaker 17Penn Hospital, have this MRI done. I received clear results and a total chemo response for one that I praise God for every single day.
Speaker 18And thank you.
Speaker 4Thank you.
Speaker 17After that, I was scheduled for a lumpectomy. That was scheduled August 28th. I completed that surgery and so thankful, so grateful again because, of course, with that pathology report, there was no evidence of disease and nothing was... Nothing was there. Everything was gone. And again, I praise God for that. One of the verses that God truly instilled in my heart through this journey was Philippians 4.13. And
Speaker 17it's always been my favorite verse, but this verse during this journey was for instruction and direction. Because he told me every day, Tanya, you've got this. You can do all things through me who strengtheneth you. And then on the days that I wanted to give up and I wanted to say, you know what, I don't want to do this chemo again, it was instruction. No, get up because you can do this. I'm right here with you and you can do this. So I'm thankful for that. Radiation,
Speaker 17I began that last Thursday. And again, to thank you because I'm able to do my radiation at UNC Health Center right here in Eden, which is five minutes from my home, five minutes from my work, which praise God, I went back to work on September 30th. And ever so thankful to be back and part of such a wonderful team as Rockingham County Schools is. But again, thankful to have UNC Health Center to where I can do
Speaker 17my radiation here. And I don't have to do that back and forth to Greensboro. And I have 15 treatments of that. Today was treatment number three, so 12 more to go. So I praise God for that. And I'm going to tell you a few funny little things I learned along the way about chemo.
Speaker 18The cravings.
Speaker 17There were some of the most intense cravings that I have ever seen. One of my most favorite ones, McDonald's sweet tea. It was a blessing for me to be able to just get in my car, drive a few minutes down the road when I had days that I felt good enough, swing through that drive-through, get my sweet tea, drive around for a little bit, head back home just to get outside and see a different set of four walls. Or the days that I have cravings for, oh my gosh, I got to go to cookout and get me a
Speaker 17Butterfinger milkshake, you know, just to have these things available. So I say to you as a citizen of Rockingham County, please continue to bring these businesses, bring the medical.
Speaker 18Facilities to us. I mean, truly, I.
Speaker 17Feel blessed as a resident of Rockingham County to say that I have been taken care of in so many ways by my community, by my employer, by my husband, my family, our two sons that I would look at every day and say, this is the why.
Speaker 18This is the why you keep pushing.
Speaker 17And as I'm almost completed the end of the journey, I have immunotherapy every six weeks now, so I will finish that in February. I will still continue to get MRIs every six months. Praise God, I'll be able to do that to Annie Penn. I don't have to go any further to get those things. So truly, please keep advocating for the businesses, for the healthcare in our county to bring them here close to us. It's truly been a blessing to me, truly been a blessing in my journey.
Speaker 17And one thing I would like to advocate for Thankfully, I'm still fighting in it just a little bit with the radiation. But as a survivor, one thing that does concern me, about every three months as a resident of Eden, I go to my mailbox and I'm looking at my water report. It's a little concerning to me, and I'm like, oh, okay, there's carcinogens in there. Mine was not genetic, so it's something environmental that I've come into contact with. But it's like, okay,
Speaker 17you can drink your water. You can bathe with the water and do all the things. But as a cancer survivor, that alarms me. So if one thing that I could advocate for on behalf of all citizens of Rockingham County, on behalf of all those that are fighting cancer and all cancer survivors, can we please take a look at our water and make sure that what we're taking in, what we're bathing in every day is gonna be healthy for our bodies. But again, I can't thank you enough for letting me be here to be able to speak
Speaker 17on behalf of breast cancer survivors, breast cancer fighters, every cancer survivor and fighter that's out there now. Thank you for what we have here. Please continue to add more. And I just thank you for everything. And truly, I just want to thank God for just allowing me to stand here cancer free.
Speaker 18And I am grateful and so blessed. Thank you.
Speaker 6Thank you.
Speaker 1We appreciate you sharing all of your intimate details with us about that, and we just really appreciate your time.
Speaker 2Commissioner Richardson.
Speaker 5Before you leave, because you brought this up about water purity, I just came from a statewide meeting of commissioners, and we were establishing priorities for our goals for the coming year, and it looks like one of those is going to be, and this has been an ongoing thing, is the removal of chemicals from all the waters within the state, particularly the PFAS areas, and it's going to require money from the state as well as conscientious application. But keep talking
Speaker 5because it's not falling on deaf ears.
Speaker 2Thank you again.
Speaker 1So gentlemen, that takes us to Item 5, request for approval of our agenda. There is one clerical error that I need to make a correction to. Item 8B2, the tax pen should be reflected as 791400662632. With that amendment, do we have a motion to approve?
Speaker 11Motion.
Speaker 1Motion by Commissioner Richardson, second by Commissioner Hall.
Speaker 2All in favor?
Speaker 11Aye.
Speaker 19Aye.
Speaker 1That takes us to item six, which is our consent agenda. Items under the consent agenda are considered to be non-controversial in nature. If you have any questions about anything under the consent agenda, please reach out to the county manager's office.
Speaker 2Gentlemen, do we have a motion to approve our consent agenda?
Speaker 5So moved.
Speaker 1Motion by Commissioner Callum, second by Commissioner Berger.
Speaker 2All in favor?
Speaker 4Aye.
Speaker 2Motion carries. Takes us to item 7, new business. Mr.
Speaker 1Metzler, do we have any new business this evening? That will take us to item 8, which is our public hearings. We will begin with a public hearing from Ms. Emily Luther and Parker Poe. Request approval for resolution of the Board of Commissioners of the County of Rockingham, North Carolina. on proven issuance of bonds by the Public Finance Authority for the benefit of the Piedmont Affordable Seniors Housing Foundation, Holdco, LLC.
Speaker 2Good evening. Good evening.
Speaker 19Instead of Emily Luther, this is Michael Ward with Collier Securities.
Speaker 20Nick Wilson, and I would represent the individuals involved with the transaction, buyer.
Speaker 12Seller, operator.
Speaker 2Okay. Well, then, are you guys prepared to do a presentation?
Speaker 19We can speak a little bit about the resolution.
Speaker 2Okay, please.
Speaker 19Sure. Well, thank you for having us. My name is Michael Ward with Collier Securities. We're the underwriter for the contemplated bonds in the resolution. And first and foremost, when talking about this issuance, I just want to stress to the board and the community members present here tonight that this will not be an obligation of the county in any way, not a financial obligation. The county will not be party to any of the financing documents, nor bear the cost or risk of these bonds. These have been approved by a national issuer with the authority to issue
Speaker 19tax-exempt bonds. And as part of the Internal Revenue Code and tax law, we are required to seek an additional approval and hold a public hearing with a local governing body, which is you all tonight. So Nick is going to speak a little bit about the project, the landings at Rockingham, and we're happy to answer any other questions you have.
Speaker 1Then what I'll do is I will go ahead and open the public hearing, and then I'll let you speak on that, okay?
Speaker 2So we will open the public hearing. Please continue.
Speaker 12Nick Wilson.
Speaker 20I'm representing the buyer-seller.
Speaker 2I apologize. Before we begin the public hearing, Clyde, could you just go over the rules?
Speaker 8Yes.
Speaker 21All those wishing to speak during a public hearing will have signed in on the sign-up sheet located at the entrance to the commissioner's chambers. Speakers will be called in the order in which they signed up. The applicant will be asked to present the proposal.
Speaker 11for the resolution.
Speaker 21For consideration, and we'll be allotted up to 15 minutes to present their proposal. The public speakers who signed up will each have three minutes to address the board, and each individual may yield their time to another individual for a total of six minutes.
Speaker 11After the public.
Speaker 21Hearing has concluded, the commissioners will then deliberate on the resolution.
Speaker 2All right, please continue.
Speaker 20Nick Wilson, representing operator, owner, current owner, and then also the buyer, helping put everything together. The priority of this project ever since its inception has been affordable senior housing. The group sees the tax-exempt bond issuance as a way to fix costs on the financing side as far as access to capital to make sure that we are able to keep. The operations of the community affordable for everyone in the county.
Speaker 20The priority is for, again, fixing capital costs and moving kinda out of the current structure. As far as the operations, nothing at the community will change. The operator is gonna continue and carry forward into the new transaction. That was a requirement of the transaction. So people at the community won't see or feel a difference.
Speaker 2The same operator, same people.
Speaker 20Nothing is anticipated to change there. This is simply a change up the chain of ownership.
Speaker 2Thank you very much. Does that complete your statement?
Speaker 11Yeah.
Speaker 2All right.
Speaker 1So for this item, we had no one signed up to speak. So with that, I will close the public hearing. Gentlemen, do we have any questions? If not, I will entertain a motion.
Speaker 11So moved.
Speaker 2Motion by Commissioner Hall.
Speaker 11Second.
Speaker 2Second by Commissioner Richardson. All in favor? Aye. Motion carries. Thank you, gentlemen.
Speaker 19Thank you very much.
Speaker 1That takes us to item B with Mr. Adam Barr, our senior planner, coming up for case 2026-16.
Speaker 12Thank you, Mr. Chairman and members of the board.
Speaker 22Before us tonight is zoning planning case 2026-16. This is a request to go from light industrial to residential agriculture. This is coming to you as a conventional rezoning. So as always with the conventional rezoning, let's always keep in mind that we're considering all of the potential uses under both of these potential zoning districts. For the record, the tax pen for this is 890204930169, and it is located at 310 Elm Grove Church Road. And the planning board
Speaker 22did hear this at their most recent planning board meeting and voted unanimously for approval. You can see we have a vicinity map here. It's going to be on the southeast side of Reidsville, heading towards the Guilford County line. Here we'll see it's Location off of Elm Grove, just south of Mizpah. As you can see, the LI and the pink, this is pretty much the only LI in the area specifically. And then pretty much everywhere else around
Speaker 22it is a pretty good mixture of various different residential-type zoning districts. Mostly we have RA there in the green, and then a little bit of RP and some RM as well.
Speaker 2Here we have an aerial of the property.
Speaker 22It is currently wooded with no structures on it at the moment. There did used to be a sawmill on the property for many years that eventually ceased operation and then the structure within the past 10 or so years has also been removed from the property. The land use plan currently has this area designated as the O2 land class or the rural lands transect.
Speaker 12And this area is generally going to be.
Speaker 22Categorized as those that are relatively undeveloped, including agriculture, forestry lands, low density residential. And for the most part, it's generally looking for that RA zoning district for this particular type of property. So with that, I'd be happy to answer any questions that you have, and we do have the applicant here tonight.
Speaker 12For this as well.
Speaker 2Gentlemen, do we have any questions at this point?
Speaker 23I do.
Speaker 2Commissioner Callum.
Speaker 24Was there any calls for or against this?
Speaker 22We just had one call, and it was really just a general inquiry to see what was going on.
Speaker 12All right.
Speaker 2Thank you. Commissioner Richland.
Speaker 5I assume that they're interested in residential as... Is this potential residential construction impending immediately or undetermined?
Speaker 22I mean, I'll probably let the applicant kind of discuss his general intentions with it a little bit, but my understanding is that it is mostly just going to kind of stay in the family. Maybe there's an intention to build at least a home somewhat in the immediate future and then just kind of potential for maybe just a few lots to kind of stay within the family kind of down the road.
Speaker 2Thank you. All right, well then, if the applicant would like to come speak.
Speaker 7Yes, my name is David Simpson. I reside in 1928 Old Mill Forest Drive in Raleigh, North Carolina. I grew up there at the house beside, which used to be at Sawmill at 380. Back in 2016, I had the opportunity to purchase the 17 acres. And my plan is to keep it in the family. I don't want another
Speaker 7sawmill there. I don't want a salvage yard there. I'd like for it to be for family members. If I decide to sell them a lot for them to build a house, I will be able to do that.
Speaker 4Currently, as light industrial, I couldn't do that. So that's my plan.
Speaker 5Yes, sir.
Speaker 2That concludes your statements. All right. Thank you, Mr. Simpson.
Speaker 12Mr.
Speaker 1Simpson was also the only one that had signed up to speak for this public hearing.
Speaker 2So with that, I will close. Oh, sorry. Open the public hearing. My apologies. Do we have any questions for Mr. Simpson?
Speaker 12Okay.
Speaker 1With that, we will close the public hearing. Gentlemen, do we have any discussion? If not, I will accept a motion. Motion by Commissioner Richardson.
Speaker 13Second.
Speaker 2Second by Commissioner Callum. All in favor?
Speaker 5Aye.
Speaker 2Motion carries. Congratulations, Ms. Simpson. And Adam Barr back up for number two.
Speaker 12Thank you again, gentlemen.
Speaker 22Before us tonight is zoning planning case 2026-14. This is going to be a request to go from residential agriculture to residential mixed conditional district. Like that district implies, it is going to be a conditional rezoning. So kind of unlike that general use rezoning we just looked at, this one is where we can get site-specific. A site plan is included and potential for opening up particular conditions on it as well. For the record, the tax pen is 7914-00662632,
Speaker 22and it is currently addressed at 1329 Ellisboro Road. The planning board did hear this at their August meeting and voted six to one to recommend denial of this particular proposal. As you can see on the vicinity map here, it is going to be located on the western side of the county, just south of Madison and just west of 220.
Speaker 22And here we have a zoning map of the property. There is kind of a small piece just to the south that's also connected, so bear that in mind, and we'll have some photos of that as well. But as you can see, this property is residential agriculture. There is quite a bit of residential agriculture in the area. To the east, you'll see some pink and red. That's going to be some industrial and commercial zoning, kind of more off of 220 itself. We see some smatterings of residential protected, but mostly we see a lot of residential protected kind
Speaker 22of concentrated more towards that intersection there of Sardis Church and Ellisboro Road. At that same intersection, we also have a good bit of office and institutional as well as a parcel zone neighborhood commercial. And then there to the west, you'll see a little bit of some zoning of RM as well. Here's that other piece I was talking about. This is just directly south right across the road on Sardis Church. And as you can see, pretty much this area around this smaller section is going to be RA.
Speaker 2Here we have an aerial of the property.
Speaker 22For the most part, this property can be characterized as mostly being wooded as well as some open fields on the property. There is at least one home on the property. They're located at 1329 kind of In the center of it, maybe offset a little bit to the west towards Ellisboro. And then the rest of the area can kind of be characterized similarly. A lot of woodland, agricultural properties, as well as some residential as well. Here we have that piece to the south again. This section is pretty much just all wooded. Here we have just some sections to
Speaker 22kind of point out that there are some properties in the area that are voluntary agricultural districts. And then here we have the comprehensive land use map. As you can see, a couple things going on here. On the eastern side, you'll see that pink. That's kind of that growth corridor that we've designated along 220. Here with that yellow and orange where the property resides on, we have a mixture of kind of two different, we kind of refer to
Speaker 22these as nodes. There's several of these all throughout the county on the same land use plan. And as you can see, there's going to be kind of an orange center to it and then kind of surrounded a good bit by the yellow, which is G2 in the center and G1 kind of on the outside and a concentric ring around it. In that G2 transect, that center, that orange from the map I showed you, that G2 transect
Speaker 22is generally going to be characterized as the county's controlled density growth area. This area is generally going to be calling for zoning districts such as rural commercial, neighborhood commercial, planned unit developments, or residential mixed. And oftentimes it's kind of encouraging a mixture of those uses as well. So something like commercial properties, mixed use, single family, small scale multifamily, all of those are kind of generally seen as what
Speaker 22should go kind of in the core of these nodes throughout the county. The G1, that yellow section, and really the majority of the property is in that G1 with smaller sections there to the west and to the south is that G2. That G1 is characterized as the county's low density growth area. For the most part, it does call for this to be residential agriculture, but it does also call for other types of planned residential development and residential zoning being appropriate, such as, and specifically stating residential mix.
Speaker 22One of the things that I think particularly in the G1 and even a little bit in the G2 is there is kind of an underlying assumption that there's gonna.
Speaker 12Be low access to water and sewer services.
Speaker 22With this particular project, it does have that preliminary capacity to potentially get water and sewer. And so a lot of the assumptions kind of built into the site plan is that they would have those public utility accesses. So as it relates to the land use plan specifically, particularly in G1, G1 does call for increased density when it does have access to water and sewer. And that kind of played in a large part of our factor of
Speaker 22staff recommendation of approval on that in particular as it relates to consistency with the land use plan. Here we have the proposed conditions that we have from the applicant. And I'll just go over these really quick. The first one is that they are going to have a maximum cutoff of 1,100.
Speaker 12Residential dwelling units.
Speaker 22The second one is going to relate to setbacks, and here you can kind of see a little table to display that. The first is the minimum front setback would be 20 feet. That is a decrease from the typical setback from residential mix. That is typically 25, so that would be going down five. The side setback is being asked at 5 feet. The typical setback in the residential mix is 10.
Speaker 12And then.
Speaker 22The last one is for street side or corner lots, so those kind of lots that are abutting two different right-of-ways. We typically have an increased setback for the sides when they're corner lots. They're requesting 10 feet. That is typically 20. Other than that, the other main setback is going to be rear, and they're holding at the typical 15 as per our ordinance for RN. They are also proposing for number three here a landscape buffer yard. This is going
Speaker 22to be a 15-foot buffer yard that's following basically our partial perimeter buffer standards already in the ordinance for RN. landscape buffering, and they're proposing these mostly along the entrances along Ellisboro Road and Sardis Church frontages. And then lastly, they are also proposing a condition for home siding materials. So they're specifically kind of saying that they would be doing fiber cement siding for the exterior of their structures.
Speaker 22Here is a site plan of the property, and I apologize, the resolution, we were not able to get too terribly great here. It's not terribly different in design from the original, but there is more detail associated with it. And the main thing I'll point out here, I'll kind of let the applicant kind of go into a little bit more detail about the specifics of the project, but they are proposing phasing. It is 10 phases proposed currently. That one,
Speaker 22the map is slanted, so north is going to your right as you're looking at it. That one on the far left, that small section of property across the street of Sardis, that's going to be phase 10. But other than that, you're pretty much looking at from going south to north is how they would progress their phases for the most part, from going phase one, being there on Sardis Church, progressing into phase two, coming off Ellisboro and then coming down to three, four, five, and six. And
Speaker 22as you can see, there is quite a bit of streams and watercourses on the property as well. And pretty much for the most part, their actual development would be essentially avoiding that. So they would not really be building in anything that would factor into like floodplains or anything like that. And I did want to speak a little bit to kind of lastly, just kind of what does.
Speaker 2Process look like?
Speaker 22Say hypothetically this were to get approved, what would kind of be the next steps of the project?
Speaker 12Just kind of for just general information. The next step.
Speaker 22Really would be to go to our technical review committee. They would submit an even more detailed site plan than what they currently have.
Speaker 12Usually we get, I call.
Speaker 22Them like engineer roles, like multi-stack sheets of kind of breaking down individual kind of pieces of it. There might be one that's like existing. There might be one of just a general site plan. Might be one just showing utilities, landscaping just to kind of highlight all those different sections. And then it goes before this particular committee that we have. And here we have kind of a visual to show you for all of the particular components of that committee. The main ones I'll highlight is obviously planning would be
Speaker 22involved to ensure further UDO compliance. In a particular instance like this, we have public utilities would be an important player as well. You have the fire marshal's offices is definitely included, NCDOT, GIS, NCDQ, various different agencies, both county and outside of the county, state level agencies, things like that. And essentially what that looks like is once they submit that more detailed site plan, That's then taken to the committee.
Speaker 22We're usually all in a room together, and we kind of really get into the specifics and the weeds of exactly what is being proposed. A lot of those different agencies, such as utilities, NCDOT, fire marshals, they have their own sets of regulations and permitting and processes and stuff like that. So they're going to make preliminary comments to this plan to make sure that it's on page with not only their regulations, but kind of all of our various regulations taken as a whole. Because there can be kind of some weird funkiness when you have two different sets of
Speaker 22regulations hitting the same thing and how those can interact. So they'll make comments to the plan. If those comments lead to significant changes of the plan, we go back to the drawing board. They update the plan, they bring it back. Once it does get to the point of getting approval or comments on it are fairly minor, they would issue preliminary approval of the site plan. Even from then, that's not necessarily a go-start button on any kind of
Speaker 22particular development. As I just said, with something like NCDOT, they're going to have their own permitting process that they would have to go through. They're showing multiple different roads, proposed new roads, Almost each one of those are going to have to go through a permitting process and review through them. And so if they're not able to pass that review process, that road.
Speaker 12Cannot get built.
Speaker 22Same with something like NCDEQ. If they're required to get something like erosion and sediment control plans and permits through them, if they're unable to obtain that, that would kill the project. Same with something like utilities. That's a process that would get additional approval. And then if they are unable to meet any of the requirements, unable to essentially make it work through their engineers and everything like that, that is another step in the process that could potentially kill it.
Speaker 22Once they obtain all those individual approvals, that's kind of start when they look to get to what we call like final plat. That's kind of the last thing of issuance. They're going to get kind of final approvals from a lot of these different agencies, physically sign off on the actual kind of final map itself before it's recorded and they're able to start the lots then get created and then they can start looking to actually build homes. But that's pretty much what I wanted to say on that kind of process right there. I'd be more than happy
Speaker 22to answer any questions that you may have. We do have the applicant here and they do have their own representation through a law firm. So quite a bit of your questions I'm sure could potentially get answered with a little bit of the context that I'm sure they're going to be providing, but I'd be happy to answer any that you have right now.
Speaker 23Mr.
Speaker 2Barr, I think we'll hold questions for you until the end. Okay.
Speaker 1So for that, I will open the public hearing. And the applicant can come up. You have 15 minutes. And if you could please give your name and address.
Speaker 4I don't know how to answer it.
Speaker 2You can do it either with the mouse right here, or you can use this clicker.
Speaker 25Okay.
Speaker 12And you would just go back and forth, and if you need help, I'll be right behind you.
Speaker 4I may need help. Thank you. Good evening.
Speaker 26My name's Mike Fox. I'm here with my law partner, Nathan Duggins. We're from Tuggle Duggins, 400 Belmede Street, Suite 800 in Greensboro, North Carolina. We also have with us our client, Ray Covington, Dalton Investment Group, LLC, and our engineers, Lee Bryan and Earl Llewell.
Speaker 4And they'll be available for questions.
Speaker 26And we will also be available for questions after we finish, as well as if during the public comment period there are questions raised that you would like us to come back up and answer, we'll be glad to do that. This is just a summary of the requests which you've seen before. The staff has done a good job of explaining that. Here's a Yeah, the current zonings, which again, the staff has gone over. I'm not going to repeat those for you. But what we'd like to do is
Speaker 26propose two additional conditions here tonight. And the first one involves community amenities, which can include or not limited to swim pools, cabanas, walking trails, gathering areas, recreational facilities, playgrounds, seating areas, open spaces, and other amenities. The specific amenities shall be provided to be provided shall be determined at the time of the construction plan approval because a lot of, particularly trails and things, you have to get in there and see where you can grade, et cetera. That's the first new condition we'd like to propose. The second one
Speaker 26is open space. A minimum of 30% of the total site area shall be maintained as open space or wooded one.
Speaker 4It's not developed, basically.
Speaker 26The conditions that you have previously seen and these new conditions are reflective of things we've heard and learned from the community in numerous conversations at the planning board, et cetera, about concerns. One of the things that was raised at the planning board was well, of course you're going to leave open space because you can't build in it. Well, that's true for some of it. Only about 15% of it, and we can cover this in more detail if you'd like, is actual wetlands and floodplain that you can't build in.
Speaker 26We're anticipating leaving approximately 40, around 40% open space, but we were very comfortable with the number 30%. So there will be a lot of open space left there. I don't know if it is your process whether you have to vote to approve accepting new conditions or we can just put them in. So I would ask at this point.
Speaker 1The chair will say that we will add that to the motion, whatever the final motion will be.
Speaker 4Thank you.
Speaker 26This is a little more detailed site map and at this point I'm going to ask Lee Bryant to come up and talk a little bit about this and then Mr. Duggins will talk about traffic and then I'll come back and wrap up.
Speaker 27Good afternoon, Commissioners. I'm Lee Bryant with Evans Engineering. My address is 4609 Dundas Drive, North Carolina. I wanted to bring up something that Mike brought up about the 40% open space. I want to put that into a little bit of context. That 40% open space equates to about 200 acres. So the 30% they're putting in the condition is about 150 acres. So everybody kind of understands the scale and magnitude of how much acreage is being preserved on here. But for me tonight, I kind of want to walk through a little bit of information about phasing of the project because it's critical to understand that a
Speaker 27project of this magnitude and this scale doesn't happen overnight. So if the things to get tonight were to get approved and move forward, as Adam pointed out, there's a laundry list of things that have to be done before you can even get permits to move dirt.
Speaker 2And start working on a project.
Speaker 27That whole process together there could take six, eight, 12 months to get through that entitlement process, have all the permits in hand, and then to kind of start construction as we laid it out in large phases. can take months and months more to that. So then you come in with a home builder to come start building your homes. We're looking to get the first phase off the ground. Could take it upwards of two years before the first home is even there and anybody's living on the property. And then if you look at how we've got it phased out, they're anywhere from, you know, 90 to 100 lot phases. And for that to go through, that takes years.
Speaker 27So to go through, if you just want 100 lots a year for that, that's 10 years. So we're looking at it between a a 10- to 15-year full build-out for this project. Just understand, these things don't happen overnight. Everything doesn't come all at one time. It is a slow-moving process. It takes a lot of work to get it to that point. But on the technical side, and I'm going to give you the highlights because I know we're limited to our time tonight, but for the streets, all the internal streets will be designed by NCDOT standards that are reviewed and approved by NCDOT and submitted to them, and they'll also be inspected for work during the process.
Speaker 27The public water and sewer, what Adam pointed out, This project is to be served by public water and sewer, and we've reached out to Rockingham County directly, who has had their third-party engineer review this project. We've given the total units, and they've run their analysis on it and have confirmed that the infrastructure going down 220, the water and sewer, has the available capacity as of right now to serve the project. Also tracked down to make sure the sewer treatment plant has capacity for the project, and it does as it sits right now. But one important
Speaker 27distinction to make is Rockingham County's policy is while the infrastructure has been evaluated for full bailout, the county's current policy only allows for sewer capacity to be formally allocated as a phase-by-phase basis. So that's a critical thing that everybody kind of needs to understand the process. It is here now, but it is out. phase by phase. I won't walk through the setbacks since Mike's already done that. The building materials were part of that. The landscape buffers, the 15-foot landscape buffer, we've put in here for and
Speaker 27outlined what type of buffers be installed. But also in here, I want to point out that if available, we'd like to put berms down the property if we can. But that can't be a part of the condition now because it has to be evaluated on the engineering side when the construction plans come in. We have to look to make sure that we're putting grades in the appropriate places, that we don't dam up anything or do anything adversely affect what's going to be maybe new property owners or anything from the streets to flood or damage any streets through there as we do it. So that's something that we'll look at as a phase-by-phase because it's also... Yep, yep, that's...
Speaker 27Mike's telling me to speed up. So I'm going to hit the highlights even quicker. So I'll be here for any questions as they come up. I'm sure that we'll come through the whole process, but I'll move on and let everybody else have their turn.
Speaker 2Thank you.
Speaker 12Thank you. Nathan?
Speaker 4Can we get the next slide up? I'm Nathan Duggins.
Speaker 14I'm Mike Fox's law partner, 400 Bellamy Street, here to talk a little bit about traffic. Can y'all see the traffic considerations on your screen?
Speaker 4Yeah, there it is.
Speaker 28Okay.
Speaker 4I'm sorry.
Speaker 14On my screen, it was clicking on and off. Two things I want to lift up. First, we've worked pretty diligently with Jeremy DeLapp with NCDOT over the last 60, 90 days to analyze the existing traffic conditions and also, of course, mitigate future traffic conditions in that's going to be a product of this development. On your screen, you see on the right side, the green is the map. The green is the improvements that will be made, and
Speaker 14then on the left side are the improvements just in words. So the two ones that I wanted to lift up are the one at US 220 and Williams Road. The change there that NCDOT has made is requesting is to eliminate the east-west. So this would be right in, right out on both sides. So if you were coming from the north, moving south, you'd go right in, right out, and the same, meaning you couldn't go east-west anymore at the Williams Road 220 interchange. And then maybe a little
Speaker 14more significantly is the Sardis Church Road interchange.
Speaker 4I know it's showing as a perpendicular. It actually comes in a little bit of an angle.
Speaker 14But if you see that green arrow, that's a 925-foot acceleration lane trying to deal with the traffic flow that's going to be coming from the site, moving east and then coming south into the southern part of the county. Earl Llewellyn, who's with Kimley Horn, is here with us tonight. If there are some technical questions, I know we're moving pretty quick, but I'm here to answer those, maybe even with Earl's assistance.
Speaker 4Thank you.
Speaker 25Thank you.
Speaker 26This is just a summary of some of the responses to some of the concerns you've heard. Nathan talked about traffic and the interaction with NCDOT. I've got a slide about schools' capacity in just a second. Visibility and privacy, we've responded with the increased landscape buffers along the exterior boundaries. Lee talked about the stormwater controls, and your staff also talked about all that we would be doing to comply there. Fire protection, With the proposed public water extension from 220
Speaker 26with hydrants and firefighting water access, that should be significantly improved in the area. Water and sewer capacity, you heard Lee talk about. We've got that cleared that we can get that done. That will, of course, be paid for at the developer's cost. Environmental impacts, those will be regulated by DEQ. And, of course, we will go through the process explained by your staff to make sure that all the rules are applied properly. And the developmental density, we've agreed to limit the density to 1,100 homes under a
Speaker 26coordinated development plan. School district capacity, we got this information after we heard some concerns about school overcrowding. Again, remember, it'll be at least a decade before this is built out. So there'll be some time to plan for this, but your schools in the area are actually under capacity. And enrollment has decreased since 2017-2018. Property tax comparison. Currently, about $ 332, 000 are collected property taxes on this. Estimated at full build-out,
Speaker 26it'll be $ 400 million. And then the Rockingham County property, I mean the value, that is the current value. And then the collected taxes, almost $ 1, 900 a year to Rockingham County. Currently, and 2.276 a year at full build-out. Huntsville Fire District currently gets $ 381. They'll get almost $ 500, 000 at $ 460, 000 a year. And so the total increase in property taxes each year for this development will be $ 2, 733, 733. This is just an
Speaker 26example to show what could be done with that. We took your current budget. We did a percentage of what you chose to spend on various things.
Speaker 4And, for example, public.
Speaker 26Safety, 27.43% of your budget is going for public safety. That would be an additional $ 580, 000 that this project alone would generate. You can look down the list. Education, 23.32%. An additional $ 493, 000. Even libraries and cultural programs would get almost $ 50, 000. Of course, all of that is subject to the property tax rate you set and your decisions that you made. We just took what you did in your
Speaker 26most current budget and applied this number to it as an example of what the benefit could be.
Speaker 4This is just a summary slide.
Speaker 26It expands housing opportunities, creates employment opportunities, There's a lot of homes to be built over ten years here. This clustered housing with the extensive open space does help preserve the rural character of it and the landscaping buffer around the edge. With the public water extension from 220, it strengthens the firefighting water access for the subdivision and the nearby properties and potentially could provide a decrease in property insurance.
Speaker 26more residents support local businesses, the expanded tax base we just talked about, recreational opportunities we've discussed, and the fact that it's consistent with your future growth plan. This is sort of a repeat of what your staff covered, so I'm not going to spend a whole lot of time on that. We do have a video I'd like to quickly show you that's only a minute and a half, and I might need a little technical assistance on how to Do I just hit deploy there?
Speaker 4I think so. I know. It'll take about that.
Speaker 2Okay.
Speaker 28Thank you.
Speaker 4You're welcome.
Speaker 11Okay.
Speaker 4Three minutes, 30. Let me move it over.
Speaker 2Roy.
Speaker 12Roy.
Speaker 2Roy.
Speaker 11Let me move it over.
Speaker 5Roy.
Speaker 28Roy.
Speaker 29Is it?
Speaker 2I can't see the timer. Can you wave at me when the time is gone?
Speaker 25It's already gone.
Speaker 30It's been gone.
Speaker 31Yeah.
Speaker 4This video is a minute and 38 seconds, and then we're done.
Speaker 32Wait.
Speaker 23Why are you?
Speaker 11Okay.
Speaker 2All right.
Speaker 33We're going to wait for time.
Speaker 34This will show you the phasing in more detail.
Speaker 1Tom has expired. I appreciate your presentation here.
Speaker 26All right, let me get this stopped here if I could.
Speaker 2There we go.
Speaker 4Thank you.
Speaker 26We'll be, as I indicated earlier, we'll be glad to come back up and answer any additional questions you have.
Speaker 4Thank you.
Speaker 1We'll have seven minutes for rebuttal at the end of the public comment section. So to reiterate, we have three minutes to speak unless you yield your time to someone else for a total of six. I'm going to call out two names at a time so that whoever is next can get ready to approach the podium. and there is a maximum time for 30 minutes for public comment.
Speaker 1So first we have Wayne Schiff, and next will be Ethan Smith.
Speaker 2Yes, sir, if you can give your name and address.
Speaker 16My name is Wayne Schiff.
Speaker 4I live at 781.
Speaker 16Smothers Road.
Speaker 2You may begin.
Speaker 16And hoping for the same time courtesy Mr. Fox just got. While this 1,100 home proposal may seem like a good idea on the surface for the immediate gains, there are short and long-term impacts which need to be considered and studied further. This is not a standard request for variance, but a demand from outsiders to completely redraw the map If this one is allowed, you will open a Pandora's box from which all will be lost, including hope, the hope for preservation of Rockingham County lifestyle we know and love. Dalton is trying to convince you they will be incorporating affordable housing in this without telling you what the definition
Speaker 16of affordable is. Currently, a new home build costs about $ 200 per square foot. The average new home build is 2,000 square feet. That is a cost of $ 400, 000 per home, and they need a profit. These are $ 500, 000 homes. Who in Rockingham County can afford that? They're trying to tell you this is only two homes per acre with plenty of green space because they care about the environment. They've already lowered by over 12% the amount of green space they said they were going to have at the last meeting, but they're doing it because of topography and drainage constraints.
Speaker 16There will be 3.2 people per household in these family houses. That's 10,455 people per square mile. Jeffrey Callum, can you guess an area in the country that has that kind of population density? Mike Fox, can you? This is a population density equal to Philadelphia. It's equal to Miami. It's equal to a suburb of New York City. It is three times the density of Charlotte, the largest in our state. It's 10 times the current population density of our county
Speaker 16right now. We've had a 3.4% growth in population the past six years. This will be a 10% increase in one shot. It will strain emergency response, hospitals, schools. The water supply, we're in a historic drought. You need to consider that. You put a dollar general on 704 saying the area is a food desert. What do you think is going to happen with this population increase? Store shelves will get emptied faster than they can come up with. We will have to allow for more retail space. This population expansion means people will need jobs. They're not going to work here. They're going to work in other counties because the jobs aren't here. We'll be subsidizing other counties.
Speaker 16While Dalton has Mike Fox, I am your Marty McFly. I have been to the future on the timeline you are considering, and I can warn you of the consequences because of my past and where I have come from. Whitehall, Pennsylvania was a rural community 50 years ago with cornfields everywhere. After allowing a zoning variant such as this, you can't even find a piece of grass there. It is such a shopping mecca. The Hill Valley Estates, where Marty McFly went to in the past, were great when they were built. 30 years later, it looked like a ghetto. That's what happens with developments like these. The original owners leave just as the big maintenance items are required. We do need
Speaker 16growth here in Rockingham County. We do need to attract more businesses. There are two paths diverging you can take but one. Rockingham County needs to take the one less traveled. It looks like a more difficult path, and at times it is. But like the tortoise and the hare, slow and steady will win the race. Being a generation extra that I am, I need to quote Back to the Future just one more time. Make like a tree and.
Speaker 4Get out of here.
Speaker 2Thank you, Mr. McFly.
Speaker 35Mr.
Speaker 2Smith, you give your name and address, please.
Speaker 1Ethan Smith, 1754 Ellisboro Road, and I'm yielding my time to Chelsea Smith.
Speaker 2Chelsea, before you begin, next up we have Bobby Webster. Thank you.
Speaker 31My community and I have stood in front of this board asking for more information, more time, more consideration, and frankly, more common sense on a decision that will fundamentally change the place we call home. I will not stand here tonight and continue to beg. Because even with a packet of over 300 pages of materials pertaining to Dalton Farm that the public has had less than a week to review, still we do not have the proper answers to the many questions our community has raised. We have been presented with a traffic study whose agreed scope did not include
Speaker 31data from afternoon school dismissal peaks, weekend traffic peaks, or dedicated crash history and safety analysis. Nor does it provide a specific assessment of the agricultural equipment sharing these rural roads.
Speaker 15And those are only some of the limitations.
Speaker 31Yet even with that limited scope, the study projects more than 9,000 daily trips added to our rural roads and multiple intersections operating at failing levels of service. With some turning movements experiencing delays exceeding five minutes per vehicle, Mineral Springs Academy Street specifically, at a level of service F, had.
Speaker 15No mitigation recommended.
Speaker 31And frustratingly enough, there's no condition in this application establishing which improvements the developer must fund, when they must be completed, and how those obligations will be enforced as development progresses. NCDOT may impose separate requirements through its permitting process, but those obligations have not been established in the proposed zoning conditions before this board. This relentless approach to growth that our county seems determined to pursue will create significant safety concerns along Highway 220, long before NCDOT can make the
Speaker 31necessary improvements to bring this corridor up to interstate standards. But this bleak traffic study is only the beginning. We also have absolutely no information on the impact surrounding our public services such as fire, EMS, and law enforcement, or the cumulative impacts that assess how this development in roughly 2,500 other homes already approved will affect our public safety. We have no information on how wildlife and its surrounding habitat will be affected. Important considering the property contains 55 acres of streams and wetlands. And if environmental conservation isn't your priority,
Speaker 31perhaps having proper assessment to protect the waterways that support our growing recreational tourism should be.
Speaker 15We still have no proposed sewer route.
Speaker 31Pump station requirements, or parcel-specific easement plans for a development that will absolutely depend on the ability to safely move human waste through multiple properties for treatment. There's also nothing that identifies downstream impacts, runoff, or any proposed detention system. We have no information on the impacts that will affect our working farms and the voluntary agricultural district which surround the property. Seems pretty short-sighted considering NC law requires county land records to provide notice when a property lies within
Speaker 31half a mile of land enrolled in a VAD. Yet nothing in this application assesses how placing 1,100 homes alongside this protected agricultural area will affect the farms already operating there. What we have received, however, is an updated application and project map. And let me tell you what that updated project map actually reveals to me. It demonstrates how truly incomplete the original application was when it entered your planning office on a date that maybe only God knows because that office has not produced a verifiable time stamp. This
Speaker 31is important because it reportedly walked in or was submitted online, we still don't know, on the last day possible to reach your planning board in August. But not only did your planning staff accept what I believe to be an incomplete application and deem it complete on the last day possible, they recommended approval. Not only did your planning staff not verify the applicant's right to request this rezoning through appropriate documentation, they pushed that responsibility off on the notary that notarized the document. The signature, not only did your planning staff
Speaker 31carelessly handle a rezoning application of this magnitude, they failed to adequately address serious questions when challenged. But the potential legal concerns aren't on them tonight, they're on you. You sitting before our community tonight and choosing to go through with this vote tells everyone that you're willing to simply overlook the possible procedural deficits of case 202614. And just so the public is clear, this board has known the potential legal implications of this hearing since last Tuesday, October 13th, when it was served an official demand letter to delay
Speaker 31this hearing and correct these mistakes. If this development is truly good for our community, why is this board willing to proceed despite formal notice that the process may violate your own ordinance? Do we not deserve due process? Let me remind you that this developer is not your constituent. The one applicant that applied for this rezoning is not your constituent. So why is this county bending over backwards in a dramatic display of special privilege for these people? There's only so much ignorance that can be claimed before
Speaker 31it demands the question. Whose interests are being served by rushing this decision when the interests of the people who actually live here have repeatedly been dismissed? Do not vote to approve this rezoning tonight. Delay the decision until the questions of applicant authority, application completeness, and the adequacy of public review have been properly resolved.
Speaker 15Thank you.
Speaker 2Mrs.
Speaker 1Smith, next we have Bobby Webster, and then following we have Bobby Baker.
Speaker 16Hi, my name's Bobby Webster.
Speaker 36I live at 149 JW Road, Madison, North Carolina, and I'm going to yield my three minutes to Keith Knight.
Speaker 2I'm sorry, who are you yielding the time to?
Speaker 18Keith Knight.
Speaker 2Mr.
Speaker 1Baker. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10.
Speaker 2Mr.
Speaker 1Bobby Barker, let's go ahead and get you next. Sorry, Bobby Baker, I apologize. There's a lot of names here.
Speaker 11Bobby Baker, 1140 Ellisboro Road. I yield my time to Daniel Smith.
Speaker 17Okay.
Speaker 2Okay.
Speaker 1Danielle Smith, you are up next. You have six minutes. Following Danielle, we have Sasha Hudson.
Speaker 30Good evening.
Speaker 32I want you to really look at the people in this room. These are not strangers interfering in someone else's business. These are your constituents, taxpayers, farmers, and families. These are people who have worked this land, raised their children here, buried their loved ones here, and spent their lives building something they hope to leave for generations to come. And tonight, after months of fighting, they're asking for something that should never have required this much effort. They're asking their own government to listen. More than the entire population of Madison have signed a petition opposing this rezoning. And yet, here we are, still waiting for answers, still wondering why this
Speaker 32board seems so determined to move forward. Commissioners, we understand property rights and growth. But this is not that. This is a transformation of our entire community. And we've asked you repeatedly to show us why that transformation is in the public interest. It goes against your own land use plan, 2040 vision plan, planning and zoning board rec, and most importantly, your own voluntary agriculture district state of purpose.
Speaker 30So I have a question. What are we missing? You keep telling us this is good for Rockingham County. Wonderful.
Speaker 18Prove it.
Speaker 30Show us the numbers.
Speaker 32Show us the benefits, show us how our infrastructure and taxpayers are supposed to support this. Show us how this will benefit and enhance our community. What do you know that we don't? What are we not being told? Because if there's such a compelling argument for this project, why haven't the people whose lives will be affected.
Speaker 30Been shown that argument?
Speaker 32We've been ignored by some of you and frankly never given a solid answer on any level in any area of concern to that question. We feel very strongly on our side and that makes it so easy to speak up and explain it to anyone. Why haven't you been able to do the same? Instead, we're told some studies can happen after. Commissioners, you wouldn't tear down McMichael High School or demolish Annie Penn and then study whether rebuilding it made financial sense. So why on earth would you gamble with our entire community this way?
Speaker 34Here's another question.
Speaker 32Where are all the people who want this? We've filled these meeting rooms and attended meeting after meeting. We watched thousands of our citizens sign the petition, and through all of this, I have yet to hear one resident stand before this board and say, please bring us 1,100 houses. But you know who we have heard from? The developers' representatives. The man who stands to make an enormous profit thinks this is a fantastic idea.
Speaker 30Of course he does.
Speaker 32He gets the profit, and we get the consequences. He doesn't care about us. If he did, he would have been to at least one of the five meetings in the past two months. Not one, but suddenly he cares and is here tonight. That's not a coincidence. Don't let them play you. You're smarter than that. When the houses are sold, he can move on to his next project, but all of us here tonight and the thousands that can't be here, we don't get to walk away. Our community will be permanently and irreversibly scarred if this is approved. And that's what breaks my heart. These people have done everything citizens are supposed to do, shown up, educated themselves, researched,
Speaker 32stood up for their neighbors, and sacrificed time with their families because they believe their voices mattered. They've literally begged you for real answers. They have walked through the halls of this building with artwork depicting farms covering the walls. They've watched you praise our youth for their desire to learn the agriculture way through 4-H.
Speaker 30They have pointed out that you use a photo of rural.
Speaker 32Western Rockingham County as the cover art for your 2040 vision plan. And therefore, they are wondering how you can then justify to pave over the largest, most central piece of farmland in Ellisboro.
Speaker 30And after all of.
Speaker 32That, they still have to fight for a real response. You told us you find it useful to look at all aspects of our proposal and you suggest we do the same. Your own public information officer stated he wasn't aware of any official records or studies pertaining to any area of this concern other than traffic. And he had reviewed this with administration and the county attorney. So therefore, how are you able to look at all aspects? What exactly are you looking at if there's nothing to look at? Can you not see how this has built tremendous mistrust and anger from your constituents? you have officially admitted there
Speaker 32is no analysis to review. Respectfully, these people are not obstacles. They are the reason you were elected. At a recent meeting, one of you suggested that perhaps we feel Wentworth was too far away to make decisions for Ellisboro, that perhaps we needed to consider forming our own municipality. Again, respectfully, we know exactly how far Wentworth is from Ellisboro. We have now been driving that distance for months. We've been coming to Wentworth because that is where our representation is supposed to be. We never came here to ask you to help us form another government. We shouldn't have to.
Speaker 32We came here asking the government we already have to stand up for us. And frankly, it's disappointing that citizens who have spent months fighting to protect their homes and community would hear a response that even suggests they should look elsewhere for representation. We should not have to form our own town to have our voice matter in our own county.
Speaker 30Please listen to us.
Speaker 32We know this area better than anyone, and we know what the consequences will be. You are meant to represent us and be our voice. Every one of you has a chance to be remembered as a leader who stood up bravely when it mattered, even when it was hard. The kind of leader people are proud to say represented them, to be on the right side of Ellisboro's history. And now I want you to take one last look behind me.
Speaker 30Look at these people.
Speaker 32This is Western Rockingham County, not a developer's rendering, a subdivision map, or a spreadsheet number. These are the people who keep Western Rockingham County alive. We've shown up and spoken up. We've fought for our community. We have done our part, and we shouldn't have to fight this hard to be heard by the people we elected to represent us. You want to serve Western Rockingham County? Well, it's sitting right here in front of you. Be the reason this part of the county feels protected by you, not the reason we feel betrayed.
Speaker 30Show us the backbone you were elected to have for us.
Speaker 16Thank you.
Speaker 2Thank you, Ms.
Speaker 12Smith.
Speaker 2Sasha Hudson, and then on deck we have Jessie Southern.
Speaker 15I'm yielding my time to Jessie Southern.
Speaker 30My name is Sasha Hudson.
Speaker 15I live at 224 Landrith Road.
Speaker 3Thank you, ma'am.
Speaker 36Jessie Tuttle, Southern 2871, Ashley Loop, Reidsville. Commissioners, you have heard from literally thousands of your constituents, the people you were supposed to represent and took an oath to represent. By far, the overwhelming majority of your constituents, your employer, if you will, are opposed to this rezoning, as is the planning board, the very people you put into place to deal with issues such as this. Many of the people here tonight are hardworking small business owners. They are
Speaker 36not anti-growth, they are not anti-business. Growth and business pay our bills, put food on our tables, and pay our taxes. My father-in-law is a general contractor who builds custom homes in Rockingham County. My father has owned and operated a sawmill in Shiloh for nearly 40 years. So I'm certainly not anti-growth nor anti-business. That's literally what puts food on my table. What we are asking for is to be heard for every single piece of available, identifiable information to
Speaker 36be uncovered about a development of this magnitude. Because this will set the precedent for all future developments in all of Rockingham County. long after each of you leave the Board of Commissioners. This decision will affect generations to come and will absolutely change not only the visual landscape of Ellisboro, but the entire identity of Ellisboro, along with the rest of Rockingham County. I sent each of you an email last week, and thank you Mr. Richardson for responding. So
Speaker 36let me hit on a couple of things from that email. I was blessed to be raised in Shiloh. I was raised on a multi-generational family farm, and I could not have asked for a better childhood. After graduating from NC State, my husband, also from here, and I spent the first ten years of our marriage living in Raleigh, always planning and praying and looking for the opportunity to move back home. There seems to be a common misconception that most people leave and don't return to Rockingham County. That's simply not true.
Speaker 36I think the last meeting Sarah Stewart mentioned her four children who all went to NC State and who all returned here to live and work. I'm joined tonight by several cousins and their spouses. All of us grew up here, actually on adjoining farms, have college degrees and returned here to raise our families because we see the value in a rural lifestyle. There are few lessons we can teach our children that are greater than loving the land that is provided for our family for generations. If the five
Speaker 36of you or three of you vote to rezone the Dalton Farm tonight, you are effectively ending that opportunity for so many people like us. It's not that people my age don't want to farm and hold on to family land. We will not be able to financially hold on to the land and pay the taxes once multi-million dollar companies start buying up pieces of land like the Dalton Farm from family members who do not even live here, people you are not elected to represent. How do I know this?
Speaker 36Because I lived in a housing development in Raleigh called Headingham with thousands of housing units. 11 feet separated my house from neighbors on both sides. You could not even get a riding lawnmower between the houses if you wanted to because of the air conditioning units. Why did we buy this home? Because in 2006 at 22 years old, that's the only house we could afford. But when we sold that house to a nationwide rental company, the rent on that house was more than our mortgage was. So
Speaker 36we wouldn't even have been able to afford the house we just sold. The same thing will happen here. Spec homes will be built, locals will not be able to afford them, and we will have an influx of people who do not understand, appreciate, or accept a rural way of living, and conflict will most certainly arise between farmers who have lived and worked here for generations. To conclude, what I.
Speaker 30Would ask of you is to be sure you have exhausted.
Speaker 36Every avenue in gaining every piece of information to make the most informed decision about something that would absolutely change the fabric of our county forever, and to listen to these people, the people you represent and the people who elected you.
Speaker 4Thank you.
Speaker 2Thank you, Ms. Sumpter. Sharp followed by Cheryl Garrity.
Speaker 4Good evening.
Speaker 12Good evening.
Speaker 13My name is Robert Sharp. I live at 419 River Road in Stoneville. I come here tonight to speak in opposition.
Speaker 4To this proposal.
Speaker 13There's a lot of things I could say about it, but it takes a lot more than three minutes. I'll have to say that I'm not opposed to development. My family's farm was sold and it was developed, but it was done in a responsible manner. Just nice homes, decent sized lots. Greensboro National was part of it back in the day. This is just absurd. The densities that are being approved is absurd. And this one in particular, in
Speaker 13my opinion, is an abomination. It's an abomination. I have never seen anything as silly as that is, especially where it is. It's going to have a negative effect on that community and this county. We're talking about our homes. We're talking about our neighborhoods. We're talking about our communities. We're talking about our county, and I don't want to see this precedent set so that could be the way things are done in the future.
Speaker 11Thank you.
Speaker 2Mrs.
Speaker 1Garrity, and then we have Elizabeth, I believe it's Patheroo maybe. I apologize if I've misspelled that or mispronounced that, but you're up next.
Speaker 7Ms.
Speaker 2Garrity, please continue with your name and address.
Speaker 28My name is Cheryl Garrity. I live at 209 Longview Road, Madison, North Carolina, very close to Sardis Church Road. I came tonight to talk about data centers. But apparently this is the topic that needs to be most addressed, so that's what I'm going to talk about. I grew up in this community. I worked in tobacco as a child to earn my money to buy a bicycle, whatever.
Speaker 16On a farm.
Speaker 28I learned hard work and I learned to appreciate the community. Bobby Baker's father, I worked on his farm. Anyway, Charles Henry Dalton, who was the original owner of this land, was a wonderful, absolutely great community person. He donated land for the fire department. He donated land for the community building.
Speaker 28He donated land that's used for the ball field. I shouldn't be saying this, but he would be rolling over in his grave if he could see what is happening here tonight. He would be, I can't speak for him, but he was a wonderful man, a community person. We need community people watching out for our area. These houses
Speaker 28are built. I live over on Longview Road, which is right behind Huntsville School. And I don't know what's going to happen to my property tax. With all these houses being built around, my property tax is going to go up. I'm a single person living in a home. I don't even know if I'll be able to afford it. This is not right. It's not acceptable. We need to do something.
Speaker 2You have a minute.
Speaker 15We need to.
Speaker 28Do something to maintain the dignity of the agricultural area in which we live. It's not just that I don't want development, it's that I want positive, slow moving, acceptable development and This is not what I'm hearing about. I was sitting back there, and quite frankly, I couldn't hear a lot that was being said. And I couldn't see
Speaker 28a lot of what was happening on the maps.
Speaker 30But I did.
Speaker 28See this.
Speaker 30Smush, is that a good word?
Speaker 28Smush of houses that does not represent anything that any of us here appreciate or want. As county commissioners, I need you to listen to your constituents and do the right thing.
Speaker 2On deck we have Keith Knight.
Speaker 23I thought you said I was next.
Speaker 12You are.
Speaker 28Yes, ma'am.
Speaker 3I'm sorry.
Speaker 2Please name and address, please.
Speaker 28Yes.
Speaker 2Elizabeth Poitras.
Speaker 23I live at 410- Cassandra Road and Madison, I just respectfully request that you reject the rezoning of Dalton Farm. Please don't let us become a bedroom community for Guilford and Forsyth County and encourage suburban sprawl in this area. It's just too beautiful, too unique, and too special of a county. Thank you for your time.
Speaker 2Thank you very much. Keith Knight was yielded three minutes, so he has six.
Speaker 37My name is Keith Knight. I live at 1793 Ellisboro Road. I am coming to you tonight to read a letter from one of your fellow concerned citizens. So I'm going to read that for you. Chairman Barrow and members of the board, my name is Mark Baker. My address is 840 Ryerson Road in Madison.
Speaker 25By now.
Speaker 37You know I am represented by the Bro Law Firm who have presented the board with a demand letter and a citizen comment letter pertaining to the rezoning request of the Dalton Farm property along the Ellisboro and the Sardis Church roads in the Huntsville, Ellisboro community. More importantly, I am a lifelong resident of that community, being born and raised on the family farm adjacent to the Dalton Farm While opposed to the rezone request, I have been unable
Speaker 37to attend previous commissioner meetings due to a recent cancer diagnosis. I'm currently undergoing chemotherapy for acute myeloid leukemia and immune compromise. Thus, he's unable to present in large public gatherings such as this commissioner's public meetings. I do not share my diagnosis information. seeking your sympathy but rather to have you know why I have not stood before you in past meetings and
Speaker 37why I do not stand before you tonight. I respect the property rights of the Dalton property owners and I stress the plurality of owners. I believe it is your responsibility as elected officials of the county in this matter to also represent the property rights of the citizens of the Huntsville-Ellisboro community, particularly the property rights of property owners who surround that Dalton property and those in our community
Speaker 37who will ultimately be impacted by a high-density housing project. In addition, you have been made aware of the extreme deficiencies in the original rezone request application, which the county planning board actually rejected And county staff, including the land use director, county attorney, and county manager, have allowed to proceed forward for a potential vote on the proposal at
Speaker 37tonight's meeting. It is my opinion that the county staff mentioned above should have never considered the rezone request until all conditions, of the county adopted UDO had been fully satisfied in the original request submission. It appears for some reason that this request has been rushed through the approval process. I will leave it to we the people in the Huntsville Ellisburg community and the whole Rockingham County citizens to
Speaker 37understand and contemplate why.
Speaker 5This appears to be the case. So where does that leave the Board of Commissioners?
Speaker 37You may choose to proceed with a vote on the proposal before you tonight. If that is the choice you make, I simply ask, what's the rush? Why can't the decision be delayed in a complete application without obvious deficiencies be sent back through the planning process? I believe the rezone request ordinance requires. Why the rush? I believe that this request is approved as submitted. The Board of Commissioners will set a precedent for future approval of all high-density housing
Speaker 37projects in the county. It will also set a precedent any request for change to any regulations or ordinances established by the county, can be completely ignored, this given the board powers that extends beyond.
Speaker 4Their legal authority.
Speaker 37So I, or we, who have petitioned to, spoken to, and written to you, simply request one of two things tonight. first of all, that you reject the request to rezone the property and leave it in its current zone, or two, that you send the request back through the approval process with the deficiencies found in the original request updated, allowing the planning board, the citizens of Rockingham County, and as
Speaker 37well as you, the board of commissioners, to find ample time to review a properly completed application. My final appeal to you, Board of Commissioners, do the right thing for the majority of, as Tommy Middleton back here says, we the people who have spoken and you are to represent. If you failed to do that at tonight's meeting, I and many others would have lost complete faith in your ability to represent the people who placed you in office.
Speaker 37And we the people then can correct that in future elections.
Speaker 5Respectfully, Mark Baker.
Speaker 4Thank you.
Speaker 2Thank you, Mr. Knight. Mr. Albright, I have a question for you. So we have three minutes.
Speaker 1Well, we have two minutes, 35 seconds left, but we have one more speaker we can get to. Do I have the discretion to give them full three minutes, or do we just limit it to 35, or how does that work?
Speaker 11I think the process is to give them.
Speaker 2I can't hear you.
Speaker 11I think our.
Speaker 21Process in cases like this is to give them the three minutes.
Speaker 2Sounds good. No problem. Sam Page.
Speaker 35Commissioners, Board, my name is Sam Page. I'm a retired sheriff for Rockingham County. I served the people for 28 years. The people behind me are my former bosses and still my bosses. The current request does not align with our approved 2040 county development plan. Current zoning permits, one per acre, with 11 homes now going to six to seven homes per acre, this increased density would be a gross deviation from the current permitted zoning. Infrastructure and emergency service must
Speaker 35keep pace with any growth we're currently behind in law enforcement and emergency response capabilities. Who will fund the necessary future infrastructure And do we even know the cost of related infrastructure changes? Will the growth ultimately become a financial burden on the taxpayers once the development is complete? What will be the impact on the surrounding agriculture and existing residential zones? How does the project affect the potential loss of agricultural land in this key area? And once the farmland is paved over, it never comes back. Does this
Speaker 35project benefit the existing community? Could it lead to a rise in property taxes or other detrimental impacts for the nearby residents?
Speaker 5Have you considered the cost?
Speaker 35And I repeat, additional public safety costs for a police, sheriff's fire, and EMS. A well-planned project will benefit and enhance the community and not have a detrimental effect on those that already live in that community. If the overall effect is detrimental to the surrounding area and our residents, then the proposal should be rejected. A public official was sworn to serve the residents of their town, and I encourage you to be mindful of your obligation to the citizens prior to this evening's vote. Over 3,000 residents have gone on record opposing the zoning application. The County Planning
Speaker 35Board has rejected the zoning request, and many issues have been raised about the negative impacts of the proposal. So ask yourself, if you're truly serving the people's interests, as a commissioner, consider this, whether you would choose to live in this development under the current proposal, but before casting your vote, I would think the answer is simple. If you wouldn't choose to live in the development, your vote should be a big no.
Speaker 5Thank you.
Speaker 2Thank you, Mr. Page.
Speaker 1That completes our 30-minute public comment. The applicant will have seven minutes for rebuttal.
Speaker 26I could before my time starts. I'd like to get the video prepared before my time starts, if I could.
Speaker 1I just want to verify that you're saying you want to spend your seven-minute rebuttal time showing the video?
Speaker 7No.
Speaker 26I want to show the rest of the video, which is only about 35 seconds left.
Speaker 1It's coming out of your time, however you want to do it.
Speaker 16No, no, no.
Speaker 26I just didn't want the time for them to get the video going again to count against me is all I'm saying.
Speaker 1I will have IT come start the video if that's what you like, but it's coming out of the seven minutes.
Speaker 4That's fine. Yeah, yeah. And it needs to go to about the middle point.
Speaker 10Where was it?
Speaker 4Go right there, yeah, and start it. Back up just a little bit. Back up just a little bit. That's good.
Speaker 2Roy, are you on the timer?
Speaker 15All right, now if you just want to click the, and you.
Speaker 4Just start it.
Speaker 12Okay. Okay.
Speaker 3Thank you.
Speaker 29Yes, sir.
Speaker 20All right.
Speaker 4Thank you.
Speaker 26Also, if I could just ask for some decorum. It's very difficult to address you when there's so much going on behind me.
Speaker 1I will call for order, please. If we need to, we can stop the time until we come to order.
Speaker 2Thank you, Mr.
Speaker 34Fox.
Speaker 5Go ahead.
Speaker 4Thank you, Mr.
Speaker 11Chairman.
Speaker 26I want to address a couple things. One, there's been discussion about that somehow this process has been rushed or has been treated differently. I would disagree vehemently with that. In fact, I think it's unfair that, I mean, you've got a very competent, capable staff. They do a good job. I've had the privilege of being in front of them probably, hundreds of times, and they're always fair to everybody, and they always follow your rules, and so I think it's unfair that they've been attacked in this. This process is
Speaker 26a normal timeline. In fact, it's actually been a little delayed because we realized after the planning board meeting in August that there were some community issues that we needed some more time to address, so we asked to actually not come back in September, but to come back here in October, so there's actually been extra time allowed here, and I want the Commission to just recognize that. Addressing a couple of things, you know, the cluster developments allow greater open spaces, which does help you allow, you know,
Speaker 26more of a green area. And in fact, with what we're shooting for, the 40%, that would be approximately 200 acres, you know, of this 500-acre tract as open space.
Speaker 4And I hope that's what the video shows. illustrate a little bit.
Speaker 26To address some of the concerns about rising costs and public safety, we've got a slide that I showed earlier that showed how much annual tax revenue this development at full build-out would generate. And certainly those funds can go to whatever this body or whichever five people are sitting up here in ten years decides. But there's certainly, this
Speaker 26is a development that is going to pay for itself. It's going to pay for the infrastructure that's required to be put in to get the water and sewer there. They're going to pay for the improvements to the road and they're also going to generate the tax base that will support these new residents that want to live in Rockingham County. The final point I want to make is that this is a county In which I think half the people that came up here in opposition said they
Speaker 26supported property rights. And this has been a county that has long held property rights as an important part of your values. And you hear a lot of people say that until somebody wants to do something with property next door to them. Then they want to control it. This property's been in the Dalton family for over 150 years. And it was actually mr. Dalton told me that it was actually his father's wish to see it Developed and see.
Speaker 4More people be able to enjoy.
Speaker 26It follows exactly what your your plan and your predecessors plan was to develop you know a higher density higher growth area along that 73 to 20 corridor the county has spent a tens of millions of dollars conservatively bringing water and sewer down that corridor and making major improvements to attract growth. And when you have a community like this where you do have a clustered density, you can
Speaker 26attract growth in the areas that you specify as opposed to just shotgun across the entire county. And so I believe that this project is meeting your development plans and your plans that your predecessors before you have set forth for, you know, At least a decade. And we believe that the staff recommendation is solid and it is supported by your future land use plan. And this is going to be a responsible development done well. And it's one that
Speaker 26you're going to be proud of and it's not going to be a burden on anyone. And I'm happy to answer any questions that you may have.
Speaker 2Do we have any questions at this time?
Speaker 34Yes.
Speaker 1We are going to go ahead and close the public hearing. Commissioner Cowan.
Speaker 24I noticed you have a study, I think a study on the traffic.
Speaker 2Was the study only on one day for a couple hours?
Speaker 4I'm going to get Mr.
Speaker 26Duggins up to address that since he's handled the traffic issues.
Speaker 14We did conduct a traffic impact analysis study, and I might ask Mr.
Speaker 12Llewellyn to come up.
Speaker 14Would you come up and kind of explain to the commissioners what your traffic count process was? We did let school to get in before he did his count, so I'm going to let him talk through his process.
Speaker 12Introduce yourself.
Speaker 5Good evening.
Speaker 29Earl Llewellyn with Kimley Horn. We prepared the traffic study for the project. First of all, The study is conducted based on DOT guidelines and the scope is also dictated by DOT. So before we begin the analysis, we send a scoping document in that confirms what the parameters are, what the study area intersections are, etc. The study is capacity related to determine the impact of this project on
Speaker 29roadway capacity. Based on that, we have found the improvements that are listed by the team to mitigate those to an acceptable operation.
Speaker 4Happy to address any questions that you've got.
Speaker 26I think a specific question was, did the study just take place.
Speaker 4In one day or was it over a long period of time?
Speaker 29Yes, every traffic study I've ever done or seen done is based on one day's worth of counts in peak hours.
Speaker 2Do you feel that that's adequate?
Speaker 18Yes.
Speaker 2Just one day.
Speaker 4Yes.
Speaker 24To find out what we need that could impact this community for years.
Speaker 5Yes, I do feel it's reliable.
Speaker 29Because the way traffic study's done, they're based on conservative assumptions.
Speaker 1Excuse me, I'm gonna need everybody to be quiet so we can hear what's going on up here, please.
Speaker 2They're based on conservative assumptions.
Speaker 29That actually take those counts and factor them up for multiple things to as much as 15% higher than they were collected. Then adding on other approved developments, background traffic, site traffic, and then factoring those up as well. So yes, I do feel like it accurately represents the impact. We also depend on DOT to look at the average daily traffic counts. comparing those to the peak hour counts. And
Speaker 29they've reviewed the study at the district office, division office, and congestion management level of DOT.
Speaker 24Now, would you feel if this development was allowed, that the intersection right there at Sardis Church and Ellsboro would eventually become a roundabout or something different due to the traffic that would be created in this development?
Speaker 5The intersection of Sardis Church.
Speaker 2And Ellisboro, right there where the development is. The intersection, I'm sorry, I didn't hear you. Order.
Speaker 1We've got to start clearing people out if we can't get some quiet up here.
Speaker 24At the intersection of Sardis Church and Ellisboro. Now, that's where the development's going to be.
Speaker 12Right.
Speaker 24If this was allowed to happen, would you feel that intersection would have to be changed? I mean, would that be in the study that you'd have to look at something like that, that that would have to be changed at some point?
Speaker 2Would you feel that that.
Speaker 4Would be adequate?
Speaker 29The study indicates that with all the things that I just mentioned, with all the projections of site traffic, background growth, other developments, and the additional conservative factors, that no additional improvements are needed at that intersection. The reason being is that four-way stops are very efficient.
Speaker 24Well, if you look, I believe we have another subdivision that's similar to that. And on Griffin Road, they had to put in a roundabout.
Speaker 29We looked at that intersection closely, and adequate operations are.
Speaker 5What we found.
Speaker 29That's what all of the DOT organizations found as well.
Speaker 1Commissioner Cowan, if I could just reiterate your point. The county administration was in touch with DOT, and they did say that. Your study met all the standards of what they look for. The question I have to follow up from Commissioner Callum is there were several suggestions that were in the study, but I know that if this were to be approved as you go through the process, DOT would have final say on what would need to be done. The question I have is because we've had several concerns about costs for improvements. As a condition of the rezone, are you
Speaker 1guys willing to accept that the applicant would absorb any costs for the improvements to the roadways based on DOT's recommendations?
Speaker 12Yes.
Speaker 14And I'm looking at the letter that's dated October 15th that I think y'all have in your possession now, which speaks to the improvements both at Williams Road and Sardis Church Road. And our client is taking on the obligation, the financial obligation to make these improvements. And like I said when we first got up, we've worked closely with NCDOT for months now that ultimately generated this communication to Mr. Llewellyn about Not only the Sardis Church interchange, not only
Speaker 14the Williams Road change, but all the interchanges that will be accessing the development.
Speaker 4And at the end of the day, whatever DOT says, we have to do.
Speaker 14And DOT ultimately will dictate what happens. And let me say this. DOT is not going to let us build an unsafe development, whether it be at Sardis Church Road, whether it be at Williams Road, or any of the other interchanges. These are all NCDOT-maintained roads, 220 Sardis Church, Williams.
Speaker 4They're all NCDOT-maintained, and they're.
Speaker 14Going to require our client or any future developer to make these roads safe.
Speaker 2Mr. Kelly, did you have anything else?
Speaker 25Yes.
Speaker 24I think it's our job on the board to look 10 years out.
Speaker 2In fact, the development was passed.
Speaker 24To you saying that's how long it would take, so we need to look beyond that. And you're showing the roads coming in on Ellisboro and Sardis Church with the green arrows dictating what was gonna happen. would any of the property from the DOT be taken.
Speaker 2From other residents?
Speaker 24Or would all this, if we had to have a turning lane or roads widen, would it all come off of the proposed development side?
Speaker 14It's our understanding that all the improvements that are called for on the green chart that we had up earlier are within the NCDOT right-of-way. So no additional land would have to be taken to make those improvements, including that acceleration lane that we showed moving south on 220.
Speaker 11Okay.
Speaker 1Any other questions at this time?
Speaker 2Commissioner Richardson.
Speaker 5Some of these are kind of basic. I just want to make sure I'm doing a lot of mental math, and that's quite a challenge. What's the average house going to cost, sale price?
Speaker 2Okay.
Speaker 26The rate and the range would be from 250 to 400 as what's projected.
Speaker 5Ask counselor Fox I asked what's the average sale price? I'm trying to get it you threw a figure out there 400 million as the value of the whole development So I'm assuming you build a thousand houses. They're gonna be four hundred thousand each is that accurate? Mr. Covington Okay. I'm kind of curious. Where's your break-even point? How many
Speaker 5houses do you have to build before you break even on your investment?
Speaker 4I'm not. I'm not sure of the answer to that.
Speaker 26You can come up if you want, Ray, but I'm not sure that's an appropriate question.
Speaker 24I think the answer to the question is there's a lot of engineering that needs to take place to know what the actual cost of moving the dirt and putting.
Speaker 5The- You understand why we're interested in total value, tax value in particular in this case. You indicated that you're going to cover the price, the developer's going to cover the price of water and sewer. Do you know what that price is going to be?
Speaker 4Do you want to come up?
Speaker 27So for the water and sewer, it's all, Rockingham County is the owner of the water and sewer system. So we supply the numbers to Rockingham County and they'll evaluate their systems. and then once we get into the actual design of it, we'll have to figure out then to what waterline sizes need to.
Speaker 5Be required, if lift stations are required.
Speaker 27At this time, the exercise is to determine whether capacity is available in the system, and it was deemed by Rockhampton.
Speaker 2I got that.
Speaker 5Yes, sir. This board has been through that many times. I'm interested because you're going to turn the water and sewer system over to the county. Therefore, if it's $ 100 a running foot, Multiply it by the distance you've got to go, and we can get an idea of the value of what you're turning over to us. Does that make sense?
Speaker 4It does.
Speaker 27Rockingham County is probably the best one to answer that question since this will be their system as well. Because at this time, we won't know that. So to determine that dollar amount, it goes into you also have to figure out what elevation things are done at because that dollar amount is for sewer, for example.
Speaker 2Is based on how deep it is.
Speaker 27So as everybody can logically understand, if you're laying it zero to six feet, it's one price. Six to eight feet is another price. Ten to 20 is another price. So it's not just the linear footage. It's also the depth. So that applies to storm drainage as well. Storm drainage had to be the size of culverts had to be done. All those exercises come much later in the project. So at this point, I couldn't give you an answer just to tell you the exact dollar amount that all the infrastructure for a thousand lot community would cost.
Speaker 1So I just want to follow up on Commissioner Richardson's questions there. So I know that it's very preliminary and you guys just explained you don't have this information, but is the hope to also run the water and sewer in the right of way?
Speaker 2Yes, sir.
Speaker 5We're looking forward to getting some hydrants on that, which will in fact impact significantly the fire rating. Mr. Metzler, you might know, how would we anticipate the fire rating improve because of the addition of hydrants?
Speaker 35That would be a question for the fire marshal, but typically it would go down.
Speaker 12I can't answer how far down it would go.
Speaker 5So I have kind of a basic question about this clubhouse and the open space. You're buying the whole piece of property. Counselor Fox, what's to keep you from changing the plan after the property's purchased and this is approved?
Speaker 26Well, in terms of the commitment for the open space, we've agreed to add a minimum of 30% as a condition.
Speaker 4It's hard for us.
Speaker 26Our goal is 40% open space, but until we do the more detailed engineering, it's hard to make sure that we could accomplish that. But we've agreed to add the 30% as a condition.
Speaker 4Of the development.
Speaker 5Yeah, but you're still going to own it.
Speaker 26And also with the amenities, we've agreed to add that as a condition too, that this will be an amenitized community.
Speaker 5You're talking about the clubhouse and so forth? Those amenities. How much do you anticipate those cost?
Speaker 4I do not know the answer to that.
Speaker 2I don't know.
Speaker 5Are those turned over to the residents or are they turned over to the county?
Speaker 26Typically, a project like this would have a homeowners association that would ultimately run all of that at some point. Once it was built out, the developer typically turns it over to the homeowners association.
Speaker 5Okay.
Speaker 4And they bear the cost of it.
Speaker 26The county does not have any cost of the amenities or anything like that.
Speaker 5That's what I'm familiar with, but this group is going to be very interested in that. This might be for our planning staff for sure. Planning staff recommended approval. Planning board turned it down. Do you stand by your approval as the staff? Now, I understand the planning board. I want you to tell me why the planning board turned it down.
Speaker 22Yeah, I mean, I don't want to speak too much to the individual thoughts and opinions of the board, but I guess there was a couple of different arguments that I heard that I recollect from the board kind of during that discussion. I do think there was a little bit of hang-up just generally on the setback ask, particularly on the sides.
Speaker 5I was led to believe it was lack of information. Is that correct?
Speaker 22There certainly was that as a component as well.
Speaker 2So those are two factors.
Speaker 22I also kind of heard from, and again, I don't want to put too much kind of specifically into the mouths of others kind of thing, but definitely some argumentation that in regards to the land use plan in particular, it really even calls for more of like a mixture of uses kind of thing. So the idea that the proposal is mostly consisting of single family housing is is an interpretation of the land use ordinance as not necessarily being wholly consistent on that basis.
Speaker 5Okay, I've got I know you're in a hurry, but I think groups.
Speaker 2Can I ask a question while you're looking at that?
Speaker 1Adam, sorry, I just want to jump in for Commissioner Richardson real quick.
Speaker 2There were several comments made.
Speaker 1That this proposal goes against the land use plan, and I just want to hear from you, the guy who's in charge of this, do you believe that to be true?
Speaker 12I do not.
Speaker 22I do think that when you look at the overall, you know, the land use plan in general is written as fairly general guidelines for the most part. It is going to have some somewhat vague language. As you can see, even on the land use map, it doesn't get super parcel specific on a lot of those pieces. I think the general intent is because This is used in guidance for legislative matters in particular, in which you.
Speaker 2Do have a lot of leeway.
Speaker 22You are going to have, you as individual commissioners, your own interpretations of.
Speaker 12What general areas should be.
Speaker 22Trying to define a character of a place is a very subjective thing to attempt to do. One thing that I do think that our land use plan in particular gets very specific on, which Me as just having worked in other jurisdictions, like I very much appreciated because not a lot of land use plans do that, is that it does in those individual land classes call out specifically the zoning district that it generally wants there. So that gives really good correspondence from the plan itself to our
Speaker 22actual ordinance and regulations. And with that, with the two particular land classes that are in here, You are calling for RM specifically, which is what the proposal is. And when you kind of look at the evidence put there, particularly on the G1, which the majority of the property is in, you really have language in there, I think, to support the idea of when you have public utilities, water and sewer availability would give you purchase to potentially
Speaker 22look at increased densities.
Speaker 12And get given the Given.
Speaker 22Kind of the specifics of this project in comparison to our end as a whole That's where I think you they are kind of showing especially like with that particular Requirement there of limiting the the density itself from what would normally be loud in our end.
Speaker 5I think it was complete answer Thank you very much This is one step in a longer process. Tonight is not the end. So when we go to TRC What are the options that that committee will have as it reviews all those technical aspects?
Speaker 22I mean Generally speaking, you know, they're going to provide their commentary, and they typically, they're not going to hold back specifically in, you know, whether or not something's going to meet the regulations. Typically, you're going to see either they are ready for the site plan to be complete, in which they will grant.
Speaker 12Approval or they will allow the.
Speaker 22Applicant developer to kind of go back to the drawing board to come up to those requirements. Because that is a little bit of a different decision than, say, a legislative. At that point, it'll be, you know, if they're able to show that they can meet all of the requirements, they would be given approval. It's just it is on the onus of the developer to be able to meet all of those requirements.
Speaker 25Okay.
Speaker 22And as you get into the specifics of individual properties, individual projects, that idea practically applied to a particular parcel, then applied to our regulations, sometimes that doesn't always work out. So like I say, typically you're either going to see either preliminary approval or allow the applicant to come back. And sometimes that ends up meaning that the applicant isn't able to make it work at times.
Speaker 5What you're saying is any and all aspects of the proposal can be adjusted.
Speaker 22There is going to be general correspondence, especially to the particular conditions that they're applying, but there certainly are aspects to the proposal that can be adjusted between approval and now the ordinance does give very specifics into what we can, what kind of adjustments can be made at an administrative level by staff before needing, because it's a conditional project, if it goes beyond that scope, then it can potentially
Speaker 22need to come back for either further rezoning process were it to go outside of the scope of what the UDO says.
Speaker 5Okay, well, thank you. This is real important because the conditional aspects of a potential approval are necessarily going to be of great interest to anybody that lives in the county or around this property. So thank you very much for that. One last question, Councilor Foxe. You probably don't know this. There happens to be a pond on the Dalton property. What are the plans for the pond?
Speaker 26I can ask Lee to come back up and see if they've determined that yet.
Speaker 27So the Dalton farm, you're talking about the largest pond where the old Dalton Lake Road used to go across? At this time, the pond's going to stay there where it's at. There's no plans to change or drain or do anything with that pond.
Speaker 5I was just curious. I thought it might have to be modified because of its proximity to Hogan's Creek.
Speaker 2Yes, sir.
Speaker 5Okay, thank you.
Speaker 12Thank you.
Speaker 2Commissioner Berger. Yes, sir.
Speaker 25So you mentioned that this project is in two different classifications in the land use plan.
Speaker 4Is that right?
Speaker 12That's correct, sir.
Speaker 25And the land use plan defines or gives guidance pertaining to those classifications.
Speaker 4Is that fair to say?
Speaker 12Yes, sir.
Speaker 25So I believe in the land use plan there's some mention as far as G1 lands are generally non-developable. And then there's some other references under different classifications about availability of utilities. So ultimately, is it fair to say that the classification can change if utilities are available for a property?
Speaker 22Yeah, I mean, I still think something like RM is still appropriate in G1 specifically. Like I said, it does call kind of on a regular basis, pretty straightforwardly, should generally be zoned residential agriculture, right? However, it does kind of have a little bit of a squishier bit of language for the RM. So it does still call for RM, but it says residential mix may be appropriate to provide for a mix of housing types or other appropriate uses.
Speaker 22So that's where you get a little bit interpretive of, well, where does the maybe appropriate aspect come in for G1 for RM, right? And so that's where I think a lot of the evidence from the land use plan calling for specifically And let me see if I can find it. However, density may increase depending on the availability of public water. I think it's kind of like your key kind of point in the plan itself to kind of say RM is definitely appropriate in G1 specifically, especially when you have
Speaker 22something like public water and utility.
Speaker 12And there's also.
Speaker 22At the very beginning, you'll say that the G1 transect is intended for low-density residential growth and includes areas with limited access to water. So I think you have an overall assumption that G1 would, for the most part, have limited access to public utilities. But in instances, and so something like RA is appropriate. In instances where it does have access to public utilities, I think that's a more logical place to start looking at, okay, RM can be appropriate in G1.
Speaker 25And the plan itself also has some examples in the back.
Speaker 2Is that right?
Speaker 25It talks about different densities.
Speaker 12That's correct.
Speaker 22Yeah, there's definitely, I mean, there's two really good examples of kind of how these nodes in particular should look in the future. This is where they're really getting into these nodes of that G2 in the center, the G1. And that's actually just on the following pages of the comprehensive plan right after G1 and in between G2. You kind of have a cutout section with rural crossroads conceptual plans with traditional detached homes, and you also have one
Speaker 22with mixed-use housing. You also just kind of have further a little bit along in the plan where it kind of starts talking a little bit more generally about mixed housing, mixed housing types, missing middle housing and things like that.
Speaker 2And that's where RM really is.
Speaker 12Kind of tied into.
Speaker 22And this is kind of like very specific kind of planner speak of like traditional neighborhood design characteristics. This is something that in planning literature really since the 60s has started from early writers.
Speaker 12Like Jane Jacob to academic.
Speaker 22Research for the past 60 years since that going to more traditional neighborhood design characteristics, such as what you would find in smaller towns all throughout rural America.
Speaker 2What have those looked like?
Speaker 22And those have typically had stronger densities in particular areas and then allowing for open space in other areas.
Speaker 2So you have.
Speaker 22various different sections and exhibits throughout the comp plan. They give illustrative examples for that missing middle, for that kind of density. And that's ultimately why I think we as staff kind of came to the conclusion to find recommendation for this, at least in regards to corresponding to the land use plan.
Speaker 4Thank you.
Speaker 11Let me ask Mr.
Speaker 33Fox, this project is slightly west of 220. About what is that distance from 220?
Speaker 4I'm sorry, I didn't hear.
Speaker 33This project is just west of US 220, which is scheduled to be I-73.
Speaker 5Correct.
Speaker 33About how far is that from US 220?
Speaker 26About a mile and a half is our engineer's estimate.
Speaker 16Okay.
Speaker 4Or maybe a mile, yeah.
Speaker 33I think you answered this earlier, but I just wanted to reiterate. The gentleman earlier said, what's the rush? He indicated that this project was being rushed. And since you've answered it, I'm going to ask Adam if he would. This is about the same process as everything else follows, doesn't it?
Speaker 22Yes, I mean, you've had many rezonings come before you. Typically, the process is we will have application come in with a 30-day time limit before the planning board. It then goes to planning board, where planning board has a meeting similar to this to make a recommendation. Typically, it is the following month that it is then heard and usually decided upon that night by you guys. So typically it would go application one month planning board the next month
Speaker 22You guys for a final decision the following month in this particular instance as I think they pointed out It did actually get extended for another month.
Speaker 12So instead of I believe it was August it was.
Speaker 22Planning board and it would have typically gone for here to have this meeting in September. The applicant actually requested more time to get particular items together to be able to provide more information. So if anything, this process from our typical rezonings is actually a little bit extended by approximately a month.
Speaker 33But the notices and the yard signs went up in July, correct?
Speaker 11Correct.
Speaker 6What?
Speaker 33Yard signs and notices that were mailed to the public. Generally they get, that's 30 days advertisement, right?
Speaker 1It is.
Speaker 4Or is it two weeks?
Speaker 22It's a range, so we can't go earlier than 10 days before a particular meeting and then no earlier than 25 days. So our typical practice is to put the signs up on the property in that first range period, leave them on the property, and then letters go out in that range right before the meeting. And we did also send a round out of courtesy letters, essentially, since we weren't necessarily going to that September meeting, as everybody
Speaker 22was aware of in the planning board meeting since that got pushed back. We actually sent out an extra round of letters to property owners within 1,000 feet just to let them know that, hey, this has been pushed out.
Speaker 12We're tentatively looking to October.
Speaker 2Okay.
Speaker 11Thank you, Adam.
Speaker 29Yes, sir.
Speaker 11Mr. Fox, the.
Speaker 33Comment was made about some letter from an attorney saying things weren't right or things weren't done properly.
Speaker 4Would you like to address that? Yes, sir, Mr.
Speaker 14Hall.
Speaker 26In regards to the zoning process, we believe that your staff followed your own ordinance and state law correctly. And as we've stated earlier, everything has been done correctly in terms of that. And in regards to the ability of or the validity of the signatures on the application, we believe that those are legal and follow your ordinance and state law as well.
Speaker 11Thank you.
Speaker 4If I could.
Speaker 2Clyde, you reviewed the application.
Speaker 4Is that correct?
Speaker 11I did with the planning department.
Speaker 16Chime in on that answer.
Speaker 21I agree with Mike Fox. Everything was done correctly. We went through it item by item.
Speaker 2Okay. Gentlemen, do we have any further questions?
Speaker 29No more.
Speaker 1All right, if not, I will entertain a motion.
Speaker 2Or any further comments?
Speaker 24I have a comment before we make a motion.
Speaker 2Commissioner Callan.
Speaker 24I do agree that as the buyer of the land, you do have rights. You do have rights to do with what you need to do. But I also believe with a room full of people, they have their rights here tonight as well.
Speaker 5I believe that.
Speaker 24There should be some type of common ground reach, and I don't think that's here tonight. So I think that you have to look into everybody here tonight and why they're here, their community. And I think it's just sad that we can't come to some sort of agreement, but everybody here has a purpose to have their right shared and their right heard. Me personally as a commissioner, I
Speaker 24do not like the setbacks which you have on your structure. I voted for less, I voted against higher setbacks at a previous one. I think the density, I'm not in favor of that either as a commissioner. So I cannot go for this. Applause And I have asked a multitude of these people here tonight and across the area, and
Speaker 24this came to me from hundreds of people, that would they accept bigger lots, bigger homes?
Speaker 2And the answer was yes.
Speaker 24So most of the people I believe here tonight are against the high density, against the homes being set on top of each other. And that's just my belief in it, and that's where I'm going to stand.
Speaker 2Thank you, Mr.
Speaker 23Chair.
Speaker 2If not, I'll accept the motion.
Speaker 11Mr. Chair, I'll make a motion.
Speaker 33Do we accept the rezoning application as presented with the modifications offered tonight?
Speaker 1Motion to approve with conditions offered by Commissioner Hall.
Speaker 2Do we have a second?
Speaker 25So that's with the conditions as far as the application and the two additional conditions. conditions stated tonight.
Speaker 4That's correct.
Speaker 2I'll second that. Second by Commissioner Berger. All in favor?
Speaker 12Aye.
Speaker 23Aye.
Speaker 2All opposed?
Speaker 29Aye.
Speaker 2Motion carries 3-2. Thank you.
Speaker 1That brings us to item 9, which is Commissioner comments. I'll call a five-minute recess while we bring the chambers to order.
Speaker 2We are back from recess.
Speaker 11Mr.
Speaker 5Chair.
Speaker 2Commissioner Hall.
Speaker 33I'd like to amend by motion, if you will.
Speaker 2By all means.
Speaker 11Mr.
Speaker 33Chair, I have a motion to recommend with the additional conditions proposed by the applicants Approval of this request based upon the consistency and reasonableness determination statements that are included in the agenda packet as may be amended during the rezoning process. And the statement is such. The board has reviewed case 26-14 rezoning to residential mixed conditional district, RMCD, as.
Speaker 4Required by NCGS 160D. The board makes the following findings.
Speaker 33Number one, the proposed action is found to be consistent with adopted Rockingham County Comprehensive Land Use Plan because A, this parcel is also located in the G1 transect according to Rockingham County's Comprehensive Land Use Plan characterized as one of the county's low density growth areas, page 48. The Rockingham County Land Use Plan suggests that areas in the G1 land class should generally be zoned residential agriculture, although
Speaker 33a planned unit development, PUD, or residential mixed, REM, may be appropriate to provide for a mix of housing types or other appropriate uses.
Speaker 5Page 48.
Speaker 4Item C.
Speaker 33The Rockingham County Land Use Plan suggests these areas provide primarily for low-density single-family residential. However, density may increase depending on the availability of public water.
Speaker 4Page 48. Item D.
Speaker 33This parcel is located in the G2 transect. According to the Rockingham County Comprehensive Land Use Plan, Characterized as one of the county's controlled density growth areas, page 54. Item E, the Rockingham County Land Use Plan suggests that areas in the G2 land class should generally be zoned rural commercial, RC, neighborhood commercial, NC, planned unit development, PUD, or residential mixed, REM, page.
Speaker 4Page 54. And lastly, item F.
Speaker 33The Rockingham County Land Use Plan suggests these areas should encourage a range of housing opportunities, including single-family and small-scale multifamily homes, to meet the needs of all ages and income levels.
Speaker 4Page 54.
Speaker 2Mr.
Speaker 1Albright, do we need to reconduct our vote, or does his amended motion stand?
Speaker 21I would ask for another vote on the amended motion.
Speaker 12All right.
Speaker 2Motion by Commissioner Hall. Do we have a second?
Speaker 36Second.
Speaker 2Second by Commissioner Berger. All in favor?
Speaker 12Aye.
Speaker 2Aye. All opposed?
Speaker 12Aye.
Speaker 11Motion carries. Thank you, Mr.
Speaker 5Chair.
Speaker 1Thank you, Commissioner Hall. That takes us to Item 9, Commissioner Comments. I will begin with Commissioner Callum.
Speaker 34I have none.
Speaker 2That takes us to Commissioner Berger.
Speaker 13Yes.
Speaker 25I just want to congratulate Justin Stewart, On his retirement, I've actually known Justin since high school, and Justin did a tremendous job when he worked for the county, and I'm sure he will continue to do a tremendous job with his next endeavor. Justin's a great guy and appreciate everything he's done.
Speaker 11Thank you.
Speaker 2Thank you, Commissioner Berger.
Speaker 5Commissioner Richardson. I, too, want to congratulate Justin Stewart. He served on our Health and Human Services Board as well as working in the field, very knowledgeable about all aspects of emergency care. And the good news is over at Rockingham Community College, he will be influencing young people and, I hope, encouraging a lot more folks to get interested in that career field. So if you know a young person out there, especially a junior or senior in high school that has some sort of interest, have him call Justin.
Speaker 5He'll get the straight skinny, as they say. That's all I got, Mr.
Speaker 33Tonight, I'd like to recognize elected officials that I happened to see. It was pretty crowded, but I did see Sheriff Parker, and I did see Madison Town Alderman Jenny Caldwell here tonight. So we appreciate those other elected officials. If I failed to see you, I apologize. But I just wanted to say, I made the comment earlier, that we are not a straight democracy. We are a constitutional republic And one of the main reasons for that is
Speaker 33to protect the rights of the individual from the majority. And I feel like that's what we did tonight. So with that, thank you, Mr.
Speaker 2Chair. Thank you, Commissioner Hall.
Speaker 1I would also like to extend my congratulations to Justin Stewart on his retirement. Justin and I have served together on a lot of different boards during my tenure. The Rockingham County Recovers Board and Health and Human Services Board specifically. Justin not just was a great employee, but he is a man who cares deeply about Rockingham County.
Speaker 2And he's fostered children.
Speaker 1He's done a lot of things to help this community and this county. And we appreciate him and wish him the best of luck in his future endeavors. With that, be a good citizen like Justin Stewart. We still are in desperate need of foster families. We still have over 160 children in foster care. So if you could please reach out to the county if you've been led into that kind of ministry.
Speaker 2With that, our next meeting will be here in the Commissioner's.
Speaker 1Chambers on Monday, November 2nd at 6.30.
Speaker 2Do we have a motion to adjourn?
Speaker 11So moved.
Speaker 2Motion by Commissioner Hall.
Speaker 11Second.
Speaker 2Second by Commissioner Callum. All in favor?
November 23, 2026 Rockingham County Commissioners Special Called Meeting AGENDA 1. Meeting Called to Order 2. Lance Metzler, County Manager Request consideration of the Resolution for Approval of the Bonding of County...
November 18, 2026 Reidsville Planning Board Meeting AGENDA 1. CALL PLANNING BOARD MEETING TO ORDER 2. ROLL CALL 3. ADOPTION OF THE AGENDA FOR NOVEMBER 18, 2026 4. APPROVAL OF MINUTES - JULY 15, 2026. 5. ITEMS FOR...
November 17, 2026 Eden City Council Meeting AGENDA 1. Meeting called to order by: Neville Hall, Mayor 2. Invocation: Pastor Samuel Moriarty, Kings Highway Christian Church 3. Pledge of Allegiance: Liam Sutton, Central...
November 17, 2026 Rockingham County Board of Elections Meeting AGENDA 1. Welcome / Call to Order 2. Pledge of Allegiance 3. Invocation - Pastor Rick Gore Victory By Grace Church, Eden 4. Approval of Agenda 5. Consent...
November 16, 2026 Rockingham County Board of Commissioners Meeting AGENDA 1. Call to Order 2. Invocation 3. Pledge of Allegiance 4. Request approval for the November 16, 2026 Agenda. 5. Recognition A. Daniel Crews, PIO...